Loading...
HomeMy WebLinkAbout00070470DEC.14.2000 4:00PM CDM AUSTIN N0.623 P.216 CONTRACT DOCUMENTS AND SPECIFICATIONS CITY OF BRYAN BRYAN-COLLEGE STATION WATER TRANSFER PUMP STATION NOVEMBER 2000 ADDENDUM NO. I Date Issued; December Greg T. Swoboda, P.E. Bidders on this project are hereby notified that this Addendum shall be attached to and made a part of the above named Contract Documents and Specifications, dated November 2000. The following items are issued to add to, modify, and clarify the Contract Documents and Specifications and Drawings. These items shall have full force and effect as the Contract Documents and Technical Specifications, and cost involved shall be included in bid prices. Bids to be submitted on the specific bid date shall conform with the additions and revisions listed herein. Acknowledge receipt of this addendum by designating receipt of the addendum on the first page of the Bid Proposal. Failure to do so may subject bidder to disqualification. REVISIONS TO CONTRACT DOCUMENTS AND TFCIMCAL SPECIFICATIONS SECTION - CITY OF BRYAN PROPOSAL a) Page 6. Add the following to the Schedule of Manufacturers and Suppliers; Specification Number "13315 Equipment Free Chlorine Residual Analyzer "Base Bid" Manufacturer or Supplier Capital Controls" Alternate Manufacturer or Supplier Amount to Deduct From Base Did and Alternates Bid Items to Use Alternate Equipment Listed DEDUCT A4201Addl.doe Page 1 of 3 DEC.14.2000 4.00PM CDM AUSTIN N0.623 P.3i6 SECTION 01010 - SUMMARY OF WORK a) Page 01010-1, Item 1.03. Add the following paragraph: "B. Contractor shall identify all items that are on the critical path and prepare and submit shop drawings on these items to the Engineer for review within two weeks after the date of the notice of award." SECTION 02700 - CONCRETE DESIGN AND SPECIFICATIONS b) Page 02700-1, Item 1.01, A.1. Delete this paragraph in its entirety and replace with the following: "1. This section includes requirements for reinforced concrete pavement, driveways, sidewalks, curbs, slope paving, and other similar flatwork." SECTION 11212 - HORIZONTAL SPLIT CASE PUMPS a) Page 11212-1, Item 1.02 C. Add the following to the end of this paragraph; "Variable Frequency Drive Controllers are specified in Section 16482." b) Page 11212-6, Item 2.02 A. Delete the language "or approved equal". c) Page 11212,6, Item 2.02 B.4. Revise the Maximum Temperature value to "100°F". d) Page 11212-6, Item 2.02 B.9. Revise the Minimum Runout Capacity (gpm) value to "2,200". e) Page 11212-6, Item 2.02 B.11. Revise the Maximum NPSHA (ft) value to "35", f) Page 11212-8, Item 2.03 G. Delete the first sentence of this paragraph and replace with the following: "Pump shafts shall be of heat treated alloy steel, rigid-shaft type and of sufficient size (the allowable stress shall be the less of 30% of ultimate strength or 18% of yield strength) to transmit the full driver horsepower accurately machined over the entire length and free from harmful and damaging vibrations." g) Page 11212-10, Item 3.01 C. Modify the first sentence of this paragraph. as follows: proper equipment (reverse dial) with test results..." SECTION 13315 - PROCESS INSTRUMENTATION-AND CONTROLS - PRODUCTS a) Page 13315-4, Item 2.02 D. Free Chlorine Residual Analyzer. Add, the following paragraph: 995. Spare Parts. Furnish as spare parts, Capital Controls BM 6330, or equal, containing thermistor assembly, 0-rings, gaskets, cleaning balls, fuses and tubing." SECTION 16150 - ELECTRIC MOTORS a) Page 16150-4, Item 2.05 C. Delete this paragraph in its entirety with no replacement, A4201 Add 1.doc Page 2 of 3 DEC.14.2000 4:01PM CDM AUSTIN N0.623 P.4i6 SECTION 16482 - VARIABLE FREQUENCY DRIVE CONTROLLERS (PWMl a) Page 16482-1, Item 1.02, Add the following language: "C. Horizontal Split-Case Pumps are specified in Section 11212." b) Page 16482-4, Item 2.01. Add the following paragraph: "I. Drives utilizing ancillary mechanical cooling equipment that must operate continuously when the drive is not operating, will not be acceptable." REVISIONS TO DRAWINGS SHEET C-1 SITE PLAN a) Revise "8" Blow-off" to read "10" Blow-off SHEET C-2 YARD PIPING PLAN a) Revise the plan view and notes per the attached Exhibit C2-A. SHEET MZ-3 STANDARD MECHANICAL DETAILS III a) Add Detail K shown on the attached Exhibit No. MZ3-A. SHEET E-2 - ELECTRTCAL SITE PLAN a) Add the following to the INCOMING POWER PLAN: " otes: 1. The two (2) 4-inch ducts between the pad mounted transformer and the power pole, and the two (2) 3-inch ducts b xWeen the pad mounted transformer and the Power Co. meter base at the building shall be concrete encased." b) Revise Note 2 as follows: "2. The underground conduits shall be concrete encased except under the roadway." c) Revise Note 3 as follows: "3. The Contractor shall bore under the strut for installation of (2) - 4" primary conduits. The bore shall be performed in a manner approved by College Station Public Utility Department. For further information please contact Mr. Tony Michalski at 979-764- 3438." d) Add the following note to this sheet: "13. The primary conduit routing and boring under the road shall be coordinated in the field." END OF ADDENDUM NO. 1 A4201Addl.doc Page 3 of 3 rte.. ^I ICTTM NO. 623 P.5/6 YiRPi ::'o" i4 EIRYAIJ W G'Y ~Z A YAVI-7, _ rr zc 6v x ro1u PauT6 TO `NE~OYALL 1 ;V7 Oft' 401.56 V4 ut r 266.01 it, plhpl/P~ -for f 1 ~w N 02.Ty 9651 , 0 1 LWTO OF C0N7TRMT100 BEE IIDTE 1 _ A, f lx~ loolzz OOIX IN- I=40' NOTES 1 ALL PIPING EXCEPT GRAVITY LINES, SHALL BE PROVIDED WITH RESTRAINED JOINTS. PROVIDING OF RESTRAINED JOINTS SHALL ONLY INCLUDE FITTINGS, BENDS, ETC AND NE SSAR PIPE GTH EACH SIDE OF THE FITTINGS; BENDS, ETC. Q 2 SEE SHEET C-3 FOR STORMWATER PIPI G. 1 eel 3 SEE SHEET E-2 FOR CONDUIT UNDER ROADWAY. 4 DUE TO LIMITED SITE AVAILABILITY, THE CONTRACTOR SHALL AT HIS OWN COST PROVIDE STORAGE FOR MATERIALS AND UUIPME~LT OFF.THE CO;4STRUCTION SITZ WATER TREATMENT PLANT EXPANSION ADDENDUM FIGURE PHASE IV SHEET No LOCATION No No CQM Camp Dresser & McKee DATE 12-14-00 C-2 1 C2-A 6,_ WE NOTE 5 r+RT 00- w C0Lf.F,6F STATION 74, ~ w ~z ~ DEC.14.2000 4:01PM CDM AUSTIN ,a FLANGED PROVIDE 1/16" GASKE" EACH FLANGE FACE C NO. 623 P.6/6 HEM NUT & 000h TYP ALL BOLTS PIPE FLANGE BOLTS ARE TO EXTEND THROUGH FLANGES & THRUST RINGS (OMITTED FOR CLARITY) CARRIER PIPE AS SHOWN ON PLANS -3/4" PROJECTION STEEL PLATE TRUST RINGS. THICKNESS TO BE AT LEAST AS THICK AS PIPE FLANGE NOTE FOR PIPE 6" DIA AND SMALLER. USE (2) 3/4" DIA TIE RODS MIN. FOR PIPE 8" DIA AND LARGER. USE (4) 1- DIA TIE ROOS MIN. THRUST HARNESS FOR COUPLING A DETAIL K NTS CDM environmental engineers. sclentlsts. DATE 12-14-00 Planners. 8 management consultants BRYAN - COLLEGE STATION WATER TRANSFER PULP STATION SHEET No LOCATION MZ-3 - ADDENDUM I EXHIBIT No No 1 I MZ3-A r Moiiy Hitchcock - High Service #3.jpg Page 1 d~ a3c4 NAPt ! N -Drainage Report JAN 2 2001 COLLEGE SW~Afl FOR ENGINEERING ,van College St a tzan FIL a ter Transfer Pump St.a 1-job Oa ~ r~~oposeff lr-c~efsf~r 1 Pump .Skitlon y O g y .~o N?S VICINITY" IWAP NTS December, 2000 Prepared By. McClure Engineering, Inc. 1008 Woodcreek Drive, Suite 103 College Station, Texas 77845 (979) 693-3838 Drainage Report FOR Bryan - College Sta tion Wa ter Transfer Pump Sta tion Pro osed Trronsfer Pump Stotlon STAWV CWW 7E UI7S e0 e4 ti o n g y E W J ~ y.. o+ a NTS W WC/N/TY MAP NTS December, 2000 Prepared By. McClure Engineering, Inc. 1008 Woodcreek Drive, Suite 103 College Station, Texas 77845 (979) 693-3838 CERTIFICATION I, Michael R. McClure, Regis tered Professional Engineer No. 32740, State of Texas, certify that this report for the drainage design of the BRYAN-COLLEGE STATION WATER TRANSFER PUMP STATION Project, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof. Michael R. McClure, P.E. # 32740 d .OF.'Z~!% i cCLUREP. r MICHAEL R. o S~c/STE?~ DRAINAGE REPORT i Bryan-College Station Transfer Pump Station College Station, Texas TABLE OF CONTENTS Bryan-College Station Water Transfer Pump Station College Station, Texas INTRODUCTION I GENERAL LOCATION AND DESCRIPTION I PRIMARY DRAINAGE BASIN DESCRIPTION 1 FLOOD HAZARD INFORMATION I DRAINAGE DESIGN CRITERIA 2 CONCLUSION 2 EXHIBITS FEMA FLOOD INSURANCE RATE MAP EXCERPT "A" DRAINAGE AREA MAP - PROPOSED CONDITIONS "B" RATIONAL FORMULAS DRAINAGE AREA CALCULATIONS "C- I " PIPE SIZE CALCULATIONS "C-2" DRAINAGE REPORT ii Bryan-College Station Water Transfer Pump Station College Station, Texas STORM DRAINAGE REPORT Bryan - College Station Water Transfer Pump Station INTRODUCTION: This storm drainage report is intended to cover the necessary drainage infrastructure for the projected improvements of the Bryan-College Station Water. Transfer Pump Station Site. The parameters used for of the on-site area are incorporated to show how the final drainage design will accomplish the desired drainage objectives according to the City of College Station's Drainage Policy and Design Standards (DPDS.) GENERAL LOCATION AND DESCRIPTION: The project site is located in northern College Station and is bounded by the Bryan-College Station Corporate Limit Line to the north, Tarrow Street to the east and southeast, and the Chimney Hill Subdivision to the west and southwest. This drainage report takes into account the building of the proposed transfer pump station building and improvements associated with its construction. PRIMARY DRAINAGE BASIN DESCRIPTION: The site drains into the proposed culverts as shown in Exhibit "B", then across Tarrow Street and into Burton Creek, then to Carter's Creek and ultimately to the Navasota River. The site is mostly open land and has a natural slope between one and two percent generally to the northeast. FLOOD HAZARD INFORMATION: This property is in a 100-year Flood Hazard Fringe Area as determined from the Federal DRAINAGE REPORT PAGE 1 Bryan-College Station Water Transfer Pump-Station College Station, Texas Emergency Management Agency Flood Insurance Rate Maps 48041 CO142C for Brazos County, Texas and Incorporated Areas effective July 2, 1992 (see Exhibit "A"). A portion of the site is also in a Zone X hazard. Therefore, the finished floors of the proposed buildings for this site will be set above the 100-year flood hazard area (E1= 278.50). DRAINAGE DESIGN CRITERIA: All drainage design is in accordance with the City DPDS. The design rainstorm is the 10 year event. Flow calculations for all drainage areas are based on the Rational Method. Pipe sizing is in accordance with Manning's Equation with an "n" of 0.014 per the DPDS. Exhibit "C-1" shows the peak runoff calculations for the drainage areas shown on Exhibit "B". Exhibit "C-2" shows the pipe sizing computations for the 100-year event. The proposed pipes are designed to handle the 100-year flows. The friction slope of the proposed 48" RCP is 0.44%, and the design slope of the pipe is 0.36%. This difference will create a small pond near the headwall during the 100-year event. Most of the runoff during the larger events will overflow the ditch and discharge directly into Burton Creek and never reach the proposed structures. Based on the calculations shown in Exhibit "C-1 the 100-year event can be captured in the existing and proposed pipes and conveyed to Burton Creek. Therefore, detention is not required. CONCLUSION: The 10-yeas post-development event is captured on site and conveyed in the proposed storm drain system to an adequate outfall. Additionally, the 100-year event will be captured in the existing and proposed pipes and conveyed to Burton Creek. The drainage design for this site meets the requirements as stated in the City of College Station Drainage Policy and Design Standards. DRAINAGE REPORT PAGE 2 Bryan-College Station Water Transfer Pump Station College Station, Texas S?` fir. i r 1 ~1p t/~ C' i 110 % t i . m cn J Ur f~tayar 2, Ct" `f OE'COLLEGE STA"tOfq x: y PROJECT SITE; . J EXHIBIT A Flood Insurance Rate Mop Excerpt Brazos County, Texas and Incorporated Areas Map Numbers: 48041C0142C Effective Date: July 2, 1992 SN W m h II _ U) q co C3 U CD M N O u l ° N ~ L N O l/ C d %I- i ce~K - CL ~ XLO~ G,.-' c3 _ 0 J c3 HEART , v N RRESi CR. v o I J a o o+ Qc C ~ m WIPWiCK M (O N 006b400-v V 00 O <n r X ' v ca o ° U `00v~ C m 0061= N~_a c ~ ~ s C:) X 7 Un o rn W 090 4 00 m rn 091=r-- °'"T c r_ (h v 9Zb w co - M LO co LD 9Z1=(O~CN c rn ~ rn 06b wy 0) CN U 1- N O Ohl=lno C c Q ti O (O 9b U42 0~N c .4.+ O U) O r 0) cQ. 91 = lf) 0) 0) G = V :3 a Zb 04 O N V O (a N ~o(U)nN O ZI = V' r-- 00 E r Q L U I"' (D N O a~ ol3sn ~ CN m.~ a ccoU? 2 i ~1 -oleo E N co m 1X a r c? r~ N IIVd oleo O LL MOId b311f1J ; o 0 0 c o HiON31 `O C U MOI=l 11311no $ o N ca c 1- cc llVd o 0 0 N m MO-1:1 4NVINEIAO HION31 0 0 0 0 0 0 M01=1 CINV"RGAO M N N Ln rl- V.71V1O1 `c' N 0 0 0 0) °o o ° °o 1N3W3AVd ° 0 0 0 (o 00 0 Cl . LO IVI1N901SEIN ° 0 0 V3aV c n N Q3dO13A34Nn v ° ° rnot` V3NV 1V1O1 d aopi o 0 Q V3bV 3JVNIVN(I z N ro EXHIBIT C-2 PIPE SIZE CALCULATIONS Bryan-College Station Water Transfer Pump Station c 4: U .4.0 .2 M 4C o a W> W a~io E~ ~ 3 ~ 3 ~ a z ~ Ua ~ ~ o o H a ~w ~w z w w ~ ~ a H H 3~ # # Ac. min yr cfs cfs # cfs % fps min min ' 1 N/A 10.6 23.6 100 88.3 88.3 1 88.3 0.44 48 7.0 80 0.19 23.76 2 N/A 0.1 6.5 100 1.6 2.1 1 2.1 0.04 18 1.2 5010.72 7.17 3 N/A 0.3 5.0 100 4.2 5.3 1 5.3 0.29 18 3.0 20 0.11 5.11 12/7/00 `Includes 25% Flow Increase for pipe sizes <2T' dia. 9907-dra.xis See Plan & Profile for pipe slope used (Pipe slope >or-- Friction slope) Exhibit C-2 NOTICE=vF ruzKit HEARING: The College Station Planning and Zoning Commission will hold a public hearing to consider a CONDITIONAL USE PERMIT AND SITE PLAN for 100 TARROW STREET FOR A WATER TRANSFER PUMP STATION. i The hearing will be held in the Council Room of the College Station City Hall, 1101 Texas Avenue at the 7:00 p.m. meeting of the Commission on Thursday, JANUARY 18, 2001. Any request for sign interpretive services for the hearing im- paired must be made 48 hours before the meeting. To make arrangements call (979) 764-3547 or (TDD) 1-800-735-2989. For additional information, please contact me at (979) 764- 3570. MOLLY HITCHCOCK Staff Planner ooa~ j 1-3-01 ' NOTICE OF PUBLIC HEARING: The College Station Planning and Zoning Commission will hold a public hearing to consider a CONDITIONAL USE PERMIT AND SITE PLAN for 100 TARROW STREET FOR A WATER TRANSFER PUMP STATION. TNe hearing will be held in the Council Room of the College S tion City Hall, 1101 Texas Avenue at the 7:00 P.M. meeting o.lthe Commission on Thursday, FEBRUARY 1, 2001. 9 Any request for sign interpretive services for the hearing im- paired must be made 48 hours before the meeting. To make arrangements call (979) 764-3547 or (TDD) 1-800-735-2989. For additional information, please contact me at (979) 764- 3570. MOLLY HITCHCOCK Staff Planner 1-17-01 IJ;,J ✓1 I