Loading...
HomeMy WebLinkAbout00070456STAFF REVIEW COMMENTS No. 1 Project: SOUTHWOOD PLAZA-R SMITH OFC(FP)-FINAL PLAT (0-233) PLANNING 1. Final Plat (Replat)- Looks fine Reviewed by: Ted Mayo Date: 12/21/00 ENGINEERING 1. Sheet SP1-4- Sewer line S- 1: Everything is ok 2. Engineer's Estimate- ok Reviewed by: Ted Mayo Date: 12/21/00 ELECTRICAL 1. Comments will be faxed as soon they are received. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 2 12/22/00 10:13 C^)979 764 3496 DEVELOPMENT SVCS to 001 ACTIVITY REPORT s*s TRANSMISSION OK TX/RX NO. 5767 CONNECTION TEL 98461161 CONNECTION ID RICHARD S SMITH START TIME 12/22 10:12 USAGE TIME 01'03 PAGES 2 RESULT OK