Loading...
HomeMy WebLinkAbout00070754AGENDA Project Review Committee CITY OF COLLEGE STATION, TEXAS City Hall Council Chambers 1101 Texas Avenue Wednesday, May 2, 2001 10:30 A.M. Extended Stay (Gateway Phase 2): Discussion and consideration of the building aesthetics of the proposed hotel in the Gateway Phase Two Subdivision located at 1401 University Drive East (01 -53) This building is wheelchair accessible. Handicapped parking spaces are available. Any request for sign interpretive services must be made 48 hours before the meeting. To make arrangements call 409 -764- 3547 or (TDD) 1- 800 - 735 -2989. ti No- 2 m LLI LM e 0 CD 0 V C:) C) C\j (N M :D C: , Ad U) O c C CO O 00 Extended Stay America Sign S urvey Pack Project* 6173 CITY: College Station State: TX Date: Revised 1/22/01 Sign Company: Anchor Sign, Inc. Contact Person: Marvin E. Guthrie Address: P.O. Box 6009 Charleston, SC 29405 Phone: 1- 800 - 213 -3331 Upon Completion forward to Construction Manager and Bill Knetge (Director of Architecture- Fax number: 954/713- 1655). Submit the following items with this report: 1. 8 1/2 x 11 site plan with location of all signage. 2. 8 1/2 x 11 actual building elevations with all building signage. 3. 8 1/2 x 11 elevations of all signage representing all actual sign faces and dimensions. I. Zoning a. Is Engineering Required? Yes. If yes, explain: Required on ground signs. b. Can the signage be submitted separately or does it have to be submitted with the building plans? Separately. c. List all agencies that must approve the sign: City of College Station Molly Hitchcock Building Department 1101 Texas Ave College Station, TX 77840 979 - 764 -3570 d. Name and telephone number of contact at municipality who must approve the sign: Molly Hitchcock or Shawna Laauwe 979 - 764 -3570 e. Estimate time required to obtain permits: Two Days. Explain Process: Special color restrictions apply. f. Inspection Schedule and Timeframe: 3 days. g. Is a variance allowed? Yes Should we pursue? No II. Temporary Signage a. Overall Size Allowed: 250 Square Foot b.Sign Letter Size Allowed: N/A c. Sign Height Restriction: 15 Foot III. Pylon Signs a. Number Allowed: One b. Maximum Height: 31' if setback 60' or more from the street. Not to exceed the building height. c. Maximum Area Each Face: 225 Square Feet based on property frontage of 400' foot or more. d. Minimum Setbacks: 10' from property line minimum, varies by sign height. e. Is the sign setback requirement to pole or edge of sign? Leading edge of the sign f. If no setback requirement, can the sign project over the property line? No g. Recommended Size: Recommend (1) 150 square foot pole sign with reader board. Height: 30' Location: Front facing University Drive. h. Are reader boards allowed? Yes i. Maximum height allowed for reader board: Not restricted j. Maximum size allowed for reader board: Not restricted k. Are changeable letters allowed? Yes IV. Building Signs a. Number Allowed: Not restricted b. Maximum Height: Not restricted. c. Maximum Area: Not restricted d. Can sign or individual letter? Not restricted e. Describe building end with best visibility for sign tower: End of the building facing University Drive f. Can all three sides of sign tower have signage? Yes g. Are the office letters on entry canopy fascia allowed? Yes What size: Not restricted. h. Recommended Size: Recommend (3) 72 square foot tower sign and a set of Office letters. Height: 42' V. Directionals a. Number Allowed: One per curb cut, can have logo. b. Maximum Height: 4 ' c. Maximum Area: 3 Square Foot. Recommended Size: Recommend (2) 3 square foot entrance monuments. Height: 3 ' Location: At both entrances to the property VI. Monument Signs a. Maximum Height: 31' if setback 60' or more from the street. b. Allowable Square Footage: 225 square foot based on property frontage of 400' or more. c. Minimum Setback: 10' from property line minimum, varies by sign height. d. Exterior Finish: Simulated stucco to match the building. e. Recommended Size: N/A Height: N/A Location: N/A VII. Trailblazer Signage a. Is Trailblazer (DOT /Highway) signage available? No b. Describe agency that regulates: Texas Logos, Inc. c. What is the approval process? N/A d. Shall signage be pursued? If NO then describe reason: No, Not available in this area. e. Describe Trailblazer location: N/A f. What is monthly cost? N/A VIII. Recommendations with Quote Recommend submitting sign proposal with the building plans for city review. IX. Comments /Pictures All signage can only have up to three colors and two letter styles. At least one of the colors must match the predominant building color, white or black does not count. R _I OI• N JC LO by U) 3 a� F C� I~ C � N U) rl- W OI I I N _U U N N O a a� ti a� M Cfl : o Q) aW U 6 _I OI• N JC LO by U) 3 a� F C� I~ C � N U) rl- W OI I I N _U U N N O a a� ti a� M Cfl O j (1) w co (1) N L ,U Q) C LF ONE men son man as on on uE I son son MEN on on on son son on N in b N cd 1~i S~ u C � son on MEN so on on ME on ONE MEN ONE son on on on ON. ON. ME. I I N Q to U 6 N N O m j M ti Cfl 6 r--I N in tL Y 'O O cd C� O U N N O Q� j a> IN me so ■■S on ■■n so me ME ■■n ■■ N ■■� ■■� ■■� ■■n ■■E ■■n �. ■■. 1 0 . on ■0 t' O j aV) -r3W CT35p L . 0 � C M O r--I N in tL Y 'O O cd C� O U N N O Q� j a> IN me so ■■S on ■■n so me ME ■■n ■■ N ■■� ■■� ■■� ■■n ■■E ■■n �. ■■. 1 0 . on ■0 t' O U M ct I N U O N N O w a 0 U Lr U U U O F. 'C U cd G." O r . V =i � w 0 O i i i i W V �I O Ir CD i co co (D 0 N N O w O" co a 0 U U U .O U O .O U a -+ Ri O V W C O V - Lij umwi C) f I 0 r � I I ( W V LL.r M r M CD U .a c0 U C". bA c� L O U U CS W W Q (S) J Q � m m o � N � N J O � C Co � c 3 m O L _ O Q I_ r.i N m W �— d � _O � r+ N L. d d 0) d it � U cn •." 0 N N O a a Q) t cd U bA cd C � a1 � W u z • a z W t �r 0 v U W W ' Q � J Q i iL w M CD W N N O N N C� U �i bA U a-+ cd _>1 2 � C s.. 0) a R 0 r . •� Q O A O '� •ti w L O - � M CO W N N O j m M i i s,— i r� f forest W Q LL cn 1 X'F cli R � N N O j m M Notice of Intent (N.O.I.) and Construction Site Notice (Attachment 2) of the Texas Commision on Environmental Quality (TCEQ) Storm Water Pollution Prevention Plan (SWPPP) for Westfield, Phase IIIB 10/01/03 Contact: Eric Wivagg 4090 Highway 6 South College Station, Texas 77845 Phone: (979) 690 -1222 ext. 20 Fax: (979) 690-0348 Notice of Intent (NOI) for Storm Water Discharges TCEQ Office Use Only Q Associated with Construction Activity under the TPDES Permit Number: TXR15•• •• --NO TPDES Construction General Permit (TXR150000) GIN Number: •• •• •• •• •• •• •• •• TCEC� help completing this application, read the TXR150000 NOI Instructions (TCEQ- 20022 - Instructions). A. Construction Site Operator EfflNew []No Change Customer Reference Number: CN Name: Stylecraft Builders, Inc. Mailing Address: 4090 State Highway 6 South City: College Station State: TX Zip Code: 77845 Country Mailing Information (if outside USA) Territory: Country Code: Postal Code: Phone Number: 979 -690 -1222 Extension: 20 Fax Number: 979 - 690 -0348 E -mail Address: ewivagg(c#-stylecraft- builders.com Type of Operator: 0 Individual 0 Sole Proprietorship - D.B.A. El Partnership 19 Corporation 0 Federal Government D State Government D County Government ❑ City Govemment 0 Other. Independent Operator? 9 Yes D No Number of Employees: D 0-20 D 21 -100 10 101 -250 ❑ 251 -500 [1 501 or higher Federal Tax ID: 742485231 State Franchise Tax ID Number: 1- 74- 2485231 -1 DUNS Numbe B. Billing Address Name: Stylecraft Builders, Inc. Mailing Address: 4090 State Highway 6 South City: College Station State: TX Zip Code: 77845 Country Mailing Information (if outside USA) Territory: C ountry Code: Postal Code: C. Project / Site Information [E New []No Change Regulated Entity Reference Number. RN Name: Westfield Phase Three B Mailing Address: 4090 State Highway 6 South City: College Station State: TX Zip Code: 77845 Physical Address: City: College Station County: BRAZOS Zip Code: 77845 Location Access Description: Graham Road (3- Meadow View Drive Latitude: 30 ° 33 ' 56 " N Longitude: 96 ° 17 ' 36 " W Degrees (•), Minutes ('), and Seconds ( ") Latitude: Longitude: — Decimal Form Standard Industrial Classification (SIC) code: 1521 Also, describe the construction activity at this site (do not repeat the SIC code): Construction of Single Family Residences Has a storm water pollution prevention plan been prepared as specified in the general permit (TXR150000)? [!]Yes [3 No Estimated area of land disturbed (to the nearest acre): 1 Is the project / site located on Indian Country Lands? E] Yes No Does this project / site discharge storm water into a municipal separate storm sewer system (MS4)? IK Yes 0 No If yes, provide the name of the MS4 operator. City of College Station Provide the nam or segment number of the w ater body that receives storm water from this project / site: Lick Creek D. Contact - If the TCEQ needs additional information regarding this application, who should be contacted? Name: Eric Wivagg Title: Architectural Designer Phone Number: 979 - 690 -1222 Extension: 20 Fax Number: 979 - 690 -0348 E -mail Address _ewivagg @stylecraft- builders.com E. Payment Information - Check / Money Order Number:_ 5 5 9 Nam on Check / Money Order. Stylecraft Builders, Inc. F. Certification I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Construction Site Operator: Prefix: Mr. _ _First: Bob Middle: Last: Anderson Suffix: Title: Construction Manager Signature: Date: Q If you have qu on how to fill out this form or about the storm water program, please contact us at (512) 2394611. Individuals are entitled to request and review their personal information that the agency gathers on its forms. They may also have any errors in their information corrected. To review such information, contact us at (5 12) 239 -3282. The completed NOI must be mailed to the following address. Use the attached document to submit the $100 application fee. Please note that the NOI and application fee are submitted separately to different addresses. Texas Commission on Environmental Quality Storm Water & General Permits Team; MC - 228 P.O. Box 13087 Austin, Texas 78711 -3087 TCEQ -20022 (05/03) Page 1 of 2 Texas Commission on Environmental Quality Payment Submittal Form The storm water application fee shall be sent under separate cover to the Texas Commission on Environmental Quality. This form must be used to submit your Storm Water Application Fee. Please complete the following information, staple your check in the space provided at the bottom of this document, and mail it to: BY REGULAR U.S. MAIL Texas Commission on Environmental Quality Financial Administration Division Cashier's Office, MC -214 P.O. Box 13088 Austin, TX 78711 -3088 BY OVERNIGHT /EXPRESS MAIL Texas Commission on Environmental Quality Financial Administration Division Cashier's Office, MC -214 12100 Park 35 Circle Austin, TX 78753 Fee Code: GPA Check / Money Order No: 57 I Storm Water General Permit: TXR150000 Amount of Check/Money Order: $100 Date of Check or Money Order: 10/,103 Name on Check or Money Order: Stylecraft Builders, Inc. Facility / Site Name: Westfield, Phase Three B Facility / Site Physical Address: City: College Station Zip Code: 77845 BCS pEVELOPMENT COMPANY FIRSTAMEAICANBANk . 2 5759 0 °STATE IHW1{Y H 8 SOl1T sRtrnro �x rfeos 409 H 1131 PAY one Hundred and 00 /100 TO THE ORDER' OF Texas 'Ccxmdssion of Enviro mental Quality 118 00575911' 1 :1131023 291: 11 990 1 TCEQ -20022 (05/03) Page 2 of 2 Attachment 2 TPDES General Permit TXR150000 CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part II.D.2. of the TCEQ General Permit Number TXR150000 for discharges of storm water runoff from construction sites. Additional information regarding the TCEQ storm water permit program may be found on the internet at: www. tnrcc. state. tx. uS /nermitt P /watemerm /wumprm /tnii P.Qtorm For Construction Sites Authorized Under Part II.D.2. (Obtaining Authorization to Discharge) the following certification must be completed: I Er,-c- w''v 4 (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read arrid understand the eligibility requirements for claiming an authorization under Part II.D.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and implemented according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4 system. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Titl /0 lu 3 Date Page 33 Contact Name and Phone Number: trl'r- W,V49�� 9�9 61 -11 d� ext. av Project Description: W est pf W, RA- t int e (Physical address or description of the site's C> ra 0 Or.`ve ovation, estimated start date and projected end ate, or date that disturbed be Sfurfi 10/1 soils will - s tabilized) EnJ lU�i�Uq Location of Storm Water Pollution St c r o F 6 Id e r s Prevention Plan : �{U9() �I -So . / s S. H . 6 t � Col(e e SY'u 7784 t `o ^ For Construction Sites Authorized Under Part II.D.2. (Obtaining Authorization to Discharge) the following certification must be completed: I Er,-c- w''v 4 (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read arrid understand the eligibility requirements for claiming an authorization under Part II.D.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and implemented according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4 system. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Titl /0 lu 3 Date Page 33 0 0 0 A ® ti ■ .t 1 /. 1 t. 1 ■ :t y ■:: ■N ■.: ■:. Ifl 1:1 IN pp s k 1 ■:: 1 ■ :: 1■:: 11h, ini c ■:: ■:: I N:.; IN :: 1. 4 ■:; ; ■ :: I ■:: i■::� ■� ■„ 1� ■::, ; c: 1 I 1 ■N � ■::: H. ■:: ■.. `� ■ ■:: ■:: 1 r.: 4 ■ ..a 1 ■.. 1 o n 1 ■t/ l, c / 1 /. 1 Wl n 1 .. x/ 1 COLLEGE STATION, TEXAS INTERIOR CORRIDOR EXTENDED ' EXTERI V% Qd IQ (3 -MAP I PROJECT REVIEW COMMITTEE STAFF REPORT Prepared by: Molly Hitchcock Date: April 26, 2001 For GATEWAY PH 2 (SP) (01 -053) All proposals involving site development or redevelopment in the Overlay District shall require building aesthetics approval from the Project Review Committee (PRC). Zoning District: C -B Business Commercial and OV Overlay Corridor District Location: 1401 University Drive East Applicant: Michael Bakke of Spitznagel, Inc. Item Summary: The applicant is developing an Extended Stay America hotel in the Gateway Phase Two Subdivision. A technical review of the proposed site plan was delayed while platting issues were being addressed. Although this submittal to the PRC comes early in the development review process, it is believed that the building footprint and signage will not change. Issues /Items for Review: 1. Architectural character • Color • Building elements • Awnings and canopies design and color 2. Building Signage • Color Supporting Materials: 1. Application 2. Building Elevation 3. Sign Package