HomeMy WebLinkAbout00070680V lb
HAND DELIVVRED
Memorandum
Ben Boettcher & Associates, Architects, In,
1702 S. Market Street
Brenham, Texas 77833
979- 836- 0523(V)
979- 836 -3519 (F)
bruce(t4bba- architccts.com
Bruce F. Bockhorn, AIA
To: Bridgette George — City of College Station
CC: Steve Schulze
BBA File
From: Bruce F. Bockhorn, AIA
Date: 3/7/01
Re: Holy Cross Lutheran Church: CUP Hearing- Response to City Staff Report
Our office has reviewed the Staff Review Comments No. 1 from the City of College Station
Development Services Division regarding the church's CUP application submitted on
February 5, 2001. Please note the following responses to the items listed in the report:
PLANNING:
1. Zoning Classifications: The zoning for the subject property and all adjacent properties
are indicated on the revised Site Survey, drawing CUP -1. [Note: Per our telephone
conversation of this morning we are re- submitting 10 prints of this plan with this
response.]
2. Setbacks: These are indicated on the revised Site Survey and Site Plan, drawings C1JP - -I
and CUP -2.
3. Easements: These indicated on the revised Site Survey and Site Plan, drawings CUP -1
and CUP -2. [Note: We are enclosing 10 prints of CUP -2 with this response.]
4. Flood Plain: The property is not in a 100 -year flood plain as certified by the surveyor on
drawing CUP -1.
5. Utility Lines: These are indicated on the revised Site Survey and Site Plan, drawings
CUP -1 and CUP -2.
6. Water and Sewer Demands: Demand calculations provided by Brazos Valley
Engineering are summarized on drawing CUP -2.
7. Square Footage of Buildings: These were previously indicated on the Code Plan,
drawing CUP -5, submitted with the original application.
8. Handicapped Parking Spaces: The proposed drop off space in front of the new building
will be taken as a bid alternate to the project. If the improvement is constructed the
church will provide the same number of handicapped spaces and include this design in
the construction document set to be reviewed for ADA compliance. Please refer to the
revised Site Plan, drawing CUP -2.
March 7, 2001
9. Landscape Reserve: This information is indicated on the revised Landscape Plan,
drawing CUP -3.
10. Existing Fences: The existing fence for the playground on the west side of the existing
building was indicated on the Site Plan, drawing CUP -2 submitted with the original
application.
11. Solid Waste Pick -up: The church uses city services to remove trash. Containers are
placed on the curb in accordance with the normal pick -up schedule.
12. Curb Details: The original application was accompanied by a three page write -up
outlining responses to the issues of the CUP Application. Please refer to item 11 under
the section, Site Plan Information Checklist. With that submittal we attached
photocopies of details taken from the engineering drawings prepared by Hester
Engineering Company sealed 04/06/97 and approved by the City of College to construct
the existing parking lot.
13. Pre - school: Please refer to our usage chart that was shown on page one of the three page
write -up that accompanied the original application.
14. Playground Area: This area was previously indicated on the revised Site Plan, drawing
CUP -2. The playground will remain at this location after the expansion.
ENGINEERING:
1. Existing and Proposed Pavement: The existing concrete pavement was shown on the
prior Site Survey, CUP -1. The proposed pavement plan is shown on the Site Plan,
CUP -2.
2. Drainage: CSC Engineering (College Station, Texas) is preparing a drainage calculation
report. This will be submitted to the city for staff review on March 8, 2001.
3. Site Plan Dimensions: This information was shown on drawing, CUP -2 that was
included in the prior submittal.
4. Utilities and Easements: Please refer to the revised Site Survey and Site Plan, drawings
CUP -1 and CUP -2 that accompanies this memorandum.
5. Estimated Domestic Waster and Sewer Usage: Demand calculations provided by Brazos
Valley Engineering are summarized on drawing CUP -2.
6. City of College Station Requirements: This note is included in the General Notes on
drawing CUP -2.
ELECTRICAL
1. Conduit Installation: The church will comply with this item.
2. Electrical Load Service: Please refer to the attached information provided by Brazos
Valley Engineering.
3. Easem Transformer is being located within the existing utility easement.
MISCELLANEOUS:
1. Irrigation System: This item is noted on the revised landscape plan submitted with this
response.
2. Back Flow Devises: The church will comply with this item and it is noted on the
Landscape Plan, drawing CUP -3.
There have been no major plan changes since the prior submittal that require additional
review by the staff. Please contact us if there are any questions regarding this response.
G /files /active /Holy Cross / memo CUP Response 03 07 01.doc
WATER SUPPLY CAL'C'ULATION
STATIC PRESSURE: 50 psi
FU
MIN
TOTAL F.U.: 133
AVG
NEW SANITARY SEWER
GPM: 77
0 GPM
77
WATER METER: 1--1 /2"
NEW DOMESTIC WATER
133
50 psi PRESSURE IN MAIN
77
<1
8.5 psi LOSS THRU METER
2.3 pal LOSS THRU TAP
15 psi FIXTURE LOSS AT END
-- psi LOSS THRU BACKFLOW
PREVENTER
5.2 pal STATIC HEAD LOSS
19 psi AVAILABLE PRESSURE
PIPE LENGTH (TAP TO METER)
20
ft
PIPE LENGTH
350
ft
VERTICAL LENGTH
12
ft
EoUIVALENT_LENGTH OF FITTINGS
140
ft
TOTAL DEVELOPED LENGTH
522
ft
PRESSURE
MAX. ALLOWABLE LOSS TOTAL
AV ILABLE&
LENGTH
19 1291
522 ft x 100 = 3.6 psi
(PER 100 ft OF PIPE)
PLUMBING LOAD SUMMARY
DESCRIPTION
FU
MIN
MAX
AVG
NEW SANITARY SEWER
114
0 GPM
77
<1
NEW DOMESTIC WATER
133
0 GPM
77
<1
HOLY (:KU55 tLtL: I KIUAL UtMANL)
LOAD SUMMARY: EXISTING 5,850 SF
NEW 8,900 SF
LOAD (WATTS)
GENERAL RECEPTACLE, CONNECTED 13,140
IDERATES:
1 ST 10,000 a 100%
REMAINDER Q 50%
LIGHTING a 3 VA/SF
MOTOR LOADS W/ GAS HEAT
5% CONTINUOUS LOAD
5% LARGEST MOTOR
XISTING LOADS
OTAL DEMAND
120 208 VOLTS
10,000
1,570
26,700
85,401
3 PH
6,675
4,954
32,800
168,099
467
AMPS
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
October 19, 2001
TO: Steve Schulze, Via fax 862 -1478
FROM: Bridgette George, Asst. Development Manager
SUBJECT: HOLY CROSS LUTHERAN (CUP) - CONDITIONAL USE PERMIT
Staff reviewed the above - mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review and approval
of the plans:
Six (6) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached;
Two (2) revised site plans; and,
One (1) landscaping plan.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764 -3570.
Attachments: Staff review comments
cc: Holy Cross Lutheran Church, 1200 Foxfire Drive, College Station, TX, 77845
Ben Boettcher & Associates, Via fax 836 -3519
Case file # 1- 500037
VIA FACSIMILE AND HAND DELIVERED
Memorandum
Ben Boettcher & Associates, Architects, Inc.
1702 S. Market Street
Brenham, Texas 77833
979 - 836- 0523(V)
979 - 836 -3519 (F)
b ruce!ii)bba- ar chitects.com
To: Bridgette George — City of College Station
CC: Steve Schulze -Holy Cross Lutheran Church
BBA File
From: Bruce F. Bockhorn, AIA
Date: 10/22/01
Re: Holy Cross Lutheran Church: Response to City Staff Report #4
Our office has reviewed from W. R. Tubbs Construction, Inc. a copy of the Staff
Review Comments No. 4 from the City of College Station Development Services
Division regarding the church's CUP application submitted on February 5, 2001.
Please note the following responses to the items listed in the report:
PLANNING:
1. Zoning Classifications: No comment/response required.
2. Setbacks: Although the comment regarding setbacks was included with item #5 of
the staff review, it is responded to in this section. Please note that the CUP -1
drawing was produced Kerr Surveying Company and a check of their CADD file
determined that a layer was inadvertently turned off. The property line is clearly
shown and is included in the partial photocopy attached to this letter. We did
note in reviewing this drawing that Kerr Surveying indicated a 25' setback at the
rear of the property that should be 50' as correctly indicated in our CUP -3
drawing that we submitted to you with our response to Staff Review Comments
#3. We will instruct Kerr Surveying to correct this setback at the rear of the
property.
3. Easements: No comment/response required.
4. Flood Plain: No comment/response required.
5. Utility Lines: The locations of the existing utility lines are shown on the
engineering drawings prepared by Hester Engineering Company sealed 04/06/97.
A partial photocopy of this sheet is attached . We have also attached photocopies
of the city's utility line location drawings that were provided to us in a
Note: Boettcher & Associates did not receive an original transmission of this document. Facsimile
transmission of the report was forwarded by W. R. Tubbs Construction and received 10/20/01.
2 A full size print will be provided with the hand delivered copy of this response.
' A full size print will be provided with the hand delivered copy of this response
October 22, 2001
preliminary meeting with Jeff Tondre. As noted in our prior response the size of
sewer line is 4" diameter and the size of the water line at entry to bldg. is 2"
diameter.
6. Water and Sewer: The location of the existing meter is shown on the attached
facsimile transmission from Brazos Valley Engineering.
7. Square Footage of Buildings: No comment/response required.
8. Handicapped Parking Spaces: No comment/response required.
9. Landscape Reserve: No comment/response required.
10. Fences: No comment/response required.
11. Solid Waste Pick -up: No comment/response required.
12. Curb Details: We still have not received a copy of the details noted in this or prior
reviews. Please note that we intend on complying with City of College Station
standards.
13. Pre - school: No comment/response required.
14. Playground Area: No comment/response required.
Eight sets of these plans are being submitted with this memorandum.
Please contact us if there are any questions regarding this response.
G /files /active/Holy Cross /Memo CUP Response #4 10 22 01.doc
2
Ben Boettcher & Assoc.
1 702 S . Market Street
Brenham, m, Texas 77833
979- 836- 0523(V)
• 800- 383 -9 ()
979- 836 -3513519 (FF)
• brace i bba- architec (e -mail)
Ben Boettcher & Assoc., Architects, Inc.
To: Bridgette George Fax: 979 - 764 -3496
From: Bruce F. Bockhorn, AI Date: 10/22/01
Re: Holy Cross Lutheran Pages: 10
CC: Steve Schulze @ Holy Cross (via
facsimile) 0
W. R. Tubbs @ Tubbs ✓ /� n/
Construction (via facsimile)
0 Urgent 0 For Review ❑ Make Corrections Noted ❑ Please Reply ❑ Original by Mail
Please find attached our responses to CUP Staff Report #4. We will be hand
delivering the full sized prints noted in the memorandum to your office.
Thank you for your prompt attention to this request.
Please deliver to Bridgette George upon receipt.
F . . . . . . . . . . . . . . . . . . . . .
f lee t y l p ,, 3
r a s
BOETTCHER ARCHITECTS TEL :1 - 979 -836 -3519 Oct 22'01 14:28 No.015 P.01
t1t1.9, r cu,: $r.Jqlay tibu 4r 5 1-F_�4 -CBE: pige 2 X :
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 0960
College Station, 7exas'7842
P�one (9791764 - 35701 Fax 1,979) 764 - 349t
MEMORANDUM
October 19, 2001
TO: Steve SO% Ze, Via fax 362 -1475
FROW Bndgstte George, Asst. Development Manager
SUBJECT' HOLY CROSS LUTHERAN (CUP) -CONDITIONAL USE PERMIT
Staff reviewed the abo'oe- mentioned site plan as requested. The f0owing page is a !'St of
staff review comments detailing items that need to be addressed. Please address the
cownwits ant evbm:t the following infoireation for further staff review and ap. ^roval of the
platy
Six Ve complete sets o construct' r, documents for tie
"d evelopment ;vith the revised s ite and landscaping plarts attached.
f Two (2; revised bite ptatns; and,
One (1) landscaping plan.
proposed
if there arc u,rnmerits that you are not addieus;ng with the revised site plan, please attach a
letter explaining the details. if you have any questions or need aad,tonsi inirirmation, please
ca ,l me at 'X42570.
Attachments staff rbL ;ew comrlent4
Co. 11cry Cross Lutheran Church, 1200 FoKflte Drive, Gollege Stavon, TX. 77845
Ben 6eottcher $ Associstes Via fax 836 -3519
Case file # 1 5 =37
BOETTCHER ARCHITECTS TEL :1 - 979- 836 -3519 Oct 22'01 14:29 No.015 P.02
";I Z" r v14: Br :ogtttr 6NvQv Pigs 3 or
STAFF REVIEW CO MMENTS
140.4
Pm eut. HOLY CROSS LJ ;CUFJ- '- LSE PFRA/`!1 J)1 -037)
PLANNING
1. OK.
2 OK
3 OK.
4 O h_
S it appears the leyer with the property line was turned off on this :: JP cony. Please
shcnv the prcperty tine on the next submittal
The mains can be seen on sheet CUP -1. bit the projects service ! nes should 01 30
be shown. Please show and descvbe the size of the chu Yvaty and serves
service lines,
6. Please idenli!vthe !ccatlor+ of the existing water meter.
7. OK
6, OK
9 GK.
10 OK.
11 OK.
12 A copy of ciao ng options reill be seat with these corn-nerlts. Fiease use one of
these standards.
13. 0K.
14 OK.
Revie by molly HitchCOCK Dale: Uctober 13. y1
140M Airy ohtnpc.s to the 11M15 Iti ta77E "ot Cn Oil r4 -v-1r. f C) Ih. :., at CoCtx x 3' t '.$ls' Lr C \pIRi-Qd .� pt✓ reu
Ira PIWltct IoNe a+•4 'L aWtd' att yv t Y1;ins A ^y ?3' Marine: y;4 G, •. tlal ^a If nc• ee<:•r•. • -i cut to t'* Cry 14
CorytrN�1• ! :OMp'els!y ss'•�L.R.
3eff RO.Iew COM)M4 1'1 PNpt % 4 '
+',PZT "r.1tu. :o
HAND DELIVERED
Memorand
Ben Boettcher & Associates, Architects, Inc
1702 S. Market Street
Brenham, Texas 77833
979 - 836 -0523 (V)
979 - 836 -3519 (F)
bruce Mbb archite cts.com
Bruce F. Bockhorn, AIA
To: Bridgette George — City of College Station
CC: Steve Schulze
BBA File
From: Bruce F. Bockhorn, AIA
Date: 3/7/01
Re: Holy Cross Lutheran Church: CUP Hearing- Response to City Staff Report
Our office has reviewed the Staff Review Comments No. 1 from the City of College Station
Development Services Division regarding the church's CUP application submitted on
February 5, 2001. Please note the following responses to the items listed in the report:
PLANNING:
1. Zoning Classifications: The zoning for the subject property and all adjacent properties
are indicated on the revised Site Survey, drawing CUP -l. [Note: Per our telephone
conversation of this morning we are re- submitting 10 prints of this plan with this
response.]
2. Setbacks: These are indicated on the revised Site Survey and Site Plan, drawings CUP -1
and CUP -2.
3. Easements: These indicated on the revised Site Survey and Site Plan, drawings CUP -1
and CUP -2. [Note: We are enclosing 10 prints of CUP -2 with this response.]
4. Flood Plain: The property is not in a 100 -year flood plain as certified by the surveyor on
drawing CUP -1.
5. Utility Lines: These are indicated on the revised Site Survey and Site Plan, drawings
CUP -1 and CUP -2.
6. Water and Sewer Demands: Demand calculations provided by Brazos Valley
Engineering are summarized on drawing CUP -2.
7. Square Footage of Buildings: These were previously indicated on the Code Plan,
drawing CUP -5, submitted with the original application.
8. Handicapped Parking Spaces: The proposed drop off space in front of the new building
will be taken as a bid alternate to the project. If the improvement is constructed the
church will provide the same number of handicapped spaces and include this design in
the construction document set to be reviewed for ADA compliance. Please refer to the
revised Site Plan, drawing CUP -2.
D1 -� '1
fit COM
LEGAL NOTICE
DATE TO BE PUBLISHED: WEDNESDAY, FEBRUARY 28, 2001 ONLY
BILL TO: The City of College Station
P.O. Box 9960
College Station, TX 77842
REFERENCE ACCOUNT # 11106712 CREDIT CARD # 5405- 8231 - 9379 -5783
NOTICE OF PUBLIC HEARING:
The College Station Planning and Zoning Commission will hold a public hearing to
consider a CONDITIONAL USE PERMIT AND SITE PLAN for 1200 FOXFIRE
DRIVE.
The hearing will be held in the Council Room of the College Station City Hall, 1101 Texas
Avenue at the 7 :00 p.m. meeting of the Commission on Thursday, MARCH 15, 2001.
Any request for sign interpretive services for the hearing impaired must be made 48 hours
before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735-
2989.
For additional information, please contact me at (979) 764 -3570
JESSICA JIMMERSON
Staff lanner
" "
FILE COPY o. -3?
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
February 27, 2001
TO WHOM IT MAY CONCERN:
Re: Consideration of a CONDITIONAL USE PERMIT AND SITE PLAN request for
1200 FOXFIRE DRIVE,
NOTICE OF PUBLIC HEARING
This is to notify you that the City of College Station is considering a CONDITIONAL
USE PERMIT AND SITE PLAN request for the following property:
Applicant: SCHULZE, STEVE
Subject Property: 1200 FOXFIRE DR
(See attached location map.)
Proposed Use: FOR AN ADDITION OF EDUCATIONAL SPACE
TO THE RELIGIOUS FACILITY
The Planning and Zoning Commission will hold a public hearing on Thursday, MARCH
15, 2001 at 7:00 p.m. to consider the request. The public hearing will be held in the City
Hall Council Room located at 1101 Texas Avenue South, College Station, Texas.
All owners of the subject property and property owners within 200 feet of the subject
property have received notification of this request.
Any request for sign interpretive services for the hearing impaired must be made 48 hours
before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735-
2989.
For additional information, contact the City Planning Office, (979) 764 -3570.
JESSICA JIM1bIERSON
Sta Planner
0
3
w
oo
N
O
r --I i — 1 — _L_ 1
U7 p W N �_ O _. ;
cn 00 bdw 0o0" O"-
'o� r *T,
V 1 cn v ,T O cn
CD
O� O O� zn
z r z z o
d c ' � r�
w 0
CD r x 4.
CD 0
C
al
41
3
N
N
II I
-1 S
ID b
� vl
N
0
.F
- --
Ol o EP 0-
E N n o �
° o�om':o
O mm ° = -
_
. w7o - ' gym
o ° oo 3
9 (c -
m Q 3� =�
m w
_ , o m <
o n o k 3 o d
� m °-- c o-m^. m
o 3 i ' o m. om m
o S m m
tn_ »ca o c
w3�o�m o.
d w y w N
.0
0
w ymcri »' p ' -
n o 3 0 0' n
nm ° 3
a w w w
m m
oo, > >wn
-
o ° ���o = w l
m --
=aaym�o
3 w
w
O cn 'o 3
nv ms =m -
n m N A n n
o w ° 2 n 2 3
w m ° o m
�o
a o
—
n m c 3
o w S w� 3 ❑� ,:
ai3 ° x. vi
--
� = =w o w
m m =
wwwwna< - - - --
3 ° w
m Q C�oo
ta- I
?
i
i
i
i t C17
A
W N 1
O
"C tnP
tz
r �N
�� xx j C7�
��ro�
tr7o
N Cn�
0 o C17
�
n
c a < O
r�
ID ID a
3
v �
�
N
+N m
M M
.p
Z
0 ivy
O
CL
CL
p o
O m
X m ^ N
y� U
cS
D
Z
m c
❑❑,❑ ❑f7
CD
y
N K m o m
n
c a < O
ID ID a
3
v �
t
° 3 -_
+N m
M M
w
w
3 -
C
3
SD
W
o
(p
N
> y
N
O
m
?.
y
Un
[ ❑❑❑❑ m
n
0
CO
N m m
o
=_`_° o
n
n
R1 3 0
c !D
m
N or m C.
N
o -.
=�
<
O � 7
� m
v
y
=
m
o
a o
m
m d
1 1 I
o o CD
T
m X
N
m
0 C, r C,)
v a w
m�
Q O-N
N
su
�O N
Q
CD
m c
rtrtrt * * rtrt�•"
CFP
�
y
.
a
y
3
v �
t
+N m
M M
C
Z�Z
(p
J
O
�
S
y
Un
i
rtrtrt * * rtrt�•"
U)
O
3
W
co
V
N
O
0
mwF Ut W N i O f0 �W V O � i W �N G Z
r_
a zi
y � w
r�
t=D m lit N O N
m J S J V n
c! � '.t7 r--, yam+ > �+ _
O
CD
C F
00 y
CD
Y D! O
CD 0
< z w RP n- O O
m3 > n v'"' O X
O
C v
CD
y y
oo --I
_r N Q
Z
0
N
m
v
T
-� C
9 � I
� a
O !
O
1
11 O
° 2 O m a
c o x
O mmoa0�ic
• w � a to°m2
o m
-
� tD -
m
> > � o m
onow fow
3 o a
m c a o_a
_ °n c
n 3 m o m 3 a
w y m fA m
- o
0 x- nm3
3�3 m
m'w3oT9. ni
m v y N m l
Hm -'
.0 y 9 m n
3 M . m m
_ m 7 fT y
S.
o c 9 o d
m »
° na y m o p
y m 3 w
oR&
0 - m j m
RA ,.
J
n 3
n E N n'° t a
- o 3 ° c 3
D o m
d °�3fDm3 I ,
a c m 3 ..
n 33 W K.
- m
m m a -
v 3 m
� � t
7 _ o
CD
moon x
y x N o m
D c a < 0
° a v Z n CD
D o
m w 3 -
d w_
D w
m o
Cl) 7 y
_ N
tD
w n
C ( C
o 0
c 3 y O
n c N a
w N m N d
O Q
O m- 0
CD
<
O m
w Q
C
0 s
y = w
9k
0 N J
CD m w
�O O O o W
41 U
CD
`D 'O ° 0.2111
.0 Q w
� I DW iooy3
�. Q N (!1
O 2 N
1 0 N
n
�: I I I
IDS
to w
w
O
l a
.r a
o\�
~ m
S
W m
N
�L J
�
O N
O
e
m
I
0137
LEGAL NOTICE
DATE TO BE PUBLISHED: WEDNESDAY, FEBRUARY 14, 2001 ONLY
BILL TO: The City of College Station
P.O. Box 9960
College Station, TX 77842
REFERENCE ACCOUNT # 11 106712 CREDIT CARD # 5405 -8231- 9379 -5783
-----------------------------------------
NOTICE OF PUBLIC HEARING:
The College Station Planning and Zoning Commission will hold a public hearing to
consider a CONDITIONAL USE PERMIT AND SITE PLAN for 1200 FOXFIRE
DRIVE.
The hearing will be held in the Council Room of the College Station City Hall, 1101 Texas
Avenue at the 7:00 p.m. meeting of the Commission on Thursday, MARCH 1, 2001.
Any request for sign interpretive services for the hearing impaired must be made 48 hours
before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735-
2989.
For additional information, please contact me at (979) 764 - 3570.
JESSICA JIM?v1ERSON
Staff Planner
e n E MAILED
l,zla�
cn
0
3
D
c
r�
m w
— 1
U1
1
A
_
W! N
aZ
Cf) 3
Si
�+
to
0
CD
c
4
CD vi
mw'3Onvn
ti
r 1
0
r� a0
D o
0
1
Z
a c
SD v
0 0
3 N
25 m
N N
0
y
m
CD
CD
y d �
O
PF
j
Ci7 ~�
O C "
y o
� Ro
n v
ID I
Q !
F
^� O
t N
7
0
0 0 o go
C m O=
w w D 0 �_ A N
1 0 P 30 y E _"
3 >>>
0 o
'. �o�
ono m a `w
w m y y °.m
y Q OM - my
o . m n c
m- ^ ° o
o 3 y o 3 g
n
6 m ' m m
J ? y w m
N y N fA
a O 3 0° a l
o o
_
W �,Y}
-4 M Ln j W N 1 r
7
CD
030
W
J > b D
00 Z 3
n
�C m
mdomom I i I I ',
Z
N
0 Co
O =
m (�
0
7 X
xcm
O Cl)
co
N Z
❑❑ ❑l ❑�_ N
X o o o 0
m
D C° <v
d CD N CD m 'O
CD
H Q N `2 a
O 0
3
d w_,
3 w Q
SD O
(n 7 N
CD
m
m 0
❑❑❑❑ m
n
V - D D D
m E f0 0
3
7
n SD N O
d G lD a
m ia m A
�a
y O m
7
3 m
w , Z
O (D 7
J �
M 7
N J »
w n o
m F d
��8 oo�D
msz 2 R
CD O y w m m
CD
. ED C, A7
� �x g =o y 3
n y D
x'O w m
CL
D
D �
OC`
Si
�+
O
-
c
m
mw'3Onvn
ti
r 1
3
Z m
�
w m
wa
4
c
y "Dm
-
-�
!- f
!ll
m
< m
co
Q v
O
Nn .
R
dN d
3
w'N� N C
a�o�m��
o m
m
=3
n3(O.y
m
1
m o - m
03
v d n c 3 y -
6 w 3 j X. N 2
1
w�� 3.
_oo
i
mdomom I i I I ',
Z
N
0 Co
O =
m (�
0
7 X
xcm
O Cl)
co
N Z
❑❑ ❑l ❑�_ N
X o o o 0
m
D C° <v
d CD N CD m 'O
CD
H Q N `2 a
O 0
3
d w_,
3 w Q
SD O
(n 7 N
CD
m
m 0
❑❑❑❑ m
n
V - D D D
m E f0 0
3
7
n SD N O
d G lD a
m ia m A
�a
y O m
7
3 m
w , Z
O (D 7
J �
M 7
N J »
w n o
m F d
��8 oo�D
msz 2 R
CD O y w m m
CD
. ED C, A7
� �x g =o y 3
n y D
x'O w m
CL
D
D �
OC`
Si
�+
O
-
c
m
v..
C3
ti
r 1
3
Z m
�
w m
wa
4
c
tft
i
!- f
!ll
m
< m
N D'
cn
T
O
CA)
co
V
IS
N
s
CID
v tS1 A y O 'Cb cn p Oo �I CJl A W N i C
(Jl A W N O
' '� °tn ��n
(0 � �
�� OWO nNxO
..+ W
m� tT, a Ci7 r ti7 O 's] O ca 0 a
O 4n m O;o C)On :D��
CD y � �O � 3p �opN
4 p > t- y �n y � 0 U)
00 . y ��.yy r a = x m=
rn � � W V y r � i � N
<.Z N N t_ z� xcom-
wQi �� y �' H m v
v D
d 00
I
o `°' h7 00 a n N o
m N r LA I '� I Z
Y C
0
3
m
9
n
O Z
3 m
9 m
� o
N
m
F 3
a
m
F
m 0 - v+ O w 4
w cn � o. o �
o�
< c o x
.o y c
O mdov�
pi
m 0 0 0 3_ j y
� = .gym
3- 5 0 y 0 0
p1 » o o' ,- <
onow �w
n
E_. y C 3 o c m W I
3
2 .
w o v m
=o ° cm w na
m o y 3 n
m m w g
o 0 H o »
a o 3 0 n
x o n 3
3 a 3 m y i
� ` w
w w 3 o�oa n
- •so v y m w
w
n
o n �
o
u,omv+-
m »
cn nN
y
a O y o J o m
o w l 3 %
w m o m -o c» w
n3(o c 3
3
a33 0
�n�i lny 3- 3'
v
a o
U S m w_ m Q
3
�'" m o
- B m 0 w.
0
rn C
CD
g m p 0 0 0
c v D 0.
a <0a lz
d 'm N m N 'O
CL N 42 n (D
N ' � O O
m w = 3
N T.
3 w Q
ti w
CID
I mo' z
n
o.
❑❑❑ m
�aI(D
o m m m
n ° 3 o
n C m Q
y W W fD a
N 0 O 4
N m
� 'a G
3 0 �
w ?
o CID �
� m
' a , o
o N 0 o'
!D lD v
'13
CID
(Dy `� R yn
y
CID
om3
_ tD 111 vi p ` b - O
(D
C
w a,
0
ID
t
T4
I
Q
O
d
a +� �. 0
V
Vl
C)
ttt
'f
0
W
O
3
W
00
V
4
c
N
O
O
Q c
l Cn
W
OD
V '�t
CD
- - � J �� J
- - ^^
3
li] N
m
CL
w�— (D o
6 8 - (D O Q
Q Q (a
v'
w
Im (D � m
�i
, U) O C
�
r 7
w
O O a
v C -' -' -
��O�+ x ^ m m
Z
00
W L: z co G)
W y +111 3 X rn m
m v
Vj m p (n
°°
y � v D
CD
o�
�I
I m
I h Z
II
II
'I II
m
I
CD
00
w
CD
5 X w O w x
C 'R
v
CD m w w -0
O N `z (D
a
21
n O
0 3
w. 0
mi
m'
o
z d
3 w -
m Q
U)
CD
3
a
2 31 D 31
O p w S
D O
II I
w w
n C N a
CD
N m (D Cl
y 0 2
O
o CD
3 <
° a m
a' m
c a c
�
-- ---
- - j 90!
S 3
%
ma °
N —
o
m o m � -. 7,
o . _
m Q 3� >>
m�
I i
...
w l 4 o
w m w
y.o °c'mo.n
� c o c
- -
---
-
j
?o o 11 3
N y .,
Y - -- 2CD Q �m wN
D' m c
y'd
m
o
i
'� ' :r O fD
r� Iw a,
��3c�ma,
m m 3
r° aH
m o
mo
�
i
II
CO r(�
- m _. x
c � � � n m
. n v m m - m
n m
3
__
Q \�
m vi
am (TN .6 0 9
S
_ E»
- m o
m
Un
o
7
O
01
M
O,
a
A
3
Bridgette George - Holy Cross Lutheran (1200 Foxfire Drive) Page 1
/ l U' - yt,.
From: 'Bruce F. Bockhorn, AIA" <bruce @bba- architects.com>
To: < jtondre @ci.college - station.tx.us>
Date: 5/5/00 9:36AM
Subject: Holy Cross Lutheran (1200 Foxfire Drive)
During a recent meeting with the church we discussed the extension of the sewer line to service the
larger property they may be acquiring from Mr. Ledbetter. you and I spoke about this during the meeting
we held in early February.
Could you confirm the approximate size of this line and the depth that it will need to be placed? Is there
an approximate cost per linear foot that we should anticipate incurring for this extension?
Your prompt attention to this request is appreciated.
Bruce Bockhorn, AIA
Ben Boettcher & Associates
800 - 383 -5649
409 - 836 -3519 fax
CC: " Bridgette George" < BGEORGE @ci.college - station.tx.us>
Memorandum
Ben Boettcher & Associates, Architects, Inc
1702 S. Market Street
Brenham, Texas 77833
409 - 836 -0523 (V)
409 - 836- 3519(F)
bruce(a)bba -arch itects.com
Bruce F. Bockhom, AIA
To: Molly Hitchcock — City of College Station (4 pages via facsimile & regular mail)
CC: Bridgette George -City of College Station
Steve Schulze
BBA file
From: Bruce F. Bockhom, AIA
Date: 3/06/00 P Z
Re: Holy Cross Lutheran Church — Request for Review of Landscaping
Following up on our meeting of January 24 ", our office has reviewed the landscaping
requirements for the development of the site in accordance with Section 11 of the City's
Zoning Ordinance. Based on your instruction during this morning's telephone call to use
the gross square footage of the site for our design we have arrived at the calculations shown
on the attached chart.
Before we proceed further we would like for your office to review these calculations and
the attached preliminary site plan. Your attention to this request is appreciated.
Attachments:
1. Calculations of Site Landscaping Requirements
2. Site Plan — Preliminary (2 pages)
G /files /active /Hoty Cross /memo to city landscaping.com
January 30, 2001
Acres
Sq. Ft.
7Divide e Square Footage Lot 1 2.018 87904.08
by 1,000 SF for points needed =
87.90
Multiply by 30 Ls 1,000 SF =
2637.12
Existing Trees - Crepe myrtle
8 40 points 320
Existing Trees - Oak
9 35 points 315
Sub - total:
635
Additional Point Credits
for parking
6
Sub -total A:
New Trees - Crepe myrtle 25 40 points
1000
NewTrees - Oak 8 75 points
600
Sub - total:
1600
Additional Point Credits for parking
160
Sub -total B:
1760
Total Points Needed =
2637.12
Total Points Obtained Existing + New =
2458.5
Total Points Still Needed =
178.62
E
93
CITY OF • STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
February 12, 2001
TO WHOM IT MAY CONCERN:
Re: Consideration of a CONDITIONAL USE PERMIT AND SITE PLAN request for
1200 FOXFIRE DRIVE.
NOTICE OF PUBLIC HEARING
This is to notify you that the City of College Station is considering a CONDITIONAL
USE PERMIT AND SITE PLAN request for the following property:
Applicant: SCHULZE, STEVE
Subject Property: 1200 FOXFIRE DR
(See attached location map.)
Proposed Use: FOR AN ADDITION OF EDUCATIONAL SPACE
TO THE RELIGIOUS FACILITY
The Planning and Zoning Commission will hold a public hearing on Thursday, MARCH
1, 2001 at 7:00 p.m. to consider the request. The public hearing will be held in the City
Hall Council Room located at 1101 Texas Avenue South, College Station, Texas.
All owners of the subject property and property owners within 200 feet of the subject
property have received notification of this request.
Any request for sign interpretive services for the hearing impaired must be made 48 hours
before the meeting. To make arrangements call (979) 764 -3547 or (TDD) 1- 800 -735-
2989.
For additional information, contact the City Planning Office, (979) 764 -3570.
JESSICA 7IMMERSON
Staff Planner
ILJ : i 1
01 -37
ARC / AMS
CORPORATE PROPERTY ASSOC 4
PO BOX 30001
COLLEGE STATION, TX 77842
01 -37
HAMILTON, IAN SCOTT &
AMANDA PAIGE
1513 FOXFIRE DR
COLLEGE STATION, TX 77845
01 -37
LETBETTER, WILLIAM D
2348 ECHO CLIFF CT
ATLANTA, GA 30345
01 -37
BEN BOETTEHER & ASSOCIATES
1702 SOUTH MARKET STREET
BRENHAM, TX 77833
01 -37
GLOCKZIN, EMMANUEL H JR &
ELAINA D
6855 GLOCKZIN RANCH RD
BRYAN, TX 77808
01 -37
HOLY CROSS LUTHERAN CHURCH
1200 FOXFIRE
COLLEGE STATION, TX 77845
01 -37
MCWHORTER, JAMES C & ANGELIA
M
5712 E SH 21
BRYAN, TX 77802
01 -37
HAMILTON, IAN SCOTT &
AMANDA PAIGE
1513 FOXFIRE DR
COLLEGE STATION, TX 77845
01 -37
KIBLER, WILLIAM L & PAMELA V
1204 FOXFIRE DR
COLLEGE STATION, TX 77845
01 -37
STEVE SCHULZE
4701 TIFFANY PARK CIRCLE
BRYAN, TX 77802
Jennifer Reeves - Bill Tubbs 412 -0672 Page 1 x
From:
Gayla Messarra
To:
Jennifer Reeves; Jessica Jimmerson
Date:
2/26/01 2:10PM
Caller:
Bill Tubbs
Company:
Tubbs Development
Phone:
412 -0672
[ *] Telephoned
[) Will call again
(] Wants to see you
[ ] Urgent
[ *] Please call
[ ] Returned your call
[ ] Came to see you
Re: Holy Cross
Some of the things you are asking for are on the drawings - some of the questions he needs clarification
as to what you are asking -
He wants to set up a meeting or a time to talk with you.
Cl 3
Ben Boettcher & Associates, Architects, Inc
1702 S. Market Street
Brenham, Texas 77833
409 - 836- 0523(V)
409 - 836 -3519 (F)
brucc(i4bba- architects.com
Memorandum
Bruce F. Bockhom, AIA
To: Molly Hitchcock — City of College Station (4 pages via facsimile & regular mail)
CC: Bridgette George -City of College Station
Steve Schulze
BBA file
From: Bruce F. Bockhorn, AIA
Date: 3/06/00 P Z
Re: Holy Cross Lutheran Church — Request for Review of Landscaping
Following up on our meeting of January 24 ", our office has reviewed the landscaping
requirements for the development of the site in accordance with Section 11 of the City's
Zoning Ordinance. Based on your instruction during this morning's telephone call to use
the gross square footage of the site for our design we have arrived at the calculations shown
on the attached chart.
Before we proceed further we would like for your office to review these calculations and
the attached preliminary site plan. Your attention to this request is appreciated.
Attachments:
I . Calculations of Site Landscaping Requirements
2. Site Plan — Preliminary (2 pages)
G/ fiiesi active/ I Cross / mein-, to city landscaping.com
January 30, 2001
Site Square Footage Lot 1
Acres
2.018
Sq. Ft.
87904.08
Divide by 1,000 SF for points needed =
87.90
Multiply by 30 points /1,000 SF =
1 2637.12
Existing Trees - Crepe myrtle
8
40 points
320
Existing Trees - Oak
9
35 points
315
Sub - total:
635
Additional Point Credits
for parking
63.5
Sub -total A:
698.5
New Trees - Crepe myrtle
25
40 points
1000
NewTrees - Oak
8
75 points
600
Sub - total:
1600
Additional Point Credits
for parking
0
Sub -total B:
E1760
Total Points Needed =
2637.12
Total Points Obtained Existing + New =
2458.5
Total Points Still Needed =
178.62
C
ST A 7i o p .Box 996 0 101 T
Po
Texas Avenue College Station, TX
Te% 409 764 3500 9 77842
February 7, 2001
Win- C. Hutton Consultants, Inc.
4809 Saint Andrews Drive
College Station, TX 77845
Living Hope Baptist Church
Waterline and Fire Flow
Dear Mr. Hutton,
Upon looking at the buildin
now should not be h
g plan and the waterline in re
flow se metered. The plumbing plans sow Bards li fire
n flow, I realized that fire
parately into the building before meterin
The pi the Waterline doesn't split et c
g plans show a meter near the building. civil plans show a m 3' fire
The water meter, for domestic supply,
v'ater eter offsite.
splitting from the PPIY, is usually with a valve and box near the bui
preventer, which i line (
p line' The primary fire flow line) Conti
waterline from usually inside the buildin , lding after
Possible con g The back flow Hues to the back flo
P for fire safet
With a sprinkled building the the city
g the fire line becomes city
It is necessary that the waterline be completely encl
to the back flow preventer if it is not
Profile of the waterline from closed in the easement up to the buildin inside the building. It is also nece
the city to service that line in hemam line to g & up
future. p to the building because it M i g ht to have a plan &
Therefore we r ght be necessary for
Please call if yoU have any & profile to be submitted to us for
Y questions, (979) 764 -3570, the city s records.
Sincer ly,
—;� ..
Thomas V. �
Graduate Engineer
chi Jr.
xc: Natalie Ruiz, Develo
pment Coordinator
Ted MaYo, Assistant City Engineer
Home of Texas A &M University
111idgette George _ Holy Cross Lutheran Church
From:
To: , Bruce F. Bockhorn" <
Date: Bridgette George., bruce@bba-architects.cOm>
Subject: 1/8/01 4:18PM <BGEORGE @ci colle
Holy Cross Luth colle ge - station.t x u >
F-,
C - -�
Brid Bette: eran Church . s
A brief update on the
a•• The church voted HO l r e Cross project that you helped with
b •The church a main at their
C..
Th
have church v Proved the master present site in early last year and into
include the been authorized to plan a con gregational e su mmer.
addition of 10 p by our office in congregational miner.
d.. A proceed with designing a g held qugust, 2000.
new site earns new classrooms and a remodeling the first vote in late
e A geotechnical inveshhe modelin Phase of the ex October.
Of the re gation
Property and existing facilities 9 of their existin passion. this
We are Port. been coin g sanctuary, will
now layin pleted this W a n co mplete.
along I would like g out the floor plan for we are awaiting a formal mission
to schedule the buildin sub
Proposed e xpansion. I do ale a meeting g and working on el evations.
o far
review for present our plan for pate an y r equests for building Before co get to
you in formation C omments. W exceptions g code °ffcials to cover the
at the end will be able to or interpretations
could of this week. send YO a at this
you give m an ids COPY of the tim but
this time for a confirmation! of the first plan and a code
other things! oration! available time to meet? I
Amazing what being out of classes at A us e that I will not for
thanks! &M does for get to call you
Your ability to focus on
Bruce F. Bockhorn, AIA
Ben Boettcher & Associates, Inc
1702 South Market Street
Brenham, Texas 77833
979 . 83 6.0523
3519 (facsimile)
800-383-5649
QI (D tol
Ll pyyj t4c.
HAND DELIVERED
February 5, 2001
Bridgette George
Assistant Development Coordinator
P. O. Box 9960
College Station, TX 77842
RE: Holy Cross Lutheran Church
Condition Use Permit
Dear Bridgette:
BOettcher
& Aiij 7 cil'teS
On behalf Holy Cross Lutheran Church we
enclosed application for a Conditional Use pee formally submitting the
message exchange of last week, the church will be submitti
the application fee under se aratr Permit. As noted in our electronic
P cover. ng the check for
If there are any questions re
accompanies it please contact our off office. aii or the info
a this submittal information that
YOU for your prompt attention
Sincerely,
01'
Bruce F. Bockhorn, AIA
CC: File
Pastor Hafer
Steve Schulze — Chairman, Building Committee
'her and Associates, Architects, Inc. 7702 South Market Street, Brenham, Texas 77833 -4946 979_836 -0523 fAX 970 0„
CITY OF COLLEGE
E GE STATIpN
Me So uth, SERVICES
1101 Texas
College So Pp gox 996
Phone (97g 9e Station, Texas 7 7842 0
764 -3570 / Fax (979) 764-
3496
ME MORANDUM
October 4, 2001
TO ' Steve
Schulze, Via fax 862 -1478
FRO Bridgette George, Assistant Developm reviewed
SUBJECT: anager
BJECT HOLY CROSS LUT
HERgN �CUP� - Site Plan
Satff the above-mentioned
oS staff review the ioned
comments and sub detailin site plan as requested.
mit the followi items that need to be The d. Please
inf ormation for further fo l low ing page is a list
rther staff review lease address the
$100 processing fee for the next
round of three (3) staff reviews; and
Two (2) complete sets
development with the revised site struction
and landscaping for
If there ping plans attached Proposed
are comments that
attach a letter a mentin Y OU are
not addressing with the revised site plan' please
information, please call me a t 764 tai Y questions
If you have i or
3 570.
Attachments: an need
additional
Staff review comments
cc: Holy Cross Lutheran
Ben Boettcher Church, 1200 F
Case file #1_ &Associates °afire Drive, College Station, TX, 7784
500037 , Via fax 836 -3519 5
Home of Texas
4" University
BOETTCHER ARCHITECTS
,r
TEL :1 - 979 -836 -3519 Oct 15'01 8:23 No.003 P.01
Ben Boettcher &Assoc. 1�
1702 S. Market Street U /( 5 4 5 01
Brenham, Texas 77833 Q�
9 79 - 836 -0523 (V) 8 - 0
80 0 - 383 -5649 (V)
97 9- 836 -3519 (F)
To: Bridgette George
From: Bruce F. Bockhorn, AIA
Re: Holy Cross Lutheran
CC: Steve Schulze @ Holy Cross
Fax: 469- 764 -3496
Date: 10/15/01
Pages: 6 (cover + memorandum + CSC
letter)
O Urgent 0 For Review O Make Corrections Noted
O Please Reply O Original by Mail
Notes: See the attached memorandum and drainage letter prepared by CSC
Engineering. We have complied with all of the requests in Staff Report #3 with
the exception of the Solid Waste Pick -up that still needs a determination by the
City staff.
For ease of checking this re- submittal we have incorporated the landscape
information onto the site plan (drawing CUP -3). We will be sending the drawings
with one of our student interns this afternoon or with our principle, Ben Boettcher
who lives in College Station, to be delivered to your office.
Thanks for your attention to this submittal.
l�' I
iA
�r
BOETTCHER ARCHITECTS TEL:1- 979 -836 -3519
VIA FACSIMILE AND HAND DELIVERED
Memorandum
To: Bridgette George — City of College Station
CC: Steve Schulze -Holy Cross Lutheran Church
BBA File
From: Bruce F. Bockhorn, AIA
Date: 10/15/01
Oct 15'01 8:24 No 003 P-02
Ben Boettcher & Associates, Architects, tects, Inc
1702 S. Market Street
Brenham, Texas 77833
9 79 - 836 -0523 (V)
979 - 836 -3519 (F)
hnicc a�hba- arc hitccts.com
Bruce F. Bockhorn, AIA
Re: Holy Cross Lutheran Church: Response to City Staff Report #3
Our office has reviewed the City of College Station Development Services Division
Staff Review Comments No. 3, dated October 4, 2001, regarding the CUP application
for Holy Cross Lutheran Church submitted on February 5, 2001. Please note the
following responses to the items listed in the report:
PLANNING:
Note: The items listed in this edition appear to follow topic and numbering sequence
from the prior list of comments.
1. Zoning Classifications - The zoning for the subject property and all adjacent
Properties are now indicated on the revised Site Survey, drawing CUP -1.
2. Setbacks: The setbacks have been properly indicated on the revised Site Plan,
drawing CUP -3.
3. Easements: No comment/response required.
4. flood d1 in: No comment/response required.
5. Utility Lines The locations of the existing utility lines were are shown
engineering drawings prepared by Hester Engineering Company sealed 04/06/97•
Where possible the lines located by the surveyor are indicated on the revised Site
Survey, drawing CUP -1.
6. Water and Sewer: The response to this item is provided in the Engineerin
Section, item 5 that follows. g
7. Square Foot a a of BuildinQS No comment/response required.
8. Handicapped Parking Spaces_ To comply with the directions of the cit y the
stops will be removed from the existing handicapped parking spaces. h ee
detail 5 on drawing CUP -3.
9. Landscape Reserve • No comment/response required.
10. Fences: The church has agreed that if a fence for screening to the residential
neighborhood on the south side is required it will be provided. Additionally the
BOETTCHER ARCHITECTS TEL:1- 979 -836 -3519 Oct 15'01 8:25 No.003 P.03
October 15, 2001
church intends to install trees at the south side of the existing building to screen
the new facility from the neighbors. We have added the landscape improvements
to the revised edition of drawing CUP -3.
11. Solid Waste Pick-up: The church continues to use city services to remove trash
with containers that are placed on the curb in accordance with the normal pick -up
schedule. The church will take no further action until the city makes a firm and
final determination regarding this item.
12. Curb Details: The original CUP Application included information under item 1 I
of the Site Plan Information Checklist where we noted the attachment of
photocopies of details taken from the engineering drawings prepared by Hester
Engineering Company sealed 04/06/97 and approved by the City of College to
construct the existing parking lot. We have now included curb details for the
remodeling work in the parking lot from our construction documents [Detail 2,
sheet C -1.2] on the drawing CUP -3.
13. Pre_ sc_ No comment/response required.
14. Playground Area• No comment/response required.
ENGINEERING:
Note: The comments of Staff Review #3 are responded to with the original number
assigned in the initial set of comments.
1. Existine and Proposed Pavement: No comment/response required.
2. Drainage: In the prior staff review Thomas Vennochi requested that a Drainage
Report or Drainage Letter be provided to justify the post - development run -off.
Please note that this report, as prepared by CSC Engineering and dated March 15,
2001 was previously submitted to the city for staff review. For ease of reference
we have enclosed another copy of the report with this submittal.
3. Site Plan Dimensions: No comment/response required.
4. Utilities an d Easements: No comment/response required.
5. Estimated Domestic Waster and Sewer Usa e: The size of sewer line is 4"
diameter. The size of the water line at entry to bldg, is 2" diameter. With regards
to the location of new water meter, this comment is not applicable as the existing
meter is being used.
6. City of College Station Requirements No comment/response required.
Eight sets of these plans are being submitted with this memorandum.
Please contact us if there are any questions regarding this response.
G /files /active /Holy Cross/ memo CUP Response 10 10 0Ldoc
BOETTCHER ARCHITECTS TEL:1- 979 -836 -3519
C
S
C
March 15, 2041
Holy Cross Lutheran Church
C/o Mr. ,Bruce Boekhom, AlA
Ben Boettcher & Asiociates Architects, inc.
1702 South Market Street
Brenham, TX 77833
Attention: Mr. Bruce Bockhom, AIA
Oct 15'01 8:26 No.003 P.04
Re: Summary Drainage Report for Proposed Addition to Holy Cross Lutheran Church;
College Station, Texas
Dear Mr. Bockhorn:
CSC Engineering do Environmental Consultants, Inc. (CSC) is pleased to submit this summary report
regarding drainage issues associated with the construction of a pro posed Lutheran Church located in College Station, Texas. A brief descript o f th
� o Holy Cross
associated drainage impacts is presented for your review and considerat r,p
n. p project and
PROJECT DESCRIPTION
Information concerning the project was provided by Ben Boettcher & Associates, Architects, Inc.
(BB &A)• We understand that the existing Holy Cross Lutheran Church at 1200 Foxfire Drive in College
Station, Texas is considering adding a building to the existing church facility. The existing church campus
is situated on the southeartem correct of the intersection of Sebasta Road and Foxfirc Drive.
The proposed addition will consist of a single structure that will be used for clRurooms. The
Proposed addition will be a single -story structure with approximate plan dimensions of 8S ft by 10S ft and
an approximate footprint area of approxinutely 8 ,900 square thee The proposed addition will be
functionally connected to the existing structure.
The existing church facility already has an extensive paved puking area that was constructed
several years ago, along with a small stormwater detention basins and outlet structure in the southeastern
corner of the property. Therefore, no new parking or paved areas are being considered in conjunction
with the proposed addition.
Grading plans for the proposed addition are e
approximately 1 R high buiWin fired to be limited to construction of an
g pad for the new addition so that the finished floor elevation of the
addition will notch that of the existing structure.
The site of the propased church addition's relatively flat with no significant grade changes. The
surface o the site was covered with short native grasses There were no trees or other distinguishing
surface features across the site. The apparent grade in the general area of the site is towards the northeast
•�• �v- •'1 V/l[J
Rryen. Teas 77AOt+ phone (4701 770.o0,n
BOETTCH A _ TEL:1- 979 - 836 -3519 Oct 15'01
IC I
Summary Drainage Report
Proposed Addition to Holy Cross Ludheran Church
College Station, Texas
DWPACT OF WRW ADDMON ON DRAINAGE CONDPPIONS
8:27 No.003 P -05
As previous crated, the size of the new addition is relatively small compared to the overall area of
the site. Specifically, the prapaed addition represents an arras of only approximately 0.2 acre.
Thomfore, the incrawd rvnofFfmm the existing property is anticipated to be relatively low.
The Rationed Formula wnt used to compute the increased amount of stormwater runoff due to the
proposed building addition. The general equation for the Rational Formula is well known:
Q -CIA
where
Q - discharge of stormwater in units of cubic feet per second (cfs)
C - coefficient that represents the average runoff characteristics of the
land cover widiin ttMO drainage scan of interest, i.e., " runoff nnefFicient.
which is dimensionless
I - rainfall intensity in units of inches per hour (in/hr), and
A - area of the site that contributes to the stormwater runoff in units of
acres
The runoff Coefficients or "C" values were computed for both pre- and post- develupmCri! cunditions. The
coetTlcient for the pt , e- development condition was determined based upon the land cover category listed
in Table Ill -1 of the "Drainage Policy and Design Standards (DPDS)" manual of the City of College
Station, Texas. A range of C- values of 0.40 to 0.70 is listed in the referenoed table for the "Landscaped
Areas" with an "Average Slope in the range of 1% to 3.5%. Since the existing ground surface has a
relatively Jehallow cdnpe, a C -value of 0.6 was selected for use for pro - development cover. The post.
development C -value was determined from the referenced table for a building roof to be 0.9.
Since the area of the church campus is relatively small, a minimum time of concentration of 10
minutes was used to compute rainfall intensity for the dssign storm recurrence interval of 3S years. Using
the intensity- duration- frequency curves developed by the Texas Department of Transportation, rainfall
intensity of 9.86 inches was calculated for the design storm event with a "return periods" of 25 years.
Theroforc, the increased stormwater runoff quantity attributable to the new building addition can
be calculated using the Rational Formula Runoff with the values previously discussed values as indicated
In the following equation:
Q " (Com4evelopmW— C Pt**Velopment)' 1 ` A
..,substituting the previously discussed values yields...
2
BOETTCHE AR CHIT ECT S TEL :1 - 979 -836 -3519
Summary Drainage Report
Proposed Addition to Holy Cross Lutheran Church
College Station, Texas
Q - (0.9 - 0.6)' 9.86 inches " 0.2
Q In 0. 59 cubic feet per second (cfs)
Oct 15'01 8 :28 No-003 P-06
The incaeu*M tlnw of 0.59 cfs is considered very minimal and should be easily accomrnodatod by
the existing detention facility, Therefore, we do not believe any new detention facility should be required
at the site. in addition, aurnsnt drainage. plena eseoeiated with the new building construction anticipate
capturing the roof drainage in a new underground piping system and routing the 10 inch diameter
discharge pipe for the roof System directly to the existing storm water detention basin. The proposed
piping system and the grading associated with the new building construcdon should improve the control
and managnrnont of +tarrnwator at the site.
We sincerely aptxuciatc the opportunity to work with the Holy Cross L,uthoran Church, es well as Be n
Boettcher &Associates on this project. please do not hesitate to contact me at (979) 778.28 10 should you
have any questions or If we Can provl&you with any additional information.
Sincerely,
CSC ENGINIERIKC dt ENMONMENTAL CONSULTANTS, ENC.
M. Frederick Conlin, Jr., P.E,
Senior Engineer
e
MFC:mf
Via Fax "'.»....+.. »......