HomeMy WebLinkAbout00070467STAFF REVIEW COMMENTS
No. 1
Project: WESTFIELD ADDITION PHASE 3 (PP)-PRELIMINARY PLAT (0-236)
PLANNING
1. Seeing that there is the distinct possibility that Victoria may not be constructed for
some time, it is in the best interest of the City for the developer to provide an access
easement such that Commercial Lot 1-A can get access through Commercial Lot 1-
B. Lot 1-13 will be allowed an access according to the Driveway ordinance. Lot 1-A
will not be allowed a separate driveway off of Graham Road. Please design the
dimensions of the easement to accommodate any site improvements and turning
radii requirements. This easement can be removed at a later date in the event it is
not needed.
2. According to previous discussions, the detention area is to be dedicated as
"Greenways". The detention area has not been determined to be "park", as noted
on the plat.
Approximately 4.3 acres of land have already been credited to this development
for the parkland dedication requirement. Preliminary calculations show only 1.7 acres
necessary for this development through Phase 3. There is still a development fee to be
paid by the developer for Phase 3. All parkland dedication requires the approval of the
City Parks Department.
3. The Westfield Phase 2 Preplat was approved 1/4/01. Please make change.
Reviewed by: Spencer Thompson Date: January 5, 2001
ENGINEERING
1. According to my resources, the 70' ROW minor collector with bike lanes has a 48'
pavement. Please make correction on plat.
2. It appears that the floodplain has been placed on the plat according to the existing
topography of the land. It is my concern how the floodplain will change when the
streets and lots have been brought to final grade and if the property line will include
all the floodplain. Can you adjust this line accordingly to reflect this change?
3.
Reviewed by: Spencer Thompson Date: January 5, 2001
Staff Review Comments Page 1 of 2
J:\PZTEXT \PZ04120. DOC
ELECTRICAL
Developer / Owner is responsible for:
All Conduit per city spec and design.
30 ft. of rigid conduit per riser pole (install first 10' - city will install remainder).
Subsurface pull boxes per city spec and design (pull boxes supplied by City)
Streetlighting per city spec and design -
will be 30 ft. mounting height, 8 ft. arm w/ 100 watt HPS cobra head style
fixture.
Reviewed by: Tony Michalsky Date: 12/27/00
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 2 of 2
J:\PZTEX11PZ04120. DOC
01/05/01 18:06 ^C1979 764 3496 DEVELOPMENT SVCS
l0 0 01
ACTIVITY REPORT x:x~*
TRANSMISSION OK
TX/RX NO.
5989
CONNECTION TEL
96909069
CONNECTION ID
START TIME
01/05 18:04
USAGE TIME
01'32
PAGES
3
RESULT
OK