Loading...
HomeMy WebLinkAbout00070225CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM January 18, 2002 TO: Robert Payne, RL Payne & Associates, Via fax 696 -8114 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOURCENET SOLUTIONS, INC (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 Site Plan Application Fee $200 Development Permit Application Fee $600 Public Infrastructure Plan Review and Inspection Fee Two (2) revised site and landscaping plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Carlan Cooper, Universal Computer Services, Via fax 595 -2624 Joe Schultz, Texcon, Via fax 690 -9797 Ed Motley, C.F. Jordan, Via fax 696 -0601 Case file #2- 500003 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: SOURCENET SOLUTIONS, INC (SP) -SITE PLAN (2- 500003) PLANNING Stop Review: No Landscaping Plan was submitted. Parking does not meet requirements. The following comments do not constitute a full review. Standard Ordinance Requirements: 1. Parking spaces cannot be shared unless the following conditions are met. A permanent easement would need to be filed and the other site would have to show that it has 80 spaces above their City requirement to permit counting of site spaces toward the site requirement. 2. Provide landscaping calculations meeting the minimum City requirements, including screening of parking. 3. Show how the site will meet the buffering requirements. t.-4e Show the side and rear setbacks. L,--5 ' Delineate the width of the driveways at the entrances? 6. Does the screening wall, shown as #46, fully screen to the height of the equipment inside? 7. Show curb detail. 8. Show the sidewalks. L--9: Provide a detail of the trash compactor area. Covenant and Restrictions Requirements: 1. Point calculations need to be shown meeting covenant requirements for the developed area. No more than 50% of the points shall be canopy trees. Existing trees may not be used to meet point requirements without Board approval. 2. L.A.U.E. areas should reflect landscaping similar to streetscaping requirements, however, points from this area do not transfer to points for the remainder of the site. 3. Parking screening cannot be in the LAUE nor can the points count toward development area points. Reviewed by: Jessica Jimmerson Date: 1 -14-02 6;'t k NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled' on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J:\PZTEXT\PZ05752.DOC Page 2 of 3 ENGINEERING 1. Sheet C -1: Need public utility easement for 6 'fire line to building; need documentation of all public utility easements for new utility lines by replat or separate instrument. Need details for new storm sewers on east and west sides of new building; need to show existing waterline off -site at southwest corner of site; note 8 -? 9' wide by 120' 2. General: Need plan /profiles and construction details for new water, sanitary sewer, and storm sewers; need detailed grading plan; need pavement design details; need a drainage analysis showing compliance with the City's Drainage Ordinance and including design calculation for new storm sewers and inlets, etc.; need fire flow analysis supporting waterline sizing; need design analysis for sanitary sewer sizing. Reviewed by: Ted Mayo Date: 01/10/02 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of 4" rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and /or site plan. email to rbolin @_ci_college- station_tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: 1 -17 -02 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley SANITATION: 1. Looks OK, but I need to see a detail of the area described as "trash compactor'. Reviewed by: Pete Caler Date: 01 /16/02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. JIPZTEXTWZ05752.D0C Page 3 of 3 FAX COVER PAGE Date: Friday, January 18, 2002 Time: 9:22 AM To: Joe Schultz Fax Phone: 690 -9797 From: Bridgette George Title: Assistant Development Manager Company: City of College Station Address: 1101 Texas Ave College Station, TX 77840 Fax Phone: 979 - 764 -3496 Phone: 979 - 764 -3570 Subject: SourceNet Solutions, Inc. Message: 4 pages including cover FAX COVER PAGE Date: Friday, January 18, 2002 Time: 9:22 AM To: Carlan Cooper Fax Phone: 595 -2624 From: Bridgette George Title: Assistant Development Manager Company: City of College Station Address: 1101 Texas Ave College Station, TX 77840 Fax Phone: 979 - 764 -3496 Phone: 979 - 764 -3570 Subject: SourceNet Solutions, Inc. Message: 4 pages including cover FAX COVER PAGE Date: Friday, January 18, 2002 Time: 9:22 AM To: Robed L. Payne Fax Phone: 696 -8114 From: Bridgette George Title: Assistant Development Manager Company: City of College Station Address: 1101 Texas Ave College Station, TX 77840 Fax Phone: 979 - 764 -3496 Phone: 979 - 764 -3570 Subject: SourceNet Solutions, Inc. Message: 4 pages including cover FAX COVER PAGE Date: Friday, January 18, 2002 Time: 9:22 AM To: Ed Motley Fax Phone: 696 -0601 From: Bridgette George Title: Assistant Development Manager Company: City of College Station Address: 1101 Texas Ave College Station, TX 77840 Fax Phone: 979 - 764 -3496 Phone: 979 - 764 -3570 Subject: SourceNet Solutions, Inc. Message: 4 pages including cover C W 'S A I Development Services Department i , f Request for Public Information C OLLEGE • Date of Request: 2 ' �f — O 2 Name: ,�'1 ,1 ti s r/ Al Address: 99 4 CI Phone #: 6 90- 7/2 2 - Fax #: INFORMATION REQUESTED (Please note: The cost of all 24 X 36 pages will be dependant on the City's cost for each page copied. Additional charges may be incurred for non - standard copies.) Please be as nameldate specific as possible. ❑ SITE PLANS ❑ DRAINAGE REPORT i PLANNING CASE FILES ❑ BUILDING PLANS ❑ MRNUTES ❑ OTHER (Please be Specific.) In making this request, I understand that the City is under no obligation to create a document to satisfy my request or to comply with a standing request for information. I further understand that the information will be released only in accordance with the Public Information Act, Government Code, Chapter 552, which may require a determination as to confidentiality by the Texas Attorney General prior to a release. I further understand that the City of College Station has 10 working das from date of request in which to solicit such a determination. REQUESTOW S SIGNATURE CITY USE ONLY Date Completed No. of Original Pages _r1 Cost i CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM February 18, 2002 TO: Robert Payne, RL Payne & Associates, Via fax 696 -8114 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOURCENET SOLUTIONS, INC (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: $200 Site Plan Review Fee $200 Development Permit Fee $600 Public Infrastructure Inspection Fee Two (2) revised site and landscaping plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Carlan Cooper, Universal Computer Services, Via fax 595 -2624 Joe Schultz, Texcon, Via fax 690 -9797 Ed Motley, C.F. Jordan, Via fax 696 -0601 Case file #2- 500003 Home of Texas A&M University STAFF REVIEW COMMENTS NO.2 Project: SOURCENET SOLUTIONS, INC - SITE PLAN (02 -03) PLANNING 1. To meet the buffering requirements, the screening wall plan and site plan should show the wall along all property lines adjacent to residential property. (i.e. all property lines adjacent to lot 19 and lot 41) In addition, the site plan needs to show the 5 foot buffer area, with required landscaping, which is required between the larger parking area and the adjacent park and school property. 2. The rear parking lot detail that was faxed into our office, appears to meet the buffer area requirements, please incorporate this into the site plan. 3. Before the site plan can be stamped approved, and further permits granted, a perpetual instrument will need to be in place for the required parking for this site that is being met by excess parking on the adjacent site. It appears that once the rear parking lot reconfiguration is incorporated into the site plan, 101 spaces will need to be included in the agreement. Please be aware that the 28 spaces that are proposed to remain in the back lot, may be able to be added to the parking agreement. 4. Please submit a conceptual landscaping plan with the resubmittal. Before C/O a full landscaping plan will need to be submitted, approved and the plantings will need to be installed. Please remember that there are two steps to this, first meeting the City's standard requirements which include, landscaping for the site, streetscaping trees, additional streetscaping points and the new buffer requirements. Then a separate evaluation and set of calculations is done based on the Covenants and Restrictions which requires dividing the property into the protected area, the LAUE and the developed area, as well as meeting Board requirements. 5. Please remember that when the location of the FDC is determined, that the City will require a public utility easement to that location. 6. Please realize that nothing is allowed in the buffer area other than the required fencing and landscaping, and any existing easements. Business Center Covenants and Restrictions 1. The Business Center Board will forward their comments once they meet on Tuesday, Feb. 19 Reviewed by: Jessica Jimmerson Date: 2 -11 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J: \HTLTR \PZLTR \PROD \PZ2002 \P0005820. DOC 2of3 ENGINEERING Construction Documents are ok; Drainage Report, water analysis, sanitary sewer analysis are ok; Need documentation that public utility easements are recorded. Reviewed by: TED MAYO Date: 02/06/02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J: \HTLTR \PZLTR \PROD \PZ2002 \P0005820. DOC 3of3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM February 22, 2002 TO: Robert Payne, RL Payne & Associates, Via fax 696 -8114 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOURCENET SOLUTIONS, INC (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: $200 Site Plan Review Fee $200 Development Permit Fee $600 Public Infrastructure Inspection Fee Two (2) revised site and landscaping plans The additional submittals listed in the Advisory Board Minutes If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Carlan Cooper, Universal Computer Services, Via fax 595 -2624 Joe Schultz, Texcon, Via fax 690 -9797 Ed Motley, rdan, Via fax 696 -0601 Case file 2 -50000 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: SOURCENET SOLUTIONS, INC - SITE PLAN (02 -03) PLANNING 1. To meet the buffering requirements, the screening wall plan and site plan should show the wall along all property lines adjacent to residential property. (i.e. all property lines adjacent to lot 19 and lot 41) In addition, the site plan needs to show the 5 foot buffer area, with required landscaping, which is required between the larger parking area and the adjacent park and school property. 2. The rear parking lot detail that was faxed into our office, appears to meet the buffer area requirements, please incorporate this into the site plan. 3. Before the site plan can be stamped approved, and further permits granted, a perpetual instrument will need to be in place for the required parking for this site that is being met by excess parking on the adjacent site. It appears that once the rear parking lot reconfiguration is incorporated into the site plan, 101 spaces will need to be included in the agreement. Please be aware that the 28 spaces that are proposed to remain in the back lot, may be able to be added to the parking agreement. 4. Please submit a conceptual landscaping plan with the resubmittal. Before C/O a full landscaping plan will need to be submitted, approved and the plantings will need to be installed. Please remember that there are two steps to this, first meeting the City's standard requirements which include, landscaping for the site, streetscaping trees, additional streetscaping points and the new buffer requirements. Then a separate evaluation and set of calculations is done based on the Covenants and Restrictions which requires dividing the property into the protected area, the LAUE and the developed area, as well as meeting Board requirements. 5. Please remember that when the location of the FDC is determined, that the City will require a public utility easement to that location. 6. Please realize that nothing is allowed in the buffer area other than the required fencing and landscaping, and any existing easements. Business Center Covenants and Restrictions The Business Center Board will forward their comments once they meet on Tuesday, Feb. 19 Reviewed by: Jessica Jimmerson Date: 2 -11 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J:\HTLTR\PZLTR\PROD\PZ2002\PO005820.DOC 2 of 3 ENGINEERING Construction Documents are ok; Drainage Report, water analysis, sanitary sewer analysis are ok; Need documentation that public utility easements are recorded. Reviewed by: TED MAYO Date: 02/06/02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J: \HTLTR \PZLTR \PROD \PZ2002 \P0005820. DOC 3 of 3 Nat alie Rui - adv b rd minut 0202.d Pa 1 MEMORANDUM TO: Development Services Department FROM: Business Center Advisory Board DATE: February 19, 2002 RE: Minutes from the Business Center Advisory Board meeting - SourceNet Building In Attendance: Absent: Kim Foutz N/a Charles Wood Glenn Brown The Board considered the following: I. SourceNet site plan Also Present: Tom Brymer Jessica Jimmerson The City Manager, Tom Brymer requests a meeting with Carlan Cooper regarding the submitted site plan prior to any re- submittal of a site plan. The Board requests the following additional submittals and/or changes: • Elevation drawings, including color and material samples • Lighting plan and specifications • Specifications for trees and bushes in the buffer areas i.e. fast growing trees and fast growing bushes that grow in excess of 6' in height • Revise protected area as directed by Carlan Cooper at the February 8, 2002 meeting i.e. protected area boundary should encompass the treed areas along the rear property line �uali Sidewalks should be installed along the entire length of the SourceNet property along Circle (not along the UCS property). The Board will allow for delay of installation of the sidewalks along the future parking area until future development occurs if a development phase line is utilized. • Rear 26 space parking lot: 1) first preference is for those spaces to be removed and accounted for in the shared parking agreement; 2) second preference is to rotate the parking lot 90° and keep as far away from the property line as possible; 3) Third preference is for the parking lot to remain but shift south 15' -20'. ;rovi ding The Board is willing to waive the front building setback from 40' to 25' in return for an additional 15' setback to the rear property line in addition to the 25' buffer required by ordinance. This will allow for the parking, service drive, and building to be moved toward Quality Circle and away from adjoining residences • Buffer fence must wrap around the corner of the lot with the iron fence II. Adjourn 02/22/02 17:51 xY979 764 3496 DEVELOPMENT SVCS 10001 * ACTIVITY REPORTa� TRANSMISSION OK TX /RX NO. 1294 CONNECTION TEL 96968114 CONNECTION ID START TIME 02/22 17:50 USAGE TIME 01'23 PAGES 4 RESULT OK 02/22/02 17:53 %T979 764 3496 DEVELOPMENT SVCS 16001 * ACTIVITY REPORT TRANSMISSION OK TX /RX NO. 1295 CONNECTION TEL 95952624 CONNECTION ID UCS FIELD SVC START TIME 02/22 17:52 USAGE TIME 01'25 PAGES 4 RESULT OK 02/22/02 17:55 8`979 764 3496 DEVELOPMENT SVCS 16001 ACTIVITY REPORT TRANSMISSION OK TX /RX NO. 1296 CONNECTION TEL 96909797 CONNECTION ID START TIME 02/22 17:54 USAGE TIME 01'24 PAGES 3 RESULT OK 02/22/02 17:58 %T979 764 3496 DEVELOPMENT SVCS 10 001 :xsx ACTIVITY REPORT�c TRANSMISSION OK TX /RX NO. 1297 CONNECTION TEL 96960601 CONNECTION ID CFJORDAN START TIME 02/22 17:56 USAGE TIME 01'31 PAGES 3 RESULT OK DEVELOPMENT SERVICES TRANSMITTAL LETTER �l, 02 0 - 3 Name /Firm: e + C- O r - 3u-e— SL-kw- Date: Address: Phone: Fax: � -go We are transmitting the following for Development Services to review and comment: (Check all that apply.): ❑ Master Development Plan ❑ Preliminary Plat ❑ Final Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR Site Plan ❑ Grading Plan ❑ Landscape Plan ❑ Irrigation Plan ❑ Building Construction Documents w/ ❑ Redlines ❑ Development Permit App. w/ ❑ Redlines ❑ Conditional Use Permit w/ ❑ Redlines ❑ Rezoning Application w/ ❑ Redlines ❑ Variance Request w/ ❑ Redlines ❑ Other - Please specify w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Waterline Construction Documents w/ ❑ Redlines ❑ Sewerline Construction Documents w/❑ Redlines ❑ Drainage Construction Documents w/ ❑ Redlines ❑ Street Construction Documents w/ ❑ Redlines ❑ Easement application with metes & bounds decsription ❑ Drainage Letter or Report w/ ❑ Redlines ❑ Fire Flow Analysis w/ ❑ Redlines Special Instructions: 4 4 V s ❑ TxDOT Driveway Permit ❑ TxDOT Utility Permit ❑ Other - Please specify St �C- P/# V rpt Sowce SO /J ,�s a t-0 ny G� �s brer, ,p e-0 V, C& .1 �,o TRANSMITTAL LETTER 1 of 1 TRANSMIT.DOC 2/11/02 0 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM March 12, 2002 TO: Robert Payne, RL Payne & Associates, Via fax 696 -8114 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOURCENET SOLUTIONS, INC (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site and landscaping plans The additional submittals listed in the Advisory Board Minutes If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jessica Jimmerson at 764 -3570. Attachments: Staff review comments cc: Carlan Cooper, Universal Computer Services, Via fax 595 -2624 Joe Schultz, Texcon, Via fax 690 -9797 �d Motley, C.F. Jordan, Via fax 696 -0601 ✓sally Godfrey V,4 B I Case file #2- 500003 Home of Texas A &M University t ` STAFF REVIEW COMMENTS NO. 3 Project: SOURCENET SOLUTIONS, INC - SITE PLAN (02 -03) PLANNING 1. The buffer area and the protected areas need to be delineated separately and the protected area calculation should not include the buffer area. 2. Show the path or paths between sections of protected area that will allow access for the building of the fence and for planting in the buffer area. 3. One of the end islands in the rear parking lot does not appear to meet the 360 sf double row end island requirement. 4. The sidewalk along the southern portion of the property will need to be continued when that section of the property develops. 5. A public utility easement is required over the water line to the location of the FDC. Reviewed by: Jessica Jimmerson Date: 3 -7 -02 Business Center Covenants and Restrictions 1. Attached please find the minutes from the Business Center Advisory Board meeting. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of5 LANDSCAPING - (2 separate sets of requirements need to be met.) The following brief overview is intended to help clarify how to calculate the landscaping requirements for this site. Please refer to the Zoning Ordinance and the Covenants and Restrictions for a complete picture of the requirements. Once the necessary calculations are done then we can address how the proposed and existing plantings will meet the requirements and how best to reflect this in the plant list. Zoning Ordinance Site (Section 11) A. Total site area of phase one as shown on site plan less the buffer area divided by 1000 = x 30 points = total site area points. Streetscaping (Section 11) B. Total linear feet of frontage of phase one less driveways and visual triangles = LF. C. LF divided by 32 = # of trees required within 50 ft of ROW. D. LF divided by 50 = x 300 = additional streetscaping points which usually may be distributed throughout the site. E. Total site area points + add'I streetscaping points = total landscaping points Buffer Area (Section 8.10) Buffer will need to be installed along full length of property. F. Requires one canopy tree for every 25 LF and one shrub for every 3 LF. Covenants and Restrictions Landscaping Developed Area + LAUE + Protected Area + Undeveloped Area = Total Site Area LAUE (Landscaping, Access and Underground Utility Easements) G. LAUE = A strip of the property 40 feet deep along the full frontage of the property. Points calculated same as streetscaping above only additional points must be used in this area and not distributed throughout the site. Protected Area H. Determined with site plan. From the total site area less the LAUE, a minimum of 15% of the remainder must be in a protected area that will not be disturbed. Developed Area I. Developed area square footage divided by 1000 = x 60 points = developed area landscaping points. No more than 50% of points may be canopy trees and existing trees may only be used to meet point requirements with the Board's approval. Reminder: Before C/O a full landscaping plan, including the irrigation plan, will need to be submitted, approved and the plantings will need to be installed. NOTE. Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3of5 MEMORANDUM TO: Development Services Department FROM: Business Center Advisory Board DATE: March 1, 2002 RE: Minutes from the Business Center Advisory Board meeting - SourceNet Building In Attendance: Absent: Also Present: Kim Foutz N/a Charles Wood Tom Brymer Natalie Ruiz Glenn Brown The Board considered the following: I. SourceNet site plan The Board approves the revised submitted site plan, with final project approval contingent upon the following conditions: • Submit lighting plan and specifications for Board approval • Submit landscape plan and specifications for Board approval. Specifications for trees and bushes in the buffer areas and around parking near residents must be fast growing species that grow in excess of 6' in height. Red tip photinias or other tall species must be installed around the perimeter of the far northeast parking lot. • Buffer areas may not be included in the calculations for required forest preserve (the buffer does not count toward forest preserve). Request that Development staff check the calculation. The forest preserve must be temporarily fenced during construction. Please depict the 25' buffer area with a different cross hatching than the forest preserve. • The Board will allow for delay of installation of the sidewalks south of the Phase I line until Phase II development occurs. When Phase II development occurs, the sidewalk must be located along Quality Circle connecting to the existing City sidewalk on the south end of the tract. • Denote location of buffer fence which must run the entire perimeter adjacent to residential properties • Provide section detail of buffer area with fence, trees, and bushes • Add a note(s) showing areas where construction access will be accomplished to install buffer fence. Motion made by Tom Brymer, seconded by Glenn Brown, and the motion passed unanimously. NOTE. Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 4 of 5 + L II. Request for waiver of 40' building setback The Board waives the front building setback from 40' to 25' in return for providing an additional 20' setback to the rear property line in addition to the 25' buffer required by ordinance. The purpose of this waiver is to allow the parking, service drive, and building to be moved toward Quality Circle and. away from adjoining residences Motion made by Tom Brymer, seconded by Glenn Brown, and the motion passed unanimously. III. Adjourn NOTE. Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 5 of 5 r -. 4 FACSIMILE COVER SHEET CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)7G4-3570 / Fax (979)7G4-3496 Date: 3 — O z # of pages including cover: to Ifyou didnotmceme a complete fax, please call ouroffice immediatelyfora newtimnsmittal TO: . �',l �� FAX: COMPANY: - 131 -1`00 RE: CCQ FROM: SSf PHONE: (979) 764 -3570 COMPANY: City of College Station REMARKS: ❑ Urgent ❑ For your review ❑ Replay ASAP ❑ FYI 03/15/02 17:46 $`979 764 3496 DEVELOPMENT SVCS 19001 t: ACTIVITY REPORT x TRANSMISSION OK TX /RX NO. 1624 CONNECTION TEL 97311700 CONNECTION ID START TIME 03/15 17:45 USAGE TIME 01'35 PAGES 5 RESULT OK TEkCON w �� General Contractors Div. of CDS Enterprises, Inc. 1707 Graham Rd. • College Station, TX 77845 •979- 690 -7711 • Fax: 979 - 690 -9797 March 21, 2002 Bridgette George Assistant Development Manager City of College Station 1101 Texas Ave. South College Station, TX 77842 RE: SourceNet Solutions — College Station, Texas Dear Ms. George: Ala Attached are two copies of the revised site plan for the SourceNet Solutions office building project. Revisions have been made in response to the Staff Review Comments No. 3 and the Minutes from the March 1, 2002 Business Center Advisory Board meeting. If you have any questions or need additional information, please do not hesitate to give me a call at (979) 690 -7711. Sincerely Yours, Joe Schultz, P.E. Civil Engineer Attachment cc: Robert Payne, AIA