Loading...
HomeMy WebLinkAbout00070584STAFF REPORT Prepared by: TED MAYO Date: FEBRUARY 7, 2001 Item: Discussion, and possible action on a FINAL PLAT( REPLAT) for the UNIVERSITY PARK SEC II SUBDIVISION BLOCK T, LOT 15 ( 3.219 acres) (FP) located at 1101 University Drive East. (1- 500023) Applicant: URBAN DESIGN GROUP Staff Recommendations: Staff recommends approval of the final plat as submitted with the condition that proof of the off -site waterline easement on Lot 10, Blk. U University Park Section II is substantiated. Item Summary: The applicant is requesting this replat into two lots ( Lot 15A, 3.219 ac.; and Lot 15B, 0.172 ac. ) in order to prepare the property for office development. Because a 7500 sq. ft. (0.172 ac.) TXU gas distribution and transmission facility presents challenges to the lot's development multiple buildings are being proposed for the site. On January 11, 2001 the City Council approved rezoning of this property from R -4 Apartment Low Density to A -P Administrative Professional. This replat includes the relocation of an existing gas line on the south side of the TXU facility and the addition of a private access easement from Lot 10, Block U to the north side of the TXU facility. This replat meets all technical requirements. Comprehensive Plan Considerations: The subject property is located in the OV Corridor Overlay District and is shown on the Land Use Plan as Regional Retail. The Thoroughfare Plan designates University Drive as a major arterial. Item Background: On October 19, 2000 the Project Review Committee considered a Driveway Variance for this development. The ruling was to allow a second shared access driveway into Lot 10, Block U subject to an adjacent existing driveway to the west being closed. Commission Action Options: The Commission has final authority over the final plat. The options regarding the final plat are: ■ Approval with conditions; ■ Approval as submitted; ■ Denial; ■ Defer action only at applicant's request; or, ■ Table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Final Plat 5. PRC Minutes INFRASTRUCTURE AND FACILITIES Water: Service will be extended from an existing 12" line on the north side of University Drive and a 6" waterline running north -south thru Lot 10, Block U. Sewer: Adequate sewer service is provided to the site by an existing 8" line at the northeast corner of the property. Streets: No Public streets, only the driveways off of University Drive Off -site Easements: Approximate 32'x36' waterline easement is required across Lot 10, Block U. Drainage: Site Plan will have to meet the Drainage Ordinance. Flood Plain: None on this property. NOTIFICATION: None required