HomeMy WebLinkAbout00070743STAFF REVIEW COMMENTS NO. 1
Project: EMERALD FOREST PH 11 (PP)- PRELIMINARY PLAT (1- 500050)
STOP REVIEW
PLANNING
1. Staff has issued a "Stop Review" due to the fact that the application as
submitted is the same as the previous application submitted for this
development in November 1999. That application was disapproved by a vote
of 5 to 1 by the Planning and Zoning Commission. Preliminary dialogue with
the applicant has established that there are several issues that need to be
clarified before a recommendation can be presented to the Planning and
Zoning Commission.
Reviewed by: Ted Mayo
ENGINEERING
Date:02 /27/01
1. Plat title block: Lots 1 -14, Block 19 should read Lots 1 -17, Block 19.
2. Metes and Bounds: Need to add bearing and distance on line between Phase
10 and pipeline corridor- approx. 660'.
Reviewed by: Ted Mayo
ELECTRICAL
Date: 02/26/01
1. Developer responsible for the installation of conduit per city design.
2. Developer responsible for the installation of streetlight per city design.
3. Coordinate necessary easement to cover all electrical infrastructure as
installed on site.
Electric conduit
Electric transformers
Streetlights
Contact Tony Michalsky at 979 - 764 -3438
Reviewed by: Tony Michalsky
Date: 02/23/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments
Page 1 of 1