Loading...
HomeMy WebLinkAbout00070244r CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM January 23, 2002 TO: Kevin Hessel, The Wallace Group, Via fax 254 -776 -2924 FROM: Bridgette George, Assistant Development Manager SUBJECT: PEBBLECREEK PH 7B -1(FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, January 28, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for February 7, 2002, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; and, One (1) Mylar original of the revised final plat with the appropriate signatures. One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @ci .college - station.tx.us If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Pebble Creek Development, Via fax 690 -6081 Ryan Virden, Via fax 254 -776 -2924 Case file #2- 500007 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: PEBBLECREEK, PH 713-1 (FP) -FINAL PLAT (2- 500007) ENGINEERING FiDal Plat X. Note- lower left corner- No. 48041 CO205 . Date of February 09, 2000 ,2' 20' off -site PUE- will need evidence of filing before plat is filed Signature block- Pebble Creek Dev. Corp. -Phase 7 -131 not 9 -A —4. Please add 100 year flood plain along the south side- see sheet 20 of plans Construction Documents 1.Cover sheet: Index- Sheets 6 -8 are Whistling Straits Drive; Sheet 9 is Piping Rock Circle. 2. Sheet 1: Final Plat is different from plat submitted for approval, ie, 22.83 vs 22.99 acres, etc. 3. Sheet 3: Is fire hydrant at northwest corner of Royal Adelade Drive and Whistling Straits Drive existing or proposed? 4. Sheets 9, 10, and 11: Add typical cross - section for outlet channel. 5. Sheet 16: Manhole at STA 15 +63.35- Label drop manhole. 6. Sheet 19: Mission Hills Drive should be Whistling Straits Drive. 7. Sheet 22: Erosion Control- need detail for silt fencing and need to show silt fencing on the down slope of any areas that are to be substantially disturbed by clearing and construction. 8. Need to add specifications and details for trench safety. 9. Sheet 31- Electrical is missing. Drainage Analysis: OK Reviewed by: Ted Mayo Date: 01 /18/02 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer installs street lighting as per city specs and design. 3. Developer provides temporary blanket easement for construction purposes. 4. Developer provides digital of plat and/or site plan for AutoCAD 14. Email to rbolin(cDci .college - station.tx.us 5. Developer provides easements for electric infrastructure as installed (including street lighting). 6. Upon completion of project surveyed sealed meets and bounds descriptive easements are necessary to release temporary blanket easement. Reviewed by: Ronnie Bolin Date: 1 -17 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2 FAX COVER PAGE Date: Wednesday, January 23, 2002 Time: 2:46 PM To: Davis Young Fax Phone: 6906081 From: Bridgette George Title: Assistant Development Manager Company: City of College Station Address: 1101 Texas Ave College Station, TX 77840 Fax Phone: 979 - 764 -3496 Phone: 979 - 764 -3570 Subject: Pebble Creek 713-1 Message: 3 pages including cover ATTN: Ryan Virden Ryan, the tax certificates for 7B -1 will suffice for 713-2. Bridgette STAFF REVIEW COMMENTS NO. 1 Project: PEBBLECREEK, PH 76 -1 (FP) -FINAL PLAT (2- 500007) ENGINEERING Final Plat Note- lower left corner- No. 48041 CO205 Date of February 09, 2000 2: 20' off -site PUE- will need evidence of filing before plat is filed .Signature block- Pebble Creek Dev. Corp. -Phase 7 -61 not 9 -A -- 4. Please add 100 year floodplain along the south side- see sheet 20 of plans Construction Documents 1.Cover sheet: Index- Sheets 6 -8 are Whistling Straits Drive; Sheet 9 is Piping Rock Circle. 2. Sheet 1: Final Plat is different from plat submitted for approval, ie, 22.83 vs 22.99 acres, etc. 3. Sheet 3: Is fire hydrant at northwest corner of Royal Adelade Drive and Whistling Straits Drive existing or proposed? 4. Sheets 9, 10, and 11: Add typical cross - section for outlet channel. 5. Sheet 16: Manhole at STA 15 +63.35- Label drop manhole. 6. Sheet 19: Mission Hills Drive should be Whistling Straits Drive. 7. Sheet 22: Erosion Control- need detail for silt fencing and need to show silt fencing on the down slope of any areas that are to be substantially disturbed by clearing and construction. 8. Need to add specifications and details for trench safety. 9. Sheet 31- Electrical is missing. Drainage Analysis: OK Reviewed by: Ted Mayo Date: 01 /18/02 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer installs street lighting as per city specs and design. 3. Developer provides temporary blanket easement for construction purposes. 4. Developer provides digital of plat and /or site plan for AutoCAD 14. Email to rbolin ci.college- station.tx.us 5. Developer provides easements for electric infrastructure as installed (including street lighting). 6. Upon completion of project surveyed sealed meets and bounds descriptive easements are necessary to release temporary blanket easement. Reviewed by: Ronnie Bolin Date:1 -17 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2 of Case file #2- 500007 STAFF REVIEW COMMENTS NO. 1 Project: PEBBLECREEK, PH 713-1 (FP) -FINAL PLAT (2- 500007) ENGINEERING Final Plat 1. Note- lower left corner- No. 48041 CO205 , Date of February 09, 2000 2. 20' off -site PUE- will need evidence of filing before plat is filed 3. Signature block- Pebble Creek Dev. Corp. -Phase 7 -131 not 9 -A 4. Please add 100 year floodplain along the south side- see sheet 20 of plans Construction Documents 1.Cover sheet: Index- Sheets 6 -8 are Whistling Straits Drive; Sheet 9 is Piping Rock Circle. 2. Sheet 1: Final Plat is different from plat submitted for approval, ie, 22.83 vs 22.99 acres, etc. 3. Sheet 3: Is fire hydrant at northwest corner of Royal Adelade Drive and Whistling Straits Drive existing or proposed? 4. Sheets 9, 10, and 11: Add typical cross - section for outlet channel. 5. Sheet 16: Manhole at STA 15 +63.35- Label drop manhole. 6. Sheet 19: Mission Hills Drive should be Whistling Straits Drive. 7. Sheet 22: Erosion Control- need detail for silt fencing and need to show silt fencing on the down slope of any areas that are to be substantially disturbed by clearing and construction. 8. Need to add specifications and details for trench safety. 9. Sheet 31- Electrical is missing. Drainage Analysis: OK Reviewed by: Ted Mayo Date: 01/18/02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer installs street lighting as per city specs and design. 3. Developer provides temporary blanket easement for construction purposes. 4. Developer provides digital of plat and /or site plan for AutoCAD 14. Email to rbolin _ci.colleae- station.tx.us 5. Developer provides easements for electric infrastructure as installed (including street lighting). 6. Upon completion of project surveyed sealed meets and bounds descriptive easements are necessary to release temporary blanket easement. Reviewed by: Ronnie Bolin Date:1 -17 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3of2