Loading...
HomeMy WebLinkAbout00070412CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM December 10, 2000 TO: McClure Engineering, Via fax 693-2554 FROM: Bridgette George, Asst. Development Coordinator obt SUBJECT: Steeplechase Suh&wsron, Phase 7- Rna/Flat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Friday, December 22, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for January 4, 2001, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; and The Mylar original of the revised final plat with the owner's signature. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments Engineering's Estimates and Construction Documents ( please pick up at Development Services) cc: John Duncum, Brazos Triad Land Dev. Partnership, Via fax 776-3089 Case file #00-223 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: STEEPLECHASE PH 7 (FP)-FINAL PLAT (0-223) ENGINEERING Final Plat 1. Everything is ok. Construction Documents 1. Sheet 4-Line W-3; tie-in to exist. 8"-sta 250+20.90 not sta 232+81.84. Drainage Report 1. Everything is ok. Engineer's Estimate Water System 1. 6"x6" Tee; Quantity shown as 4; should be 5. 2. 6" Gate Valve; Quantity shown as 8; should be 10. 3. 6"x13" Anchor Coupling; Quantity shows 8; should be 11. Reviewed by: Ted Mayo Date: 12/08/00 ELECTRICAL 1. Developer responsible for installing conduit per city spec. and design. 2. Will need a temporary blanket easement on property for construction purposes. Reviewed by: Tony Michalsky Date: 12/6/00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review.STAFF Staff Review Comments Page 1 of 2 McCLURE ENGINEERING, INC. IC00 December 1, 2000 Mrs. Natalie Ruiz Development Coordinator CITY OF COLLEGE STATION P.O. Box 9960 College Station, Texas 77842 RE: STEEPLECHASE SUBDIVISION FINAL PLAT, PHASE SEVEN & REPLAT OF LOTS 4R, 5R & 6R, BLOCK FIVE STEEPLECHASE SUBDIVISION, PHASE THREE Dear Natalie: Attached please find the following items for the above referenced related submittal: 1. Final Plat Application and Replat Application 2. Final Plat Filing Fees of $600.00 3. Replat Filing Fee of $200.00 4. Thirteen (13) folded blueline prints of the final plat and replat 5. Two (2) sets of construction plans 6. Two (2) copies of Drainage Report 7. Engineer's Construction Cost Estimate for Phase 7 construction it is my understanding that this plat and rezoning application will be reviewed by the Planning and Zoning Commission on Thursday, January 4, 2001. Should you have any questions or need additional information, please advise. Very truly yours, Michael R. McClure P.E., R.P.L. S. President MRM/mlm attachments 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 (979) 693-3838 • FAX (979) 693-2554 9 email: mcclure@tca.net 12/17/2000 SUN 23:47 FAX BRAZOS TRIAD LAND DEVELOPMENT PARTNERSHIP, LTD. STEEPLECHASE SUBDIVISION December 18, 2000 Mr. Ted Mayo Delivered by Electronic Transmission (979) 764-3496 Development Services City of College Station P. O. Box 9960 Mail Delivery to Follow College Station, Texas 77840 Re: Steeplechase Subdivision, Phase 7 Dear Mr. Mayo: In order to expedite our development plan for this phase of our development, we are requesting approval to begin construction of underground piping/conduits and earth moving prior to the final hearing by Planning and Zoning on January 4, 2001. We recognize that we do not have an official approval to perform this work until the January 0 hearing at which time we will be asking for approval by Planning and Zoning. We hold harmless the City of College Station for any costs we may incur in performing this work that might not be approved in the Planning and Zoning hearing and accept the risk of beginning the work prior to that hearing. Sincerely, Brazos Triad Land Development Partnership, Ltd. By.~-~zos Triad Corporation, General Partner Wj 001/001 301 Earl Rudder Freeway • Bryan, Texas 77802 (409) 774-6101 • FAX (409) 776-3089 DEVELOPMENT PERMIT PERMIT NO. 500083 DP-STEEPLECHASE PH 7 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: STEEPLECHASE SUBDIVISION PHASE 7 DATE OF ISSUE: 12/18/00 OWNER: BRAZOS TRIAD LAND DEVELOPMENT PARTNERSHIP LTD BRYAN, TX 77805 11901 FM 2154 DRAINAGE BASIN: BEE CREEK VALID FOR 12 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: FULL DEVELOPMENT PERMIT SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be F per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Administr /Rep ive Oybner/AgeW Contractor /L-~8 -pct Date Date Steeplechase Subdivision, Phase 7 Revised Engineer's Estimate ilPPPmher 12. 2000 Item Description Unit Quantity Estimated Unit Price Total No. Pavin Construction 1 Prepare Work Area Lump Sum 1 5000.00 5,000.00 2 Earthwork (cut) C.Y. 766 4.00 3,064.00 3 Earthwork (imported fill - loose) C.Y. 3,535 7.00 24,745.00 4 6" Reinforced Concrete Pavement w/curb S.Y. 4,758 27.00 128,466.00 5 6" Lime Stabilized Subgrade S.Y. 6,900 325 22,425.00 6 Extra Lime Ton 30 80.00 2,400.00 7 5" Reinforced Concrete Driveway S.F. 15,945 2.75 43,848.75 8 4" Concrete Sidewalk S.F. 171 2.50 427.50 9 Colored Wheelchair Ramps S.F. 107 7.25 775.75 10 Remove concrete curb & gutter L.F. 85 5.00 425.00 11 Remove concrete sidewalk S.F. 375 4.00 1,500.00 Paving Subtotal 233,077.00 Drainage Syps tem Construction 12 15" Rein£ Concrete Pipe, Str. Backfill L.F. 49 28.00 1,372.00 13 27" Reinf Concrete Pipe, Sir. Backfill L.F. 78 42.00 3,276.00 .14 27" Reinf Concrete Pipe, NonStr. Backfill L.F. 106 40.00 4,240.00 15 !0' Curb inlet Each 1 3000.00 3,000.00 16 5' Curb inlet Each 1 2300.00 2,300.00 17 Grate Inlet Each 1 2000.00 2,000.00 18 Reinforced Concrete Flume S.F., 336 650 2,184.00 19 Decorative Block Wall - Pond 1 Lump Sum 1 8000.00 8,000.00 20 Decorative Block Wall - Pond 2 Lump Sum 1 8000.00 8,000.00 21 Remove existing inlet Each 1 1000.00 1,000.00 22 Silt Fence L.F. 755 2.00 1,510.00 23 ] Inlet Protection Each 2 50.00 100.00 24 Hydromulch Seeding S.Y. 3,620 0.50 1,810.00 Drainage System Subtotal 38,792.00 Water S em Construc tion 25 8" PVC Water Line, Str. Backfill L.F. 20 24.00 480.00. 26 6" PVC Water Line, Str. Backfill L.F. 300 22.00 6,600.00 27 6" PVC Water Line, NonStr. Backfill L.F. 1,281 16.00 20,496.00 28 Fire Hydrant Assembly Each 1 1900.00 1,900.00 29 8"x6"Reducer Each 1 125.00 125.00 30 6"x 6" Tee Each 5 200.00 1,000.00 31 6" Gate Valve Each 10 400.00 4,000.00 32 6"x 24" Anchor Coupling Each 1 200.00 200.00 33 6"x 13" Anchor Coupling Each 11 125.00 1,375.00 34 6'k 45 degree bend Each 5 150.00 750.00 35 6"x 225 degree bend Each 3 150.00 450.00 36 6"x 1125 degree bend Each 4 150.00 600.00 37 6" Cap Each 2 75.00 150.00 38 Remove cap & connect to existing pipe Each 1 200.00 200.00 39 1.5" Water Ser. >10 ft (av = 45 ft.) Each 12 700.00 8,400.00 40 1.5" Water Ser. <10 ft (avg. = 7 IL) Each 3 450.00 1,350.00 41 1" Water Service av . = 13 ft. Each 3 500.00 1,500.00 Water System Subtotal 49,576.00 Sewer Syste m Construction 42 6" PVC, D-3034, Str. Backfill L.F. 637 25.00 15,925.00 43 6" PVC, D-2241, Str. Backfill L.F. 20 26.00 520.00 44 Standard Manhole, 0.6 & deep Each 1 1500.00 1,500.00 45 Standard Manhole, 8-10 ft. deep Each 1 1800.00 1,800.00 46 Connect to existing manhole Each 2 400.00 900.00 47 Remove cone & replace w/eccentric cone Each 1 500.00 500.00 48 4" Sewer Service :5 20 & (avg. = 15 ft.) Each 11 500.00 5,500.00 49 4" Sewer Service > 20 & (avg. = 51 ft.) Each 8 1000.00 8,000.00 50 Trench Safety sewer line L.F. 454 1.00 454.00 Sewer System Subtotal 34,999.00 Total Construction Cost 356,444.00 f3t«ptdp7taccdi=1; ad M~ -w (04 COLLEGE STATION In or Out CITY INFRASTRUCTURE INSPECTION NOTICE Date: -7~6' To: d~ From: Deborah Grace RE:`i~ Location: ~-✓~rr~ Q /,0, 4- a /Public Water Lines/Fire Hydrants ublic Sanitary Sewer Public Storm Sewer ❑ Public Streets ❑ /P~ublic Detention Facility Driveway Connection to Public Street ❑ Private Construction within easement ❑ No Inspection Required FEMA SFHA: Expiration Date: Watershed: Permit Engineer's Estimates Attached Construction Plans Attached Site Plan Attached Comments: COLLEGE STATION FEMA SFRA: Expiration Date: Watershed: Permit In or Out CITY INFRASTRUCTURE INSPECTION NOTICE Date: To: From: Deborah Grace RE: Location: Li /Fi H d nes re y rants Public Water ' i S li S lld ewer an tary Pub c i S l~ c Storm ewer Publ ❑ Public Streets ❑ Public Detention Facility Driveway Connection to Public Street ❑ Private Construction within easement ❑ No Inspection Required ld Engineer's Estimates Attached Construction Plans Attached Site Plan Attached Comments: McCLURE ENGINEERING, INC. 1008 Woodcreek Drive, Suite 103 College Station, Texas 77845 (979) 693-3838, FAX 693-2554 TRANSMITTAL LETTER l I bo i l Tl TO: Ms. Bridgette George Date: 12/14/2000 Proj. # Assistant Development Coordinator Attn: CITY OF COLLEGE STATION RE: Steeplechase Subdv., Phase Seven Final Plat .00_3 Steeplechase Subdv., Phase Three Replat We are sending you the following: ® Attached ❑ Invoice ® Prints ® Plans El Contractor Invoice ❑ Contracts ❑ Other ❑ Under Separate Cover Via: ❑ Bid Books F] Specifications ❑ Change Order Copies Date Description 10 Folded Blueline Prints of Phase Seven Final Plat 10 Folded Blueline Prints of Phase Three Replat 2 Revised Engineer's Construction Cost Estimate 6 y2 i~pj Sets of Construction Plans revised per staff comments These are transmitted as follows ❑ For Approval ❑ Approved as Submitted ® For your use ❑ Approved except as noted ® As Requested ® Resubmitted after Revisions ❑ For Review Comments ❑ Other 2 Sets Sets to be approved and returned to me 4 Sets Copies for your files Corrected Prints REMARKS: LET ME KNOW WHEN MY SETS OF CONSTRUCTION PLANS ARE READY TO BE PICKED UP. THANKS! COPY TO: SIGNED: o Michael R. McClure, P.E., R.P.L.S. President Steeplechase Subdivision, Phase 7 Revised Engineer's Estimate nPcemher 12.2000 Item Description Unit Quantity Esturtated Total No. Unit Price Paving Construction 1 Prepare Work Area Lump Sum 1 5000.00 5,000.00 2 Earthwork (cut) C.Y. 766 4.00 3,064.00 3 Earthwork (imported fill - loose) C.Y. 3,535 7.00 24,745.00 4 6" Reinforced Concrete Pavement w/curb S.Y. 4,758 27.00 128,466.00 5 6" Lime Stabilized Sub grade S.Y. 6,900 325 22,425.00 .6 Extra Lime Ton 30 80.00 2,400.00 7 5" Reinforced Concrete Driveway S.F. 15,945 2.75 43,848.75 8 4" Concrete Sidewalk S.F. 171 2.50 427.50 9 Colored Wheelchair Ramps S.F. 107 7.25 775.75 10 Remove concrete curb & gutter L.F. 85 5.00 425.00 11 Remove concrete sidewalk S.F. 375 4.00 1,500.00 Paving Subtotal 233,077.00 Drainage S stem Construction 12 15" Reinf. Concrete Pipe, Str. Backfill L.F. 49 28.00 1,372.00 13 27" Reinf Concrete Pipe, Str. Backfill L.F. 78 42.00 3,276.00 14 27" Reinf Concrete Pipe, Non-Str. Backfill L.F. 106 40.00 4,240.00 15 10' Curb inlet Each 1 3000.00 3,000.00 16 5' Curb inlet Each 1 2300.00 2,300.00 17 Grate Inlet Each 1 2000.00 2,000.00 18 Reinforced Concrete Flume S.F.. 336 6.50 2,184.00 19 Decorative Block Wall - Pond 1 Lump Sum 1 8000.00 8,000.00 20 Decorative Block Wall - Pond 2 Lump Sum 1 8000.00 8,000.00 21 Remove existing inlet Each 1 1000.00 1,000.00 22 Silt Fence L.F. 755 2.00 1,510.00 23 Inlet Protection Each 2 50.00 100.00 24 H dromulch Seeding S.Y. 3,620 0.50 1,810.00 Drainage System Subtotal 38,792.00 Water Systfte m Construction 25 8" PVC Water Line, Str. Backfill L.F. 20 24.00 480.00 26 6" PVC Water Line, Str. Backfill L.F. 300 22.00 6,600.00 27 6" PVC Water Line, Non-Str. Backfill L.F. 1,281 16.00 20,496.00 28 Fire Hydrant Assembly Each 1 1900.00 1,900.00 29 8'k 6" Reducer Each 1 125.00 125.00 30 6"x 6" Tee Each 5 200.00 1,000.00 31 6" Gate Valve Each 10 400.00 4,000.00 32 6"x 24" Anchor Coupling Each 1 200.00 200.00 33 6"x 13" Anchor Coupling Each 11 125.00 1,375.00 34 6"x 45 degree bend Each 5 150.00 750.00 35 6"x 22.5 degree bend Each 3 150.00 450.00 36 6"x 11.25 degree bend Each 4 150.00 600.00 37 r 6" Cap Each 2 75.00 150.00 38 Remove cap & connect to existing pipe Each 1 200.00 200.00 39 1.5" Water Ser. >10 ft (avg. = 45 ft.) Each 12 700.00 8,400.00 40 1.5" Water Ser. <10 ft (avg. = 7 R) Each 3 450.00 1,350.00 41 1" Water Service (avg. = 13 ft. Each 3 500.00 1,500.00 Water System Subtotal 49,576.00 Sewer S tem Construction 42 6" PVC, D-3034, Str. Backfill L.F. 637 25.00 15,925.00 43 6" PVC, D-2241, Str. Backfill L.F. 20 26.00 520.00 44 Standard Manhole, 0.6 ft. deep Each 1 1500.00 1,500.00 45 Standard Manhole, 8-10 ft. deep Each 1 1800.00 1,800.00 46 Conned to existing manhole Each 2 400.00 800.00 47 Remove cone & replace w/eccentric cone Each 1 500.00 500.00 48 4" Sewer Service < 20 & (avg. = 15 ft.) Each 11 500.00 5,500.00 49 4" Sewer Service > 20 ft. (avg. = 51 ft.) Each 8 1000.00 8,000.00 50 Trench Sa (sewer line fiely L.F. 454 1.00 454.00 - Sewer System Subtotal 34,999.00 Total Construction Cost 356,444.00 OF 65923 fsteeplc/p7/axccl/esdnate and proposal Steeplechase Subdivision, Phase Revised Engineer's Estimate n&P,-mher 12- 2000 Item - Description Unit Quantity Estimated Total No. Unit Price Paving Construction 1 Prepare Work Area Lump Sum 1 5000.00 5,000.00 2 Earthwork (cut) C.Y. 766 4.00 3,064.00 3 Earthwork (imported fill - loose) C.Y. 3,535 7.00 24,745.00 4 6" Reinforced Concrete Pavement w/curb S.Y. 4,758 27.00 128,466.00 5 6" Lime Stabilized Sub de S.Y. 6,900 325 22,425.00 6 Extra Lime Ton 30 80.00 2,400.00 7 5" Reinforced Concrete Driveway S.F. 15,945 2.75 43,848.75 8 4" Concrete Sidewalk S.F. 171 2.50 427.50 9 Colored Wheelchair Ramps S.F. 107 7.25 775.75 10 Remove concrete curb & gutter L.F. 85 5.00 425.00 11 Remove concrete sidewalk S.F. 375, 4.00 1,500.00 Paving Subtotal 233,077.00 Drains e S stem Construction 12 15" Rein£ Concrete Pipe, Str. Backfill L.F. 49 1,372.00 13 27" Rein£ Concrete Pipe, Str. Backfill L.F. 78 3,276.00 14 27" Reinf. Concrete Pipe, NonStr. Backfill L.F. 106 F 4,240.00 15 10' Curb inlet Each 1 3,000.00 16 5' Curb inlet Each 1 2300.00 2,300.00 - 17 Grate Inlet Each 1 . 2,000.00 18 Reinforced Concrete Flume S.F.. 336 6.50 2,184.00 19 Decorative Block Wall - Pond 1 Lump Sum 1 8000.00 8,000.00 20 Decorative Block Wall - Pond 2 Lump Sum 1 8000.00 8,000.00 21 Rernove existing inlet Each 1 1000.00 1,000.00 22 Silt Fence L.F. 755 2.00 1,510.00 23 Inlet Protection Each 2 50.00 100.00 24 H dromulch Seeding S.Y. 3,620 0.50 1,810.00 Drainage System Subtotal 38,792.00 Water Syste m Construction 25 8" PVC Water Line, Str. Backfill L.F. 20 24.00 480.00 26 6" PVC Water Line, Sir. Backfill L.F. 300 22.00 6,600.00 27 6" PVC Water Line, Non-Str. Backfill L.F. 1,281 16.00 20,496.00 28 Fire Hydrant Assembly Each 1 1900.00 1,900.00 29 8x 6" Reducer Each 1 125.00 125.00 30 6"x 6" Tee Each 5 200.00 1,000.00 31 6" Gate Valve Each 10 400.00 4,000.00 32 6"x 24" Anchor Coupling Each 1 200.00 200.00 33 6"x 13" Anchor Coupling Each 11 125.00 1,375.00 34 6"x 45 degree bend Each 5 150.00 750.00 35 6"x 22.5 degree bend Each 3 150.00 450.00 36 6"x 11.25 degree bend Each 4 150.00 600.00 37 6" Cap Each 2 75.00 150.00 38 Remove cap & connect to existing pipe Each 1 200.00 200.00 39 1.5" Water Ser. >10 ft (avg. = 45 ft.) Each 12 700.00 8,400.00 40 1.5" Water Ser. <10 ft (avg. = 7 ft.) Each 3 450.00 1,350.00 41 1" Water Service (avg. = 13 ft. Each 3 500.00 1,500.00 Water System Subtotal 49,576.00 Sewer S tem Construction 42 6" PVC, D-3034, Str. Backfill L.F. 637 25.00 15,925.00 43 6" PVC, D-2241, Str. Backfill L.F. 20 26.00 520.00 44 Standard Manhole, 0-6 ft. deep Each 1 1500.00 1,500.00 45 Standard Manhole, 8-10 ft. deep Each 1 1800.00 1,800.00 46 Connect to existing manhole Each 2 400.00 800.00 47 Remove cone & replace w/eccentric cone Each 1 500.00 500.00 48 4" Sewer Service < 20 & (avg. = 15 ft.) Each 11 500.00 5,500.00 49 4" Sewer Service > 20 ft. (avg. = 51 ft.) Each 8 1000.00 8,000.00 50 Trench Safety (sewer line L.F. 454 1.00 454.00 Sewer System Subtotal 34,999.00 Total Construction Cost 356,444.00 fsteeptelpWexceliestimatc and proposal BRAZOS TRIAD LAND DEVELOPMENT PARTNERSHIP, LTD. STEEPLECHASE SUBDIVISION December 18, 2000 Mr. Ted Mayo Development Services City of College Station P. O. Box 9960 College Station, Texas 77840 Delivered by Electronic Transmission (979) 764-3496 Mail Delivery to Follow Re: Steeplechase Subdivision, Phase 7 Dear Mr. Mayo: In order to expedite our development plan for this phase of our development, we are requesting approval to begin construction of underground piping/conduits and earth moving prior to the final hearing by Planning and Zoning on January 4, 2001. We recognize that we do not have an official approval to perform this work until the January 4t' hearing at which time we will be asking for approval by Planning and Zoning. We hold harmless the City of College Station for any costs we may incur in performing this work that might not be approved in the Planning and Zoning hearing and accept the risk of beginning the work prior to that hearing. Sincerely, Brazos Triad Land Development Partnership, Ltd. By~_Brazos Triad ►oration, General Partner 301 Earl Rudder Freeway • Bryan, Texas 77802 (409) 774-6101 • FAX (409) 776-3089