HomeMy WebLinkAbout00070456STAFF REVIEW COMMENTS No. 1
Project: SOUTHWOOD PLAZA-R SMITH OFC(FP)-FINAL PLAT (0-233)
PLANNING
1. Final Plat (Replat)- Looks fine
Reviewed by: Ted Mayo Date: 12/21/00
ENGINEERING
1. Sheet SP1-4- Sewer line S- 1: Everything is ok
2. Engineer's Estimate- ok
Reviewed by: Ted Mayo Date: 12/21/00
ELECTRICAL
1. Comments will be faxed as soon they are received.
NOTE: Any changes made to the plans, that have not been requested by
the City of College Station, must be explained in your next
transmittal letter and "bubbled" on your plans. Any additional
changes on these plans that have not been pointed out to the City,
will constitute a completely new review.
Staff Review Comments Page 1 of 2
12/22/00 10:13 C^)979 764 3496 DEVELOPMENT SVCS
to 001
ACTIVITY REPORT s*s
TRANSMISSION OK
TX/RX NO. 5767
CONNECTION TEL 98461161
CONNECTION ID RICHARD S SMITH
START TIME 12/22 10:12
USAGE TIME 01'03
PAGES 2
RESULT OK