Loading...
HomeMy WebLinkAbout00070700STAFF REVIEW COMMENTS No. 1 Stopped Review: All of the parent tract property owners must be parties to the Master Development Plan. The following comments do not constitute a complete review. PLANNING 1. The application should accurately reflect the acreage in each zoning district. ,i2. Title Block needs to reflect acreage of the parent tract. The boundaries of the parent tract should be bolded. How were the boundaries of the parent tract determined? Provide information. 5. The City does not recognize property subdivision lines that were not established in accordance with the subdivision regulations. Remove any such lines from the plan. If they are planned to be Project: ASSOCIATES PARK SUBDIVISION (MDP) (01 -41) future phases, then label them as such. J; Lot and Blocks are generally labeled independent of what phase they are in. There usually are not 2 Lot 1, Block 1's in the same development. . One of the proposed future tracts does not have access. Show approximate location of the bike path as shown on the Thoroughfare Plan. —9. Show approximate location of the floodway /floodplain throughout property. J6'A priority level 2 greenway traverses the R -1 property. ,"ote #6 is not accurate for the Master Development Plan. Reviewed by: Jessica Jimmerson Date: 2 -20 -01 ENGINEERING 1. Please show any and all existing easements on these seven tracts. Reviewed by: Spencer Thompson Date: ELECTRICAL 1. The City of College Station, Electric division plans on building an Overhead power line along the rear property line next to the pipeline easement. 2. Additional easements will be necessary to provide power to Phase 1 & 2 lots across the Hwy 30 partnership properties. 3. Developer is responsible for acquiring necessary easements. Contact Tony Michalsky at 979 - 764 -3438 Reviewed by: Tony Michalsky Date: 02/16/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J: \PZTEXT\PZ04369. DOC Page 1 of 2 STAFF REVIEW COMMENTS No. 2 Project: ASSOCIATES PARK SUBDIVISION - MDP (01 -41) PLANNING It appears that the zoning line you have depicted is west of the actual zone line that we show. This may affect your site design requirements in the future. Reviewed by: JESSICA JIMMERSON Date: 5 -2 -01 ENGINEERING 1. The City will require the construction of a sewer line from the existing 21" line to the adjoining property on the southeast. Please provide a PUE to that point for this purpose. This may be done at the preliminary plat stage. Please see Chapter 11, Section 3 of the City Code of Ordinances for reimbursement of utility line costs. 2. The City will require the construction of a water line from SH 30 to the adjoining property on the northwest. Please provide a PUE for that purpose. This may be done at the preliminary plat stage. Please see Chapter 11, Section 3 of the City Code of Ordinances for reimbursement of utility line costs. 3. Please note that this MDP must be approved by the P &Z prior to a first round review of the Final Plat. Reviewed by: Spencer Thompson Date: May 2, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J: \PZTEXT\PZ04776.DOC Page 1 of 1