HomeMy WebLinkAbout00070387CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
December 5, 2000
TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via fax 90-1480
r
FROM: Bridgette George, Asst. Development Coordinato J
SUBJECT: Castlegate Sub &; sion Section 2, Phase 1- final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by Friday, December 22, 10:00 a.m. to be placed on the next
available Planning and Zoning Commission meeting scheduled for January 4, 2001, 7:00 p.m.
in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and
The Mylar original of the revised final plat with the owner's signature.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Joe Schultz, P. E. , Via fax 690-9797
Case file #00-216
Home of Texas A&M University
STAFF REVIEW COMMENTS No. 1
Project: CASTLEGATE SUB SEC 2 PH 1 (FP)-FINAL PLAT (0-216)
ENGINEERING
Final Plat
1. Sheet 1-Lot 37, Blk. 2; Show 5' P.U.E. along south side- Lot 27, Blk. 2;
Show 5' P.U.E. along south side-Lot 28, Blk. 2; Show 10' P.U.E. along
north side- Lot 28, Blk. 2; ? 15' accessway along east side ?-clarify.
Construction Plans
1. Sheet 1- Waterlines W2-1, W2-2, and W2-3 are labeled S2-1, S2-2, and
S2-3.
2. Sheet 2- Profile; Storm sewer 203 shown at sta. 4+30-should be at sta.
4+92.
2. Sheet 5- Channel 2; minimum depth should be 27-check sta. 0+00 to sta.
3+00.
3. Sheet 6- Channel 1; minimum depth should be 30"-check sta. 0+00 to sta.
4+00.
4. Sheet 11- Plan; M H No. 211-sta. 07+79.46 not 04+79.46.
Drainage Report
1. Page 6- Table 1 does not show intensity and T/C calculations.
2. ? Pages 14 & 15-Q10 & Q100 (pipe flow diagram), pipe 234 and JB 210
do not exist.
Reviewed by: Ted Mayo
Date: 12/05/00
ELECTRICAL
1. No comment
Reviewed by: Jennifer Reeves Date: 11/30/00
NOTE: Any changes made to the plans, that have not been
requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional
changes on these plans that have not been pointed out to the City,
will constitute a completely new review.
Staff Review Comments Page 1 of I
STAFF REVIEW COMMENTS
No. 2
Project: CASTLEGATE SUB SEC 2 PH 1 (FP)-FINAL PLAT (0-216)
PLANNING
1. Final Plat- ok
Reviewed by: Ted Mayo Date: 12/27/00
ENGINEERING
1. Construction Documents- Everything is ok.
2. Drainage Report- Everything is ok.
3. Engineer's Estimate- ok
Reviewed by: Ted Mayo Date: 12/27/00
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1 of 1
Castlegate Subdivision, Section 2, Phase 1
Response to Staff Review Comments No. 1
Engineering:
Final Plat
Sheet 1 - changes made per comments; Clarification made: 20' accessway
0 Z v ? between Lots 28 & 29 of Block 2 is a part of Restricted Open Space Reserve
"D2" 0.43 acres.
Construction Documents
Sheets 1, 2, 5, 6 & 11 - changes made per comments.
Drainage Report
0( A 1. Page 6 - changes made per comments.
C.% 2. Pages 14 & 15 - changes made per comments.
ly
General:
Two copies of the Engineer's Cost Estimate are attached.