HomeMy WebLinkAbout00070542Ell STAFF REVIEW COMMENTS No. 2 Project: DP- Covenant Family Ch -Add Pking - Development Permit (1- 100014) ENGINEERING 1. Since you have supplied documents for the construction of a wall, but the owner is wishing to construct a berm "in the mean time ", please show the construction details on Sheet C -3 for the berm construction. These may be in the form of a figure or notes. 2. The Drainage Report has been approved. 3. The Development Permit will be issued when the construction drawings have been received and approved. Reviewed by: Spencer Thompson Date: June 21, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 3 STAFF REVIEW COMMENTS No. 1 Project: ANDERSON RIDGE SUB PH 4 (FP) -FINAL PLAT (1- 500014) PLANNING 1. oopr V , 0- '7 Aar Reviewed by: *PLANNER NOT ASSIGNED* Date: ENGINEERING Final Plat (Replat) 1. Easements: 25' access easement On west and south side of Lot 2R, BLK. 4 (Repla label private Access easement to City's Lot 4R- show specific ocation or provide blanket easement with specific location to be established at a late/not The City's two utility easements on Lot 2, BLK. 4 (Original Plat) - th be abandoned until the new water tower is in service and the old er is removed from service. 2. 3r Reviewed by: Ted Mayo ELECTRICAL 1. Need a 20 ft. easement along Holleman Dr. 2. Need a 20 ft. easement along Park Place Dr. 3. Need a 10 ft. easement along rear property line. Reviewed by Tony Michalsky Date: January 22, 2001 Date: 01/22/01 Staff Review Comments Page 1 of 2 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. WA STAFF REVIEW COMMENTS No. 1 Project: ANDERSON RIDGE SUB PH 4 - FINAL PLAT (01 -14) �g1 QA � PLANNING V T itle block should read "Vacating and Final Plat" instead of Replat. he original plat should be labeled "Vacating ". •3�,1N ere is Lot 3? There are two Lot 5's - a Lot 5 and Lot 5R. ots do not need to be labeled with an "R ", since this is not a replat. In regard to the 2 utility easements on Lot 2, Blk 4 (Original Plat), we can't file the plat as it is abandoning both easements until the water tower is relocated, and if the plat is not filed, building permits can't be issued. Also, the western easement, under the proposed Aggieland Printshop, can't be abandoned until the line from Texas Ave. directly to the tower, is installed. And, it is our understanding that the eastern easement, that is under the proposed parking lot, can not be abandoned until the water tower is moved. There appear to be 2 options. A. Abandon only the western easement with the plat, allowing the plat to be filed once the line is constructed from the water tower to the line in Texas Ave. (This will need an easement.) This will allow building permits to be issued prior to the relocation of the tower. Then abandon the eastern easement after the tower is relocated. B. Abandon both easements with the plat, but in their place provide a temporary blanket utility easement over this area. V Show dedication of 15 feet of additional ROW along Holleman. Reviewed by Jessica Jimmerson Date: 1 -23 -01 ENGINEERING 1. asements: 25' access easement on west and south side of Lot 2R, BLK. 4 V Replat)- label private. Access easement to City's Lot 4R- show specific location or provide blanket easement with specific location to be established at a later date. Reviewed by: Ted Mayo J:\PZTEXT\PZ04194. DOC Date: January 22, 2001 Page 1 of 2 i /ELECTRICAL 1. Need a 20 ft. easement along Holleman Dr. 2. Need a 20 ft. easement along Park Place Dr. 3. Need a 10 ft. easement along rear property line. Reviewed by: Tony Michalsky Date: 01/22/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J:\PZTEXT\PZ04194. DOC Page 2 of 2