HomeMy WebLinkAbout000704396 0 - 36
FACSIMILE COVER SHEET
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764-3570 / Fax (979)764-3496
Date: December 27, 2000 # of pages including cover: 1
Ifyou didnot receive a complete fax, please call our office immediately for a new transmittal
TO: Scott Eidson and UDG FAX:764-1576 and 696-9752
COMPANY:
RE: Villas Crystal Park
FROM: Bridgette George PHONE: (979)764-3570
COMPANY: City of College Station
REMARKS: ❑ Urgent ® For your review ❑ Replay ASAP ❑ FYI
Developer / Owner is responsible for:
All conduit per city spec and design
There is several hundred feet of conduit that will need to be laid off site to get to the City's
existing OH powerline. Easements will be needed to cover this line as installed.
30 ft. of rigid conduit per riser pole (install first 10' - city will install remainder).
Subsurface pull boxes per city spec and design (pull boxes supplied by City)
Concrete transformer and/or junction box pads per city spec and design.
Developer / Owner needs to provide the City of College Station with:
Electric load data for project (transformer delivery is currently 20 to 26 weeks).
Temporary blanket easement on property for construction purposes.
Upon completion of project, meets and bounds descriptive easements must be surveyed and
sealed, which are necessary to release temporary blanket easement.
Metering will be CT metered on padmount transformer.
Service conduit and conductor from transformer to building by owner / developer.
Thank you, Bridgette
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
December 21, 2000
TO: Urban Design Group, Via fax 696-9752
FROM: Bridgette George, Asst. Development Review Manager J T
SUBJECT: Vjllage @ Crystal Park Site Plan
0s"
Staff reviewed the above-mentioned site plan as requested but had to stop review due to an
incomplete submittal. The following page is a preliminary list of staff review comments
detailing items that need to be addressed. Please address the comments and submit the
following information for further staff review:
Two (2) complete sets of construction documents for the proposed development
with the revised site and landscaping plans attached.
If you would like to schedule a meeting to go over the staff review comments, please give me a
call. If there are comments that you are not addressing with the revised site plan, please attach
a letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Scott Eidson, Via fax 764-1576
Case file #00-230
Home of Texas A&M University
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Firm: Urban Design Group Date: December 11, 2000
Address: 909 Southwest parkway East, Suite E Phone: (979) 696-9653
College Station, Texas 77840 Fax: (979)696 -9752
We are transmitting the Following for Development Services to review and comment: (Check all that
app
ly-):
❑
Master Development Plan
w/❑
Redlines
0
Development Permit App.
❑
Preliminary Plat
w/❑
Redlines
❑
Conditional Use Permit
❑
Final Plat
w/❑
Redlines
0
Rezoning Application
❑
FEMA CLOMA/CLOMP,/LOMA/LOMR w/❑
Redlines
❑
Variance Request
✓
Site Plan
w/❑
Redlines
❑
Other-Please Specify
❑
Grading Plan
w/❑
Redlines
0 Landscape Plan
w/0
Redlines
❑ Irrigation Plan
w/❑
Redlines
❑
Building Construction Documents
w/❑
Redlines
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑
Waterline Construction Documents w/ ❑
Redlines
❑ TxDOT Driveway Permit
❑
Sewerline Construction Documents w/ ❑
Redlines
❑ TxDOT Utility Permit
❑
Drainage Construction Documents w/ ❑
Redlines
❑ Other - Please Specify
❑
Street Construction Documents w/ ❑
Redlines
❑
Easement application with metes & bounds description
✓
Drainage Letter or Report w/ ❑
Redlines
✓
Fire Flow Analysis w/ ❑
Redlines
Special Instructions:
PROJECT: Village Q Crystal Park
BRIDGET Attached please find our submittal on the Village @a, Crustal Park Project If you need
anvthin .else from us or would like to meet, please let us know. Thanks for your help.
TRANSMITAL LETTER
TRANSMIT.DOC 03/23/99
A
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
March 4, 2002
TO: Deborah Keating, Urban Design Group, Via fax 696-9752
FROM: Bridgette George, Assistant Development Manager
SUBJECT: VILLAGE @ CRYSTAL PARK (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review:
Two (2) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Staff review comments
cc: Scott Eidson, Via fax 764-1576
Case file #0-230
Home of Texas A&M University
A
STAFF REVIEW COMMENTS NO. 3
Project: VILLAGE @ CRYSTAL PARK (SP)-SITE PLAN (0-230)
PLANNING
1. The interior parking spaces on the west - side along the north end island will need to
be screened from the R.O.W.
2. Please delineate the existing types/caliper and location of existing trees to remain in
the reserved area. This is pertinent information; otherwise, you will be required to
install the required buffer with plantings.
Reviewed by: Jennifer Reeves Date: 02/26/02
ENGINEERING
1. Concerning the waterline construction plans, please raise the 12" line along FM
2818 to a point such that the branches from this line do not require such extreme
offsets. These offsets allow entrapped air into the City system.
2. Sheet C-3: It does not appear to be sufficient room for a 12x6 tee, 6" spool piece,
6" elbow, 6" spool piece, 6x6 tee, and FH assembly and still ensure the hydrant
remains in the easement. Please reconfigure to ensure compliance.
3. Line-W-2: Your line should end with a fire hydrant unless the line continues to the
building. A tap will be made onto the line before the hydrant for domestic use. If the
line continues to the building, such as a fire line, the line must be in an easement.
4. Sheet C-2: at Sta3+77.91, what is the cross for? This line does not continue.
Please see previous note.
5. Sheet C-2: Please design line as flat, without the rise and fall. After the main line is
lowered, this should allow this line to be constructed in a flatter projection.
6. Is a manhole to be constructed on this site?
7. Sheet C-3: Note on headwall and wingwall says 12". 1 do not believe this is correct.
Please add note concerning rip-rap (or other) erosion control as required.
Reviewed by: Spencer Thompson
Date: March 4, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 2
9 . -DA-.
DEVELOPMENT SERVICES
TRANSMITTAL LETTER Ey0 OPJ3 0
Name/Firm: URB Acv QESI C Al a r2-o.~P Date: 12 • io • d /
Address: 27oo FY9k- R-~aD6P- ~2 wAy S>~~3on Phone: 1, -1 &.9453
Co4/- E6E -57r41722±~/ 'TV 778 .5 Fax: U9a 9-2.52
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
❑ Master Development Plan
❑ Preliminary Plat
❑ Final Plat
❑ FEMA CLOMA/CLOMR/LOMA/LOMR
U- Site Plan
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ a
Ryas C--
w/
❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
❑ Development Permit App.
❑ Conditional Use Permit
❑ Rezoning Application
❑ Variance Request
❑ Other - Please specify
❑ Grading Plan
❑ Landscape Plan
❑ Irrigation Plan
❑ Building Construction Documents
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑
Waterline Construction Documents
w/ ❑
Redlines
❑
Sewerline Construction Documents
w/❑
Redlines
❑
Drainage Construction Documents
w/ ❑
Redlines
❑
Street Construction Documents
w/ ❑
Redlines
❑
Easement application with metes & bounds dec
sription
❑
Drainage Letter or Report w/ ❑
Redlin
es
❑
Fire Flow Analysis
w/ ❑
Redlines
Special Instructions:
❑ TxDOT Driveway Permit
❑ TxDOT Utility Permit
❑ Other - Please specify
(3 r' d e f J 6 -7Zh i 5 Sou r,ry .7`fo Q~~ 4XT e s G $ -f Q 4I S
.c._
C'~"'~ ~y~-~~ ~G~# c.L oLL•~oL~ P~C.S ~ I c ves ~ i7 ovJ i ~ yo w j4n d% ..j
v
A n,Sw G+'G,sL ~.f ft C Old ~ct ~~f a. n ~-S.
1 of 1
TRANSMITTAL LETTER
TRANSMIT 12/10/01