Loading...
HomeMy WebLinkAbout00070783Transmit Log Record BitWare Client Page 1 Status Date Time To Company Application OK 3/16/01 9:50:30 Joe Schultz Texcon General Contractors Microsoft Word - PZ04519.DOC OK 3/16/01 9:56:10 Joe Schultz Texcon General Contractors Microsoft Word - PZ04501.DOC OK 3/16/01 10:02:26 Johnson Investments Microsoft Word - PZ04519.DOC OK 3/16/01 10:04:52 Johnson Investments Microsoft Word - PZ04501.DOC TEXCON General Contractors Div. of CDS Enterprises, Inc. 1707 Graham Rd. • College Station, TX 77845 • 979 - 690 -7711 • Fax: 979 - 690 -9797 March 8, 2001 Bridgette George Asst. Development Coordinator City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Replat for Stone Forest Subdivision, Phase 1 — College Station, Texas Dear Ms. George: The plat for the above mentioned subdivision was inadvertently filed prior to completion of the infrastructure construction. Attached are 13 copies of the Replat for Phase 1. The replat is required to add additional utility easements at the request of the City Electrical Department. We request that the fee for this replat be waived. If you have any questions or need additional information, please do not hesitate to give me a call at (979) 690 -7711. Sincerely Yours, �r Joe Schultz, P.E. Civil Engineer Attachments r CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM March 16, 2001 TO: Joe Schultz, P. E., Texcon General Contractors, Via fax 690 -9797 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: Stone ForestSubdl" Aon, Phase I - FnalFlat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, March 26, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for April 5, 2001, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; and The Mylar original of the revised final plat with the owner's signature. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Johnson Investments, Inc., Via fax 915 - 625 -3672 Case file #01 -64 Home of Texas A &M University 02 TPX CON General Contractors Div. of CDS Enterprises, Inc. 1707 Graham Rd. • College Station, TX 77845 • 979 - 690 -7711 • Fax: 979 - 690 -9797 March 22, 2001 Bridgette George Asst. Development Coordinator City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Vacating and Final Plat for Stone Forest Subdivision, Phase 1 — College Station, Texas Dear Ms. George: Attached are 10 copies of the "Vacating and Final Plat" for Phase 1 and the Mylar original. We changed the plat from a "Replat" to a "Vacating and Final Plat." The revisions made involved adding additional utility easements at the request of the City Electrical Department, as well as a note stating that no lot lines or lot dimensions have changed from the original plat. If you have any questions or need additional information, please do not hesitate to give me a call at (979) 690 -7711. Sincerely Yours, `t Jo Schultz, P.E. Civil Engineer Attachments MEMORANDUM March 28, 2001 TO: Planning and Zoning Commission FROM: Spencer Thompson, Development Services, Engineering SUBJECT: FINAL PLAT for STONE FOREST SUBD PH 1- RESUBMITTAL (FP) Item: Discussion and possible action on a FINAL PLAT for STONE FOREST SUBD PH 1- RESUBMITTAL (FP), consisting of 24.38 acres off Greens Prairie Road. (1- 500064) Applicant: TEXCON Staff Recommendations: Staff recommends approval as submitted. Item Summary: This submittal is intended to vacate the previous plat has been in order to add several public utility easements to the subdivision. No lot lines or dimensions have changed from the initial plat. This property was the Texas Centroid Ranch. It was rezoned from C -1 to R -1 B and then subdivided. Access was required to Lakeway Drive. The Final Plat for Stone Forest Phase I was earlier approved by the Commission, however the City asked the Developer to add additional Public Utility Easements (PUE's) in various areas. In order to accommodate these additions, a vacating and amending plat was resubmitted. Comprehensive Plan Considerations: N/A Budgetary & Financial Summary: N/A Attachments: 1. Area map 2. Application 3. Copy of Plat 1 Deborah Grace - Stone Forest Ph 1 Page - From: Spencer Thompson To: Deborah Grace Date: 6/4/01 10:02AM Subject: Stone Forest Ph 1 60 lots x $148.00 = $8,880.00 60 lots x $308.00 = $18,540.00 Total = $27,420.00