Loading...
HomeMy WebLinkAbout00070743STAFF REVIEW COMMENTS NO. 1 Project: EMERALD FOREST PH 11 (PP)- PRELIMINARY PLAT (1- 500050) STOP REVIEW PLANNING 1. Staff has issued a "Stop Review" due to the fact that the application as submitted is the same as the previous application submitted for this development in November 1999. That application was disapproved by a vote of 5 to 1 by the Planning and Zoning Commission. Preliminary dialogue with the applicant has established that there are several issues that need to be clarified before a recommendation can be presented to the Planning and Zoning Commission. Reviewed by: Ted Mayo ENGINEERING Date:02 /27/01 1. Plat title block: Lots 1 -14, Block 19 should read Lots 1 -17, Block 19. 2. Metes and Bounds: Need to add bearing and distance on line between Phase 10 and pipeline corridor- approx. 660'. Reviewed by: Ted Mayo ELECTRICAL Date: 02/26/01 1. Developer responsible for the installation of conduit per city design. 2. Developer responsible for the installation of streetlight per city design. 3. Coordinate necessary easement to cover all electrical infrastructure as installed on site. Electric conduit Electric transformers Streetlights Contact Tony Michalsky at 979 - 764 -3438 Reviewed by: Tony Michalsky Date: 02/23/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1