Loading...
HomeMy WebLinkAbout00070388Deborah Grace - Re: castlegate - two things Page ; From: Natalie Ruiz To: Jessica Jimmerson Date: 7/10/01 10:16AM Subject: Re: castlegate - two things Go ahead and call Joe at Texcon for a revised mylar. (I'd call him but 1 have no idea what I'm talking about.) So far, three final plats have been filed for Castlegate: Section 1, Phase 1 (00-178) - 50 lots, $15,450 park dev'I fee Section 2, Phase 1(01-124) - 27 lots, $8,343 park dev'i fee Section 4, Phase 1 (00-207) - 44 lots, $13,596 park dev'I fee When Section I, Phase i was filed, Wallace posted a letter of credit in the amount of $15,450 to cover the park development fee for only those 50 lots. With each phase, we need to make sure that we repeive a bond or letter of credit for the park development fee - $309 per lot. Grace, please contact Wallace to let him know that his bond for Section 1, Phase I is about to expire. The new letter of credit needs to be in the amount of $37,389. With each subsequent final plat, he will be responsible for posting a guarantee in the amount of $309 per lot until the park improvements have been constructed & accepted by the City. Thanks! Jessica Jimmerson 07/09/01 01:20PM 1. we do not appear to have the most recent copy of the MPP (file #00-136) mylars in the drawer. I ve the older ones in my office. what do we need to do? just call joe at Texcon for the new mylars? 2. Before any more final plats are filed we will need to make sure that they have bonded out of the development fee that would otherwise be required. Parks will handle approving the park developement plan and inspections for acceptance. Once the improvements are accepted by the city, then the bond can be released. think that Wallace already bonded out of the development fee, but I did not know how to check whether they have just been bonding out of each phase as they go, or if they bonded out of it all with the first phase that was filed. Let me know if any of the above requires clarification. Thanks, jes CC: 0\ -\%sA ok,;S4 0o a~ 0~-15 Bridgette George; Deborah Grace; Ted Mayo oo-a3'l 0\-30 (D() 2-1(4~) January 17, 2001 Natalie Thomas Ruiz, AICP Development Review Manager City of College Station 1101 Texas Ave. South College Station, TX 77842 Green Prairie Investors, Ltd. 5010 Augusta Circle College Station, TX 77845 RE: Castlegate Subdivision - College Station, Texas Dear Ms. Ruiz: This letter addresses the development of the park land for the Castlegate Subdivision - Sections 1 through 4. The following is a summary of the timeline for the development of the parks: Park At Subdivision Entrance on Greens Prairie Road Pond & path design completed 12-15-00 Construction 12-15-00 thru 4-1-01 Neighborhood Park for Sections 1 - 4 Park Planning 10-15-00 thru 2-15-01 Design 2-15-00 thru 4-1-01 Construction 4-1-01 thru 8-31-01 The schedule for the subdivision infrastructure construction is as follows: Section 1 - Phase 1 Section 4 - Phase 1 Section 2 - Phase 1 Section 3 - Phase 1 11-1-00 thru 3-1-01 12-1-00 thru 5-1-01 2-1-01 thru 7-1-01 3-1-01 thru 9-1-01 If you have any questions or need additional information, please do not hesitate to give me a call at (979) 693-7830. Sincerely Yours, Wallace Phillips Manager