Loading...
HomeMy WebLinkAbout00070629STAFF REVIEW COMMENTS No. 1 Project: CASTLEGATE SUB SEC 4 PH 2 -FINAL PLAT (1- 500030) PLANNING 1. Final Plat: Everything looks fine. Reviewed by: Ted Mayo ENGINEERING Date: 02/01/01 1. Construction Documents: Sheet 1- Note at southwest corner; storm sewer pipe 410 should read storm sewer pipe 419. 2. Drainage Report: Appendix "13% Page Q /10 cfs. Pipe Flow Diagram; error in flow for pipes 418, 417, 416, 415, 412; ditto for individual pipe data sheets 3. Design Report: Sanitary Sewer Lines- looks ok. 4. Engineer's Estimate: ok Reviewed by: Ted Mayo ELECTRICAL Date: 02/01/01 1. Coordinate necessary easement to cover all electrical infrastructure as installed on site. Electric conduit Electric transformers Electric pull boxes and switchgear Streetlight services between lots 2. Direct questions to Tony Michalsky at 979 - 764 -3438 Reviewed by: Tony Michalsky Date: 2/2/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1