Loading...
HomeMy WebLinkAbout00070509STAFF REVIEW COMMENTS No. 1 PLANNING 1. Reviewed by: ENGINEERING Project: ACADEMY (RZ)-REZONING (0-225) *PLANNER NOT ASSIGNED* Date: 1. Metes and Bounds description: N75* 28' 10"E 11.46'; should be 111.46'. 2. Sheet S-1: Property Boundary - left off N 75* 28' 10"E 111.46' (north boundary). Reviewed by: ELECTRICAL Ted Mayo Date: 12/11 /00 1. Developer responsible for installing conduit per city spec. and design. 2. Developer responsible for providing and installing street lights per city spec. and design 3. Developer responsible for providing easements to cover all primary electrical lines and equipment. 4. Developer responsible for providing 5' easements to cover streetlight light services as needed Reviewed by: Jennifer Reeves Date: Staff Review Comments Page 1 of 2 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 2