Loading...
HomeMy WebLinkAbout00070680V lb HAND DELIVVRED Memorandum Ben Boettcher & Associates, Architects, In, 1702 S. Market Street Brenham, Texas 77833 979- 836- 0523(V) 979- 836 -3519 (F) bruce(t4bba- architccts.com Bruce F. Bockhorn, AIA To: Bridgette George — City of College Station CC: Steve Schulze BBA File From: Bruce F. Bockhorn, AIA Date: 3/7/01 Re: Holy Cross Lutheran Church: CUP Hearing- Response to City Staff Report Our office has reviewed the Staff Review Comments No. 1 from the City of College Station Development Services Division regarding the church's CUP application submitted on February 5, 2001. Please note the following responses to the items listed in the report: PLANNING: 1. Zoning Classifications: The zoning for the subject property and all adjacent properties are indicated on the revised Site Survey, drawing CUP -1. [Note: Per our telephone conversation of this morning we are re- submitting 10 prints of this plan with this response.] 2. Setbacks: These are indicated on the revised Site Survey and Site Plan, drawings C1JP - -I and CUP -2. 3. Easements: These indicated on the revised Site Survey and Site Plan, drawings CUP -1 and CUP -2. [Note: We are enclosing 10 prints of CUP -2 with this response.] 4. Flood Plain: The property is not in a 100 -year flood plain as certified by the surveyor on drawing CUP -1. 5. Utility Lines: These are indicated on the revised Site Survey and Site Plan, drawings CUP -1 and CUP -2. 6. Water and Sewer Demands: Demand calculations provided by Brazos Valley Engineering are summarized on drawing CUP -2. 7. Square Footage of Buildings: These were previously indicated on the Code Plan, drawing CUP -5, submitted with the original application. 8. Handicapped Parking Spaces: The proposed drop off space in front of the new building will be taken as a bid alternate to the project. If the improvement is constructed the church will provide the same number of handicapped spaces and include this design in the construction document set to be reviewed for ADA compliance. Please refer to the revised Site Plan, drawing CUP -2. March 7, 2001 9. Landscape Reserve: This information is indicated on the revised Landscape Plan, drawing CUP -3. 10. Existing Fences: The existing fence for the playground on the west side of the existing building was indicated on the Site Plan, drawing CUP -2 submitted with the original application. 11. Solid Waste Pick -up: The church uses city services to remove trash. Containers are placed on the curb in accordance with the normal pick -up schedule. 12. Curb Details: The original application was accompanied by a three page write -up outlining responses to the issues of the CUP Application. Please refer to item 11 under the section, Site Plan Information Checklist. With that submittal we attached photocopies of details taken from the engineering drawings prepared by Hester Engineering Company sealed 04/06/97 and approved by the City of College to construct the existing parking lot. 13. Pre - school: Please refer to our usage chart that was shown on page one of the three page write -up that accompanied the original application. 14. Playground Area: This area was previously indicated on the revised Site Plan, drawing CUP -2. The playground will remain at this location after the expansion. ENGINEERING: 1. Existing and Proposed Pavement: The existing concrete pavement was shown on the prior Site Survey, CUP -1. The proposed pavement plan is shown on the Site Plan, CUP -2. 2. Drainage: CSC Engineering (College Station, Texas) is preparing a drainage calculation report. This will be submitted to the city for staff review on March 8, 2001. 3. Site Plan Dimensions: This information was shown on drawing, CUP -2 that was included in the prior submittal. 4. Utilities and Easements: Please refer to the revised Site Survey and Site Plan, drawings CUP -1 and CUP -2 that accompanies this memorandum. 5. Estimated Domestic Waster and Sewer Usage: Demand calculations provided by Brazos Valley Engineering are summarized on drawing CUP -2. 6. City of College Station Requirements: This note is included in the General Notes on drawing CUP -2. ELECTRICAL 1. Conduit Installation: The church will comply with this item. 2. Electrical Load Service: Please refer to the attached information provided by Brazos Valley Engineering. 3. Easem Transformer is being located within the existing utility easement. MISCELLANEOUS: 1. Irrigation System: This item is noted on the revised landscape plan submitted with this response. 2. Back Flow Devises: The church will comply with this item and it is noted on the Landscape Plan, drawing CUP -3. There have been no major plan changes since the prior submittal that require additional review by the staff. Please contact us if there are any questions regarding this response. G /files /active /Holy Cross / memo CUP Response 03 07 01.doc WATER SUPPLY CAL'C'ULATION STATIC PRESSURE: 50 psi FU MIN TOTAL F.U.: 133 AVG NEW SANITARY SEWER GPM: 77 0 GPM 77 WATER METER: 1--1 /2" NEW DOMESTIC WATER 133 50 psi PRESSURE IN MAIN 77 <1 8.5 psi LOSS THRU METER 2.3 pal LOSS THRU TAP 15 psi FIXTURE LOSS AT END -- psi LOSS THRU BACKFLOW PREVENTER 5.2 pal STATIC HEAD LOSS 19 psi AVAILABLE PRESSURE PIPE LENGTH (TAP TO METER) 20 ft PIPE LENGTH 350 ft VERTICAL LENGTH 12 ft EoUIVALENT_LENGTH OF FITTINGS 140 ft TOTAL DEVELOPED LENGTH 522 ft PRESSURE MAX. ALLOWABLE LOSS TOTAL AV ILABLE& LENGTH 19 1291 522 ft x 100 = 3.6 psi (PER 100 ft OF PIPE) PLUMBING LOAD SUMMARY DESCRIPTION FU MIN MAX AVG NEW SANITARY SEWER 114 0 GPM 77 <1 NEW DOMESTIC WATER 133 0 GPM 77 <1 HOLY (:KU55 tLtL: I KIUAL UtMANL) LOAD SUMMARY: EXISTING 5,850 SF NEW 8,900 SF LOAD (WATTS) GENERAL RECEPTACLE, CONNECTED 13,140 IDERATES: 1 ST 10,000 a 100% REMAINDER Q 50% LIGHTING a 3 VA/SF MOTOR LOADS W/ GAS HEAT 5% CONTINUOUS LOAD 5% LARGEST MOTOR XISTING LOADS OTAL DEMAND 120 208 VOLTS 10,000 1,570 26,700 85,401 3 PH 6,675 4,954 32,800 168,099 467 AMPS CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM October 19, 2001 TO: Steve Schulze, Via fax 862 -1478 FROM: Bridgette George, Asst. Development Manager SUBJECT: HOLY CROSS LUTHERAN (CUP) - CONDITIONAL USE PERMIT Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Six (6) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached; Two (2) revised site plans; and, One (1) landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Holy Cross Lutheran Church, 1200 Foxfire Drive, College Station, TX, 77845 Ben Boettcher & Associates, Via fax 836 -3519 Case file # 1- 500037 VIA FACSIMILE AND HAND DELIVERED Memorandum Ben Boettcher & Associates, Architects, Inc. 1702 S. Market Street Brenham, Texas 77833 979 - 836- 0523(V) 979 - 836 -3519 (F) b ruce!ii)bba- ar chitects.com To: Bridgette George — City of College Station CC: Steve Schulze -Holy Cross Lutheran Church BBA File From: Bruce F. Bockhorn, AIA Date: 10/22/01 Re: Holy Cross Lutheran Church: Response to City Staff Report #4 Our office has reviewed from W. R. Tubbs Construction, Inc. a copy of the Staff Review Comments No. 4 from the City of College Station Development Services Division regarding the church's CUP application submitted on February 5, 2001. Please note the following responses to the items listed in the report: PLANNING: 1. Zoning Classifications: No comment/response required. 2. Setbacks: Although the comment regarding setbacks was included with item #5 of the staff review, it is responded to in this section. Please note that the CUP -1 drawing was produced Kerr Surveying Company and a check of their CADD file determined that a layer was inadvertently turned off. The property line is clearly shown and is included in the partial photocopy attached to this letter. We did note in reviewing this drawing that Kerr Surveying indicated a 25' setback at the rear of the property that should be 50' as correctly indicated in our CUP -3 drawing that we submitted to you with our response to Staff Review Comments #3. We will instruct Kerr Surveying to correct this setback at the rear of the property. 3. Easements: No comment/response required. 4. Flood Plain: No comment/response required. 5. Utility Lines: The locations of the existing utility lines are shown on the engineering drawings prepared by Hester Engineering Company sealed 04/06/97. A partial photocopy of this sheet is attached . We have also attached photocopies of the city's utility line location drawings that were provided to us in a Note: Boettcher & Associates did not receive an original transmission of this document. Facsimile transmission of the report was forwarded by W. R. Tubbs Construction and received 10/20/01. 2 A full size print will be provided with the hand delivered copy of this response. ' A full size print will be provided with the hand delivered copy of this response October 22, 2001 preliminary meeting with Jeff Tondre. As noted in our prior response the size of sewer line is 4" diameter and the size of the water line at entry to bldg. is 2" diameter. 6. Water and Sewer: The location of the existing meter is shown on the attached facsimile transmission from Brazos Valley Engineering. 7. Square Footage of Buildings: No comment/response required. 8. Handicapped Parking Spaces: No comment/response required. 9. Landscape Reserve: No comment/response required. 10. Fences: No comment/response required. 11. Solid Waste Pick -up: No comment/response required. 12. Curb Details: We still have not received a copy of the details noted in this or prior reviews. Please note that we intend on complying with City of College Station standards. 13. Pre - school: No comment/response required. 14. Playground Area: No comment/response required. Eight sets of these plans are being submitted with this memorandum. Please contact us if there are any questions regarding this response. G /files /active/Holy Cross /Memo CUP Response #4 10 22 01.doc 2 Ben Boettcher & Assoc. 1 702 S . Market Street Brenham, m, Texas 77833 979- 836- 0523(V) • 800- 383 -9 () 979- 836 -3513519 (FF) • brace i bba- architec (e -mail) Ben Boettcher & Assoc., Architects, Inc. To: Bridgette George Fax: 979 - 764 -3496 From: Bruce F. Bockhorn, AI Date: 10/22/01 Re: Holy Cross Lutheran Pages: 10 CC: Steve Schulze @ Holy Cross (via facsimile) 0 W. R. Tubbs @ Tubbs ✓ /� n/ Construction (via facsimile) 0 Urgent 0 For Review ❑ Make Corrections Noted ❑ Please Reply ❑ Original by Mail Please find attached our responses to CUP Staff Report #4. We will be hand delivering the full sized prints noted in the memorandum to your office. Thank you for your prompt attention to this request. Please deliver to Bridgette George upon receipt. F . . . . . . . . . . . . . . . . . . . . . f lee t y l p ,, 3 r a s BOETTCHER ARCHITECTS TEL :1 - 979 -836 -3519 Oct 22'01 14:28 No.015 P.01 t1t1.9, r cu,: $r.Jqlay tibu 4r 5 1-F_�4 -CBE: pige 2 X : CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 0960 College Station, 7exas'7842 P�one (9791764 - 35701 Fax 1,979) 764 - 349t MEMORANDUM October 19, 2001 TO: Steve SO% Ze, Via fax 362 -1475 FROW Bndgstte George, Asst. Development Manager SUBJECT' HOLY CROSS LUTHERAN (CUP) -CONDITIONAL USE PERMIT Staff reviewed the abo'oe- mentioned site plan as requested. The f0owing page is a !'St of staff review comments detailing items that need to be addressed. Please address the cownwits ant evbm:t the following infoireation for further staff review and ap. ^roval of the platy Six Ve complete sets o construct' r, documents for tie "d evelopment ;vith the revised s ite and landscaping plarts attached. f Two (2; revised bite ptatns; and, One (1) landscaping plan. proposed if there arc u,rnmerits that you are not addieus;ng with the revised site plan, please attach a letter explaining the details. if you have any questions or need aad,tonsi inirirmation, please ca ,l me at 'X42570. Attachments staff rbL ;ew comrlent4 Co. 11cry Cross Lutheran Church, 1200 FoKflte Drive, Gollege Stavon, TX. 77845 Ben 6eottcher $ Associstes Via fax 836 -3519 Case file # 1 5 =37 BOETTCHER ARCHITECTS TEL :1 - 979- 836 -3519 Oct 22'01 14:29 No.015 P.02 ";I Z" r v14: Br :ogtttr 6NvQv Pigs 3 or STAFF REVIEW CO MMENTS 140.4 Pm eut. HOLY CROSS LJ ;CUFJ- '- LSE PFRA/`!1 J)1 -037) PLANNING 1. OK. 2 OK 3 OK. 4 O h_ S it appears the leyer with the property line was turned off on this :: JP cony. Please shcnv the prcperty tine on the next submittal The mains can be seen on sheet CUP -1. bit the projects service ! nes should 01 30 be shown. Please show and descvbe the size of the chu Yvaty and serves service lines, 6. Please idenli!vthe !ccatlor+ of the existing water meter. 7. OK 6, OK 9 GK. 10 OK. 11 OK. 12 A copy of ciao ng options reill be seat with these corn-nerlts. Fiease use one of these standards. 13. 0K. 14 OK. Revie by molly HitchCOCK Dale: Uctober 13. y1 140M Airy ohtnpc.s to the 11M15 Iti ta77E "ot Cn Oil r4 -v-1r. f C) Ih. :., at CoCtx x 3' t '.$ls' Lr C \pIRi-Qd .� pt✓ reu Ira PIWltct IoNe a+•4 'L aWtd' att yv t Y1;ins A ^y ?3' Marine: y;4 G, •. tlal ^a If nc• ee<:•r•. • -i cut to t'* Cry 14 CorytrN�1• ! :OMp'els!y ss'•�L.R. 3eff RO.Iew COM)M4 1'1 PNpt % 4 ' +',PZT "r.1tu. :o HAND DELIVERED Memorand Ben Boettcher & Associates, Architects, Inc 1702 S. Market Street Brenham, Texas 77833 979 - 836 -0523 (V) 979 - 836 -3519 (F) bruce Mbb archite cts.com Bruce F. Bockhorn, AIA To: Bridgette George — City of College Station CC: Steve Schulze BBA File From: Bruce F. Bockhorn, AIA Date: 3/7/01 Re: Holy Cross Lutheran Church: CUP Hearing- Response to City Staff Report Our office has reviewed the Staff Review Comments No. 1 from the City of College Station Development Services Division regarding the church's CUP application submitted on February 5, 2001. Please note the following responses to the items listed in the report: PLANNING: 1. Zoning Classifications: The zoning for the subject property and all adjacent properties are indicated on the revised Site Survey, drawing CUP -l. [Note: Per our telephone conversation of this morning we are re- submitting 10 prints of this plan with this response.] 2. Setbacks: These are indicated on the revised Site Survey and Site Plan, drawings CUP -1 and CUP -2. 3. Easements: These indicated on the revised Site Survey and Site Plan, drawings CUP -1 and CUP -2. [Note: We are enclosing 10 prints of CUP -2 with this response.] 4. Flood Plain: The property is not in a 100 -year flood plain as certified by the surveyor on drawing CUP -1. 5. Utility Lines: These are indicated on the revised Site Survey and Site Plan, drawings CUP -1 and CUP -2. 6. Water and Sewer Demands: Demand calculations provided by Brazos Valley Engineering are summarized on drawing CUP -2. 7. Square Footage of Buildings: These were previously indicated on the Code Plan, drawing CUP -5, submitted with the original application. 8. Handicapped Parking Spaces: The proposed drop off space in front of the new building will be taken as a bid alternate to the project. If the improvement is constructed the church will provide the same number of handicapped spaces and include this design in the construction document set to be reviewed for ADA compliance. Please refer to the revised Site Plan, drawing CUP -2. D1 -� '1 fit COM LEGAL NOTICE DATE TO BE PUBLISHED: WEDNESDAY, FEBRUARY 28, 2001 ONLY BILL TO: The City of College Station P.O. Box 9960 College Station, TX 77842 REFERENCE ACCOUNT # 11106712 CREDIT CARD # 5405- 8231 - 9379 -5783 NOTICE OF PUBLIC HEARING: The College Station Planning and Zoning Commission will hold a public hearing to consider a CONDITIONAL USE PERMIT AND SITE PLAN for 1200 FOXFIRE DRIVE. The hearing will be held in the Council Room of the College Station City Hall, 1101 Texas Avenue at the 7 :00 p.m. meeting of the Commission on Thursday, MARCH 15, 2001. Any request for sign interpretive services for the hearing impaired must be made 48 hours before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735- 2989. For additional information, please contact me at (979) 764 -3570 JESSICA JIMMERSON Staff lanner " " FILE COPY o. -3? CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 February 27, 2001 TO WHOM IT MAY CONCERN: Re: Consideration of a CONDITIONAL USE PERMIT AND SITE PLAN request for 1200 FOXFIRE DRIVE, NOTICE OF PUBLIC HEARING This is to notify you that the City of College Station is considering a CONDITIONAL USE PERMIT AND SITE PLAN request for the following property: Applicant: SCHULZE, STEVE Subject Property: 1200 FOXFIRE DR (See attached location map.) Proposed Use: FOR AN ADDITION OF EDUCATIONAL SPACE TO THE RELIGIOUS FACILITY The Planning and Zoning Commission will hold a public hearing on Thursday, MARCH 15, 2001 at 7:00 p.m. to consider the request. The public hearing will be held in the City Hall Council Room located at 1101 Texas Avenue South, College Station, Texas. All owners of the subject property and property owners within 200 feet of the subject property have received notification of this request. Any request for sign interpretive services for the hearing impaired must be made 48 hours before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735- 2989. For additional information, contact the City Planning Office, (979) 764 -3570. JESSICA JIM1bIERSON Sta Planner 0 3 w oo N O r --I i — 1 — _L_ 1 U7 p W N �_ O _. ; cn 00 bdw 0o0" O"- 'o� r *T, V 1 cn v ,T O cn CD O� O O� zn z r z z o d c ' � r� w 0 CD r x 4. CD 0 C al 41 3 N N II I -1 S ID b � vl N 0 .F - -- Ol o EP 0- E N n o � ° o�om':o O mm ° = - _ . w7o - ' gym o ° oo 3 9 (c - m Q 3� =� m w _ , o m < o n o k 3 o d � m °-- c o-m^. m o 3 i ' o m. om m o S m m tn_ »ca o c w3�o�m o. d w y w N .0 0 w ymcri »' p ' - n o 3 0 0' n nm ° 3 a w w w m m oo, > >wn - o ° ���o = w l m -- =aaym�o 3 w w O cn 'o 3 nv ms =m - n m N A n n o w ° 2 n 2 3 w m ° o m �o a o — n m c 3 o w S w� 3 ❑� ,: ai3 ° x. vi -- � = =w o w m m = wwwwna< - - - -- 3 ° w m Q C�oo ta- I ? i i i i t C17 A W N 1 O "C tnP tz r �N �� xx j C7� ��ro� tr7o N Cn� 0 o C17 � n c a < O r� ID ID a 3 v � � N +N m M M .p Z 0 ivy O CL CL p o O m X m ^ N y� U cS D Z m c ❑❑,❑ ❑f7 CD y N K m o m n c a < O ID ID a 3 v � t ° 3 -_ +N m M M w w 3 - C 3 SD W o (p N > y N O m ?. y Un [ ❑❑❑❑ m n 0 CO N m m o =_`_° o n n R1 3 0 c !D m N or m C. N o -. =� < O � 7 � m v y = m o a o m m d 1 1 I o o CD T m X N m 0 C, r C,) v a w m� Q O-N N su �O N Q CD m c rtrtrt * * rtrt�•" CFP � y . a y 3 v � t +N m M M C Z�Z (p J O � S y Un i rtrtrt * * rtrt�•" U) O 3 W co V N O 0 mwF Ut W N i O f0 �W V O � i W �N G Z r_ a zi y � w r� t=D m lit N O N m J S J V n c! � '.t7 r--, yam+ > �+ _ O CD C F 00 y CD Y D! O CD 0 < z w RP n- O O m3 > n v'"' O X O C v CD y y oo --I _r N Q Z 0 N m v T -� C 9 � I � a O ! O 1 11 O ° 2 O m a c o x O mmoa0�ic • w � a to°m2 o m - � tD - m > > � o m onow fow 3 o a m c a o_a _ °n c n 3 m o m 3 a w y m fA m - o 0 x- nm3 3�3 m m'w3oT9. ni m v y N m l Hm -' .0 y 9 m n 3 M . m m _ m 7 fT y S. o c 9 o d m » ° na y m o p y m 3 w oR& 0 - m j m RA ,. J n 3 n E N n'° t a - o 3 ° c 3 D o m d °�3fDm3 I , a c m 3 .. n 33 W K. - m m m a - v 3 m � � t 7 _ o CD moon x y x N o m D c a < 0 ° a v Z n CD D o m w 3 - d w_ D w m o Cl) 7 y _ N tD w n C ( C o 0 c 3 y O n c N a w N m N d O Q O m- 0 CD < O m w Q C 0 s y = w 9k 0 N J CD m w �O O O o W 41 U CD `D 'O ° 0.2111 .0 Q w � I DW iooy3 �. Q N (!1 O 2 N 1 0 N n �: I I I IDS to w w O l a .r a o\� ~ m S W m N �L J � O N O e m I 0137 LEGAL NOTICE DATE TO BE PUBLISHED: WEDNESDAY, FEBRUARY 14, 2001 ONLY BILL TO: The City of College Station P.O. Box 9960 College Station, TX 77842 REFERENCE ACCOUNT # 11 106712 CREDIT CARD # 5405 -8231- 9379 -5783 ----------------------------------------- NOTICE OF PUBLIC HEARING: The College Station Planning and Zoning Commission will hold a public hearing to consider a CONDITIONAL USE PERMIT AND SITE PLAN for 1200 FOXFIRE DRIVE. The hearing will be held in the Council Room of the College Station City Hall, 1101 Texas Avenue at the 7:00 p.m. meeting of the Commission on Thursday, MARCH 1, 2001. Any request for sign interpretive services for the hearing impaired must be made 48 hours before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735- 2989. For additional information, please contact me at (979) 764 - 3570. JESSICA JIM?v1ERSON Staff Planner e n E MAILED l,zla� cn 0 3 D c r� m w — 1 U1 1 A _ W! N aZ Cf) 3 Si �+ to 0 CD c 4 CD vi mw'3Onvn ti r 1 0 r� a0 D o 0 1 Z a c SD v 0 0 3 N 25 m N N 0 y m CD CD y d � O PF j Ci7 ~� O C " y o � Ro n v ID I Q ! F ^� O t N 7 0 0 0 o go C m O= w w D 0 �_ A N 1 0 P 30 y E _" 3 >>> 0 o '. �o� ono m a `w w m y y °.m y Q OM - my o . m n c m- ^ ° o o 3 y o 3 g n 6 m ' m m J ? y w m N y N fA a O 3 0° a l o o _ W �,Y} -4 M Ln j W N 1 r 7 CD 030 W J > b D 00 Z 3 n �C m mdomom I i I I ', Z N 0 Co O = m (� 0 7 X xcm O Cl) co N Z ❑❑ ❑l ❑�_ N X o o o 0 m D C° <v d CD N CD m 'O CD H Q N `2 a O 0 3 d w_, 3 w Q SD O (n 7 N CD m m 0 ❑❑❑❑ m n V - D D D m E f0 0 3 7 n SD N O d G lD a m ia m A �a y O m 7 3 m w , Z O (D 7 J � M 7 N J » w n o m F d ��8 oo�D msz 2 R CD O y w m m CD . ED C, A7 � �x g =o y 3 n y D x'O w m CL D D � OC` Si �+ O - c m mw'3Onvn ti r 1 3 Z m � w m wa 4 c y "Dm - -� !- f !ll m < m co Q v O Nn . R dN d 3 w'N� N C a�o�m�� o m m =3 n3(O.y m 1 m o - m 03 v d n c 3 y - 6 w 3 j X. N 2 1 w�� 3. _oo i mdomom I i I I ', Z N 0 Co O = m (� 0 7 X xcm O Cl) co N Z ❑❑ ❑l ❑�_ N X o o o 0 m D C° <v d CD N CD m 'O CD H Q N `2 a O 0 3 d w_, 3 w Q SD O (n 7 N CD m m 0 ❑❑❑❑ m n V - D D D m E f0 0 3 7 n SD N O d G lD a m ia m A �a y O m 7 3 m w , Z O (D 7 J � M 7 N J » w n o m F d ��8 oo�D msz 2 R CD O y w m m CD . ED C, A7 � �x g =o y 3 n y D x'O w m CL D D � OC` Si �+ O - c m v.. C3 ti r 1 3 Z m � w m wa 4 c tft i !- f !ll m < m N D' cn T O CA) co V IS N s CID v tS1 A y O 'Cb cn p Oo �I CJl A W N i C (Jl A W N O ' '� °tn ��n (0 � � �� OWO nNxO ..+ W m� tT, a Ci7 r ti7 O 's] O ca 0 a O 4n m O;o C)On :D�� CD y � �O � 3p �opN 4 p > t- y �n y � 0 U) 00 . y ��.yy r a = x m= rn � � W V y r � i � N <.Z N N t_ z� xcom- wQi �� y �' H m v v D d 00 I o `°' h7 00 a n N o m N r LA I '� I Z Y C 0 3 m 9 n O Z 3 m 9 m � o N m F 3 a m F m 0 - v+ O w 4 w cn � o. o � o� < c o x .o y c O mdov� pi m 0 0 0 3_ j y � = .gym 3- 5 0 y 0 0 p1 » o o' ,- < onow �w n E_. y C 3 o c m W I 3 2 . w o v m =o ° cm w na m o y 3 n m m w g o 0 H o » a o 3 0 n x o n 3 3 a 3 m y i � ` w w w 3 o�oa n - •so v y m w w n o n � o u,omv+- m » cn nN y a O y o J o m o w l 3 % w m o m -o c» w n3(o c 3 3 a33 0 �n�i lny 3- 3' v a o U S m w_ m Q 3 �'" m o - B m 0 w. 0 rn C CD g m p 0 0 0 c v D 0. a <0a lz d 'm N m N 'O CL N 42 n (D N ' � O O m w = 3 N T. 3 w Q ti w CID I mo' z n o. ❑❑❑ m �aI(D o m m m n ° 3 o n C m Q y W W fD a N 0 O 4 N m � 'a G 3 0 � w ? o CID � � m ' a , o o N 0 o' !D lD v '13 CID (Dy `� R yn y CID om3 _ tD 111 vi p ` b - O (D C w a, 0 ID t T4 I Q O d a +� �. 0 V Vl C) ttt 'f 0 W O 3 W 00 V 4 c N O O Q c l Cn W OD V '�t CD - - � J �� J - - ^^ 3 li] N m CL w�— (D o 6 8 - (D O Q Q Q (a v' w Im (D � m �i , U) O C � r 7 w O O a v C -' -' - ��O�+ x ^ m m Z 00 W L: z co G) W y +111 3 X rn m m v Vj m p (n °° y � v D CD o� �I I m I h Z II II 'I II m I CD 00 w CD 5 X w O w x C 'R v CD m w w -0 O N `z (D a 21 n O 0 3 w. 0 mi m' o z d 3 w - m Q U) CD 3 a 2 31 D 31 O p w S D O II I w w n C N a CD N m (D Cl y 0 2 O o CD 3 < ° a m a' m c a c � -- --- - - j 90! S 3 % ma ° N — o m o m � -. 7, o . _ m Q 3� >> m� I i ... w l 4 o w m w y.o °c'mo.n � c o c - - --- - j ?o o 11 3 N y ., Y - -- 2CD Q �m wN D' m c y'd m o i '� ' :r O fD r� Iw a, ��3c�ma, m m 3 r° aH m o mo � i II CO r(� - m _. x c � � � n m . n v m m - m n m 3 __ Q \� m vi am (TN .6 0 9 S _ E» - m o m Un o 7 O 01 M O, a A 3 Bridgette George - Holy Cross Lutheran (1200 Foxfire Drive) Page 1 / l U' - yt,. From: 'Bruce F. Bockhorn, AIA" <bruce @bba- architects.com> To: < jtondre @ci.college - station.tx.us> Date: 5/5/00 9:36AM Subject: Holy Cross Lutheran (1200 Foxfire Drive) During a recent meeting with the church we discussed the extension of the sewer line to service the larger property they may be acquiring from Mr. Ledbetter. you and I spoke about this during the meeting we held in early February. Could you confirm the approximate size of this line and the depth that it will need to be placed? Is there an approximate cost per linear foot that we should anticipate incurring for this extension? Your prompt attention to this request is appreciated. Bruce Bockhorn, AIA Ben Boettcher & Associates 800 - 383 -5649 409 - 836 -3519 fax CC: " Bridgette George" < BGEORGE @ci.college - station.tx.us> Memorandum Ben Boettcher & Associates, Architects, Inc 1702 S. Market Street Brenham, Texas 77833 409 - 836 -0523 (V) 409 - 836- 3519(F) bruce(a)bba -arch itects.com Bruce F. Bockhom, AIA To: Molly Hitchcock — City of College Station (4 pages via facsimile & regular mail) CC: Bridgette George -City of College Station Steve Schulze BBA file From: Bruce F. Bockhom, AIA Date: 3/06/00 P Z Re: Holy Cross Lutheran Church — Request for Review of Landscaping Following up on our meeting of January 24 ", our office has reviewed the landscaping requirements for the development of the site in accordance with Section 11 of the City's Zoning Ordinance. Based on your instruction during this morning's telephone call to use the gross square footage of the site for our design we have arrived at the calculations shown on the attached chart. Before we proceed further we would like for your office to review these calculations and the attached preliminary site plan. Your attention to this request is appreciated. Attachments: 1. Calculations of Site Landscaping Requirements 2. Site Plan — Preliminary (2 pages) G /files /active /Hoty Cross /memo to city landscaping.com January 30, 2001 Acres Sq. Ft. 7Divide e Square Footage Lot 1 2.018 87904.08 by 1,000 SF for points needed = 87.90 Multiply by 30 Ls 1,000 SF = 2637.12 Existing Trees - Crepe myrtle 8 40 points 320 Existing Trees - Oak 9 35 points 315 Sub - total: 635 Additional Point Credits for parking 6 Sub -total A: New Trees - Crepe myrtle 25 40 points 1000 NewTrees - Oak 8 75 points 600 Sub - total: 1600 Additional Point Credits for parking 160 Sub -total B: 1760 Total Points Needed = 2637.12 Total Points Obtained Existing + New = 2458.5 Total Points Still Needed = 178.62 E 93 CITY OF • STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 February 12, 2001 TO WHOM IT MAY CONCERN: Re: Consideration of a CONDITIONAL USE PERMIT AND SITE PLAN request for 1200 FOXFIRE DRIVE. NOTICE OF PUBLIC HEARING This is to notify you that the City of College Station is considering a CONDITIONAL USE PERMIT AND SITE PLAN request for the following property: Applicant: SCHULZE, STEVE Subject Property: 1200 FOXFIRE DR (See attached location map.) Proposed Use: FOR AN ADDITION OF EDUCATIONAL SPACE TO THE RELIGIOUS FACILITY The Planning and Zoning Commission will hold a public hearing on Thursday, MARCH 1, 2001 at 7:00 p.m. to consider the request. The public hearing will be held in the City Hall Council Room located at 1101 Texas Avenue South, College Station, Texas. All owners of the subject property and property owners within 200 feet of the subject property have received notification of this request. Any request for sign interpretive services for the hearing impaired must be made 48 hours before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735- 2989. For additional information, contact the City Planning Office, (979) 764 -3570. JESSICA 7IMMERSON Staff Planner ILJ : i 1 01 -37 ARC / AMS CORPORATE PROPERTY ASSOC 4 PO BOX 30001 COLLEGE STATION, TX 77842 01 -37 HAMILTON, IAN SCOTT & AMANDA PAIGE 1513 FOXFIRE DR COLLEGE STATION, TX 77845 01 -37 LETBETTER, WILLIAM D 2348 ECHO CLIFF CT ATLANTA, GA 30345 01 -37 BEN BOETTEHER & ASSOCIATES 1702 SOUTH MARKET STREET BRENHAM, TX 77833 01 -37 GLOCKZIN, EMMANUEL H JR & ELAINA D 6855 GLOCKZIN RANCH RD BRYAN, TX 77808 01 -37 HOLY CROSS LUTHERAN CHURCH 1200 FOXFIRE COLLEGE STATION, TX 77845 01 -37 MCWHORTER, JAMES C & ANGELIA M 5712 E SH 21 BRYAN, TX 77802 01 -37 HAMILTON, IAN SCOTT & AMANDA PAIGE 1513 FOXFIRE DR COLLEGE STATION, TX 77845 01 -37 KIBLER, WILLIAM L & PAMELA V 1204 FOXFIRE DR COLLEGE STATION, TX 77845 01 -37 STEVE SCHULZE 4701 TIFFANY PARK CIRCLE BRYAN, TX 77802 Jennifer Reeves - Bill Tubbs 412 -0672 Page 1 x From: Gayla Messarra To: Jennifer Reeves; Jessica Jimmerson Date: 2/26/01 2:10PM Caller: Bill Tubbs Company: Tubbs Development Phone: 412 -0672 [ *] Telephoned [) Will call again (] Wants to see you [ ] Urgent [ *] Please call [ ] Returned your call [ ] Came to see you Re: Holy Cross Some of the things you are asking for are on the drawings - some of the questions he needs clarification as to what you are asking - He wants to set up a meeting or a time to talk with you. Cl 3 Ben Boettcher & Associates, Architects, Inc 1702 S. Market Street Brenham, Texas 77833 409 - 836- 0523(V) 409 - 836 -3519 (F) brucc(i4bba- architects.com Memorandum Bruce F. Bockhom, AIA To: Molly Hitchcock — City of College Station (4 pages via facsimile & regular mail) CC: Bridgette George -City of College Station Steve Schulze BBA file From: Bruce F. Bockhorn, AIA Date: 3/06/00 P Z Re: Holy Cross Lutheran Church — Request for Review of Landscaping Following up on our meeting of January 24 ", our office has reviewed the landscaping requirements for the development of the site in accordance with Section 11 of the City's Zoning Ordinance. Based on your instruction during this morning's telephone call to use the gross square footage of the site for our design we have arrived at the calculations shown on the attached chart. Before we proceed further we would like for your office to review these calculations and the attached preliminary site plan. Your attention to this request is appreciated. Attachments: I . Calculations of Site Landscaping Requirements 2. Site Plan — Preliminary (2 pages) G/ fiiesi active/ I Cross / mein-, to city landscaping.com January 30, 2001 Site Square Footage Lot 1 Acres 2.018 Sq. Ft. 87904.08 Divide by 1,000 SF for points needed = 87.90 Multiply by 30 points /1,000 SF = 1 2637.12 Existing Trees - Crepe myrtle 8 40 points 320 Existing Trees - Oak 9 35 points 315 Sub - total: 635 Additional Point Credits for parking 63.5 Sub -total A: 698.5 New Trees - Crepe myrtle 25 40 points 1000 NewTrees - Oak 8 75 points 600 Sub - total: 1600 Additional Point Credits for parking 0 Sub -total B: E1760 Total Points Needed = 2637.12 Total Points Obtained Existing + New = 2458.5 Total Points Still Needed = 178.62 C ST A 7i o p .Box 996 0 101 T Po Texas Avenue College Station, TX Te% 409 764 3500 9 77842 February 7, 2001 Win- C. Hutton Consultants, Inc. 4809 Saint Andrews Drive College Station, TX 77845 Living Hope Baptist Church Waterline and Fire Flow Dear Mr. Hutton, Upon looking at the buildin now should not be h g plan and the waterline in re flow se metered. The plumbing plans sow Bards li fire n flow, I realized that fire parately into the building before meterin The pi the Waterline doesn't split et c g plans show a meter near the building. civil plans show a m 3' fire The water meter, for domestic supply, v'ater eter offsite. splitting from the PPIY, is usually with a valve and box near the bui preventer, which i line ( p line' The primary fire flow line) Conti waterline from usually inside the buildin , lding after Possible con g The back flow Hues to the back flo P for fire safet With a sprinkled building the the city g the fire line becomes city It is necessary that the waterline be completely encl to the back flow preventer if it is not Profile of the waterline from closed in the easement up to the buildin inside the building. It is also nece the city to service that line in hemam line to g & up future. p to the building because it M i g ht to have a plan & Therefore we r ght be necessary for Please call if yoU have any & profile to be submitted to us for Y questions, (979) 764 -3570, the city s records. Sincer ly, —;� .. Thomas V. � Graduate Engineer chi Jr. xc: Natalie Ruiz, Develo pment Coordinator Ted MaYo, Assistant City Engineer Home of Texas A &M University 111idgette George _ Holy Cross Lutheran Church From: To: , Bruce F. Bockhorn" < Date: Bridgette George., bruce@bba-architects.cOm> Subject: 1/8/01 4:18PM <BGEORGE @ci colle Holy Cross Luth colle ge - station.t x u > F-, C - -� Brid Bette: eran Church . s A brief update on the a•• The church voted HO l r e Cross project that you helped with b •The church a main at their C.. Th have church v Proved the master present site in early last year and into include the been authorized to plan a con gregational e su mmer. addition of 10 p by our office in congregational miner. d.. A proceed with designing a g held qugust, 2000. new site earns new classrooms and a remodeling the first vote in late e A geotechnical inveshhe modelin Phase of the ex October. Of the re gation Property and existing facilities 9 of their existin passion. this We are Port. been coin g sanctuary, will now layin pleted this W a n co mplete. along I would like g out the floor plan for we are awaiting a formal mission to schedule the buildin sub Proposed e xpansion. I do ale a meeting g and working on el evations. o far review for present our plan for pate an y r equests for building Before co get to you in formation C omments. W exceptions g code °ffcials to cover the at the end will be able to or interpretations could of this week. send YO a at this you give m an ids COPY of the tim but this time for a confirmation! of the first plan and a code other things! oration! available time to meet? I Amazing what being out of classes at A us e that I will not for thanks! &M does for get to call you Your ability to focus on Bruce F. Bockhorn, AIA Ben Boettcher & Associates, Inc 1702 South Market Street Brenham, Texas 77833 979 . 83 6.0523 3519 (facsimile) 800-383-5649 QI (D tol Ll pyyj t4c. HAND DELIVERED February 5, 2001 Bridgette George Assistant Development Coordinator P. O. Box 9960 College Station, TX 77842 RE: Holy Cross Lutheran Church Condition Use Permit Dear Bridgette: BOettcher & Aiij 7 cil'teS On behalf Holy Cross Lutheran Church we enclosed application for a Conditional Use pee formally submitting the message exchange of last week, the church will be submitti the application fee under se aratr Permit. As noted in our electronic P cover. ng the check for If there are any questions re accompanies it please contact our off office. aii or the info a this submittal information that YOU for your prompt attention Sincerely, 01' Bruce F. Bockhorn, AIA CC: File Pastor Hafer Steve Schulze — Chairman, Building Committee 'her and Associates, Architects, Inc. 7702 South Market Street, Brenham, Texas 77833 -4946 979_836 -0523 fAX 970 0„ CITY OF COLLEGE E GE STATIpN Me So uth, SERVICES 1101 Texas College So Pp gox 996 Phone (97g 9e Station, Texas 7 7842 0 764 -3570 / Fax (979) 764- 3496 ME MORANDUM October 4, 2001 TO ' Steve Schulze, Via fax 862 -1478 FRO Bridgette George, Assistant Developm reviewed SUBJECT: anager BJECT HOLY CROSS LUT HERgN �CUP� - Site Plan Satff the above-mentioned oS staff review the ioned comments and sub detailin site plan as requested. mit the followi items that need to be The d. Please inf ormation for further fo l low ing page is a list rther staff review lease address the $100 processing fee for the next round of three (3) staff reviews; and Two (2) complete sets development with the revised site struction and landscaping for If there ping plans attached Proposed are comments that attach a letter a mentin Y OU are not addressing with the revised site plan' please information, please call me a t 764 tai Y questions If you have i or 3 570. Attachments: an need additional Staff review comments cc: Holy Cross Lutheran Ben Boettcher Church, 1200 F Case file #1_ &Associates °afire Drive, College Station, TX, 7784 500037 , Via fax 836 -3519 5 Home of Texas 4" University BOETTCHER ARCHITECTS ,r TEL :1 - 979 -836 -3519 Oct 15'01 8:23 No.003 P.01 Ben Boettcher &Assoc. 1� 1702 S. Market Street U /( 5 4 5 01 Brenham, Texas 77833 Q� 9 79 - 836 -0523 (V) 8 - 0 80 0 - 383 -5649 (V) 97 9- 836 -3519 (F) To: Bridgette George From: Bruce F. Bockhorn, AIA Re: Holy Cross Lutheran CC: Steve Schulze @ Holy Cross Fax: 469- 764 -3496 Date: 10/15/01 Pages: 6 (cover + memorandum + CSC letter) O Urgent 0 For Review O Make Corrections Noted O Please Reply O Original by Mail Notes: See the attached memorandum and drainage letter prepared by CSC Engineering. We have complied with all of the requests in Staff Report #3 with the exception of the Solid Waste Pick -up that still needs a determination by the City staff. For ease of checking this re- submittal we have incorporated the landscape information onto the site plan (drawing CUP -3). We will be sending the drawings with one of our student interns this afternoon or with our principle, Ben Boettcher who lives in College Station, to be delivered to your office. Thanks for your attention to this submittal. l�' I iA �r BOETTCHER ARCHITECTS TEL:1- 979 -836 -3519 VIA FACSIMILE AND HAND DELIVERED Memorandum To: Bridgette George — City of College Station CC: Steve Schulze -Holy Cross Lutheran Church BBA File From: Bruce F. Bockhorn, AIA Date: 10/15/01 Oct 15'01 8:24 No 003 P-02 Ben Boettcher & Associates, Architects, tects, Inc 1702 S. Market Street Brenham, Texas 77833 9 79 - 836 -0523 (V) 979 - 836 -3519 (F) hnicc a�hba- arc hitccts.com Bruce F. Bockhorn, AIA Re: Holy Cross Lutheran Church: Response to City Staff Report #3 Our office has reviewed the City of College Station Development Services Division Staff Review Comments No. 3, dated October 4, 2001, regarding the CUP application for Holy Cross Lutheran Church submitted on February 5, 2001. Please note the following responses to the items listed in the report: PLANNING: Note: The items listed in this edition appear to follow topic and numbering sequence from the prior list of comments. 1. Zoning Classifications - The zoning for the subject property and all adjacent Properties are now indicated on the revised Site Survey, drawing CUP -1. 2. Setbacks: The setbacks have been properly indicated on the revised Site Plan, drawing CUP -3. 3. Easements: No comment/response required. 4. flood d1 in: No comment/response required. 5. Utility Lines The locations of the existing utility lines were are shown engineering drawings prepared by Hester Engineering Company sealed 04/06/97• Where possible the lines located by the surveyor are indicated on the revised Site Survey, drawing CUP -1. 6. Water and Sewer: The response to this item is provided in the Engineerin Section, item 5 that follows. g 7. Square Foot a a of BuildinQS No comment/response required. 8. Handicapped Parking Spaces_ To comply with the directions of the cit y the stops will be removed from the existing handicapped parking spaces. h ee detail 5 on drawing CUP -3. 9. Landscape Reserve • No comment/response required. 10. Fences: The church has agreed that if a fence for screening to the residential neighborhood on the south side is required it will be provided. Additionally the BOETTCHER ARCHITECTS TEL:1- 979 -836 -3519 Oct 15'01 8:25 No.003 P.03 October 15, 2001 church intends to install trees at the south side of the existing building to screen the new facility from the neighbors. We have added the landscape improvements to the revised edition of drawing CUP -3. 11. Solid Waste Pick-up: The church continues to use city services to remove trash with containers that are placed on the curb in accordance with the normal pick -up schedule. The church will take no further action until the city makes a firm and final determination regarding this item. 12. Curb Details: The original CUP Application included information under item 1 I of the Site Plan Information Checklist where we noted the attachment of photocopies of details taken from the engineering drawings prepared by Hester Engineering Company sealed 04/06/97 and approved by the City of College to construct the existing parking lot. We have now included curb details for the remodeling work in the parking lot from our construction documents [Detail 2, sheet C -1.2] on the drawing CUP -3. 13. Pre_ sc_ No comment/response required. 14. Playground Area• No comment/response required. ENGINEERING: Note: The comments of Staff Review #3 are responded to with the original number assigned in the initial set of comments. 1. Existine and Proposed Pavement: No comment/response required. 2. Drainage: In the prior staff review Thomas Vennochi requested that a Drainage Report or Drainage Letter be provided to justify the post - development run -off. Please note that this report, as prepared by CSC Engineering and dated March 15, 2001 was previously submitted to the city for staff review. For ease of reference we have enclosed another copy of the report with this submittal. 3. Site Plan Dimensions: No comment/response required. 4. Utilities an d Easements: No comment/response required. 5. Estimated Domestic Waster and Sewer Usa e: The size of sewer line is 4" diameter. The size of the water line at entry to bldg, is 2" diameter. With regards to the location of new water meter, this comment is not applicable as the existing meter is being used. 6. City of College Station Requirements No comment/response required. Eight sets of these plans are being submitted with this memorandum. Please contact us if there are any questions regarding this response. G /files /active /Holy Cross/ memo CUP Response 10 10 0Ldoc BOETTCHER ARCHITECTS TEL:1- 979 -836 -3519 C S C March 15, 2041 Holy Cross Lutheran Church C/o Mr. ,Bruce Boekhom, AlA Ben Boettcher & Asiociates Architects, inc. 1702 South Market Street Brenham, TX 77833 Attention: Mr. Bruce Bockhom, AIA Oct 15'01 8:26 No.003 P.04 Re: Summary Drainage Report for Proposed Addition to Holy Cross Lutheran Church; College Station, Texas Dear Mr. Bockhorn: CSC Engineering do Environmental Consultants, Inc. (CSC) is pleased to submit this summary report regarding drainage issues associated with the construction of a pro posed Lutheran Church located in College Station, Texas. A brief descript o f th � o Holy Cross associated drainage impacts is presented for your review and considerat r,p n. p project and PROJECT DESCRIPTION Information concerning the project was provided by Ben Boettcher & Associates, Architects, Inc. (BB &A)• We understand that the existing Holy Cross Lutheran Church at 1200 Foxfire Drive in College Station, Texas is considering adding a building to the existing church facility. The existing church campus is situated on the southeartem correct of the intersection of Sebasta Road and Foxfirc Drive. The proposed addition will consist of a single structure that will be used for clRurooms. The Proposed addition will be a single -story structure with approximate plan dimensions of 8S ft by 10S ft and an approximate footprint area of approxinutely 8 ,900 square thee The proposed addition will be functionally connected to the existing structure. The existing church facility already has an extensive paved puking area that was constructed several years ago, along with a small stormwater detention basins and outlet structure in the southeastern corner of the property. Therefore, no new parking or paved areas are being considered in conjunction with the proposed addition. Grading plans for the proposed addition are e approximately 1 R high buiWin fired to be limited to construction of an g pad for the new addition so that the finished floor elevation of the addition will notch that of the existing structure. The site of the propased church addition's relatively flat with no significant grade changes. The surface o the site was covered with short native grasses There were no trees or other distinguishing surface features across the site. The apparent grade in the general area of the site is towards the northeast •�• �v- •'1 V/l[J Rryen. Teas 77AOt+ phone (4701 770.o0,n BOETTCH A _ TEL:1- 979 - 836 -3519 Oct 15'01 IC I Summary Drainage Report Proposed Addition to Holy Cross Ludheran Church College Station, Texas DWPACT OF WRW ADDMON ON DRAINAGE CONDPPIONS 8:27 No.003 P -05 As previous crated, the size of the new addition is relatively small compared to the overall area of the site. Specifically, the prapaed addition represents an arras of only approximately 0.2 acre. Thomfore, the incrawd rvnofFfmm the existing property is anticipated to be relatively low. The Rationed Formula wnt used to compute the increased amount of stormwater runoff due to the proposed building addition. The general equation for the Rational Formula is well known: Q -CIA where Q - discharge of stormwater in units of cubic feet per second (cfs) C - coefficient that represents the average runoff characteristics of the land cover widiin ttMO drainage scan of interest, i.e., " runoff nnefFicient. which is dimensionless I - rainfall intensity in units of inches per hour (in/hr), and A - area of the site that contributes to the stormwater runoff in units of acres The runoff Coefficients or "C" values were computed for both pre- and post- develupmCri! cunditions. The coetTlcient for the pt , e- development condition was determined based upon the land cover category listed in Table Ill -1 of the "Drainage Policy and Design Standards (DPDS)" manual of the City of College Station, Texas. A range of C- values of 0.40 to 0.70 is listed in the referenoed table for the "Landscaped Areas" with an "Average Slope in the range of 1% to 3.5%. Since the existing ground surface has a relatively Jehallow cdnpe, a C -value of 0.6 was selected for use for pro - development cover. The post. development C -value was determined from the referenced table for a building roof to be 0.9. Since the area of the church campus is relatively small, a minimum time of concentration of 10 minutes was used to compute rainfall intensity for the dssign storm recurrence interval of 3S years. Using the intensity- duration- frequency curves developed by the Texas Department of Transportation, rainfall intensity of 9.86 inches was calculated for the design storm event with a "return periods" of 25 years. Theroforc, the increased stormwater runoff quantity attributable to the new building addition can be calculated using the Rational Formula Runoff with the values previously discussed values as indicated In the following equation: Q " (Com4evelopmW— C Pt**Velopment)' 1 ` A ..,substituting the previously discussed values yields... 2 BOETTCHE AR CHIT ECT S TEL :1 - 979 -836 -3519 Summary Drainage Report Proposed Addition to Holy Cross Lutheran Church College Station, Texas Q - (0.9 - 0.6)' 9.86 inches " 0.2 Q In 0. 59 cubic feet per second (cfs) Oct 15'01 8 :28 No-003 P-06 The incaeu*M tlnw of 0.59 cfs is considered very minimal and should be easily accomrnodatod by the existing detention facility, Therefore, we do not believe any new detention facility should be required at the site. in addition, aurnsnt drainage. plena eseoeiated with the new building construction anticipate capturing the roof drainage in a new underground piping system and routing the 10 inch diameter discharge pipe for the roof System directly to the existing storm water detention basin. The proposed piping system and the grading associated with the new building construcdon should improve the control and managnrnont of +tarrnwator at the site. We sincerely aptxuciatc the opportunity to work with the Holy Cross L,uthoran Church, es well as Be n Boettcher &Associates on this project. please do not hesitate to contact me at (979) 778.28 10 should you have any questions or If we Can provl&you with any additional information. Sincerely, CSC ENGINIERIKC dt ENMONMENTAL CONSULTANTS, ENC. M. Frederick Conlin, Jr., P.E, Senior Engineer e MFC:mf Via Fax "'.»....+.. »...... _ 4�t4e1' 3