STAFF REPORT
Item: A final plat of Pebble Creek Phase 7A containing 81 single family lots and associated right -
of-way on 44.88 acres, south of the existing subdivision and accessed by Pebble Creek Parkway.
(99 -204)
Applicant: The Wallace Group, Inc for Pebble Creek Development, Co
Item Summary: The plat is for 44.88 acres including 81 residential lots and associated right -of-
way. The plan is in general compliance with the Comprehensive Plan and the preliminary plat
which was approved by the Commission on December 3, 1998. This Phase of the subdivision will
be accessed by the existing Pebble Creek Parkway and will be single access pending construction
of Phase 7C.
Item Background: A preliminary plat for Pebble Creek Phase 7 was approved with conditions
by the Commission on December 3, 1998. Staff has meet with the applicant regarding the existing
fencing off of the linear park along Pebble Creek Parkway and fencing limitations within the
floodplain drainage easements. Steve Beachy, Director of the Parks and Recreation Department
has agreed to allow the fence to remain in its current configuration pending the development of the
hike and bike trail through the park. At that time, the developer has agreed to modify the fence as
needed. The engineer has agreed to draft limitations regarding fencing of the flood plain, however
has not submitted any information as of the writing of this report...
Budgetary & Financial Summary: There is no oversize participation requested at this time.
Staff Recommendations: Staff recommends approval with the conditions that the property be re-
zoned to R-1 and other conditions as underlined in this report.
Related Advisory Board Recommendations: not applicable
Commission Action Options: The Commission has final authority over the final plat. The options
regarding the final plat are approval as submitted, approval with conditions, or denial. Defer
action or table only at applicant's request.
Supporting Materials:
1. Location Map
2. Application
3. Engineering Information and Notification Information
4. Copy of Final Plat
o:\group\deve serlstfrpt\99- 204.doc
INFRASTRUCTURE AND FACILITIES
Water: 8 and 6 inch mains will be constructed within the subdivision to service the
individual lots and be connected to an existing 12 inch truck line within the Pebble Creek
Parkway right -of - -way .
Sewer: 6 inch service lines will be constructed within the subdivision and will connect
to the existing 16 and 18 inch trunk lines adjacent to the subdivision. The connection to
the existing lines will require crossing the future Pebble Creek Section 7B subdivision
and this crossing will be constructed to serve that future section.
Streets: The first segment of the proposed looped residential collector Royal Adelade
Drive will be constructed and tied into Pebble Creek Parkway.
Sidewalks: Will be provided on both sides of all collectors and one side of all residential
streets.
Ofd site Easements: An offsite easement is being dedicated to extend sewer service
through the future section of Pebble Creek Section 7B subdivision.
Drainage: The applicant is proposing to use enclosed storm sewers systems to convey
the stormwater runoff. Previous studies have shown that the area should be developed
without providing on -site detention.
Flood Plain: A private drainage easement is proposed to contain the flood plain of a
minor tributary of Lick Creek. A study of flood plain limits should be completed for
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: not applicable
Parkland Dedication: Previously dedicated with earlier phases of Pebble Creels.
NOTIFICATION:
Legal Notice Publication(s): N/A
Advertised Commission Hearing Dates(s): N/A
Advertised Council Hearing Dates: N/A
Number of Notices Mailed to Property Owners Within 200': N/A
Response Received: None as of this writing
o:\groupWevq_smUffrpt\99-204.doc
be approved and added to the plat.
dp
STAFF REPORT
Item: Consideration of a Preliminary Plat of Pebble Creek Phase 7 containing 174 acres and 305
single family lots, south of the existing subdivision and including the extension of Pebble Creek
Parkway. (98 -333)
Applicant: The Wallace Group, Inc for Pebble Creek Development, Co.
Item Summary: The Land Use Plan shows the area as medium density single family with a
density range of 3 to 6 dwelling units per acre. The plan is for 305 single family lots to be
developed over 3 phases. The gross density will be 1.7 dwelling units per acre and the net density
(excluding rights -of -way) will be 2.7 dwelling units per acre. The development will extend Pebble
Creek Parkway as a major residential collector to the south and is consistent with the Thoroughfare
Plan. Royal Adelade Drive, a residential collector street, will be looped through the subdivision
providing two access points to the subdivision from Pebble Creek Parkway. Phase 7A and 7B will
be constructed as a 160 lot single access subdivision. At the time Phase 7C is developed, Pebble
Creek Parkway will be extended and provide another point of access.
The subdivision is bounded to the north by Pebble Creek Golf Course, to the east and southeast by
Lick Creek Park, and to the southwest by undeveloped future phases of Pebble Creek Subdivisions.
The extension of Pebble Creek Parkway will provide another point of access to the existing Lick
Creek Park. The Parks and Recreation Department is proposing to extend the bike trail in Pebble
Creek Parkway (see item background) through the Lick Creek Park between this development and
the creek south of this development.
Item Background: The subdivision is in general conformance with the revised Master
Preliminary Plan approved on August 6, 1996, by the Planning and Zoning Commission.
Parkland indication requirements for this and previous sections of the development was
accomplished by dedicating an approximate 170 feet wide strip along Pebble Creek Parkway. As
part of the development of early phases of Pebble Creek, the developer was required to construct a
bike path within a portion of this area. This bike path is intended to connect Lick Creek Park with
the linear greenbelt that runs north toward Carter Creek. The bike path north of this section and to
the south of Murfield Court was built and subsequently removed by the applicant. Staff previously
contacted the developer and informed them of the need to re- construct and extend the bike path at
the time the next phase was proposed. A northern portion of this city owned park land has been
closed off to public access by the Pebble Creek golf course development with signs stating "private
property."
Budgetary & Financial Summary: There is no oversize participation requested at this time.
Staff Recommendations: Staff recommends approval with the conditions listed below as well as
conditions underlined in this report.
• The property is re-zoned to R 1
• The Phasing Line separating Phase 7A and 7B be extended between Lot 1 and 2 of Block 41.
o:\ group ldeve_ser\sthpt\98- 333.doc
The Phasing Line separating Phase 7B and 7C be extended to center on the lot lines
The inclusion of Pebble Creek Parkway and associated hike and bike trail in Phase 7C.
Related Advisory Board Recommendations: N/A
Commission Action Options:
The Commission acts as a recommending body on the question of preliminary plats pending an
ordinance change directed by Council giving sole authority for plat approval to the Commission.
The options regarding the plat are approval as submitted, approval with conditions, or denial.
Defer action or table only at applicant's request.
Supporting Materials:
1. Location Map
2. Application
3. Infrastructure and Facilities Information
4. Notification Information
5. Copy of Preliminary Plat
o:\group\deve_ser\s ftt\98- 333.doc
INFRASTRUCTURE AND FACE ITIES
Water: A 12 inch trunk line will be extended through the subdivision within the Pebble
Credo Parkway right -of -way as part of the development. 8 and 6 inch mains will be
constructed within the subdivision to the service the individual lots.
Sewer: 6 inch service lines will be constructed within the subdivision and will conned to
the existing 16 and 18 inch trunk lines adjacent to the subdivision.
Streets: This plan shows the extension of Pebble Creek Parkway as a north - south
major collector and is consistent with the Thoroughfare Plan. The developer will also
construct five thru and seventeen cul-de -sac streets. The streets located in phases B and
C have not been named as required by the Subdivision Regulations. The applicant
should name these streets at this time. The intersection of Royal Adelade and a cross
street with a cul- de-sac is slightly off set. The re- alignment of this intersection should
be investigated. The applicant has agree to this request at the time of final platting of
Phase 7B.
Off -site Easements: Not applicable
Sidewalks: Will be provided on both sides of all collectors and one side of all residential
streets. The Commission has the discretion to require sidewalks on cul-de -sacs if
"needed to provide through pedestrian access." With several of these cul-de -sacs
backing up to Lick Creek Park, the Commission may desire to exercise this discretion.
Drainage: The applicant is proposing to use enclosed storm sewers systems to convey
the stormwater runoff. As currently proposed there are 13 locations at which stormwater
is discharged across the park property. To minimize impacts to the parks and
comply with city Drainage Policies, these systems should be consolidated and piped
to the center line of the creeks . A median with an open channel is proposed for one
street. The channel should be enclosed to minimize maintenance. In discussions with
the applicant , their only reason for having the median was to allow open channel
drainage. Given that they will have to enclose the channel, they would like to delete the
median.
Flood Plain: The subdivision is located in the fork of Lick Creek and Alum Creeks. A
portion of 98 lots are located within the flood plains of these creeks and minor
tributaries. The applicant is proposing to fill several lots to provide a buildable area on
the lots. The fill must be in compliance with the Drainage Policies and permitting
must be done prior to final plat approval. Drainage easements are proposed for all
lots which contain flood plain to provide flood conveyance. Impediments, such as solid
fences, should be restricted from the drainage easements.
Oversize request: See Budgetary and Financial Summary Section.
Parkland Dedication: Previously dedicated with earlier phases of Pebble Creek.
o:\group\deve__scr\stfrpt\98-333.doc
The subdivision is located adjacent to Lick Creek Park. Because of this proximity to the
park, it maybe desirable to have at least one internal access point between the park and
subdivision. In discussions with the Parks Director, the has stated that he did not have a
concern if we did not have access from 1 or 2 points since it is not a neighborhood park.
This may be an item the Commission would desire to discuss.
Impact Fees: Not applicable
NOTIFICATION:
Legal Notice Publication(s): Not applicable
Advertised Commission Hearing Dates(s): Not applicable
Advertised Council Hearing Dates: Not applicable
Number of Notices Mailed to Property Owners Within 200': Not applicable
Response Received: Not applicable
o:\groupWeve serfs fttVB- 333.doc
STAFF REPORT
Prepared by: TED MAYO Date: January 30, 2002
Email: tmayo @ci.college- station.tx.us
Item: Consideration of a Final Plat for the PEBBLE CREEK PHASE 7 -131
SUBDIVISION (22.99 acres)(34 lots) located east of Pebble Creek Parkway and
east of Pebble Creek Subdivision Phase 7 -A. (2- 500007)
Applicant: THE WALLACE GROUP FOR PEBBLE CREEK DEVELOPMENT
COMPANY
Staff Recommendation: Staff recommends approval with the following
conditions: A clearly marked temporary emergency secondary accessway is to
be provided to access Phase 7 -131 as required by the City Council as a condition
of their approval of rezoning of this tract on January 24, 2002. The following
street name changes are to be made: Piping Rock Circle to Piping Rock Court;
Whistling Straits Drive east of Royal Adelade Drive to Whistling Straits Court;
Royal Adelade Drive at Whistling Straits Drive to Royal Adelade Loop.
Item Summary: The proposed Pebble Creek Phase 7 -131 Subdivision includes
38 R -1 single family (0.53 ac. avg.) lots and complies with the Land Use Plan,
the Thorough Plan, the Pebble Creek Master Plan, and the Preliminary Plat of
Section 7 which was approved by the Planning and Zoning Commission
December 3, 1998. The Final Plat for Pebble Creek Phase 7 -A (44.88 acres- 81
lots) was approved February 4, 1999. This property was rezoned from A -O to R-
1 by the City Council January 24, 2002. The required parkland dedication for this
development was addressed in previous submittals.
Commission Action Options: The Commission has final authority over the final
plat. The options regarding the final plat are:
1. Approval as submitted;
2. Approval with conditions;
3. Denial;
4. Table; or,
5. Defer action only at applicant's request.
Supporting Materials:
1. Location Map
2. Application
3. Infrastructure and Facilities
4. Copy of Final Plat
reated on 01130102 9:55 AM
I :IGROUPIDEVE SERITedIFP Staff ReportPC781.DOC
INFRASTRUCTURE AND FACILITIES
Water: Will be extended from the adjacent development.
Sewer: Will be extended from existing infrastructure.
Streets: Proposed street design is in accordance with City of College
Station standards.
Off -site Easements: 20' PUE north and east of Royal Adelade Drive.
Developer must show proof of filing of this easement instrument before
final plat can be filed.
Drainage: The development will be required to comply with the Drainage
Ordinance. A variable width drainage and conservation easement is
proposed along the south side of this property.
Flood Plain: The 100 year floodplain runs across the middle of Lots 38
and 39 of Block 39 on the east side of this development. These lots were
oversized to allow sufficient buildable area outside the floodplain.
Impact Fees: None
NOTIFICATION:
None Required