Loading...
HomeMy WebLinkAbout00070782STAFF REVIEW COMMENTS NO. 1 Project: STONE FOREST SUBD PH 1- RESUBMITTAL (FP) -FINAL PLAT (1- 500064) ENGINEERING 1. Please consider a "Vacating and Final Plat" for this procedure or add to the "NOTE" something to the effect of "No lot lines or dimensions have changed from the original plat ". Reviewed by: Spencer Thompson ELECTRICAL Date: March 14, 2001 1. Need 15 ft. PUE between lots 8 & 9, Blk 3. (The PUE between lots 9 & 10 is not needed for electrical). Reviewed by: Tony Michalsky Date: 3 -14 -01 MISCELLANEOUS 1. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J: \PZTEXT\PZ04501. DOC Page 1 of 1