Loading...
HomeMy WebLinkAbout000706273 DEVELOPMENT SERVICES TRANSMITTAL LETTER NamejFirm: Address: r70 (--IZAA a 11 — 4D - Cot zAle STAnct.,1 nc Date: /- Z (, - Z -^%=>/ Phone: Fax: GO - 119 7 We are transmitting the following for Development Services to review and comment: (Check all that apply.): ❑ Master Development Plan ❑ Preliminary Plat Final Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR ❑ Site Plan ❑ Grading Plan ❑ Landscape Plan ❑ Irrigation Plan ❑ Building Construction Documents w/ ❑ Redlines ❑ Development Permit App w/ ❑ Redlines ❑ Conditional Use Permit w/ ❑ Redlines ❑ Rezoning Application w/ ❑ Redlines ❑ Variance Request w/ ❑ Redlines ❑ Other - Please specify w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines .FRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: Waterline Construction Documents w/ ❑ Redlines Sewerline Construction Documents w/❑ Redlines Drainage Construction Documents w/ ❑ Redlines Street Construction Documents w/ ❑ Redlines ❑ Easement application with metes & bounds decsription Id Drainage Letter or Report w/ ❑ Redlines Fire Flow Analysis (5o6walte.d FVCV i 0cs w/ ❑ Redlines with Sec �1 N1) Special Instructions: ❑ TxDOT Driveway Permi ❑ TxDOT Utility Permit ❑ Other - Please specify '��� V --, Coaj" E �Pr>�te _0 TRANSMnTAL LLr MR l of TRANSMrr.DOC 03/23/99 42/02/01 13:09 V979 764 3496 DEVELOPMENT SVCS to 001 * ACTIVITY REPORT TRANSMISSION OK TX /RX NO. 6453 CONNECTION TEL 96909797 CONNECTION ID START TIME 02/02 13:08 USAGE TIME 00'58 PAGES 2 RESULT OK 02/02/01 13:11 3'979 764 3496 DEVELOPMENT SVCS U001 * ACTIVITY REPORT *ss TRANSMISSION OK TX /RX NO. 6454 CONNECTION TEL 96901480 CONNECTION ID START TIME 02/02 13:10 USAGE TIME 00'57 PAGES 2 RESULT OK CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM February 2, 2001 TO: Joe Schultz, P. E., Texcon, Via fax 690 -9797 FROM: Bridgette George, Asst. Development Review Manager Ot SUBJECT: Castlegate Subdivision, Section 4, Ph. 2 - R nal Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, February 19, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for March 1, 2001, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; and, The Mylar original of the revised final plat with the owner's signature. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Wallace Phillips, Greens Prairie Investors, LTD, Via fax 690 -1480 Case file #01 -30 Home of Texas A &M University v I 0 1 TPACON General Contractors Div. of CDS Enterprises, Inc. 1707 Graham Rd. • College Station, TX 77845 • 409 - 690 -7711 • Fax: 409 - 690 -9797 February 9, 2001 Bridgette George Asst. Development Coordinator City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Castlegate Subdivision, Section 4, Phase 2 — College Station, Texas Dear Ms. George: 7 d Attached are 10 copies of the revised Final Plat, the revised mylar original, 5 revised copies of the construction documents marked "Issued for Construction," and' - ; draina If you have any questions or need additional information, please do not hesitate to give me a call at (979) 690 -7711. Sincerely Yours, Joe Schultz, P.E. Civil Engineer Attachments 1 : Deborah Grace - Re: castlegate - two things Page 1 From: Natalie Ruiz To: Jessica Jimmerson Date: 7110/01 10:16AM Subject: Re: castlegate - two things Go ahead and call Joe at Texcon for a revised mylar. (I'd call him but I have no idea what I'm talking about.) So far, three final plats have been filed for Castiegate: Section 1, Phase 1 (00 -178) - 50 lots, $15,450 park dev'I fee Section 2, Phase 1(01 -124) - 27 lots, $8,343 park dev'I fee Section 4, Phase 1 (00 -207) - 44 lots, $13,596 park dev'I fee When Section I, Phase I was filed, Wallace posted a letter of credit in the amount of $15,450 to cover the park development fee for only those 50 lots. With each phase, we need to make sure that we repeive a bond or letter of credit for the park development fee - $309 per lot. Grace, please contact Wallace to let him know that his bond for Section 1, Phase I is about to expire. The new letter of credit needs to be in the amount of $37, 389. With each subsequent final plat, he will be responsible for posting a guarantee in the amount of $309 per lot until the park improvements have been constructed & accepted by the City. Thanks! >>> Jessica Jimmerson 07/09/01 01:20PM >>> 1. we do not appear to have the most recent copy of the MPP (file #00 -136) mylars in the drawer. 1 Piave the older ones in my office. what do we need to do? just call joe at Texcon for the new mylars? 2. Before any more final plats are filed we will need to make sure that they have bonded out of the development fee that would otherwise be required. Parks will handle approving the park developement plan and inspections for acceptance. Once the improvements are accepted by the city, then the bond can be released. N think that Wallace already bonded out of the development fee, but I did not know how to check whether they have just been bonding out of each phase as they go, or if they bonded out of it all with the first phase that was filed. Let me know if any of the above requires clarification. Thanks, jes CC: Bridgette George; Deborah Grace; Ted Mayo 0\ 0o a� O �