HomeMy WebLinkAbout00070527STAFF REVIEW COMMENTS
No. 1
Project: GOLD'S GYM (SP) -SITE PLAN (1- 500012)
PLANNING
Please show ownership and zoning for abutting properties.
\',2. Please show use of property on the site plan.
X3. Please show proposed easements on site plan.
✓4. Please show 8' screening fence for proposed dumpster location.
1 Please show proposed and existing utility vault locations.
6a/6. An end island is needed at the northeast property line off Brentwood Drive.
7. Total square- footage shown for landscaping does not agree with what is shown on
entire lot.
Curb construction requires #4 rebar.
Streetscaping requires trees along the street in addition to extra required
landscaping points. Please make adjustments for these extra required landscaping
points and re- calculate.
Note: Crepe Myrtles are considered non - canopy trees. Please make adjustments
to streetscape/ landscaping table.
O.AII landscaping must be inside property lines unless a PIP, for Brentwood, or a
1 TXDOT permit, for Texas Avenue, is submitted.
11.Vegetation used to meet Streetscaping requirements can count toward required
landscaping points.
2. Plant materials proposed for Texas Ave. are non - canopy trees. Canopy trees are
along Brentwood. Please make the appropriate adjustments in the
J streetscape /landscape table.
3. Plantings or enhanced paving is needed on all paving islands. This also applies to
the 4' wide interior island proposed in the front.
14. Please remove note 12 from Landscaping Plan.
15. Irrigation is required. Please provide a note that irrigation will be approved before
issuance of a C.O.
16. Please provide a water and sanitary sewer legend to include water demands and
sewer loadings as described in the "Site Plan Minimum Requirements ".
Reviewed by: JENNIFER REEVES Date: January 19, 2001
Staff Review Comments Page 1 of 2
ENGINEERING
1. Sheet C -4. Is the note referring to "Curb and Paving Detail" date correct (10/01 /01)?
2. Sheet C -8. Please provide Hydaulic Grade Line on storm drain as per City Design
Manual. 10 -yr/ 100 -yr. Q, Vel., elev.
3. Sheet C -8. Please include call -out of stations and fittings a beginning of waterline
and cross.
4. Sheet C -9. Manhole not required on sewer. A tap is sufficient. This note is provided
for your convenience. You may show any changes on next submittal.
5. Sheet C -9. In note at the water meter location, please include the word "meter" for
domestic service and the words "meter" and "backflow preventer" for irrigation
service.
6. Sheet C -9. The irrigation plan shows the meter location at the next parking island to
the south.
7. Sheet L -2. The irrigation plan shows the meter location at the next parking island to
the south from which the utility plan is showing.
8. Please remember that a Drainage Report is required for this project as per the City
Design Manual.
9. Please remember to submit TXDOT permits and drawings (4 copies).
10. Please remember platting requirements for this site.
Reviewed by
SPENCER THOMPSON
Date: January 22, 2001
ELECTRICAL
1. Developer / Owner is responsible for:
All conduit per city spec and design
From power pole to transformer location and through to the front west
corner of property for future underground loop.
30 ft. of rigid conduit per riser pole (install first 10' - city will install remainder).
Concrete transformer pads per city spec and design.
2. Developer / Owner needs to provide the City of College Station with:
Electric load data for project (transformer delivery is currently 20 to 26 weeks).
Temporary blanket easement on property for construction purposes.
Upon completion of project, meets and bounds descriptive easements must be
surveyed and sealed, which are necessary to release temporary blanket
easement.
3. Metering will be CT metered on padmount transformer.
4. Service conduit and conductor from transformer to building by owner / developer.
Reviewed by: Tony Michalsky Date: 01/22/01
Staff Review Comments Page 2 of 2
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. Back Flow devises must be tested upon installation as per City Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 3 of 2
01/22/01 18:17 ^g979 764 3496 DEVELOPMENT SVCS
4001
* ACTIVITY REPORTx
TRANSMISSION OK
TX /RX NO.
6233
CONNECTION TEL
19723530943PPP161
CONNECTION ID
START TIME
01/22 18:15
USAGE TIME
02'09
PAGES
4
RESULT
OK
STAFF REVIEW COMMENTS
No. 2
Project: GOLD'S GYM (SP) -SITE PLAN (1- 500012)
PLANNING
1. Please show zoning for abutting parcels.
2. Please show all easements as "Existing" or "Proposed ".
4. The access drive coming off of Texas Avenue, the north side of this access drive
needs to be irrigated to keep the ground cover alive.
5. The Interior landscape table needs to be edited. The total Red Tip Phontinas
provided is 146, which brings the total points to 1460, this also changes the over
all total points to 7420.
ro �e
Reviewed by: JENNIFER REEVES Date: 03/13/01
ENGINEERING
1. Sheet C -3: Please add note to relocate existing fire hydrant and meters at Texas
Avenue entrance.
2. Sheet C -8: Please plot HGL on storm sewer for fully developed site conditions.
3. Sheet C -8: Please include profile of entire waterline from tee to building.
4. Sheet C -9. PUE shall include entire waterline to building or RPZBP, which ever
comes first.
Reminders: You will need a Drainage Report for this Development Permit.
You will need to submit TXDOT Permits for the driveway and utility work
done in the ROW (3 copies).
Reviewed by: Spencer Thompson
Date: March 13, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments
J: \PZTEXT\PZ04496. DOC
Page 1 of 1
Transmit
Log Record
Status
Date
OK
3/16/01
OK
3/16/01
BitWare Client
Time To Company
Application
Page 1
11:38:48 Craig Wallendorf
11:40:54 Craig Wallendorf
Microsoft Word - PZ04521.DOC
Microsoft Word - PZ04496.DOC
STAFF REVIEW COMMENTS
No. 3
Project: GOLD'S GYM (SP) -SITE PLAN (1- 500012)
PLANNING
1. The access drive coming off of Texas Avenue, you need to provide
irrigation for the north side of this access drive to keep the ground cover
alive, unless you provide a phase line for this section, then you would
provide irrigation when that phase goes in.
Reviewed by: Jennifer Reeves Date: 03/27/01
ENGINEERING
1. No comments
Reviewed by: Spencer Thompson Date: 3/27/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments