HomeMy WebLinkAbout00070555STAFF REVIEW COMMENTS
No. 1
Project: ALEXANDRIA 4 B (FP) -FINAL PLAT (1- 500019)
ENGINEERING
1. We will be requesting the corrected plat to be submitted in digital form if
available prior to filing the plat at the Courthouse.
Reviewed by: Thomas V. Vennochi Jr. Date: 30 JAN 01
ELECTRICAL
1. Developer is responsible for the cost of streetlight installation.
Reviewed by: Tony Michalsky
Date: 1/26/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1 of 2
DP- ALEXANDRIA PH 4 -13 (1- 100004)
ENGINEERING REVIEW
COMMENTS No. 1
1. An EPA Notice of Intent is necessary for sites great than 5 acres.
Reviewed by: Thomas V. Vennochi Jr. Date: 1/30/01
NOTE: Any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled"
on your plans. Any additional changes on these plans that have not been pointed
out to the City of College Station will constitute a completely new review.
STAFF REVIEW COMMENTS NO.2
Project: ALEXANDRIA PH. 4 -13 (FP) -FINAL PLAT (1- 500019)
ENGINEERING
1. Please change date in title block from January 2001 to October 2001.
2. Lot 1, Blk. 7- 10' P.U.E.: Adjust arrow to property line.
Reviewed by: Ted Mayo Date: 10/23/01
ELECTRICAL
1.
Reviewed by: Tony Michalsky Date:
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional
changes on these plans that have not been pointed out to the City, will constitute a completely
new review.
Home of Texas A &M University