HomeMy WebLinkAbout00070709STAFF REVIEW COMMENTS NO. 1
Project: ROCK PRAIRIE ELEM- TEMP CLSRM (SP) -SITE PLAN (01 -044)
PLANNING
The site plans and information submitted were only reviewed in regards to the
proposed changes.
1. Please identify the new location for the existing tree.
Reviewed by: Molly Hitchcock
Date: February 19, 2001
ENGINEERING
1. Drainage Letter: Acceptable
2. Everything else looks fine
Reviewed by: Ted Mayo
Date: February 20, 2001
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City will constitute a completely new review.
Staff Review Comments Page 1 of 1