HomeMy WebLinkAbout00070722STAFF REVIEW COMMENTS
No. 2
Project: GATEWAY PH 2 (PP)- PRELIMINARY PLAT (0 -232)
ENGINEERING
1. We do not require the annotation of wetlands area on our plats here at the
City of College Station. Please remove the designation, outline and
hatching of the wetlands area from the plat.
2. This Gateway property was rezoned from R -1 to R -5 in 1995 along with
the 20 R -5 zoned acres to the north. At that time, the intent was for all of
the R -5 area to become a single multi - family development. In 1997, the
property was rezoned to C -B, which essentially disconnected the future
multi - family property, to the north of this 5.700 -acre tract, from any street
frontage. That rezoning included 4 conditions, three of which need to be
shown on the plat at this time. There needs to be only one access drive for
the entire 5.700 -acre tract. There needs to be access through the subject
tract that serves both the R -5 tract to the north and the A -P tract to the
west; and that there be a 100' landscape buffer between the C -B and R -5
tracts.
Note: The fourth condition of the 1997 rezoning requires the property owner to
provide a sewer impact study analyzing the impact of the development on the
sewer infrastructure.
Staff is currently researching whether this condition has been satisfied with any
recent city sewer projects.
Reviewed by: Thomas V. Vennochi Jr. Date: 11 JAN 01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a comnlA +ely new review.
AtI l a - d" mA
Staff Review Comments Page 1 of 1
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY PH 2 (FP) -FINAL PLAT (1- 500047)
ENGINEERING
1. The Preliminary Plat must be completely processed per the Staff Review
Comments No. 2, dated January 11, 2001 (attached).
2. These comments are also reflected as conditions for approval, as presented
to the Planning & Zoning Commission in the Staff Report, dated January 10,
2001 (attached).
3. The Planning & Zoning Commission approved the Preliminary Plat with the
conditions on January 18, 2001 by a motion of 7 -0, as stated in the P &Z
Minutes (Agenda Item No. 2.6, attached).
Reviewed by:
Thomas V. Vennochi Jr.
Date: 02/23/01
ELECTRICAL
1. Developer responsible for the installation of conduit per city design and
requirements for development.
2. Need a 20 ft easement along the rear property line. 10' on each side of the
property line.
Contact Tony Michalsky at 979 - 764 -3438
Reviewed by: Tony Michalsky
Date: 02/23/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1 of 1
STAFF REVIEW COMMENTS
No. 2
Project: GATEWAY PH 2 (PP)- PRELIMINARY PLAT (0 -232)
ENGINEERING
1. We do not require the annotation of wetlands area on our plats here at the
City of College Station. Please remove the designation, outline and
hatching of the wetlands area from the plat.
2. This Gateway property was rezoned from R -1 to R -5 in 1995 along with
the 20 R -5 zoned acres to the north. At that time, the intent was for all of
the R -5 area to become a single multi - family development. In 1997, the
property was rezoned to C -B, which essentially disconnected the future
multi- family property, to the north of this 5.700 -acre tract, from any street
frontage. That rezoning included 4 conditions, three of which need to be
shown on the plat at this time. There needs to be only o acc drive f or
t entire 5.700 -acre tra ct. There needs access through the subject
tract that serves both the R -5 tract to the north and the A -P tract to the
west; and that there be a 100' landscape buffer between the C -13 and R -5
tracts.
Note: The fourth condition of the 1997 rezoning requires the property owner to
provide a sewer impact study analyzing the impact of the development on the
sewer infrastructure.
Staff is currently researching whether this condition has been satisfied with any
recent city sewer projects.
Reviewed by: Thomas V. Vennochi Jr. Date: 11 JAN 01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comment9 Page 1 of 1
STAFF REPORT
Prepared by: Thomas V. Vennochi Jr. Date: 10 Jan 01
Development Engineering
Item: Consideration of a Preliminary Plat for the Gateway 2 (PP) [o ted at
1401 University Drive E. (0 -232).
Applicant: Miller, Danny
Staff Recommendations: Staff recommends approval of a Lfinallat wit the
following conditions. There needs to be only one access entire
5.700 -acre tract. There needs to be access through the subject tract that serves
both the R -5 tract to the north and the A -P tract to the west. There needs to be a
100' landscape buffer between the C.45 and R -5 tracts.
Item Summary:
• This property is a 5.700 -acre tract, to be platted as two separate lots. It is
part of the 25.566 -acre parent tract.
• The applicant intends to build a hotel on the eastern most lot, Lot 1. There is
no use proposed for the western lot, Lot 2, at this time.
• It is zoned as C -B, business commercial.
• The subject property is bounded on the:
North by vacant R -5 zoning to the College Station city line;
South by University Drive ( TxDOT ROW) with office uses across the road;
East by Gateway Phase I (zoned as C-B also, most of which is currently
vacant, except for the Exxon station, Cheddar's and The Texas Roadhouse);
West by a vacant A -P zoned lot.
• The Lot 2 contains mostly floodplain but is still considered developable
towards the front of the lot on University Drive. The rear of the lot contains
part of the access easement necessary to access the R -5 zoning to the north.
Comprehensive Plan Considerations:
• The City's Land Use Plan classifies this area as Mixed Use. The layout of the
tract accommodates uses that comply with the mixed use concept.
• University Drive is depicted as a major arterial on the Thoroughfare Plan.
• There will not be any Parkland or Open Space Dedication.
• At this time, because of the widening of University Drive by TXDOT, the
developer will not be required to install sidewalks on University Drive. The
TXDOT project will include sidewalks on both sides of University Drive,
• This preliminary plat complies with the Master Preliminary Plat that was
approved in October of 1998.
• There is no rezoning required.
Item Background: The subject property was rezoned from R -1 to R -5 in 1995
along with the 20 R -5 zoned acres to the north. At that time, the intent was for all
of the R -5 area to become a single multi - family development. In 1997, the
Cmecea on 07AM5 7:58 PM
.MPZrornsRP_ Doc
Property was rezoned to C -B, which essentially disconnected the future multi-
family property from any street frontage. That rezoning included 4 conditions,
three of which need to be shown on the plat at this time. There needs to be only
one access drive for the entire 5.700 -acre tract. There needs to be access
through the subject tract that serves both the R -5 tract to the north and the A -P
tract to the west; and that there needs to be a 100' landscape buffer between the
C -B and R -5 tracts.
Budgetary $ Financial Summary: There is no oversized participation involved
in this property.
Commission Action Options: The Commission has final authority over the
Preliminary Plat. Options regarding this item are as follows:
• Approval with conditions
• Denial
• Table only at applicant's request
Supporting Materials:
1. Location Map
2. Copy of Application
3. Infrastructure and Facilities
4. Copy of Preliminary Plat
5. Staff Review Comments #2
INFRASTRUCTURE AND FACILITIES
Water: Water is being provided through a 12" waterline along University
Drive to serve this property for domestic, fire and irrigation usage
Sewer: Sewer is being provided through a 12" sewer fine that runs along
the north edge of the property,
Streets: The hotel will be accessed by an existing 60' access easement
running along the eastside of the property. There is an existing 30' wide,
concrete paved, cross access & public utility easement joining this one
from the east. This cross access easement is off -site to serve the lots
west of The Texas Roadhouse from the rear. They are Lots 3, 4, & 5 of
Block 1, Phase i which have been recently developed,
Drainage: Drainage will be handled at the time of site plan development
in accordance with the City of College Station Drainage Ordinance.
Approximately one third of'the property is in the flood plain.
Flood Plain: The plat shows the 100 -year floodplain located on the
property per the 1992 FEMA maps. There are two separate lots on this
plat. Lot 2 of this property is made up mostly of a finger of the Burton
Creek floodplain. There is an existing 30' Access Easement running
Crested on 0710"S 7.56 PM
J:{PZTEXMRP.DOC
0
Y. LUINUANUgAINU4,LAh Nt;
/27101 14:49 To:Danny Mi11er
b1 'e,jubujja;
Fram :Bridgette George
Mar -1 -01 12:09F'M; Page 21 2
764 -3896 Page 1/1
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY PH 2 (FP) -FINAL PLAT (1- 500047)
ENGINEERING
1. The Preliminary P19t must be completely processed per the Staff Review
Comments No. 2, dated January 11, 2001 (attached).
2. These comments are also reflected as conditions for approval, as presented to
the Planning & Zoning: Commission in the Staff Report, dated January 10, 2001
(attached).
3. The Planning & ZoniN Commission approved the Preliminary Plat with the
conditions on January 18, 2001 by a motion of 7 -0, as stated in the P&Z Minutes
(Agenda Item No. 2:6, attached).
Reviewed by'. Thomas V. Vennochi Jr. Date: 02/23/01
ELECTRICAL
1. Developer responsible for the installation of conduit per city design and
requirements for development.
2. Need a 20 ft easement along the rear property line. 10' on each side of the
property line.
Contact Tony Michalsky :at 979 - 7643438
Reviewed by: Tony Michalsky Date: 02/23/01
� S
NOTE: Any changes made to the plans, that have not been requested by the City of
College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additidhal:dhanges on these plans that have not been pointed out to
the City, will constitute icompletely new review.
Staff Review Commerds
Page 1 o(1
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY PH 2 (SP) -SITE PLAN (01 -053)
PLANNING
The following pages were considered: 3, 4, 5, 9, and 10.
1. Please include the submittal date on the site plan and add revision dates as
appropriate.
2. Please show the ownership and zoning of the subject parcel and abutting
parcels.
3. Please annotate the ROW width.
4. Please show the size of the existing wastewater line.
5. Please provide a water and sanitary sewer legend to include water demands
(minimum, maximum and average demands in gallons per minute) and sewer
loadings (maximum demands in gallons per day).
6. Parking islands must be landscaped or treated with enhanced pacing. One
island is identified as sidewalk. Please provide more information.
7. 1032 feet of interior islands are still needed.
8. Unless otherwise required by Sanitation, the dumpster enclosure needs to be
12 ft. x 12 ft. Please remove the gates from the enclosure.
9. Please indicate the location of the fire department connections.
10. On page 10, please add a note that the accessible - related details shown will
meet ANSI standards.
11. A 6 -inch raised curb is required around all edges of all paved areas. This
includes off - street parking areas.
12. Please verify that #4 bar will be used in curbs.
13. The following trees are shown within barricade areas but do not have the
symbol designating such: 29, 34, 35, 43, 295, 297, 326, 328, 334, and 350.
Is it that these trees will be within the fenced area but the fence will not be the
appropriate distance from the trunks? Please clarify.
14. There seems to be a discrepancy between the number of existing canopy
trees outside the barricade area and within the barricade area. Please
confirm these numbers.
15. Please include trees # 326 and 328 in the tree list on page 9.
16. Trees outside of the property line can not be counted for this project.
17. Note #2 on page 4 states that all parking islands will be landscaped. Please
identify the vegetation to be used in the southern and eastern islands.
18. Under "Irrigation Notes ", please state the irrigation will be approved prior to
C.O.
19. Parking requires a continuous screen from the ROW. Please continue the
line of shrubs or provide a berm in the gap along the southernmost parking
area.
Reviewed by: Molly Hitchcock Date: March 2, 2001
Staff Review Comments Page 1 of 1
ENGINEERING
1. TXDOT is going to add sidewalks, a storm sewer system and place /replace
driveways with their near future widening of University Drive. It might be to
your benefit to coordinate with them on building your driveway.
2. Please send a completed 'Permit to Construct Access Driveway Facilities on
Highway Right of Way' ( TXDOT Form 1058) and two copies along with three
additional copies of your Site Plan (sheet 4) so we can forward for
administrative approval to TXDOT.
3. Please annotate your sheets with individual titles.
4. Your creek flow arrows are going in the wrong direction. I don't see any flow
indicators except for what is in the legend.
5. Please put all of your drainage and storm sewer layout on your grading plan
and increase the line widths on the SSLs, which I assume stands for Storm
Sewer Line.
6. It appears that you have drainage inlet grates on your sidewalks. Please
clarify this.
Reviewed by: Thomas V. Vennochi Jr. Date: March 5, 2001 (initial)
Mach 12, 2001 (revised)
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City
Ordinance 2394.
2. Back Flow devises must be tested upon installation as per City Ordinance
2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City will constitute a completely new review.
Staff Review Comments Page 2 of 1
UJ /1J /U1 lU:U`.f "Ulu 104 44y0 1)LVPLUY➢1C.1N1 OV%,O
WJUU1
* * * * * * * * * * * * * * * * * * * * * * * * * **
* ** ACTIVITY REPORT * **
* * * * * * * * * * * * * * * * * * * * * * * * * **
TRANSMISSION OK
TX /RX NO.
6984
CONNECTION TEL
3060338PPPPP161
CONNECTION ID
START TIME
03/13 10:07
USAGE TIME
01'13
PAGES
3
RESULT
OK
STAFF REVIEW COMMENTS
No. 2
Project: GATEWAY PH 2 (FP) -FINAL PLAT (1- 500047)
ENGINEERING
1. The bearing on L18 needs to be the same as the bearing on the property
line separating the A -P tract, 48d 10" 42'.
2. L22 needs to be a curve as part of the curve for the 60' private access
easement.
Reviewed by: Thomas V. Vennochi Jr. Date: 04/10/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1 of 1
STAFF REVIEW COMMENTS
No. 2
Project: GATEWAY PH 2 (FP) -FINAL PLAT (1- 500047)
ENGINEERING
1. The bearing on L18 needs to be the same as the bearing on the property
line separating the A -P tract, 48d 10" 42'.
2. L22 needs to be a curve as part of the curve for the 60' private access
easement.
Reviewed by: Thomas V. Vennochi Jr. Date: 04/10/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1 of 1