Loading...
HomeMy WebLinkAbout00070709STAFF REVIEW COMMENTS NO. 1 Project: ROCK PRAIRIE ELEM- TEMP CLSRM (SP) -SITE PLAN (01 -044) PLANNING The site plans and information submitted were only reviewed in regards to the proposed changes. 1. Please identify the new location for the existing tree. Reviewed by: Molly Hitchcock Date: February 19, 2001 ENGINEERING 1. Drainage Letter: Acceptable 2. Everything else looks fine Reviewed by: Ted Mayo Date: February 20, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Staff Review Comments Page 1 of 1