Loading...
HomeMy WebLinkAbout00070598STAFF REPORT Prepared by: Jessica Jimmerson Date: February 20, 2001 Item: Public hearing, discussion, and possible action on a Conditional Use Permit, site plan, for the Texas Avenue Baptist Church located at 3400 Texas Avenue South. (01 -25) Applicant: Rabon Metcalf, for Texas Avenue Baptist Church Staff Recommendation: Staff recommends approval of the proposal. Item Summary: Churches may be permitted as conditional uses in any district upon approval from the Planning and Zoning Commission. The applicant is requesting approval to expand their church facilities, in two phases, at the existing site. The proposal is for expansion in two phases. In the first phase, the new addition will be used as a fellowship hall and as additional classroom space. Since the number of seats provided for worship will not be changing with phase one, no additional parking is required. In phase two, a new worship center is proposed, along with some additional classroom space. The new worship center will seat more people than the existing space. Therefore, additional parking is required, with landscaping to screen it in phase two. The property is zoned C -1. Adjacent property to the south and west is zoned R -5 and is developed as multifamily. Property to the north is zoned C -1 and is currently used for landscaping material sales. Comprehensive Plan Considerations: The Land Use Plan shows this area as Attached Residential and Institutional. The requested expansion complies with the Comprehensive Plan. Item Background: A conditional use permit was granted for this property in July of 1990. The original proposal included future phases similar to the project submitted at this time. The current proposal differs in the location of the phase 2 parking. The original proposal showed it along the frontage road. This project shows it along the northern property line and interior to the site. Conditions in the area have not changed significantly since the original permit was approved. Staff Analysis: Section 14 of the Zoning Ordinance authorizes the existence of conditional uses. The Commission may permit a conditional use subject to appropriate conditions and safeguards, when after public notice and hearing the Commission finds that: (Staff comments are in italics) 1. "The proposed use meets all the minimum standards established in the ordinance for the type of use proposed." Staff conducted a technical review Created on 021201019:55 PM J: I PZTEXTIPZ04410. DOC and found general compliance with development regulations with the exception of the items listed below in the staff recommendation. 2. "That the proposed use meets the purposed and intent of the ordinance and is in harmony with the development policies and goals and objectives as embodied in the Comprehensive Plan for Development of the City. The request is in compliance with the Comprehensive Plan. 3. "That the proposed use will not be detrimental to the health, welfare, and safety of the surrounding neighborhood or its occupants, nor be substantially or permanently injurious to neighboring property." The public hearing is an opportunity for the Commission to measure the potential impact on surrounding land uses. The Commission may impose additional reasonable restrictions or conditions to carry out the spirit and intent of the ordinance and to mitigate adverse effects of the proposed use. These requirements may include, but are not limited to, increased open space, loading and parking requirements, additional landscaping, and additional improvements such as curbing, sidewalks and screening." Unless the public hearing bring to light any new information indicating potential negative impacts, Staff recommends approval with Staff Review Comments. Commission Action Options: The Commission has final authority over the Conditional Use Permit and associated site plan. The options regarding the use permit are: 1. Approval as submitted; 2. Approval with conditions relating to specific site characteristics or with time limitations; 3. Denial with specified reasons for denial; 4. Table; or, 5. Defer action to a specified date. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Site Plan Created on 02/20/019:55 PM 2 J: I PZTEXTIPZ04410. DOC INFRASTRUCTURE AND FACILITIES Water: Water service to the site is adequate for the proposed use. Sewer: Sewer service to the site is adequate for the proposed use. Streets: This property has adequate access from the SH6 service road and from Deacon by way of two paved alleys. Drainage: Project will be required to comply with the City's Drainage Ordinance. NOTIFICATION: Legal Notice Publication(s): The Eagle; 2 -14 -01 Advertised Commission Hearing Dates(s): 3 -1 -01 Number of Notices Mailed to Property Owners Within 200': 13 Response Received: None as of date of staff report. Created on 021201019:55 PM 3 J: I PZTEX11PZ04410. DOC