HomeMy WebLinkAbout00070429j - - -------7
(Apo-f
OLLEGE STATION
FOR OMCE,_VSE ONLY
P&ZCASE NO.• t cz ' "t
DATE SUBMTTTED•
P!-116 A
FINAL PLAT APPLICATION
(check one) Minor Amending X Final Vacating Replat
The following items must be submitted by an established filing deadline date for P & Z Commission consideration.
MINIMUM SUBMITTAL REQUIREMENTS:
✓ Filing Fee of $200.00.
✓ Development Permit Application Fee of $100.00 (if applicable).
✓ Infrastructure Inspection Fee of $300.00 (applicable if any public infrastructure is being constructed.).
✓ Application completed in full.
Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable).
Paid tax certificates from City of College Station, Brazos County and College Station I.S.D.
✓ A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
Two (2)copies of public infrastructure plans associated with this plat (if applicable).
APPLICATION DATA
UME OF SUBDIVISION Sun Meadows, Phase 1
SPECIFIED LOCATION OF PROPOSED SUBDIVISION A sixty acre tract situated at the
northeast quadrant of the intersection of South Graham Road and Schaffer
Roads The- tract is bounded on the north by Arnold Road.
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name Mr. Hartzell Elkins (Graham Road LTD.)
Street Address 2508 River Forest
State Texas Zip Code 7 7 8 0 2 E-Mail Address N/A
Phone Number (979) 774-4090 Fax Number (979) 774-4090
PROPERTY OWNER'S INFORMATION:
Name Mr. Hartzell Elkins
Street Address 2508 River Forest City Bryan
State Texas Zip Code 7 7 8 0 2 E-Mail Address N/A
Phone Number (979) 774-4090 Fax Number (979) 774-4090
ARCHITECT OR ENGINEER'S INFORMATION:
Name Rogers Engineering Services
Street Address 208A SW PKWY East City College Station
State TX Zip Code 77840 E-Mail Address agr@rogersengineering.co m
Phone Number (979) 680-8840 Fax Number (979) 680-8841
City Bryan
FINAL PLAT APPLICATION 1 of 3
kLLGE STATION
SUBMIT APPLICATION AND THIS
LIST CHECKED OFF WITH 13
FOLDED COPIES OF PLAT FOR REVIEW
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT L M77'ED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
1. Drawn on 24" x 36" sheet to scale of 100' per inch or larger.
39 2. Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
Jt 3. Title Block with the following information:
N Name and address of subdivider, recorded owner, planner, engineer and surveyor.
31 Proposed name of subdivision. (Subdivision name & street names will be approved through
Brazos County 911.) (Keplats need to retain original subdivision name.)
Date of preparation.
$I Engineer's scale in feet.
}13l Total area intended to be developed.
4. North Arrow.
5. Subdivision boundary indicated by heavy lines.
6. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger.
)1. 7. All applicable certifications based on the type of final plat.
Ownership and Dedication
Surveyor and/or Engineer
City Engineer (and City Planner, if a minor plat)
CKL Planning and Zoning Commission (delete if minor plat)
Brazos County Clerk
Brazos County Commissioners Court Approval (ET7 Plats only)
)KL 8. Paid tax certificates.
13 9. If submitting a replat where there are existing improvements, submit a survey of the subject property showing
the improvements to ensure that no encroachments will be created.
10. If using private septic systems, add a general note on the plat that no private sewage facility may be installed
on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the
provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant
to the provisions of Section 21.004 of the Texas Water Code.
11. Location of the 100 Year Floodplain and floodway, if applicable, according to the most recent available data.
W 12. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data.
FINAL PLAT CHECKLIST I of 2
13. Matches the approved preliminary plat and/or master development plan.
14. The location and description with accurate dimensions, bearings or deflection angles and radii, area, center
angle, degree of curvature; tangent distance and length of all curves for all of the following: (Show existing
items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as
well as, those within the subdivision).
Existing Proposed
❑ ~l Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp. turn around
unless they are shorter than 100 feet.
❑ ~I Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s sufficient to
meet Thoroughfare Plan.)
❑ Street offsets and/or intersection angles meet ordinance.
❑ Alleys.
❑ )n Easements.
❑ A number or letter to identify each lot or site and each block.
❑ Greenbelt area/park linkages/parkland dedication ( All proposed dedications must be reviewed by
the Parks and Recreation Board prior to P & Z Commission consideration.)
15. Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a
Licensed Texas Professional Engineer that include the following:
❑
Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street,
alley and/or sidewalk layout of the subdivision. (may be combined with other utilities).
❑
Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer
layout of the subdivision. (Utilities of sufficient saddepth to meet the utility master plan and any
future growth areas.)
❑
Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and
grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient
size/depth to meet the utility master plan and any future growth areas.)
❑
Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage
channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25, 50
and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention
if used. One sheet must show the overall drainage layout of the subdivision.
❑
Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E.
❑
Drainage Report.
❑
Erosion Control Plan (must be included in construction plans).
16. All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume
and page listed to indicate where the separate instrument easements were filed. Separate instrument easements
must be filed prior or concurrently with Final Plat.
J~4 17. Are there impact fees associated with this development? Yes ❑ No
Impact fees for R-1, R-2, & R-3 zoned final plats, must be paid prior to filing.
18. Will any construction occur in TexDOT rights-of-way? ❑ Yes )KNo
If yes, TexDOT permit must be submitted along with the construction documents.
NOTE:
1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat
at the Courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOI) must be submitted prior to
issuance of a development permit.