Loading...
HomeMy WebLinkAbout00070670STAFF REPORT Prepared by: Ted Mayo Date: February 19, 2001 Item: Discussion, and possible action on a FINAL PLAT for the CASTLEGATE SUBDIVISION SECTION 1 PHASE 2 located north of Greens Prairie Road and west of proposed State Highway 40. (1- 500034) Applicant: WALLACE PHILLIPS, GREENS PRAIRIE INVESTORS, LTD. Staff Recommendations: Staff recommends approval of the final plat with the condition that the call of North 35* 45' 33" West on page 2 of the final plat, second paragraph of metes and bounds description, be corrected to North 35* 45'33" East. Item Summary: The Section 1, Phase 2 Final Plat includes 74 PDD -H single family (0.26 ac., avg.) lots and is in compliance with the Master Preliminary Plat for the Castlegate Subdivision which was approved in September 2000. This property was rezoned from A -O to PDD -H in August 2000. The Park Board approved 3.91 and 4.35 park sites in June 2000. Budgetary & Financial Summary: An oversize participation request in the amount of $374,638.00 was approved by the City Council on November 09, 2000 for the cost differential between a 12" off -site waterline and a 24" line as requested by the City. Commission Action Options: The Commission has final authority over the final plat. The options regarding the final plat are: ■ Approval with conditions; ■ Approval as submitted; ■ Denial; ■ Defer action only at applicant's request; or, ■ Table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Final Plat INFRASTRUCTURE AND FACILITIES Water: Water service will be extended from Castlegate Section 1, Phase 1 thru this development. Sewer: Sanitary sewer service will be extended to and thru this development from the City's Spring Creek Sanitary Sewer Impact Fee line which is currently under construction. Streets: Includes 1623' of Ravenstone Loop (60' ROW, 24' BC -BC) ; Appelby Place (cul -de -sac)- 695'; 50' ROW, 24' BC -BC; Edinburg Place (cul -de -sac)- 810', 50' ROW, 24' BC -BC. Drainage: Compliance with the Drainage Ordinance will be verified. A regional detention pond is being constructed just west of SH 6 and will include capacity for this development. Flood Plain: There is no 100 year floodplain on this tract. Impact Fees: This development is in the Spring Creek Sanitary Sewer Impact Fee Area (97 -01) and impact fees of $349.55 per living unit equivalent will be due at time of filing of final plat. NOTIFICATION: None required