Loading...
HomeMy WebLinkAbout00070646I STAFF REVIEW COMMENTS No. 1 Project: Stone Forest Phase 2 (FP) -Final Plat (1 -033) PLANNING 1. It appears you will need a P.I.P. for any proposed private improvements (i.e. landscaping) in the 10' of ROW along Agate Drive. The P.I.P. will assign the burden of maintenance to the owner of the improvements and away from the City. Reviewed by: Spencer Thompson Date: February 8, 2001 ENGINEERING 1. Please recheck Curve Table Chord Bearing column for accuracy. Reviewed by: Spencer Thompson Date: February 8, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J:\PZTEXT\PZ04302. DOC Page 1 of 1 STAFF REVIEW COMMENTS No. 1 Project: Stone Forest Phase 2 (FP) -Final Plat (1 -033) PLANNING / 1. It appears you will need a P.I.P. for any proposed private improvements (i.e. landscaping) in th 10' f ROW along Agate Drive. The P.I.P. will assign the burden of maintenance to the owner of the improvements and away from the City. Reviewed by: Spencer Thompson Date: February 8, 2001 ENGINEERING v k � � 1. Please recheck Curve Table Chord Bearing column for accuracy. Reviewed by: Spencer Thompson Date: February 8, 2001 ELECTRICAL 1. Developer responsible for the installation of conduit and streetlight per city design and requirements. 2. Coordinate necessary easement to cover all electrical infrastructure as installed on site. Electric conduit Electric transformers Electric pull boxes and switchgear Streetlight services between lots Contact Tony Michalsky at 979 - 764 -3438 Reviewed by: Tony Michalsky Date: 02/21/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J:\PZTEXT\PZ04302. DOC Page 1 of 2