HomeMy WebLinkAbout00070534STAFF REVIEW COMMENTS
No. 1
Project: POUNDERS SUB DIVISION (PP)- PRELIMINARY PLAT (1- 500013)
PLANNING
1.
Reviewed by: *PLANNER NOT ASSIGNED* Date:
ENGINEERING
1. Preliminary Plat: Title says Preliminary Plan- change to Preliminary Plat
Add note in 1/2" letters- NOT FOR RECORD
Show location of existing waterline
Vicinity map- show approximate distance to College
Station city limits.
Reviewed by: Ted Mayo Date: 01/18/01
ELECTRICAL
1.
Reviewed by: Tony Michalsky Date:
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City
Ordinance 2394.
Staff Review Comments Page 1 of 2
2. Back Flow devises must be tested upon installation as per City Ordinance
2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 2 of 2
STAFF REVIEW COMMENTS
No. 1
Project: POUNDERS SUBDIVISION (PP)- PRELIMINARY PLAT (1- 500013)
PLANNING
This review has been stopped until parent tract information has been
provided to the City. The following comments are preliminary and do not
constitute a full review.
1. The master development plan of the parent tract (when it was annexed into
the city in 1974) needs to be included with the preliminary plat submission.
2. Please indicate the Point of Beginning.
3. In the metes and bounds description, please replace the question marks with
the appropriate data.
4. Please remove setback lines from the plat.
Reviewed by: Molly Hitchcock Date: January 22, 2001
ENGINEERING
1. Preliminary Plat: Title says Preliminary Plan- change to Preliminary Plat.
2. Add note in 1/2" letters- NOT FOR RECORD.
3. Show location of existing waterline.
4. Vicinity map- show approximate distance to College Station city limits.
Reviewed by: Ted Mayo Date: 01/18/01
ELECTRICAL
No Comments
Reviewed by: Tony Michalsky Date: 01/22/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City will constitute a completely new review.
Staff Review Comments Page 1 of 2
STAFF REVIEW COMMENTS
No. 2
Project: POUNDERS SUBDIVISION (MPP)- MASTER PRELIMINARY PLAT
(01 -013)
PLANNING
1. Please include "NOT FOR RECORD" in the title block.
2. Please show the parent tract on the vicinity map.
Reviewed by: MOLLY HITCHCOCK Date: February 16, 2001
ENGINEERING
1. Everything looks fine.
Reviewed by: TED MAYO Date: 02/16/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City will constitute a completely new review.
Staff Review Comments Page 1 of 1