HomeMy WebLinkAbout00070500FACSIMILE COVER SHEET
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764-3570 / Fax (979)764-3496
Date: December 27, 2000 # of pages including cover: 1
Ifyou didnotreceive a complete fax, please call our office immediately for a new transmittal
TO: Wallace Phillips FAX: 690-1480
COMPANY: Greens Prairie Investors, Ltd.
RE: Castlegate Subdivision, Section 3, Phase 1
FROM: Bridgette George PHONE: (979)764-3570
COMPANY: City of College Station
REMARKS: ❑ Urgent ® For your review
Developer / Owner is responsible for:
All Conduit per city spec and design.
Streetlighting per city spec and design.
❑ Replay ASAP ❑ FYI
Thank you, Bridgette
12/29/00 09:52 V979 764 3496 DEVELOPMENT SVCS 10001
* ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO. 5836
CONNECTION TEL 96909797
CONNECTION ID
START TIME 12/29 09:51
USAGE TIME 00'58
PAGES 2
RESULT OK
12/29/00 09:51 V979 764 3496 DEVELOPMENT SVCS
I6 0 01
x~~xx ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO.
5835
CONNECTION TEL
96901480
CONNECTION ID
START TIME
12/29 09:49
USAGE TIME
01'23
PAGES
3
RESULT
OK
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
December 27, 2000
TO: Joe Schultz, P.E., Texcon, Via fax 690-9797
FROM: Bridgette George, Asst. Development Review Manager
SUBJECT: Castlegate Subdivision, Section 3, Phase 1- Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by Monday, January 8„ 10:00 a.m. to be placed on the next
available Planning and Zoning Commission meeting scheduled for January 18, 2001, 7:00
p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and,
The Mylar original of the revised final plat with the owner's signature.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Wallace Phillips, Greens Prairie Investors, Ltd., Via fax 690-1480
Case file #00-237
Home of Texas A&M University
12/27/00 12:27 ^2979 764 3496 DEVELOPMENT SVCS 19001
* ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO. 5783
CONNECTION TEL 96901480
CONNECTION ID
START TIME 12/27 12:26
USAGE TIME 00'58
PAGES 2
RESULT OK
12/27/00 12:24 %T979 764 3496 DEVELOPMENT SVCS 10001
* ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO. 5782
CONNECTION TEL 96909797
CONNECTION ID
START TIME 12/27 12:23
USAGE TIME 00'54
PAGES 1
RESULT OK
t
12/27/00 17:53 '-'979 764 3496 DEVELOPMENT SVCS 19001
i
* ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO. 5802
CONNECTION TEL 96901480
CONNECTION ID
START TIME 12/27 17:52
USAGE TIME 00'33
PAGES 1
RESULT OK
Green Prairie Investors, Ltd.
5010 Augusta Circle j
College Station, TX 77845
January 17, 2001
Natalie Thomas Ruiz, AICP
Development Review Manager
City of College Station
1101 Texas Ave. South
College Station, TX 77842
RE: Castlegate Subdivision - College Station, Texas
Dear Ms. Ruiz:
This letter addresses the development of the park land for the Castlegate Subdivision - Sections 1
through 4. The following is a summary of the timeline for the development of the parks:
Park At Subdivision Entrance on Greens Prairie Road
Pond & path design completed 12-15-00
Construction 12-15-00 thru 4-1-01
Neighborhood Park for Sections 1 - 4
Park Planning 10-15-00 thru 2-15-01
Design 2-15-00 thru 4-1-01
Construction 4-1-01 thru 8-31-01
The schedule for the subdivision infrastructure construction is as follows:
Section 1 - Phase 1
11-1-00 thru 3-1-01
Section 4 - Phase 1
12-1-00 thru 5-1-01
Section 2 - Phase 1
2-1-01 thru 7-1-01
Section 3 - Phase 1
3-1-01 thru 9-1-01
If you have any questions or need additional information, please do not hesitate to give me a call at
(979) 693-7830.
Sincerely Yours,
001,
Wallace Phillips
Manager
0
TE CON
d14CCao73
General Contractors
Div. of CDS Enterprises, Inc.
1707 Graham Rd. • College Station, TX 77845 • 409-690-7711 • Fax: 409-690-9797
January 4, 2001
Bridgette George
Asst. Development Coordinator
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Castlegate Subdivision, Section 3, Phase 1 - College Station, Texas
Dear Ms. George:
Attached are 10 copies of the revised Final Plat, the revised mylar original, 5 revised
V copies of the construction documents and 2 revised drainage reports. Also attached is a
summary of our response to the Staff Review Comments.
If you have any questions or need additional information, please do not hesitate to give
me a call at (979) 690-7711.
Sincerely Yours,
~r"
Joe Schultz, P.E.
Civil Engineer
Attachments
Castlegate Subdivision, Section 3, Phase 1
Response to Staff Review Comments No. 1
Planning:
Final Plat
Sheet 2 - changes made per comments.
Engineering:
Drainage Report
Page 7 - changes made per comments.
onstruction Documents
Sheets 2, 9 & 11 - changes made per comments.
General:
Also attached are:
Two copies of the Engineer's Cost Estimate
Two copies of the Proposed Sanitary Sewer Line Design Report
Sent By TEXCON;
979 690 9797; Jan-2-01 2:37PM;
Page 1/2
OCR a37
TEXCO
GENERAL CONTRACTORS
Div. of CDS Enterprises, Inc.
1707 Graham Road Phone: (979)690-7711
College Station, TX 77845 Fax: (979)690-9797
FAX TRANSMITTAL COVER SHEET
Date:
To
Company:
! - 02-0!
C. 0, t-. S.
Fax t - 3 4 `l b
Number of pages: Z-
(Including this cover sheet)
From: of 5..l._1+t
Company: TEXCQN
Fax M: (979)5,.90-4797
Message: ff~~
5C c JL p-A Yto - ~ o jnn z. a. a t o
Kole le'~ ir.c l ^o-j Sjey W46- jj ary
If you do not receive the complete transmission, please contact us at (979)690-7711.
Sent By: TEXCON;
f
q 979 690 9797; Jan-2-01 2:37PM;
b ~
U1
-0. W
N
Z
0m
m0
o> 'A-nMO>7 p-1
w mm ZO M 0 mM
m-1
rrz ~
ODD
m
AQZ
cD .Z-0 JD 00 D V, m
p z
ZED (
f)
C
I
rr
_
Z
0
W
r1i
f~lp0~
~
M
dZ 000 ~
zZ 0 D Km
~ o
v D
z ;D
@
ADD apn O
C
OXX0
D
r
omo k >r
D
ZZ -nmzmz O
=V1
~
Om(/I[n
D
m
p
U) z M C) A O R. (/i N
m
flf ~
D
z n cn (A
-4
Ln m
Z
-j M> M ~0 0+ C~
W
0-4
A- COMO ~M
v
r~
Or~~ ~
M m I m
m
Mm
QM M
z
Ln ~
7
>
00K ZAVi
Zp~? 0=- O
Z r~
lnD
r-
C.i
zmz
m
-
r
r
M
-
w
r 00 ;D
Z cnN
0~ I) ns n N ZZ
m
m
pD
rn2
NOX
r
CO
rn
M=Z Or- cn o -u m
z
OMM
r -.4
D n
1 D O DO m m v
T+ Z Z m 0 ,
-i
ZOO
ME
OZ
D TI cn
D
;o
ADCs
z
f~T
CZis
z r O OO 71
p(nM
pV1
--40 N0 C O
(D!1
fD~
>
N
= I m m I
M>-~~O -1D
m
~
m
= CG
~o
;up-<o> z
A
p
D
A
z v z
m
v►
N D O
f=+1
d
m
40,71 o ~ 0,4 O
n
~jc A mom
,
°
Z
CA
m M yam
m
O Z ~
~&oo
O
'
\ v /
~1~1
c f*1
co
a o
m
C/1
a~ m
D
t -4 r'
°
~
q
_
,
~
o °
00
!Tl
c p
~o
Z
~o
my rl z N~
-
Z
~r
D Z OO
F
> w
r
m
M
a
N+n CD (0)
T
V
6. rn C)
-0
C
~-4s~,
m~~<
mD
V~oa, mo
> in
Z ~W
m
r o N
rq 4
14
rFl N -1 D
0
~
C
M
3 T
MS. 0
~
°
~
-40 ;T
x a
U
7
L rrl
'
N
w
-
X
"
O
; ,
D
N
Q
n
o
CD In
z
z
N A.
Page 2/2
TEXCON
General Contractors
Div. of CDS Enterprises, Inc.
1707 Graham Rd. • College Station, TX 77845 • 979-690-7711 • Fax: 979-690-9797
May 8, 2001
Bridgette George
Asst. Development Coordinator
City of College Station
1101 Texas Ave. South
College Station, TX 77842
RE: Castlegate Subdivision - College Station, Texas
Dear Ms. George:
~v
9 ABM
r ~
p,
Attached are copies of revised Final Plats, sheets 1 of 2, for Section 2, Phase 1 and
J:e Section 3, Phase 1 for the Castlegate Subdivision.. Section 2 has revisions requested by
Tony Mihalsky with the College Station electrical department. These revisions are
highlighted on the attached cop Section 3 jhas revisions requested by Tony which are
highlighted in yellow on the attached copy and also Mat has been revised. to, include a
drainage easement along the floodplain and stream area at hots 14A,.15A. an-d 6A., This
easement was omitted from the previously submitted plat. This revision is highlighted in
red on the attached copy.
Please confirm what needs to be submitted for each of these plats so that I can have it
prepared and submitted by Friday, May 11.
If you have any questions or need additional information, please do not hesitate to give
me a call at (979) 690-7711.
Sincerely Yours,
Joe Schultz, P.E.
Civil Engineer
Attachment
Go
47 -Iii4C 4
r
TPACON
General Contractors
Div. of CDS Enterprises, Inc.
1707 Graham Rd. • College Station, TX 77845 • 979-690-7711 • Fax: 979-690-9797
July 25, 2001
Natalie Thomas Ruiz
Development Review Manager
City of College Station
1101 Texas Ave. South
College Station, TX 77842
RE: Castlegate Subdivision Section 3 - Phase 1 - College Station, Texas
Dear Ms. Ruiz:
Attached is the Engineer's cost estimate for the Castlegate Subdivision, Section 3, Phase
1. The original cost estimate and the amount remaining to complete the work are each
shown on the estimate.
If you have any questions or need additional information, please do not hesitate to give
me a call at (979) 690-7711.
Sincerely Yours,
W44
Joe Schultz, P.E.
Civil Engineer
Attachment
T01456
(2 P'w
cc: Wallace Phillips
Nora Thompson
ENGINEER'S COST ESTIMATE
CASTLEGATE SUBDIVISION
COLLEGE STATION, TEXAS
SECTION 3 - PHASE 1
Item Estimated
No. Description Quantity
Sitework
1
Mobilization/Layout
1.0
2
Erosion /Seeding/bale dams/constr. Entr.
1.0
3
Site Preparation
2.9
4
Topsoil Stripping & Replacement
2,750
5
Excavation/Grading
4,200
6
Lime Stabilized Subgrade
9,125
7
Concrete Curb and Gutter
5,210
8
Base Material - 6" depth
4,860
9
Base Material - 7" depth
3,690
10
Asphalt Paving - 1 1/2" depth
8,550
11
Color Special Concrete
720
12
ADA Ramps
4
13
Concrete Apron
1,600
Storm Drainage
14
18" RCP - str. backfill
69
15
18" RCP - non-str. backfill
358
16
24" RCP - str. backfill
60
17
24" RCP - non-str. backfill
30
18
27" RCP - str. backfill
56
19
27" RCP - non-str. backfill
152
20
42" RCP - non-str. backfill
6
21
54" RCP - str. backfill
178
22
54" RCP - non-str. backfill
500
23
Junction boxes
2
24
Inlets 10' wide
9
25
Inlets 15' wide
3
26
Rip Rap at channel discharges
120
27
Channel excavation
2,200
LS
LS
AC
CY
CY
SY
LF
SY
SY
SY
SF
EA
SF
LF
LF
LF
LF
LF
LF
LF
LF
LF
EA
EA
EA
TN
CY
A
July 25, 2001
Unit
Estimated
%
Amount
Price
Cost
Complete
Remaining
$8,000.00
$8,000.00
100
0.00
$6,000.00
$6,000.00
75
1,500.00
$3,000.00
$8,700.00
100
0.00
$4.00
$11,000.00
80
2,200.00
$3.50
$14,700.00
100
0.00
$3.00
$27,375.00
100
0.00
$7.00
$36,470.00
95
1,823.50
$5.75
$27,945.00
50
13,972.50
$6.50
$23,985.00
50
11,992.50
$4.25
$36,337.50
25
27,253.13
$6.00
$4,320.00
0
4,320.00
$400.00
$1,600.00
0
1,600.00
$5.00
$8,000.00
80
1.600.00
Subtotal
$214,432.50
$66,261.63
$36.00
$2,484.00
100
0.00
$26.00
$9,308.00
100
0.00
$38.00
$2,280.00
100
0.00
$32.00
$960.00
100
0.00
$46.00
$2,576.00
100
0.00
$36.00
$5,472.00
100
0.00
$85.00
$510.00
100
0.00
$120.00
$21,360.00
100
0.00
$100.00
$50,000.00
100
0.00
$2,500.00
$5,000.00
95
250.00
$3,200.00
$28,800.00
95
1,440.00
$4,000.00
$12,000.00
95
600.00
$40.00
$4,800.00
0
4,800.00
$3.00
$6,600.00
50
3.300.00
Subtotal
$152,150.00
$10,390.00
Page 1 of 2
Waterline
28
12" Waterline - PVC(C900)-str. backfill
90
LF
$46.00
$4,140.00
90
414.00
29
12" Waterline - PVC(C900)-non-str. backfill
540
LF
$38.00
$20,520.00
90
2,052.00
30
8" Waterline - PVC(C900)-str. backfill
77
LF
$30.00
$2,310.00
90
231.00
31
8" Waterline - PVC(C900)-non-str. backfill
1,467
LF
$26.00
$38,142.00
90
3,814.20
32
6" Waterline - PVC(C900)-str. backfill
40
LF
$26.00
$1,040.00
90
104.00
33
6" Waterline - PVC(C900)-non-str. backfill
180
LF
$18.00
$3,240.00
90
324.00
34
Gate Valves -12"
1
EA
$1,500.00
$1,500.00
90
150.00
35
Gate Valves - 8"
5
EA
$600.00
$3,000.00
90
300.00
36
Gate Valves - 6"
1
EA
$500.00
$500.00
90
50.00
37
M.J. Bends and Tees 12"
7
EA
$500.00
$3,500.00
90
350.00
38
M.J. Bends and Tees 8"
13
EA
$350.00
$4,550.00
90
455.00
39
M.J. Bends and Tees 6"
2
EA
$250.00
$500.00
90
50.00
40
Connect to Existing
2
EA
$350.00
$700.00
90
70.00
41
Water Services
14
EA
$700.00
$9,800.00
90
980.00
42
Fire Hydrant Assembly
4
EA
$2,000.00
$8,000.00
90
800.00
43
2" Blow off Assembly
3
EA
$400.00
$1,200.00
90
120.00
Subtotal
$102,642.00
$10,264.20
Sanitary Sewer
44
8" SDR 26 Pipe
982
LF
$30.00
$29,460.00
90
2,946.00
45
6" SDR 26 Pipe
1,196
LF
$20.00
$23,920.00
90
2,392.00
46
Tie-in to existing Manhole
2
EA
$500.00
$1,000.00
90
100.00
47
Sewer Services
14
EA
$700.00
$9,800.00
90
980.00
48
6" Stack Pipe Riser
5
LS
$250.00
$1,250.00
90
125.00
49
Manholes -12' depth
8
EA
$2,400.00
$19,200.00
90
1.920.00
Subtotal
$84,630.00
$8,463.00
Total Sitework
$214,432.50
$66,261.63
Total S
torm Drainage
$152,150.00
$10,390.00
Total Water
$102,642.00
$10,264.20
~E
Total S
anitary Sewer
$84,630.00
$8,463.00
r`~; • •''9S' iP,
Engineering @5%
$27,692.73
95
$1,384.64
~
0-1 *
TOTAL CONSTRUCTION
$581,547.23
$96,763.46
.
j JOSEPH. P.. SCHULTZ... f
65889 :
+
I~F S~... ►sTEa~,~
s
%i2/ONZ _ l A
11 .2S_tk
Page 2 of 2
Waterline
28
12" Waterline - PVC(C900)-structural backfill
90
LF
$46.00
$4,140.00 ✓
29
12" Waterline - PVC(C900)-non-structural backfill
54Q/
LF
$38.00
$20,520.00
30
8" Waterline - PVC(C900)-structural backfill
77
LF
$30.00
$2,310.00
31
8" Waterline - PVC(C900)-non-structural backfill
1,467
LF
$26.00
$38,142.00
32
6" Waterline - PVC(C900)-structural backfill
40
LF
$26.00
$1,040.00
33
6" Waterline - PVC(C900)-non-structural backfill
180
LF
$18.00
$3,240.00 '
34
Gate Valves - 12"
1 i/
LF
$1,500.00
$1,500.00
35
Gate Valves - 8"
5
LF
$600.00
$3,000.00''
36
Gate Valves - 6"
1 ✓
LF
$500.00
$500.00---
37
M.J. Bends and Tees 12"
7 ✓
EA
$500.00
$3,500.00
38
M.J. Bends and Tees 8"
13-~
EA
$350.00
$4,550.00
39
M.J. Bends and Tees 6"
2
EA
$250.00
$500.00--
40
Connect to Existing
2-
EA
$350.00
$700.00-/
41
Water Services
14-~'
EA
$700.00
$9,800.00-
42
Fire Hydrant Assembly
4 '
EA
$2,000.00
$8,000.00-
43
2" Blow off Assembly
3
EA
$400.00
$1,200.00
Subtotal
$102,642.00
Sanitary Sewer
44 8" SDR 26 Pipe
982 " LF $30.00
$29,460.00
45 6" SDR 26 Pipe
1,196v--"LF $20.00
$23,920.00 ✓
46 Tie-in to existing Manhole
2 ✓ EA $500.00
$1,000.00
47 Sewer Services
14/ EA $700.00
$9,800.00
48 6" Stack Pipe Riser
5 LS $250.00
$1,250.00,x
49 Manholes -12' depth
8 ✓ EA $2,400.00
$19,200.00
Subtotal
$84,630.00
OF T1
-
%P
~E •••••••F;lg
6
t
Total Sitework
$214,432.50
'
~
~ *
Total Storm Drainage
$152,150.00
• N••.•N•••••••••••••••••••
p. CHUL17
%
JOSEPH
Total Water
$102,642.00
j
t
~
Total Sanitary Sewer
$84,630.00
~
65889 :
.
~9 :,•q
TOTAL CONSTRUCTION
$553,854.50 '
lee.
• •
1i ss
Engineering @5%
$27,692.73 '
~
i
TOTAL PROJECT
$609,239.95
`;D3,O1
Page 2 of 2
Deborah Grace - Re: castlegate - two things Page I
From:
Natalie Ruiz
To:
Jessica Jimmerson
Dale:
7/10/01 10:16AM
Subject:
Re: castlegate - two things
Go ahead and call Joe at Texcon for a revised mylar. (I'd call him but I have no idea what I'm talking
about.)
So far, three final plats have been filed for Castlegate:
Section 1, Phase 1 (00-178) - 50 lots, $15,450 park dev'I fee
Section 2, Phase 1(01-124) - 27 lots, $8,343 park dev'I fee
Section 4, Phase 1 (00-207) - 44 lots, $13,596 park dev'I fee
~ l
When Section I, Phase I was filed, Wallace posted a letter of credit in the amount of $15,450 to cover
the park development fee for only those 50 lots. With each phase, we need to make sure that we
receive a bond or letter of credit for the park development fee - $309 per lot.
Grace, please contact Wallace to let him know that his bond for Section 1, Phase I is about to expire.
The new letter of credit needs to be in the amount of $37,389. With each subsequent final plat, he will
be responsible for posting a guarantee in the amount of $309 per lot until the park improvements have
been constructed & accepted by the City.
Thanks!
Jessica Jimmerson 07109/01 01:20PM
1. we do not appear to have the most recent copy of the MPP (file #00-136) mylars in the drawer. I
ve the older ones in my office. what do we need to do? just call joe at Texcon for the new mylars?
2. Before any more final plats are filed we will need to make sure that they have bonded out of the
development fee that would otherwise be required. Parks will handle approving the park developement
plan and inspections for acceptance. Once the improvements are accepted by the city, then the bond
can be released.
think that Wallace already bonded out of the development fee, but I did not know how to check whether
they have just been bonding out of each phase as they go, or if they bonded out of it all with the first
phase that was filed.
Let me know if any of the above requires clarification.
Thanks, jes
CC:
0~-34
0o a~
0~-\5
Bridgette George; Deborah Grace; Ted Mayo
0\-30
Ln r~ '
4- F1 -VK
ac)
TPACON
General Contractors
Div. of CDS Enterprises, Inc.
1707 Graham Rd. • College Station, TX 77845 • 979-690-7711 • Fax: 979-690-9797
July 25, 2001
Natalie Thomas Ruiz
Development Review Manager
City of College Station
1101 Texas Ave. South
College Station, TX 77842
RE: Castlegate Subdivision Section 3 - Phase 1 - College Station, Texas
Dear Ms. Ruiz:
Attached is the Engineer's cost estimate for the Castlegate Subdivision, Section 3, Phase
1. The original cost estimate and the amount remaining to complete the work are each
shown on the estimate.
If you have any questions or need additional information, please do not hesitate to give
me a call at (979) 690-7711.
Sincerely Yours,
W~-Ik
Joe Schultz, P.E.
Civil Engineer
Attachment
cc: Wallace Phillips
Nora Thompson
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE: 6-22-01
RE: COMPLETION OF
Dear Sir:
The purpose of our letter is to request that the following listed improvements be approved
and accepted as being constructed under city inspection and completed according to plans
and specifications as approved and required by the City of College Station, Texas. This
approval and acceptance by the City is requested in order that we may finalize any sub-
contracts and to affirm their warranty on the work. This approval and acceptance by the
City of the improvements listed below does hereby void the letter of guarantee for the
listed improvements on the above reference project.
The one year warranty is herby affirmed and agreed to by TX c-bK and
by their sub-contractors as indicated by signatures below.
WORK COMPLETED
S7`rtv~'`s
L✓ci ~/H ~c S
Masi 7 u c l 14 G3-
DATE
/J.7' Ao /
8/aa/o/
Owner zv~C c eA~1i1
Address: VV90
100,
~ T,Y 1TFY.5
Signature:
Contractor: ,T~2Gou
Address: / 7e 7 05n/4
ZOWS
Signature:
6,"Y
tility Representative
ACCEPTANCE & APPROVAL \4.,
City Engineer