HomeMy WebLinkAbout00070457Mar 21 01 04:14p Michael McClure 979 693-2554 p•2
SOUTHWOOD PLAZA, PHASE 1
SEWER SYSTEM
ENGINEER'S ESTIMATE
December 18, 2000
Estimated Total
Item Description Unit Quantity Unit Price
No. 1 1,oao.00 1,000.00
1 Mobilization Lump Sum
L.F. 63 20.00 1,260.00
2 6" PVC, D-3034, Non-Str. Backfil( EACH 2 1,500.00 3,000.00
3 Standard Manhole, 0-6 ft. deep EACH 1 350.00 350.00
4 4" Sewer Service 7 ft. av length) Total Cost $5,610.00
Page 1 of 1