Loading...
HomeMy WebLinkAbout15-15.... GF No. BC1401557 CERTIFICATE THE STATE OF TEXAS § § COUNTY OF BRAZOS § BRAZOS COUNTY ABSTRACT COMPANY does hereby certify that we have examined the records in the office of the Clerk of the County Court of Brazos County, Texas, affecting the title to the said property described below from March 27, 2014: Being all that certain lot, tract or parcel of land lying and being situated in the ROBERT STEVENSON SURVEY, Abstract No. 54, City of College Station, Brazos County, Texas, and being au that 1.12 acre tract described in Deed from Mark Carron Lenz to Discount Fuels, LLC recorded in Volume 9853, page 11, Official Records of Brazos County, Texas, AND all that 0.377 acre tract described in Deed from Mary Jane Lenz to Discount Fuels, LLC recorded in Volume 9853, page 17, Official Records of Brazos County, Texas, and being more particularty described by metes and bounds as follows: BEGINNING at a 112• iron rod found at the most easterly comer of said Discount Fuels called 1.498 acre tract of land, for the easterly comer of the tract of land herein described, same being at the north corner of Lot 9 of Block 1, Southern Trace Subdivision, an addition to College Station according to the Amending Plat thereof recorded in Volume 7289, page 243, Official Records of Brazos County, Texas, same being the east comer of a called 1.53 acre tract of land described in a deed to Mark Carroll Lenz and recorded in Volume 4736, page 204, Official Records of Brazos County, Texas, and being in the southwest line of State Highway No. 40, a variable width right-of-way as recorded in Volume 5202, page 255, Official Records of Brazos County, Texas; THENCE South 41°53'31" West (S 41°50'11" W Record) a distance of 385.14 feet (385.00' Record) along the southeast line of said Discount Fuels, LLC called 1.498 acre tract, the southeast line of said Mark Carroll Lenz called 1.53 acre tract and common northwest line of Lots 9 through 5 of Block 1 of said Amended Southern Trace Subdivision to a 112• iron rod at the south comer of said Discount Fuels, LLC called 1.498 acre tract and a common westerly comer of said Lot 5, same being in the east line of F.M. Highway No. 2154 -Wellborn Road, a variable width right·of-way, as widened, and being the southeast corner of that certain called 0.41 acre tract out of the said Mark Carroll Lenz called 1.53 acre tract conveyed to the Texas Department of Public Transportation (TXDOT) in Volume 6515, page 241, Official Records of Brazos County, Texas; THENCE North 00°48'37" West (N 00°51'35" W Record) along the east line of said F.M. Highway No. 2154 -Wellborn Road, at a distance of 262.4 feet passing a northwest line of said Mark Carroll Lenz called 1.53 acre tract and the common southeast line of a called 0.697 acre tract of land described in a deed to Mary Jane Lenz recorded in Volume 4736, page 204, Official Records of Brazos County, Texas, same being at the northeast comer of said (TXDOT) called 0.41 acre tract and the common southeast comer of that certain called 0.32 acre tract out of the said Mary Jane Lenz called 0.697 acre tract conveyed to the Texas Department of Public Transportation (TXDOT) in Volume 6515, page 241, Official Records of Brazos County, Texas, and continuing on for a total distance of 457.02 feet (456.98' Record) to a (TXDOT) concrete monument found in the north line of said Mary Jane Lenz called 0.697 acre tract, same being at the northeast comer of said {TXDOT) caled 0.32 acre tract. and being at the common northwest comer said Discount Fuels, LLC called 1.498 acre tract. for the northwest comer of the tract of land herein described, and also being at the intersection of the east line of said F.M. Highway No. 2154, with the southeast line of aforesaid State Highway No. 40; THENCE along and with the southeast line of said State Highway No. 40 and the common line of said Discount Fuels, LLC called 1.498 acre tract, the following courses and distances numbered (1) through (3): 1) South 87°47'33" East (S 87°53'37" E Record), a distance of 78.53 feet (78.58' Record) to a (TXDOT) concrete monument found for the northeast comer of said Mary Jane Lenz called 0.697 acre tract, for a comer of the tract of land herein descnbed; 2) South 29°06'39" East (S 28°41'25" E Record), a distance of 16.65 feet (16.62' Record) to a (TXDOT) brass monument found at the northwest comer of aforesaid Mark Carron Lenz called 1.53 acre tract, for a corner of the tract of land herein described; 3) South 49°13'23• East (S 49°12·21· E Record), a distance of 233.81 feet (233.82' Record) to the POINT OF BEGINNING and CONTAINING 1.499 ACRES or 65,300 SQUARE FEET OF LAND, MORE OR LESS. NOTE -This Company does not represent that the above acreage or square footage calculations are correct. We find the following actions or conveyances affecting the title to said land (specifically excluding any conveyances respecting mineral estate) through January 61 2015 O 8:00 A.M.: Special Warranty Deed dated March 28, 2014, executed by Discount Fuels, LLC to Stripes LLC, recorded in Volume 11929, page 222, Official Records of Brazos County, Texas. Full Release of Lien dated April 1, 2014, executed by American Momentum Bank to Discount Fuels, LLC, recorded in Volume 11983, page 212, Off1eial Records of Brazos County, Texas. Release of Right of First Refusal dated April 4, 2014, executed by and between Discount Fuels, LLC and Stripes LLC, recorded in Volume 11951, page 166, Official Records of Brazos County, Texas. Full Release of Lien dated April 19, 2014, executed by Mark Carroll Lenz to Discount Fuels, LLC, recorded in Volume 11983, page 210, Official Records of Brazos County, Texas. Memorandums of Oil and Gas Lease dated September 10, 2013, recorded April 28, 2014, executed by Patricia Woolridge, et al to Petroedge Energy Ill LLC, recorded in Volume 11977, pages 65, 67, 69 and 71, Official Records of Brazos County, Texas. We do not certify as to property taxes. 2 ---------------- ' ,,. This certificate is for informational purposes only and the information contained herein shall not be relied on in the issuance of any title Insurance policy. The liability of Brazos County Abstract Company in this connection is limited to $0.00, being the charge made for this certificate. WITNESS OUR HAND at Bryan, Texas, January 7, 2015 at 8:00 a.m. 3 .1 . FOR OFFICE USE ONLY CASE NO.: \5::gQQ0 \5 DATE SUBMITTED:JJlllti 6 TIME: ?>.W C lTY OF Coll.EGE STATIO 1 Home o/Texas A&M Univmity• STAFF: --'0;.__.,,Q"..__ _____ _ DEVELOPMENT PLAT APPLICATION 1)~ MINIMUM SUBMITTAL REQUIREMENTS: /~ $932 Development Plat Application Fee. --fj $233 Waiver Request to Subdivision Regulations Fee (if applicable). _g $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ~ Application completed in full. This application form provided by the City of College Station must be used / and may not be adjusted or altered. Please attach pages if additional information is provided. /[M""'Six (6) folded copies of plat. (A signed mylar original must be submitted after staff review). --0 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. _Q Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). /~iUe Report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, ~ yncumbrances, etc. ~~ Paid tax certificates from City of College Station, Brazos County and College Station l.S.D. ~ The attached Development Plat checklist with all items checked off or a brie~xplanation as to why they are ~. f Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT D ick~ I nm "1211ke£ Add'clt co ADDRESS J3foo J f'M.:LlsY LEGAL DESCRIPTION (Lot, Block, Subdivision) / ...... rtt~(_,_1 '"&_...,,....,k,_,_l ___ +l .._.'\_,_<i-'--R~~=+-• _..,e_=·=ji_,,,·et)""-=eY'179~=n,...;_,_l\_,_·_,..5'-"lf.___ SPECIFIED LOCATION OF PROPOSED PLAT: APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Mike R. Choate mchoate@susser.com Street Address 4525 Ayers Street City Corpus Christi State TX. ~· .,_.., Zip Code 78415 ------- Phone Number 361-693-8828 361.-851-9514 Revised 9/1 4 Page 1 of 8 PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple owners): Name __ s_tr~ip_e_s_L_L_c _____________ E-mail __ s_us_s_e_r._co_m __ ~_, ___________ _ Street Address 4525 Ayers Street City Corpus Christi State __ T_x_. ______ Zip Code 78415 Phone Number 361 ·693-3619 Fax Number 361-851-9514 Name Street Address City ~ a1/) State "TX Zip Code 17 8<'.J 3 Phone Number _,""'i ..... ~-"'g_,"""'~'-"-"(jS-=-,.....---------Fax Number f?Jq{-~D L/ Total Acreage j. qqg R-0-W Acreage ..... ll..,_/-+A ...... A'------------ Current zoning of subject property ~~-=----------------------------- Floodplain Acreage _,,,.=--------------------------------- Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? " I. Requested waiver to subdivision regulations and reason for same (if applicable): Regarding the waiver request, explain how: O Yes jgf No 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. Revised 9114 Page 2 of 8 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ord inance Requested oversize participation, _______________________________ _ Total Linear Footage of Proposed Public: Streets Sidewalks Sanitary Sewer Lines Water Lines Channels Storm Sewers Bike Lanes I Paths Parkland Dedication due prior to filing the Development Plat: ACREAGE: ___ No. of acres to be dedicated + $ ____ development fee ___ No. of acres in floodplain ___ No. of acres in detention ___ No. of acres in greenways OR FEE IN LIEU OF LAND: No. of SF Dwelling Units X $ = $ --------- -----(date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPL/CATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. ::5-ii-:pe$ LL~ , ·~ tE ~ <=L3~=2 ): .. Ol-O°t-2o/~ Signature and title Date 'Br~ W i t l 1 l O-.n1 s 6,. \l ic.~ P~s.l~-4~ l O~ib71.$ WIZ.!>+- Revised 9/14 Page 3 of 8 g.--- DEVELOPMENT PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) Drawn on 24" x 36" sheet to scale of 100' per inch or larger. Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. Title Block with the following information: ~ Name and address of subdivider, recorded owner, planner, engineer and surveyor. Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911.) (Property that has been previously platted must retain original subdivision name.) Date of preparation. Engineer's scale in feet. Total area shown on development plat. North Arrow. Subdivision boundary indicated by heavy lines. If more than 1 sheet, an index sheet showing entire subdivision at ,a scale of 500 feet per inch or larger. All applicable certification. cg---- g-- [0' i 0 Ownership and Dedication Surveyor and/or Engineer City Engineer Planning and Zoning Commission Brazos County Clerk Brazos County Commissioners Court Approval (ET J Plats only) If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. Location of the 100 Year Floodplain and floodway, if applicable, according to the most recent available data. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. g' The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following : (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Existing Proposed Revised 9/14 D D D Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance. Page 7 of 8 .. Existing Proposed D D D D D ca'. y D w D A number or letter to identify each lot or site and each block. Parkland dedication/greenbelt area/park linkages (All proposed dedications must be reviewed by the Parks and Recreation Advisory Board prior to P&Z Commission consideration.) Building, structure or improvement or proposed modification of the external configuration of the building, structure, or improvement. Each easement and right-of-way, including alleys, within or abutting the boundary of the surveyed property. Any part of the property intended to be dedicated to public use of for the use of purchasers or owners of lots fronting on or adjacent to the sidewalk, alley, square, park, or other part. Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: D Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street, alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). D Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) D Water line plan showing fire hydrants, valves. etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) O Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the subdivision. D Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. D Letter of Completion for public infrastructure or guarantee I surety in accordance with UDO Section 8.6. D Drainage Report. D Erosion Control Plan (must be included in construction plans). ~ All off-site easements necessary for infrastructure construction must be shown on the development plat with a volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be provided in recordable form prior to being scheduled for P&Z Commission consideration. ~Are there impact fees associated with this development? r Yes } vNO · Impact fees must be paid prior to building permit. ~ Will any construction occur in TxDOT rights-of-way? Mes r No If yes, TxDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected development plat to be submitted in digital form if available prior to filing the plat at the Courthouse. 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOJ) must be submitted prior to issuance of a development permit. Revised 9/14 Page 8 of 8 Job Name Building Location System Contract Data File I RJS()N FI r._ J\ " ' ) <. I \ I l " Harrison French and Associates 1705 S. Walton Blvd ., Suite 3 Bentonville, AR 72712 479-273-7780 : \)1cJ ... ~ \yoYI Dvvlc.s; .p.,?ltL·hOY\ c: l I l > : 61-1 y 0 ~ Wl ll btrLV\ iz.A (),l Leo; e ?r1101\CVl 1 n : Hydrant Supply.WXF Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Report Stripes #2468 College Station, TX < 1 < I \ I I State Highway 40 and FM 2154 I I l This report provides the current available hydrant water supply for the proposed Stripes Store #2468. When determining fire hydrant flow rates in accordance with the International Fire Code, Appendix B Table 105.1 based upon the size of the building and its current classification as a Type V-B structure, the required flow rate is 1750 gpm at 20 psi from the remote hydrant on the property is required. On 1/28/15 a hydrant flow test was performed by Eugene Marshal with College Station Utilities and witnessed by Justin Tamplin and Howard Mitchel. The hydrants tested are located within the Southern Trace Subdivision. Reference Attachment B for hydrant locations. During the test one 2-1/2 inch outlet was utilized. A Pitot reading of 65 was recorded for the hydrant with discharge coefficients of 0.9. This resulted in a flow of 1350 GPM with a residual pressure of 71 psi. The static and residual pressures were taken at an elevation of approximately 346 .0, AMSL, which is 12 feet above the FFE of the store. Static pressure before and after the test was 73 psi . It is assumed that the flow test hydrant is supplied by 8" ductile iron. A 6" tap will connect to the 8" city line and supply the hydrant on site. SUMMARY OF RESULTS 1 -6" Supply to Site Hydrant Static Water Pressure at Source Connection: Residual pressure at Source Connection: Assumed Elevation Difference Required Fire Hydrant Flow: Available Fire Hydrant Flow: 73 psig 71psi @ 1350gpm 12ft. resulting in +5.2 psig 20psi@ 1750gpm 51.9psi@ 1750gpm The available hydrant supply results do meet the minimum requirements of the International Fire Code. The results include pressure loss for piping, fittings and elevation differences. Harrison French and Associates City Water Supply: C1 -Static Pressure . 73 C2 -Residual Pressure: 71 C2 -Residual Flow 1350 150 140 130 p 120 R 110 E 100 s 90 s 80 u 70 R 60 E 50 40 30 20 10 C1 02 20@1400 600 800 Page Date Demand: c~ 1000 1200 1400 1600 FLOW ( N " 1.85 ) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 D1 -Elevation D2 -System Flow D2 -System Pressure Hose ( Demand ) D3 -System Demand Safety Margin 03 1800 : -5.197 : 17.778 : 1750 : 1750 : 51 .989 ing ed ma~ Harrison French and Associates Fitting Legend Abbrev. Name E NFPA 13 90' Standard Elbow F NFPA 13 45' Elbow G NFPA 13 Gate Valve T NFPA 13 90' Flow thru Tee Units Summary Diameter Units Length Units Flow Units Pressure Units y, 1 1 0 3 Inches Feet % 2 1 0 4 11.4 2 3 1 1 0 0 5 6 US Gallons per Minute Pounds per Square Inch 1 y, 2 2Y2 3 4 5 6 7 2 2 3 3 0 1 1 1 8 10 12 15 Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors 3y, 8 3 1 17 of 120 except as noted with *. The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a * will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. 4 5 6 8 10 12 14 18 4 5 7 9 2 2 3 4 20 25 30 35 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Page 2 Date 10 12 14 16 18 20 24 22 27 35 40 45 50 61 11 13 17 19 21 24 28 5 6 7 8 10 11 13 50 60 71 81 91 101 121 Pressure I Flow Summary -STANDARD Harrison French and Associates Node No. H1 UG1 TEST Elevation 334.0 346.0 346.0 K-Fact Pt Actual 0.0 11 .0 17.78 Pn na na na Flow Actual 1750.0 The maximum velocity is 18.84 and it occurs in the pipe between nodes H1 and UG1 Density Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Page 3 Date Area Press Re . Final Calculations -Hazen-Williams Harrison French and Associates Hyd. Ref. Point H1 to UG1 UG1 to TEST Oa Qt 1750.00 1750.0 0.0 1750.0 0.0 1750.00 Dia. "C" Pf/Ft 6.16 140.0 0.0690 8.27 140.0 0.0164 Fitting or Eqv. Ln. 2E 40.168 F 10.042 G 4.304 2E 56.936 T 55.354 0.0 Pipe Ftng's Total 180.000 54.514 234.514 300.000 112.290 412.290 Pt Pe Pf 0.0 -5.197 16.193 10.996 0.0 6.782 17.778 Pt Pv Pn Page 4 Date Notes Qa = 1750 Vel = 18.84 Vel = 10.45 K Factor = 415.05 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Co ege S ation Utilities Reliable, Affordable, Community Owned Date test completed Wednesday, January 28, 2015 Time completed 8:30 Test completed by Eugene Marshall Witness Justin Tamplin, Howard Mitchell FLOW HYDRANT Location 4005 Southern Trace Court Nozzle size 2.5 Hydrant number V-068 Pitot reading in PSI 1350 Flow in G.P.M. 65 STATIC HYDRANT Location Hydrant number Static PSI Residual PSI Comments 4029 Southern Trace Drive V-067 73 71 Requested WELL SORN RO C Project Name: Stripes Project Location: College Station, TX Date: February 3, 2015 OPINION OF PROBABLE COST Estimate is based upon Sidewalk Plan OTP SITE PREPARATION Earthwork Clear, grub, and prep EROSION AND SEDIMENT CONTROL Erosion Control Lump Sum SIDEWALK Aggregate Base Sidewalk WATER LINE AND HYDRANT Main Extension Hydrant 6" 4" 6" __ ........... ,~~ ---e_OF r, \ ; ~1>-1-··········~''• ; C:J •• •• -LL ·· .. \S' t f ........ J'{ II•"•• •••• :'~ jl. .....• ~ ................................... :: ...... , ~ PAUL J. MOSS ~ ~·····;························ ............. : ... J ~ -o"-. 116731 ltCJ '• 1>"·.. /"-'~ ··~0~···~1CENS~~···~~ '~\a·~~~: ~ ~~ \ ~~-~ 1-1~/IS 0.14 265 265 90 Unit Unit Price AC $ 1,500.00 SITE PREP TOTAL Unit Unit Price EA $ 750.00 EROSION TOTAL Unit Unit Price SY $ 10.00 SY $ 25.00 SIDEWALK Unit Unit Price LF $ 25.00 EA $ 4,000.00 SIDEWALK SITE PREPARATION EROSION AND SEDIMENT CONTROL SIDEWALK WATER LINE AND HYDRANT SUB-TOTAL 10% CONTINGENCY GRAND TOTAL Total $ 210.00 $ 210.00 Total $ 750.00 $ 750.00 Total $ 2,650.00 $ 6,625.00 $ 9,275.00 Total $ 2,250.00 $ 4,000.00 $ 6,250.00 $ 210.00 $ 750.00 $ 9,275.00 $ 6,250.00 $ 16,485.00 $ 1,648.50 $ 18,133.50 HFA ARCHITECTS f.NGlNEERS l:-J T ifR I 0 RS } 1\H.P fSt)N ~f{l· NC I I 0}~0/1 6 (6-10 10,'IW \ I I To: Planning & Development Services City of College Station 1101 Texas Avenue College Station, TX 77840 Attn: Erika Bridges I I > LEITEROFTRANSMITTAL fu Date: March 24, 2015 Project No: 10-15-00008 Project: Stripes Convenience Store #2468 CSTX: 15-9000015 Subject: Dick's Iron Dukes Addition Development Plat Please find the following items for your use with the above referenced project. If you have any questions or need additional information, please contact me. Copies Description 1 Response Letter 1 Revised Fire Flow Report 1 C4. l Waterline Profile f 1 Cl.2 Sidewalk 'J...., 1 I Revised Cost Estimate t1/N~ If enclosures are not as noted, please notify our office immediately. Sincerely, Jenifer Paz Project Manager I 713-702-0987 jenifer.paz@hfa-ae.com 1705 S Walton Blvd, Suite 3 Bentonville, AR 72712 www.hfa-ae.com Phone: 479-273-7780 Fax: 888-520-9685 Project Name: Stripes Project Location: College Station, TX Date: April 28, 2015 OPINION OF PROBABLE COST SITE PREPARAT!QN brthwork Oear. grub, and prep EROSION ANO SEDIMENT CONTROL Erosion Control Lump Sum S!OEWAUC Aggregate Base Sidewalk WATER LINE ANO HYDRANT 6" 4" C900 Main Extension w/Fittings 'Fire Hydrant Valve & Assembly 12" Gate Valve and Valve Box 8" Gate Valve· and Valve Box s•Tap Assembly 8" __ ,,,,,,,, ...:"'-..-€.OF/.~\\\ -..<J>-' •• •·••·•·•••• '· -0' .. * .. ·"'t .::' .··· ........ -. .:f *:' ·•• •• •li "*: '*'i. jl ...... '. ................................... : ...... l J PAUL J. MOSS ~ ., ........................................... ~·····!! ~ . • i! ·~ ~-... 116731 /ti:J ,,~ ·.. .··41~ ll~OI ~"·~1~ENS~.?.--;_~,.:-S ....... c~"'-- ' ~~ :\.~ \ ·_' ,'-- 0,,/ '--'\ / l J"" !.!nil Unit Price 0.2 AC s l,S00.00 SITE PREP TOTAL Unit .!.!!!!1.f!ill 1 EA s 750.00 EROSION TOTAL !.1Jll! Unit Price 275 SY s 10.00 275 SY $ 25.00 SIDEWALK Unit Unit Price 90 LF s 35.00 EA s 4,000.00 EA $ 2,500.00 EA $ 1,500.00 EA $ 1,500.00 WA TFR UNE ANO HYDRANT SITF PREPARAnON EROSION AND SEDIMENT CONTROL SIDEWAU< WATER LINE AND HYDRANT SUB-TOTAL l0% CONTINGENCY GRAND.TOTAL Total $ 300.00 $ 300.00 Iilli.! $ 750.00 $ 7SO.OO Iilli.! $ 2.750.00 $ 6,875.00 $ 9,625.00 .!2!2! $ 3,lS0.00 $ 4,000.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ U,650.00 $ 300.00 $ 750.00 $ 9,625.00 $ 12,650.00 $ 23,325.00 $ 2,332.50 $ 25,657.50 Job Name Building Location System Contract Data File FP I· ' ) < I \ I I ._ Harrison French and Associates 1705 S. Walton Blvd., Suite 3 Bentonville, AR 72712 479-273-7780 : ST~R;_, Z~B : Z..'700 SF : HwY &.10 ~ FM ~1$ ~ Hydrant Supply. WXF Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Revision #2 4/9/15 ll\PPJ'i<..> Water Supply Report Stripes #2468 College Station, TX ( ( State Highway 40 and FM 2154 l RI ( fl This report provides the current available hydrant water supply for the proposed Stripes Store #2468. When determining fire hydrant flow rates in accordance with the International Fire Code, Appendix B Table 105.l based upon the size of the building, 4, 700 square feet, and its current classification as a Type V-B structure, the required flow rate is 1750 gpm at 20 psi from the remote hydrant on the property is required. An additional 25 gpm has been added to the required fire flow demand in order to account for peak daily demand for a total of 1775 gpm. See attached calculations for reference. On 1/28/15 a hydrant flow test was performed by Eugene Marshal with College Station Utilities and witnessed by Justin Tamplin and Howard Mitchel. The hydrants tested are located within the Southern Trace Subdivision. Reference attachment for hydrant locations. During the test one 2-1/2 inch outlet was utilized. A Pitot reading of 65 was recorded for the hydrant with discharge coefficients of 0.9. This resulted in a flow of 1350 GPM with a residual pressure of 71 psi. The static and residual pressures were taken at an elevation of approximately 346.0, AMSL, which is 12 feet above the FFE of the store. Static pressure before and after the test was 73 psi. It is assumed that the flow test hydrant is supplied by 8" ductile iron. An 8" tap ·.viii connect to the 12" city line and supply the hydrant on site. Reference hydraulic node map for pipe sizes, locations and approximate 8" tap location. SUMMARY OF RESULTS 1-8" Supply to Site Hydrant Static Water Pressure at Source Connection: Residual pressure at Source Connection: Assumed Elevation Difference Required Fire Hydrant Flow: Available Fire Hydrant Flow: 73 psig 71psi @ 1350gpm 12ft. resulting in +5.2 psig 20psi@ 1775gpm 69.7psi @ 1775gpm Maximum velocity was found to be 10.6 fps. Reference attached hydraulic calculations. The available hydrant supply results do meet the minimum requirements of the International Fire Code. The results include pressure loss for pipe lengths and fittings. Due to the building FFE is 12ft. below the test hydrant 5.2psig was added to the available hydrant supply. Water Supply Curve C Harrison French and Associates City Water Supply: C1 -Static Pressure . 73 C2 -Residual PressL1re: 71 C2 -Residual Flow 1350 150 140 130 p 120 R 110 E 100 s 90 s 80 u 70 R 60 E 50 40 30 20 10 C1 -- 600 800 CZ 1000 1200 1400 1600 FLOW ( N " 1.85 ) Demand: D1 -Elevation D2 -System Flow D2 -System Pressure Hose ( Demand ) D3 -System Demand Safety Margin 03 1800 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Page 1 Date : -5.197 : 5.125 : 1775 : 1775 : 64.556 Fittings Used Summary Harrison French and Associates Fitting Legend Abbrev. Name E NFPA 13 90' Standard Elbow G NFPA 13 Gate Valve T NFPA 13 90' Flow thru Tee Units Summary Diameter Units Length Units Flow Units Pressure Units y, 1 0 3 Inches Feet :y. 2 0 4 rn 2 3 0 0 5 6 US Gallons per Minute Pounds per Square Inch 1% 2 2Y:z 3 4 5 6 7 0 1 1 1 8 10 12 15 Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CF actors 3% 8 1 17 of 120 except as noted with*. The fittings marked with a* show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a* will be adjusted in the calculation for CFactors of other than 120 and diameters other than Scheel 40 per NFPA. 4 5 6 8 10 12 14 18 2 2 :3 4 20 25 30 35 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Page 2 Date 10 12 14 16 18 20 24 22 27 35 40 45 50 61 5 6 7 8 10 11 13 50 60 71 81 91 101 121 Pressure I Flow Summary -STANDARD Harrison French and Associates Node No. H1 UG2 UG1 TEST Elevation 334.0 334.0 346.0 346.0 K-Fact Pt Actual 0.0 2.97 -1.36 5.13 Pn na na na na Flow Actual 1775.0 The maximum velocity is 10.6 and it occurs in the pipe between nodes H1 and UG2 Density Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Page 3 Date Area Press Reg. Finpl Calculations -Hazen-Williams Harrison French and Associates Hyd. Ref. Point HI to UG2 UG2 to UG1 UG1 to TEST Qa Qt 1775.00 1775.0 0.0 1775.0 0.0 1775.0 0.0 1775.00 Dia. "C" Pf/Ft 8.27 140.0 0.0169 12.34 140.0 0.0024 8.27 140.0 0.0169 Fitting or Eqv. Ln . G 6.326 T 55.354 E 28.468 E 42.195 T 93.767 0.0 E 28.468 T 55.354 0.0 Pipe Ftng's Total 85.750 90.148 175.898 225.850 135.962 361 .812 300.000 83.822 383.822 Pt Pe Pf 0.0 0.0 2.970 2.970 -5.197 0.870 -1.357 0.0 6.482 5.125 Pt Pv Pn Page 4 Date ******* Notes Qa = 1775 Vel = 10.60 Vel = 4.76 Vel = 10.60 K Factor= 784.06 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 ****** College Station Utilities Reliable, ff ordab/e, Communit 0 ned Time completed 8:30 Test completed by Eugene Marshall Witness Justin Tamplin. Howard Mitchell FLOW HYDRANT Location 4005 Southern Trace Court Nozzle size 2.5 Hydrant number V-068 Pitot reading in PSI 1350 IFlow in G.P.M. 65 STA TIC HYDRANT Location Hydrant number Static PSI IResidual PSI Comments 4029 Southern Trace Drive V-067 73 71 Requested (J 6 z ;:u I I Ar z Ar 0 0 . . STORE SITE / CONT. TO CITY LOOP [SITE HYDRANT / / 0 1;.-'"/' '~ <· "'-Z"1r -~ / \ "1'.'.(:; r / '-';1'. '/ .. c.'!Jz---APPROX. .:iv \'o '\'· \/ v \ TAP LOCATION /"'" ""·., / / ":; / / " CONT. TO CITY LOOP CONT. TO CITY LOOP \ /, "~> / / " / / ""' / \/ \ \-.,,. ;v4 tJ 'V LocAT10N OF TEST HYDRANT I ~ ""'-CONT. TO CITY LOOP Estimate is based upon Sidewalk Plan OTP SITE PREPARATION Earthwork Clear, grub, and prep EROSION AND SEDIMENT CONTROL Erosion Control Lump Sum Aggregate Base Sidewalk WATER LINE ANO HYDRANT Main Extension Hydrant 6" 4" 8" Project Name: Stripes Project Location: College Station, TX Date: February 3, 2015 OPINION OF PROBABLE COST 0.2 275 275 90 Unit Unit Price AC $ 1,500.00 SITE PREP TOTAL .!l!!!! Unit Price EA $ 750.00 EROSION TOTAL Unit Unit Price SY $ 10.00 SY $ 25.00 SIDEWALK Unit Unit Price lf $ 35.00 EA $ 4,000.00 SIDEWALK SITE PREPARATION EROSION AND SEDIMENT CONTROL SIDEWALK WATER LINE AND HYDRANT SUB-TOTAL 101' CONTINGENCY GRAND TOTAL Total $ 300.00 $ 300.00 Total $ 750.00 $ 750.00 Total $ 2,750.00 $ 6,875.00 $ 9,625.00 Total $ 3,150.00 $ 4,000.00 $ 7,150.00 $ 300.00 $ 750.00 $ 9,625.00 $ 7,150.00 $ 17,825.00 $ 1,782.50 $ 19,607.50 April 13, 2015 City of College Station 1101 Texas Avenue S. College Station, TX 77842 RE : Letter of Acknowledging City Standards Dick's Iron Duke Addition, College Station, Texas Dear Mrs. Bridges, The purpose of this letter is to acknowledge that the construction plans for the water and fire protection for the above referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guidelines Manual. No alternate design or construction methodology was used in this project. I also acknowledge, to the best of my knowledge, that the details provided in the construction plans are in accordance with the Bryan/College Station Standard Details. Sincerely, Paul Moss, P.E. __ ,,,,,,,, ----<€.OF r;~\\ -""""' ........... ,, .. -,._,r:-.• * ... .f\f. ;' -..,.... •• •• v· I { :_..-·· •r•· ··~~··'~ ";! .•••• :. ............................... " .. '"M••I ~ PAUL J. MOSS I ~·····;'""""""'"''"""""""""" ..... : .... ., ~, -o\ 116731 /~I '• ~ ·.. .··§f~ t,O~~··~ CENS~~·~ff.:" 8 ... .,, .. ~V.:f' \0~ it/ l?J//'J ll\1 Pl~\..) } PI < l I ( l l I I > RESPONSE LETTER Code Comment Response 2 Project: Project Address: Date: Stripes Convenience Store #2468 13601 FM 2154 College Station, TX 77845 03/19/15 These revisions form a part of the Contract Documents and modify or interpret the previous Dl'awings dated l2124/l4 tO' include-these revisions aflCt responses as noted below STAFF REVIEW COMMENTS NO. 1 1. Please provide a Letter of Acknowledgement and TCEQ Site Notice. Comment #-1': Response: Comment#2: Comment#3: Response: Comment#4: Response: Comment#5: Response: Comment '#6: Comment#?: Comment#8: Required letters will be provided. Cl.2 -Water in the ditch should not sheet flow across the proposed sidewalk. Please provide means for the water to go under the sidewalk. Sfjof erevati"M ttave been modlfietf s-o no wafer Sffeertrow~ acrt1s-s-the 5td'ewari:: Cl.2 -North of the proposed driveway, the dimension between the back of curb and the property line is not legible. This dimension should now be legible. Cl.2 -The sidewalk ramps need to line up with each other. The sidewalk ramps now line up with each other. Cl.2 -The proposed curb (where the old driveway was located) should be shown. This is now shown. C4.1-Show and label the existing waterline. This-is-now S"hown and" rabef etf. C4.1-Note GD is not accurate since you are extending a public main for a fire hydrant rather than a water service. We have i:emoved note 6D fi:om. the plan.. C4.1-Specify the tee or TS&V connection to the existing 12-inch waterline. FYl. .. Since it is a 6-inch waterline connecting to a 12-inch, a TS&V may be specified. 809 Southwest A Street, Suite 201 Bentonville, Arkansas 72712 Phone 479.273.7780 Fax 479.273 .9436 www.hfa-ae.com Page I 1 Response: Comment#9: I I \I l'I .... <.) l I I < I l RESPONSE LETTER We have specified the TS&V and called this out using the city detail Wl-02 on figure Wl. C4.1 -At the water/sewer crossing, please add a note specifying TCEQ special requirements. Response: This has now been specified on the call out on the water line profile. Comment #10: C4.1-The waterline is required to be at least 5.5-ft from the edge of the PUE. Response: The water line has now been moved 5.5' away from the PUE and called out. Comment #11 : C4.1-The vertical scale on the profile drawing appears to be incorrect. Response: We checked the profile and we believe the vertical scale to be correct. Comment #12: C4.1 -The waterline should have a minimum 4-ft of cover and a maximum 5-ft of cover. Respoose;. lhe. wateF line. has been adjusted t& meet tcf:lese. standards We. adjust.ed the. pFefile. t& show this. Comment #13: FYI... The public infrastructure associated with the plat are required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. Response: Comment #14: Fire Flow-The report should analyze the system with peak daily demand plus fire flow demand. Response: An acf'ditionar zs gpm Ms been incrucrecr in the ffydraufic carcurations ancr reffected in the water report. Comment #15: Fire Flow -The maximum velocity allowed is 12 fps, whereas the report indicates that the max velocity is 18.84 fps. Response: The pipe leading to the site hydrant has been increased from 6" to 8" in order to comply. Max velocity is now 10.6 fps. Comment #16: Fire Flow -The summary should also reference the building size that was utilized to calculate the fire flow. (The site plan has "5093 LEFT" listed above the finished floor, which I assumed was intended to say 5093 SF. If that is correct, then the fire flow would actually be 2,000 gpm.) Response: Gross square footage is 4,480 resulting in a 1750 gpm hydrant demand. 809 Southwest A Street, Suite 201 Bentonville, Arkansas 72712 Phone 479.273.7780 Fax 479.273.9436 www.hfa-ae.com Page I 2 ll\I PI 1..> FP!. Cll < l ' I I I I > RESPONSE LETTER Comment #17: Fire Flow -Please provide calculations showing how 51 .9 psi at 1750 gpm was deten:n#l.ed.. Response: See attached hydraulic calculations in water report. The available hydrant supply was derived from a flow test performed as stated in the report. The flow test results were used as the source point in the calculations. The results of this calculation were taken and used to derive the available water supply at the hydrant. Friction loss, pipe fittings, and elevation differences are accounted for in the supply at the hydrant. Com ment #18: Fire Flow -The report indicates that you are connecting to an existing 8-inch main rather than a 12-inch. Res-ponse: Tfle wafet reporf ff as ffeen revised fo reffed fftis information. Hydraulic carc:orafions have been adjusted. 809 Southwest A Street, Suite 201 Bentonville, Arkansas 72712 Phone 479.273.7780 Fax 479.273 .9436 www.hfa-ae.com Page I 3 ti \H.Rl~() l·RI < I I --- l < I l f .. I > NARRATIVE Construction Change Directive #1 Project: Project Address: Date: Stripes Convenience Store #2468 13601 FM 2154 College Station, TX 77845 03/19/15 These revisions form a part of the Contract Documents and modify or interpret the previous Drawings dated 12124/14 to include these revisions as noted below. GENERAL Item #1: Item #2: Item #3: Refer to Sheet C1 .2 a) Updated the spot elevations along the proposed sidewalk of Wellborn Road b) Updated the sidewalk ramps to align with each other. c) Updated the sidewalk plan to show the old driveway location. Refer to Sheet C4.1 a) The existing water line is now shown and labeled. b) Adjusted the 60 note. c) Specified the TS&V connection d) Added a note specifying TCEQ special requirements e) Moved the water line so it is a min 5.5 from the edge of the PUE. f) Adjusted the water line profile so the water line now has a min 4' of cover and an max 5' of cover. Ref er to Water Report a) Adjusted hydraulic calculations to provide an additional peak daily demand of 25gpm. b) Increased pipe from hydrant to city tap from 6" to 8" in order to comply with the maximum velocity of 12 fps. c) Added additional information regarding gross square footage. Actual gross square footage is 4,480 SF. d) Revised water report to reflect 12" tap instead of 8. tap. End of Construction Change Directive #1 Sincerely, Bogue Louis Ebbrecht AIA,NCARB Program Manager II I Project Architect II 479.273.7780 ext 233 bo.ebbrecht@hfa-ae.com 1705 S Walton Blvd, Suite 3 Bentonville, Arkansas 72712 Phone 479.273 .7780 Fax 888.520.9685 www.hfa-ae.com Job Name Building Location System Contract Data File S() 1 F J E ( · 1 i Harrison French and Associates 1705 S. Walton Blvd., Suite 3 Bentonville, AR 72712 4 79-273-7780 : Hydrant Supply.WXF l I ' I l l Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 - Revision #1 3/20/15 If \PR!'.'-!() Water Supply Report Stripes #2468 College Station, TX State Highway 40 and FM 2154 !·PIN< il \ I I This report provides the current available h arant water supply for the proposed Stripes Store #2468. When determining fire hydrant flow rates i accordance with the International Fire Code, Appendix B Table 105.1 based upon the size of the buil · 4,840 square feet, and its current classification as a Type V-B structure, the required flow rate is 750 pm at 20 psi from the remote hydrant on the property is required. An additional 25 gpm has been added to the required fire flow demand in order to account for peak daily demand for a total of 1775 gpm. See attached calculations for reference. On 1/28/15 a hydrant flow test was performed by Eugene Marshal with College Station Utilities and witnessed by Justin Tamplin and Howard Mitchel. The hydrants tested are located within the Southern Trace Subdivision. Reference Attachment B for hydrant locations. During the test one 2-1/2 inch outlet was utilized. A Pitot reading of 65 was recorded for the hydrant with discharge coefficients of 0.9. This resulted in a flow of 1350 GPM with a residual pressure of 71 psi. The static and residual pressures were taken at an elevation of approximately 346.0, AMSL, which is 12 feet above the FFE of the store. Static pressure before and after the test was 73 psi. It is assumed that the ffow test hydrant is supplied by i211 ductHe iron. A gn tap wlfr connect to the 12" city line and supply the hydrant on site. SUMMARY OF RES UL TS 1 -8" Supply to Site Hydrant Static Water Pressure at Source Connection: Residual pressure at Source Connection: Assumed Elevation Difference Required Fire Hydrant Flow: Available Fire Hydrant Flow: 73 psig 71psi @ 1350gpm 12ft. resulting in +5.2 psig 20psi @ 1775gpm 74.6psi@ 1775gpm Maximum velocity was found to b-e 10.6 fps. Reference attached hydraulic calculations. The avaHable hydrant supply results do meet the minimum requirements of the International Fire Code. The results include pressure loss for pipe lengths and fittings. Due to the building FFE is 12ft. below the test hydrant 5.2psig was added to the available hydrant supply. Water Supply Curve C Harrison French and Associates City Water Supply: C1 -Static Pressure : 73 C2 -Residual Pressure: 71 C2 -Residual Flow 1350 150 140 130 p 120 R 110 E 100 s 90 s 80 C1 u 70 R 60 E 50 40 30 20 10 02 20@1400 600 800 Page 1 Date Demand: C2 1000 1200 1400 1600 FLOW ( N" 1.85) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 D1 -Elevation D2 -System Flow D2 -System Pressure Hose ( Demand ) D3 -System Demand Safety Margin 1800 03 : -5.197 : 0.301 : 1775 : 1775 : 69.380 Fittings Used Summary Harrison French and Associates Fitting Legend Abbrev. Name E NFPA 13 90' Standard Elbow F NFPA 13 45' Elbow G NFPA 13 Gate Valve T NFPA 13 90' Flow thru Tee Units Summary Diameter Units Length Units Flow Units Pressure Units y. 1 1 0 3 Inches Feet o/. 2 1 0 4 1X 2 3 1 1 0 0 5 6 US Gallons per Minute Pounds per Square Inch 1% 2 2Y. 3 4 5 6 7 2 2 3 3 0 1 1 1 8 10 12 15 Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CF actors 3Y. 8 3 1 17 of 120 except as noted with*. The fittings marked with a* show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a * will be adjusted in the calculation for CF actors of other than 120 and diameters other than Sched 40 per NFPA. 4 5 6 8 10 12 14 18 4 5 7 9 2 2 3 4 20 25 30 35 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 " ~ •" ft Page 2 Date 10 12 14 16 18 20 24 22 27 35 40 45 50 61 11 13 17 19 21 24 28 5 6 7 8 10 11 13 50 60 71 81 91 101 121 Pressure I Flow Summary-STANDARD Harrison French and Associates Node No. H1 UG1 TEST Elevation 334.0 346.0 346.0 K-Fact Pt Actual 0.0 -0.85 0.3 Pn na na na Flow Actual 1775.0 The maximum velocity is 10.6 and it occurs in the pipe between nodes H1 and UG1 Density Computer Programs by Hydratec Inc. Route 11 1 Windham N.H. USA 03087 Page 3 Date Area Press Reg. Final Calculations -Hazen-Williams Harrison French and Associates Hyd. Ref. Point H1 to UG1 UG1 to TEST Qa Qt 1775.00 1775.0 0.0 1775.0 0.0 1775.00 Dia. "C" Pf/Ft 8.27 140.0 0.0169 12.34 140.0 0.0024 Fitting or Eqv. Ln. 2E 56.936 F 14.234 G 6.326 2E 84.39 T 93.767 0.0 Pipe Ftng's Total 180.000 77.496 257.496 300.000 178.157 478.157 Pt Pe Pf 0.0 -5.197 4.348 -0.849 0.0 1.150 0.301 Page 4 Date Pt Pv ******* Notes Pn Qa = 1775 Vel = 10.60 Vel = 4.76 K Factor= 3235.30 Computer Programs by Hydratec Inc. Route 111 Windham N. H. USA 03087 ..... ****** College Station Utilities Reli b/e, ff ordab/e, Communit 0 n d Date test completed Wednesday1 ~anuary 28, 2015 Time completed 8:30 Test completed by Eugene Marshall Witness Justin Tamplin, Howard Mitchell FLOW HYDRANT Location 4005 Southern Trace Court Nozzle size 2.5 Hydrant number V-068 Pitot reading in PSI 1350 Flow in G.P.M. 65 STATIC HYDRANT Location 4029 Southern Trace Drive Hydrant number V-067 Static PSI Residual PSI Comments Requested N RAMP W LL N A NR 0 ~stripe~ May 18th 2015 Erika Bridges Planning & Development Services City of College Station 1101 Texas Avenue S. College Station, TX 77842 Re: Dick's Iron Dukes Letter of Credit Mrs. Bridges, Mike R Choate Engineering & Construction Tel: 361.693.8828 Cell: 361.290.3037 Fax: 361.851.9514 mchoate@susser.com Our Engineer has prepared a cost estimate for the public improvements associated with Dick's Iron Dukes Final Plat in the amount of $25,657.50. This cost is for the sidewalks along Wellborn Road, water line extension and fire hydrant. As required by the Subdivision Regulations in the Unified Development Code, a Check, or Letter of Credit is being provided in lieu of construction in order to obtain final plat approval by the Planning & Zoning Commission. All public and private improvements are expected to commence upon approval of the development permit and is expected to be completed by DEC. 2015. Should you have any questions in regards to the cost estimate, check or Letter of Credit, please contact me. Sincere~ . .-.-/- Ttt L ~ Uw-.o.L Mike R. Ctloate Sunoco -Stripes LLC Engineering & Construction Street Address: 4525 Ayers Street, Corpus Christi, Texas 78415 j Mailing Address: P .0. Box 9036, Corpus Christi, Texas 78469 www.susser.com APPLIED PETROLEUM TECHNOLOGIES, LTD. P.O. Box 4227 CORPUS CHRJSTI, TEXAS 78469-4227 (361) 884-2463 Bank of America ~ BankotAmericllofTexa!l,N.A. ~ Wichita Fab, Texas .,,,,,,.. Member Federal Deposit Insurance CorporatlOn 88-130 TX 1119 154273 CHECK NO .. DATE AMOUNT I '*****$25,657 dollars and .50 cents***************** 5/19/2015********$25,657.50**~ PAY TO THE ORDER OF City of College Station 1101 Texas Avenue College Station, TX 77840 _vo10 AFTl;8 ~o ~AYS LETTER OF COMPLETION CITY ENGINEER DATE: /0 -JC)-c)o/.) CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Rt=:· COMPLETION OF (S'"/R1t£.) -!Jlf hi) ,· . t? \ct:s Tun DlA.kfi'Si Dear Sir: . ~ ..... The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by'-~~~~~~~::­ and by their subcontractors as indicated by signatures below. WORK COMPLETED WARRANTY DATE /t//Jt/~ k/JR j_l/Vffr/6 12C j/ypAA,JI f4nJr;g jAp1y-,aq JiwCP. II· , .IS' «.rr1vtt:k : ) Owner: S'1Zi~S J.i£ · Phone Number: "71 J-9 f-Jn'/ Address: t 9 f ,Atu-r ,£: C,aevs c~s-r . id. 7 fc/ J5' Signatur ACCEPTANCE & APPROVAL -q, -- City Represe ~ d:t:J Revised 1/'J1AJ7 Contractor: S uN'(t'CH &t1..Qu..i6 Jv~s. J;~ Phone Number:jJ(? .J GJS-JSSJ Address: 'lJI /ILaJy tj( A/Ek' J.~udf'CJS, U ~ PLATFILED vylA OFFSITE ESMTS FILED ...rJ!-TEMP BLANKET ESMT FILED ~NO OTHER ESMTB NEEDED ENGi ERING COMMENTS NO. 2 Repeat) Please provide a Letter of Acknowledgement and TCEQ Site Notice. Also, please provide a revised cost estimate. Repeat) C1 .2 -Water in the ditch should not sheet flow across the proposed sidewalk. Please provide means for the water to go under the sidewalk. It appears that there is /.:). water coming from the south that will need to cross under the sidewalk. \.::) (Repeat) C4. 1 -Show and label the existing waterline. Please label the existing aterline as 12-inch. Also, the material of the proposed line needs to be labeled (rather than giving the option of DI or C900). w; U. ~S -h> ~L. Cf\()() \~ed. (Repeat) C4.1 -Specify the tee or TS&V connection to the existing 12-inch waterline. FYl. .. Since it is a 6-inch waterline connecting to a 12-inch, a TS&V may be specified. ince an 8-inch waterline is required to meet velocity requirements, a tee and valve will need to be cut in to the 12-inch waterline. (Repeat) C4. 1 -At the water/sewer crossing, please add a note specifying TCEQ special requirements. It looks like the bend will need to be shifted over in order to (i:\. be able to center a joint of water pipe over the sanitary sewer line. \J (Repeat) C4. 1 -The vertical scale on the profile drawing appears to be incorrect. It appears that the vertical scale is actually 1 "=5'. G (Repeat) FYI ... The public infrastructure associated with the plat are required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. 8. (Repeat) Fire Flow -The summary should also reference the building size that was utilized to calculate the fire flow. (The site plan has "5093 LEFT' listed above the finished floor, which I assumed was intended to say 5093 SF. If that is correct, then the fire flow would actually be 2,000 gpm.) Based on the building size of 4,840 s.f. and ype VB material type referenced in the report, the required fire flow is 2,000 gpm and 2 fire hydrants. Please revise report. . C1 .2 -Please include SW3 standard details on this sheet since the ramps will need to nform to these details. (FYI. .. There are some details shown on this sheet that may be moved if they are not applicable.) 1.2 -The portion of sidewalk located at the back of curb must be a minimum 8-ft wide. ).t Fire Flow -Please provide an exhibit showing the referenced nodes. ~V\c:Let" @ FYI. .. The TxDOT driveway permit will need to be approved prior to any construction 0 activities in their right-of-way. We will approve the plans ahead of the TxDOT permit, but 1ct6\ OI ~will be a conditional approval. T@ 'S+l-Reviewed by: Erika Bridges Date: 4/6/15 -11< eos+ es+-D:e0 iW., s~ I LF i f\otuck #IL vMvt--s t ~. -f'iihl)js? :>Jt ~, ~M'\S {bf s~~, 1 lxll5 U3) ENGINEERING COMMENTS NO. 2 1. (Repeat) Please provide a Letter of Acknowledgement and TCEQ Site Notice. Also, please provide a revised cost estimate. 2. (Repeat) C1 . 2 -Water in the ditch should not sheet flow across the proposed sidewalk. Please provide means for the water to go under the sidewalk. It appears that there is water coming from the south that will need to cross under the sidewalk. 3. (Repeat) C4. 1 -Show and label the existing waterline. Please label the existing waterline as 12-inch. Also, the material of the proposed line needs to be labeled (rather than giving the option of DI or C900). 4 . (Repeat) C4 . 1 -Specify the tee or TS& V connection to the existing 12-inch waterline. FYl ... Since it is a 6-inch waterline connecting to a 12-inch, a TS&V may be specified. Since an 8-inch waterline is required to meet velocity requirements, a tee and valve will need to be cut in to the 12-inch waterline. 5. (Repeat) C4. 1 -At the water/sewer crossing, please add a note specifying TCEQ special requirements. It looks like the bend will need to be shifted over in order to be able to center a joint of water pipe over the sanitary sewer line. 6. (Repeat) C4. 1 -The vertical scale on the profile drawing appears to be incorrect. It appears that the vertical scale is actually 1 "=5'. 7. (Repeat) FYI ... The public infrastructure associated with the plat are required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. 8. (Repeat) Fire Flow -The summary should also reference the building size that was utilized to calculate the fire flow. (The site plan has "5093 LEFT" listed above the finished floor, which I assumed was intended to say 5093 SF. If that is correct, then the fire flow would actually be 2,000 gpm.) Based on the building size of 4,840 s.f. and Type VB material type referenced in the report, the required fire flow is 2,000 gpm and 2 fire hydrants. Please revise report. 9. C1 .2 -Please include SW3 standard details on this sheet since the ramps will need to conform to these details. (FYI ... There are some details shown on this sheet that may be removed if they are not applicable .) 10. C1 .2 -The portion of sidewalk located at the back of curb must be a minimum 8-ft wide. 11 . Fire Flow -Please provide an exhibit showing the referenced nodes. 12. FYI ... The TxDOT driveway permit will need to be approved prior to any construction activities in their right-of-way. We will approve the plans ahead of the TxDOT permit, but it will be a conditional approval. Reviewed by: Erika Bridges Date: 4/6/15 ENGINEERING COMMENTS NO. 1 @ Please provide a Letter of Acknowledgement and TCEQ Site Notice. ir relJi::e.d ~ . (!) C1 .2 -Water in the ditch should not sheet flow across the proposed sidewalk. Please ,~ ;provide means for the water to go under the sidewalk. \;! J 1.2 -North of the proposed driveway, the dimension between the back of curb and the roperty line is not legible. 1.2 -The sidewalk ramps need to line up with each other. 1.2 -The proposed curb (where the old driveway was located) should be shown. 4.1 -Show and label the existing waterline. ~\ ().:5 \"Z}' l..tYWf\AAO : 4.1 -Note 60 is not accurate since you are extending a public-mai'nfor a life hydrant ~~ther than a water service. ~4.1 -Specify the tee or TS&V connection to the existing 12-inch waterline. ~ FYl. .. Since it is a 6-inch waterline connecting to a 12-inch, a TS&V may be specified.11Z ret· ~ C4.1 -At the water/sewer crossing, ...,Please add a note specifying TCEQ special requirements .~ on \OULflo~ of \.{t;Mr~d:s Dl\l. ~trfl ~~'.-4-~ C«\4C.r4). C4 .1 -The waterline is required to be at least 5.5-ft from1the edge of the PUE. ~.1 -The vertical scale on the profile drawing appears to be incorrect. ~ob, j, il..e, I '-=-'5 ' 4.1 -The waterline should have a minimum 4-ft of cover and a maximum 5-ft of cover. YI ... The public infrastructure associated with the plat are required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. 14. Fire Flow -The report should analyze the system with peak daily demand plus fire flow demand. 15. Fire Flow -The maximum velocity allowed is 12 fps, whereas the report indicates that the max velocity is 18.84 fps. 16. Fire Flow -The summary should also reference the building size that was utilized to calculate the fire flow. (The site plan has "5093 LEFT" listed above the finished floor, which I assumed was intended to say 5093 SF. If that is correct, then the fire flow would actually be 2,000 gpm.) 17. Fire Flow -Please provide calculations showing how 51 . 9 psi at 1750 gpm was determined. 18. Fire Flow -The report indicates that you are connecting to an existing 8-inch main rather than a 12-inch . Reviewed by: Erika Bridges Date: 2/25/15 N~"ZDC-~ ~ '..rk Sl~IL ~Is f (\)J1cle;I citiV1 '+ Off lY,"' OfP oviQS {lfty\ + il'C/kdl.tj, -*~"ev\ ef RJ(\S+. dw wJ~? (__-:fj ~· .e~ ~ ~\ .. :~DDT ~rt-N<L~fl) ~ llmfD\Jcl ~. (?nD( r Iv (iJ\\J WO('(_ \f\ ~ {Ow . v rr. -¥ µ:,11 i W\lMY\ 'V' Sic:LeJ,,xut ~ired .fbr' f>r-h M f{)c_ . f: f\re_ ftM -1,1\1(\){\5 ~!'{, R\wJ ~ f).-e., \:i!M)-f (l)\f\cLe, &h hl C,0f((,~"5 -\-1) Y\OM-5 ve:Q-ereAu.d I SOP: Filing of Final Plats -Letters of Completion Engineering Inspector/Date: 04/23/14 Project Engineer/Date: DP Number: Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written confirmation from the following contacts before forwarding Letter of Completion to development review engineer: o Erosion/Drainage: Donnie Willis (0: 764-6375, C: 229-7632) CS Water Services -General: Charles "Butch" Willis (0: 764-3435, C: 777-1202) • Water -coordinate fire flow analyses (or the design engineer for non-city utilities) and confirm test results meets min requirements with the dev review engineer (specific hydrants to test, if simultaneous, and min allowable flow) i/t, • Sanitary \.)fb CS Water Service -Liftstation: Doug Wallace (0: 764-6333) o CS Electric and Streetlights: Gilbert Martinez (0: 764-6255) er" CS Public Works-Traffic Signs/Markings): Lee Robinson (0: 764-3695) if BTU Electric and Streetlights: Sonia Creda (0: 821-5770) John Fontinoe or Randy Trimble (0: 821-5728) Confirm with development review engineer that service agreement is in place with BTU ~fo. Non-City Utility Service Providers: (Wellbornlwater SUD, Brushy Creek SUD, Wickson Creek SUD, etc) confirm with development review engineer that infrastructure is complete and for outstanding issues, ·. . o Digital Constrution Pictures: From contractor on CD-R, Inspector to confirm and file ----:::::~~ Record Drawings: (2 Red-Lined Copies) for all Public Infrastructure with the following attestation: "I, General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor o Record Drawings: (2 Red-Lined Copies) for Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station." (affix seal) Licensed Professional Engineer State of Texas No. ___ _ "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor Inspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings, inspector to: o file one set of Record Drawings in Public Works files, and o forward one set of Record Drawings to Jeffery Speed (CSU) Inspectors should forward Letters of Completion to the development review engineer that reviewed and stamped the construction plans after confirming: o the date on the Letter of Completion Warranty should reflect the date when all associated punchlist items are completed, and o the Owner is shall be listed as the one affirming the one-year warranty Development review engineer to: o add Dev Permit Number to Letter of Completion o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar is ready to be filed), all necessary easements (including offsite) have been filed, and blanket easement issues are resolved, and o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the plat it may have been filed ahead of construction.) Deborah Grace-Rosier {Planning) to file the Final Plat utilizes a coversheet to confirm: o infrastructure is accepted by Letter of Completion -or-Surety is provided and acceptable, o signed and notarized mylar of final plat, o parkland dedication has been paid, o digital file of final plat is provided, o a current paid tax certificate has been submitted, o sidewalk fee in lieu paid (if applicable), and Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been filed, we have all necessary easements, etc -and then forward the Letter of Completion to Alan Gibbs (City Engineer) for final signature. Carol (Sr. Asst. City Engineer) to: o enter the engineer's estimate and Letter of Completion date into Inspection List o forward hard original of finalized Letter of Completion to Crystal (P&DS). Crystal to: verify o signatures on the Letter of Completion, o forward scanned copy of Letter of Completion and associated Engineers Estimate to the owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Chris Haver (Building), Carol Thompson (Accounting), Kristina Keller (Accounting), Courtney Kennedy (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Charles "Butch" Willis (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering), Erika Bridges (Engineering), Danielle Singh (Engineering), Gilbert Martinez (Electric) and Deborah Grace- Rosier (Planning). Kristina Keller will forward to Diane Broadhurst (CSU) after her review. o if don't have email addresses, mail copies to the owner and contractor, and o place the original in Development Permit file. Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file. Date test completed Monday November 2, 2015 Time completed 9:00 A.M. Test completed by Howard Mitchell Witness Jeff Boriski FLOW HYDRANT Location Stripes on Wellborn Nozzle size 2.5 Hydrant number V-133 Pitot reading in PSI 65 Flow in G.P.M. 1350 STATIC HYDRANT Location 4005 Southern Trace Hydrant number V-068 Static PSI 77 Residual PSI 72 Comments Initial LETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS DATE: //-Jo;",Jo/j RE: COMPLETION OF ~~~~~~~~- D 1 c K. s IRON Dv't::::i=s (ST R..\ P~s ·#zLf-<o<iS ~ Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by .tlf<-1 P£S-LlC, and by their subcontractors as indicated by signatures below. WORK COMPLETED (Jt;fSµG ltOE&JJlb/{. r ;;;;. Owner: S-r fl.I e~Y LJ.c_ . Phone Number: };I-'9 J-ggs 8 Address: /JCOI F!1 Jlrf Co L/J~C1£ J--(~1a,,J ~ Mic.bAe\. cboa±e.,~Sli\l\QC..O. ~ Signal~ ACCEPTANCE & APPROVAL ~y~~ Revised 1131107 WARRANTY DATE Contractor: ScJ.Nre__cl./-&1 fd l'!t Sys~ Phone Number: <b.?.>O -(o~S---grs=s-3 Address: 91/ ~ ~ New 8~ c --y;;fc*"' ~PLAT FUD ~OFFSITE ISllTS FILED ~TEMP LANKET ESMT FILID ~NO OTHER E9MTS N11D1D SOP: Filing of Final Plats -Letters of Comoletion Engineering Inspector/Date: l<A'-< A\°<-GE~.sv--1.GGR. Project Engineer/Date: DP Number: FP \ 5 -15 04/23/14 Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written confirmation from the following contacts before forwarding Letter of Completion to development review engineer: /Erosion/Drainage: Donnie Willis (0: 764-6375, C: 229-7632) ~<f" CS Water Services -General: Charles "Butch" Willis (0: 764-3435, C: 777-1202) • Water -coordinate fire flow analyses (or the design engineer for non-city utilities) and confirm test results meets min requirements with the dev review engineer (specific hydrants to test, if simultaneous, and min allowable flow) • Sanitary ~ CS Water Service -Liftstation: Doug Wallace (0: 764-6333) 'c1~ CS Electric and Streetlights: Gilbert Martinez (0: 764-6255) ~~ CS Public Works -Traffic Signs/Markings): Lee Robinson (0: 764-3695) ~'t:--BTU Electric and Streetlights: Sonia Creda (0: 821-5770) John Fontinoe or Randy Trimble (0: 821-5728) \i Confirm with development review engineer that service agreement is in place with BTU ~\\'><Non-City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson Creek SUD, etc) confirm with development review engineer that infrastructure is complete and for outstanding issues, o Digital Constrution Pictures: From contractor on CD-R, Inspector to confirm and file o Record Drawings: (2 Red-Lined Copies) for all Public Infrastructure with the following attestation: "I, General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor o Record Drawings: (2 Red-Lined Copies) for Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station." (affix seal) Licensed Professional Engineer State of Texas No. ___ _ "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor Inspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings, inspector to: o file one set of Record Drawings in Public Works files, and o forward one set of Record Drawings to Jeffery Speed (CSU) Inspectors should forward Letters of Completion to the development review engineer that reviewed and stamped the construction plans after confirming: o the date on the Letter of Completion Warranty should reflect the date when all associated punchlist items are completed, and o the Owner is shall be listed as the one affirming the one-year warranty Development review engineer to: o add Dev Permit Number to Letter of Completion o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar is ready to be filed), all necessary easements (including offsite) have been filed, and blanket easement issues are resolved, and o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the plat it may have been filed ahead of construction.) Deborah Grace-Rosier (Planning) to file the Final Plat utilizes a coversheet to confirm: o infrastructure is accepted by Letter of Completion -or-Surety is provided and acceptable, o signed and notarized mylar of final plat, o parkland dedication has been paid, o digital file of final plat is provided, o a current paid tax certificate has been submitted, o sidewalk fee in lieu paid (if applicable), and Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been filed, we have all necessary easements, etc -and then forward the Letter of Completion to Alan Gibbs (City Engineer) for final signature. Carol (Sr. Asst. City Engineer) to: o enter the engineer's estimate and Letter of Completion date into Inspection List o forward hard original of finalized Letter of Completion to Crystal (P&DS). Crystal to: verify o signatures on the Letter of Completion, o forward scanned copy of Letter of Completion and associated Engineers Estimate to the owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Chris Haver (Building), Carol Thompson (Accounting), Kristina Keller (Accounting), Courtney Kennedy (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Charles "Butch" Willis (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering), Erika Bridges (Engineering), Danielle Singh (Engineering), Gilbert Martinez (Electric) and Deborah Grace- Rosier (Planning). Kristina Keller will forward to Diane Broadhurst (CSU) after her review. o if don't have email addresses, mail copies to the owner and contractor, and o place the original in Development Permit file. Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file. Project Name: Stripes Project Location: College Station, TX Date: April 28, 2015 OPINION OF PROBABLE COST Estimate is based upon Sidewalk Plan OTP SITE PREPARATION Earthwork Clear, grub, and prep EROSION AND SEDIMENT CONTROL Erosion Control Lump Sum Aggregate Base Sidewalk WATER LINE AND HYDRANT 6" 4• C900 Main Extension w/Fittings Fire Hydrant Valve & Assembly 12" Gate Valve and Valve Box 8" Gate Valve and Valve Box 8" 8" Tap Assembly _, ..... ,,,'\: ----€.OF rl:'~\ -~~ ·········~''• ..:-~_ ............... '? •• ~ ..... .... '" *: ~·~. ••••"••·••"••••••·•••·•••""'•••nu••.,.,.,,,,'! PAUL J. MOSS I ............................... : ..... 1 -o\ 116731 .. ~~' i)·.. .··~; a~0 ~· ~'c~~s~~\;~ N TC: ___ _ :.... U.,/ 2-"/IS- Unit Unit Price 0.2 AC $ 1,500.00 SITE PREP TOTAL !.!!ill ~ EA $ 750.00 EROSION TOTAL !.!!ill Unit Price 275 SY $ 10.00 275 SY $ 25.00 SIDEWALK Unit Unit Price 90 LF $ 35.00 EA $ 4,000.00 EA $ 2,500.00 EA $ 1,500.00 EA $ 1,500.00 WATER LINE AND HYDRANT SITE PREPARAn ON EROSION AND SEDIMENT CONTROL SIDEWALK WATER LINE AND HYDRANT SUB-TOTAL 10% CONnNGENCY GRAND TOTAL Total s 300.00 $ 300.00 !Q!fil s 750.00 $ 7SO.OO Total s 2,750.00 s 6,875.00 $ 9,625.00 !Q!fil s 3,150.00 s 4,000.00 s 2,500.00 s 1,500.00 s 1,500.00 $ 12,650.00 $ 300.00 $ 750.00 $ 9,62S.00 $ 12,6SO.OO $ 23,325.00 $ 2,332.50 $ 25,657.50 MEMORANDUM ro DATE: March 13, 2015 TO: Mike R. Choate, via; mchoate@susser.com / FROM: Jessica Bullock, Staff Planner SUBJECT: DICK'S IRON DUKES ADDITION (DVPL) Staff reviewed the above-mentioned development plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x36" set of civil construction documents; Letter of Acknowledgement and TCEQ Site Notice; Revised fire flow report; Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Jenifer Paz, jenifer.paz@hfa-ae.com J / Kerr Surveying LLC, via; louise.barker@suddenlinkmail.com P&DS Project No. 15-00900015 Planning & Development Services P.O. BOX9960 • llOl TEXAS AVENUE · COU.EGESTATION ·TEXAS · 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: DICK'S IRON DUKES ADDITION (DVPL) -15-00900015 PLANNING 1. Please see Engineering comments below from the first round . We did not receive revised construction documents with the second submittal and these comments are still outstanding. Reviewed by: Jessica Bullock Date: 3/12/15 ENGINEERING COMMENTS NO. 1 1. Please provide a Letter of Acknowledgement and TCEQ Site Notice. 2. C1 .2 -Water in the ditch should not sheet flow across the proposed sidewalk. Please provide means for the water to go under the sidewalk. 3. C1 .2 -North of the proposed driveway, the dimension between the back of curb and the property line is not legible. 4. C1 .2 -The sidewalk ramps need to line up with each other. 5. C1 .2 -The proposed curb (where the old driveway was located) should be shown. 6. C4.1 -Show and label the existing waterline. 7. C4.1 - Note 6D is not accurate since you are extending a public main for a fire hydrant rather than a water service. 8. C4.1 -Specify the tee or TS& V connection to the existing 12-inch waterline. FYI. .. Since it is a 6-inch waterline connecting to a 12-inch, a TS&V may be specified. 9. C4.1 -At the water/sewer crossing , please add a note specifying TCEQ special requirements. 10. C4.1 -The waterline is required to be at least 5.5-ft from the edge of the PUE. 11 . C4.1 -The vertical scale on the profile drawing appears to be incorrect. 12. C4.1 -The waterline should have a minimum 4-ft of cover and a maximum 5-ft of cover. 13. FYI. .. The public infrastructure associated with the plat are required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. 14. Fire Flow -The report should analyze the system with peak daily demand plus fire flow demand. 15. Fire Flow -The maximum velocity allowed is 12 fps, whereas the report indicates that the max velocity is 18.84 fps. 16. Fire Flow -The summary should also reference the building size that was utilized to calculate the fire flow. (The site plan has "5093 LEFT" listed above the finished floor, which I assumed was intended to say 5093 SF. If that is correct, then the fire flow would actually be 2,000 gpm.) 17. Fire Flow -Please provide calculations showing how 51.9 psi at 1750 gpm was determined. 18. Fire Flow -The report indicates that you are connecting to an existing 8-inch main rather than a 12-inch. Reviewed by: Erika Bridges Date: 3/12/15 Cnv oF CouEGE STAT JON Home ofTexm A&M University° FOR OFFICE USE ONLY CASENO.: D\/t.:.f2.0\S-~oco\S DATE SUBMITTED: CJCt-1 {I 0 { 15 TIME: \ •. \ S STAFF: ~f\~U ______ _ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application. Case No.: !fl Existing Project Submittal. Case No.: IS-q O(J 00 t::S:::::..._ ______________ ....., Project Name D ick 's \ron Du..'Kes A--dch-\-)0(' (\)V PL) We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Rezoning Application D Conditional Use Permit D Preliminary Plan D Final Plat D Development Plat D Site Plan D Special District Site Plan D Special District Building I Sign D Landscape Plan D Non-Residential Architectural Standards D Irrigation Plan D Variance Request D Development Permit D Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR D Grading Plan D Other -Please specify below INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/1 0 I~ Print Form HFA (~I I ARCHITECTS ~ INIERIORS () ( I I ._, I l ) To: Planning & Development Services City of College Station 1101 Texas Avenue College Station, TX 77840 Attn: Erika Bridges LETTER OF TRANSMITTAL Date: April 16, 2015 Project No: 10-15-00008 Project: Stripes Convenience Store #2468 CSTX Project No. 15-9000015 Subject: Dick's Iron Dukes Addition Development Plat Please find the following items for your use with the above referenced project. If you have any questions or need additional information, please contact me. Copies Descri tion 1 Res nse Letter I Cost Estimate 1 I I Construction Documents If enclosures are not as noted, please notify our office immediately. Sincerely, Jenifer Paz Project Manager I 713-702-0987 jenifer.paz@hfa-ae.com 1705 S Walton Blvd, Suite 3 Bentonville, AJ{ 72712 www.hfa-ae.com Phone: 479-273-7780 Fax: lSlSlS-520-9685 RRIS()N FP 1 NC 'l 1 ( ) I RESPONSE LETTER Code Comment Response 2 Project: Project Address: Date: Stripes Convenience Store #2468 13601 FM 2154 College Station, TX 77845 04-10-2015 These revisions form a part of the Contract Documents and modify or interpret the previous Ol'awings dated 3/26/2015 to include these revisions and responses as noted below STAFF REVIEW COMMENTS NO. 1 Comment#1 : Response: Comment#2: Response: Comment#3: Response: Comment#4: Response: Comment#S: Response: Comment#B: Response: Please provide a letter of acknowledgement and TCEQ Site Notice. Also, please provide a revised cost estimate. Letter of acknowledgement and cost estimate are provided. TCEQ site notice will be provided once contractor is awarded per conversation with the City. Cl.2 -Water in the ditch should not sheet flow across the proposed sidewalk. Please provide means for the water to go under the sidewalk. Per conversation with the City, current grades are not showing water going into ditch along Wellborn. The water is sheet flowing over the curbing. No sidewalk chase will be necessary. C4.1-Show and label the existing waterline. The existing water line has now been showed and labeled. C4.1-Specify the tee or TS&V connection to the existing 12-inch waterline. FYl...Since it is a 6-inch waterline connecting to a 12-inch, a TS&V may be specified. Since an 8- inch waterline is required to meet velocity requirements, a tee and valve will need to be cut in to the 12-inch waterline. We have specified the TS&V and called this out using the city detail Wl-02 on figure Wl. We have removed the TS&V and added a valve on both the existing 12" line as well as a valve on the proposed 8" line and an 8''X12" Tee as requested by the city. C4.l -At the water/sewer crossing, please add a note specifying TCEQ special requirements. It looks like the bend will need to be shifted over in order to be able to center a joint of water pipe over the sanitary sewer line. The proposed 8" water line has been adjusted as requested by the city. C4.1-The vertical scale on the profile drawing appears to be incorrect. It appears that the vertical scale is actually 1" -5' We apologize after we printed full size we realized the vertical scale is actually 1"=4'. This is now called out accurately on the water line profile. 809 Southwest A Street, Suite 201 Bentonville, Arkansas 72712 Phone 479.273.7780 Fax 479.273 .9436 www.hfa-ae.com Page I 1 HAl RISC> f'p I' C I I < ) < I I I I > RESPONSE LETTER Comment #7: FYI... The public infrastructure associated with the plat are required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. Response: Noted. Comment #8: Fire Flow -The summary should also reference the building size that was utilized to calculate the fire flow. (The site plan has "5093 LEFT" listed above the finished floor, which I assumed was intended to say 5093 SF. If that is correct, then the fire flow would actually be 2,000 gpm.) Based on the building size of 4840 s.f. and Type VB material type referenced in the report, the required tire flow is 2,000 gpm and 2 tire hydrants. Please revise report. Response: Report has been revised. The building falls under the 4800sf threshold so no additional hydrant will be required. Comment #9: Cl.2 -Please include SW3 standard details on this sheet since the ramps will neet to conform to those details. (FYI... There are some details shown on this sheet that may be removed if they are not applicable.) Response: We have now added the SW3 standard details on this sheet. Comment #10: Cl.2 -The portion of sidewalk located at the back of curb must be a minimum 8-ft wide. Response: This portion of the sidewalk is now 8'. Comment #11 : Fire fiow -Piease provide an exhibit showing the referenced nodes. Response: An exhibit featuring the nodes has been provided in the report. Comment #12: FYI -The TxDOT driveway permit will need to be approved prior to any construction activities in their right-of-way. We will approve the plans ahead of the TxDOT permit, but it 'Ni!! be a conditional approva l. Response: Noted. 809 Southwest A Street, Suite 201 Bentonville, Arkansas 72712 Phone 479.273.7780 Fax 479.273.9436 www.hfa-ae.com Page I 2 DATE: TO: FROM: SUBJECT: Crrv OF C OLLEGE STATION Home o/TexasA&M University• MEMORANDUM February 26, 2015 Mike R. Choate, via; mchoate~ser.com Jessica Bullock, Staff Planner DICK'S IRON DUKES ADDITION (DVPL) Staff reviewed the above-mentioned development plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x36" copy of the revised development plat; One (1) 24"x36" set of civil construction documents; Letter of Acknowledgement and TCEQ Site Notice; Revised fire flow report; Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Kerr Surveying LLC , via; louise.b~suddenlinkmail.com P&DS Project No. 15-00900015 Planning & Development Services P 0. BOX 9960 • 1101 TEXAS AVENUE · COLLEGE STATION ·TEXAS • 778'12 TEL. 979.764.3570 ·FAX. 979.764.3'1% cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Dick's Iron Dukes Addition (DVPL) (15-00900015) PLANNING d ~· 3. Please add the blanket easements to the development plat under notes. Please remove "Certificate of City Planner". Revise title block to include "Final Plat being a Development Plat of Dick's Addition". Remove 15' label for landscape easement and just maintain the PUE label. Iron Dukes 5. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. 6. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Jessica Bullock Date: February 25, 2015 ENGINEERING COMMENTS NO. 1 1. Please provide a Letter of Acknowledgement and TCEQ Site Notice. 2. C1 .2 -Water in the ditch should not sheet flow across the proposed sidewalk. Please provide means for the water to go under the sidewalk. 3. C1 .2 -North of the proposed driveway, the dimension between the back of curb and the property line is not legible. 4. C1 .2 -The sidewalk ramps need to line up with each other. 5. C1 .2 -The proposed curb (where the old driveway was located) should be shown. 6. C4.1 -Show and label the existing waterline. 7. C4.1 -Note 6D is not accurate since you are extending a public main for a fire hydrant rather than a water service. 8. C4.1 -Specify the tee or TS& V connection to the existing 12-inch waterline. FYI ... Since it is a 6-inch waterline connecting to a 12-inch, a TS&V may be specified. 9. C4.1 -At the water/sewer crossing, please add a note specifying TCEQ special requirements. 10. C4.1 -The waterline is required to be at least 5.5-ft from the edge of the PUE. 11 . C4.1 -The vertical scale on the profile drawing appears to be incorrect. 12. C4.1 -The waterline should have a minimum 4-ft of cover and a maximum 5-ft of cover. 13. FYI ... The public infrastructure associated with the plat are required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. 14. Fire Flow -The report should analyze the system with peak daily demand plus fire flow demand. 15. Fire Flow -The maximum velocity allowed is 12 fps, whereas the report indicates that the max velocity is 18.84 fps. 16. Fire Flow -The summary should also reference the building size that was utilized to calculate the fire flow. (The site plan has "5093 LEFT' listed above the finished floor, which I assumed was intended to say 5093 SF. If that is correct, then the fire flow would actually be 2,000 gpm.) 17. Fire Flow -Please provide calculations showing how 51 .9 psi at 1750 gpm was determined. 18. Fire Flow -The report indicates that you are connecting to an existing 8-inch main rather than a 12-inch. Reviewed by: Erika Bridges Date: February 25, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 9, 2015 MEMORANDUM DATE: February 4, 2015 TO: Mike R. Choate, via ; mchoate@susser.com V FROM: Jessica Bullock, Staff Planner SUBJECT: DICK'S IRON DUKES ADDITION (DVPL) Thank you for the submittal of the required documents for your Development Plat application. Erika Bridges, Graduate Engineer II, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Wednesday, February 18, 2015. If you have questions in the meantime, please feel free to contact us. PC : Kerr Surveying LLC, via ; louise.barker@suddenlinkmail.com P&DS Project No . 15-00900015 Pla11ning & Development Services P.O. BOX 9960 • I 10111:XAS AVENUE · COLLEGE STATION · TEXAS • 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 cst>t.gov/devservices -........ ._,.....,==--------~CITY OF CoUEGE S TATIONJ _______ ...,...,..,. ... ..., ............... Home of Texas A&M University• =- MEMORANDUM DATE: January 16, 2015 TO: Mike R. Choate, via ; mchoate@susser.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: DICK'S IRON DUKES ADDITION (DVPL) I reviewed the above-mentioned Development Plat application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal. Please submit the following information so this application can be forwarded for review: $600 Development Permit application fee; Construction documents for the sidewalk along Wellborn Road with engineer's cost estimate; and Water analysis/fire flow report for the tract. Please be aware that if this application is not completed before Monday, March 2, 2015, it will expire and a new application and fees will be necessary to continue the platting process. If you have questions or need additional information regarding the above-listed engineering documents, please contact Carol Cotter, Assistant City Engineer, at 979.764.3570. If you have other questions, please also feel free to contact me at 979.764.3570 PC : Kerr Surveying LLC, via; louise.barker@suddenlinkmail.com P&DS Project No. 15-00900015 Pla11ni11g & Development Services P.O. BOX 9960 • 1101 'JT.XAS AVENUE · COLLEGE STATION · TEXAS · 77842 TEL. 979.764. 35 70 • FAX. 979. 764.3496 cst>1.gov/devservices vr PLANNING & DEVELOPMENT SERVICES CrrY OF Coll.EGE ST...r10N TRANSMITTAL COVER LETTER Please check one of the options below to clearly define the purpose of your submittal. C Documents for a previous incomplete submittal "fJ Existing Project Submittal Project Name: 'fDkk1s J10Y1 ':t>o ke_s Contact Name: Phone No.: IZb g __ ~9S: We are transmitting the following for Planning & Development Services to review and comment. (Please check fill that apply). C Comprehensive Plan Amendment r. Rezoning Application D Non-Residential Architectural Standards 0 Irrigation Plan C: Master Development Plan C Preliminary Plat einal Plat C Development Plat C:Site Plan C Special District Site Plan I Special District Building I Sign C Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS O Variance Request [J Development Permit D Conditional Use Permit 0 FEMA CLOMA/CLOMR/LOMA/LOMR O Grading Plan D Other -Please specify below All infrastructure documents must be submitted as a complete set The following are included in the complete set: [j Waterline Construction Documents [i TxDOT Driveway Permit J; TxDOT Utility Permit C Drainage Letter or Report r. Fire Flow Analysis I Other -Please specify Special Instructions: / JrU/aV 29-Aug-08 0 Sewerline Construction Documents [J Drainage Construction Documents O Street Construction Documents D Easement Application j l-IFA ARClllTECTS ENGINEERS INTERIORS HARl~ISON FRENC:::I-I & A ~ ~ <) < I A ·1 <.,, {5-l5 OJ-3-(5 &.~3(p CD LETTER OF TRAN SM ITT AL To: Planning & Development Services City of College Station 1101 Texas Avenue College Station, TX 77840 Date: February 3, 2015 City Project No: 15-00900015 HFA Project No: 10-15-00008 Project: Dick's Iron Ducks Addition (Stripes) Attn: Jason Schubert Subject: Dick's Iron Ducks Addition Plat SH 40 & Well born Please find the following items for your use with the above referenced project. If you have any questions or need additional information, please contact me. Copies Description I $600 Development Permit appli cation Fee (check# 154236) I Engineer's Cost Estimate I Water Analysis/Fire Flow Report I Sidewalk Construction Documents I Water Line & Hydrant Construction Documents If enclosures are not as noted, please notify our office immediately. Sincerely, Jenifer Paz Project Manager I 713-702-0987 jenifer.paz@hfa-ae.com Hand Delivery I 705 S Walton Blvd, Suite 3 Bentonville, AR 727 I 2 www. hfa-ae.corn Phone: 4 79-273-7780 Fax: 888-520-9685 DATE: January 16, 2015 C ITY OF C oll.EGE STATION Home a/Texas A&M University" MEMORANDUM TO: Mike R. Choate, via; mchoate@susser.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: DICK'S IRON DUKES ADDITION (DVPL) I reviewed the above-mentioned Development Plat application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal. Please submit the following information so this application can be forwarded for review: $600 Development Permit application fee; Construction documents for the sidewalk along Wellborn Road with engineer's cost estimate; and Water analysis/fire flow report for the tract. Please be aware that if this application is not completed before Monday, March 2, 2015, it will expire and a new application and fees will be necessary to continue the platting process. If you have questions or need additional information regarding the above-listed eng ineering documents, please contact Carol Cotter, Assistant City Engineer, at 979. 764.3570. If you have other questions, please also feel free to contact me at 979. 764.3570 PC: Kerr Surveying LLC, via; louise.barker@suddenlinkmail.com P&DS Project No. 15-00900015 Planning e!r Development Services P .0 . BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 cstx.gov/devservices C ITY OF C OLLEGE STATION DEVELOPMENT PLAT for Dick's Iron Dukes Addition 15-00900015 SCALE: One lot on approximately 1.5 acres LOCATION: 13601 FM 2154 (Wellborn Road}, generally located at the southern intersection of Wellborn Road and William D. Fitch Parkway. ZONING: PDD Planned Development District APPLICANT: Mike Choate, Stripes LLC PROJECT MANAGER: Jessica Bullock, Staff Planner Jbullock@cstx.gov RECOMMENDATION: Staff recommends approval of the Development Plat. Planning & Zoning Commission Page 1 of 3 June 4, 2015 lJ Q) <O CD N 0 ....., (,.) DEVELOPMENT REVIEW .... DEVELOPMENT HISTORY Annexation: Zoning: Site development: COMMENTS July 1995 A-0 Agricultural Open (upon annexation) POD Planned Development District (2010) Revised POD Planned Development District (2014) Vacant Parkland Dedication Fees: N/A Greenways: N/A Pedestrian Connectivity: There is a 6-foot sidewalk proposed along Wellborn Road that will connect to the adjacent residential area with gated access. Bicycle Connectivity: N/A Impact Fees: NA REVIEW CRITERIA Compliance with Subdivision Regulations: The proposed Development Plat is in compliance with the Subdivision Regulations contained in the Unified Development Ordinance. STAFF RECOMMENDATION Staff recommends approval of the Development Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Development Plat Planning & Zoning Commission June 4, 2015 Page 3 of 3 DICK'S IRON DUKES Ii DEVELOPMENT PLAT Scale= 1: 112 (Feet) 1 S 87° 48' 44" E 78.41 2 S 29° 16' 06" E 16.73 3 S 49° 16' 05" E 233.73 / / 5 3 / / / 4 s 41 ° 51' 33" w 385.05 5 N 50' 26" W 456.93 N ! Zonin.g Districts R E RS GS R-1B D T Rusi Estate Ruttiet d Subutban Gene al Subutban Single Family Residential Dup!Rx TO'.vnhousa Ru J R-4 R-6 M p 0 SC GC Cl BP vr DEVELOPMENT REV IEW I Multi-Famliy BPI Business PBI Industrial igh Density Multi-Family NAP Netutsl Ate as Protected Manuf1ctur d ome Pat C-3 Light Commercial Offle M-1 Llg ht Industrial Suburban Com 91cial M-2 eavy lndu~ trial General Commercial C -lJ College and U n iv f!f5 ity Commercial-Industrial R& D Research and Development Bu.s inus Part P-MUD Planned Mixe-d-Use Development DICK'S IRON DUKES ADDITION Case: 15-15 POD WPC G-1 G-2 G-l ov ROD KO Planned Development District W If Pen Cteet Dev. CoHidDI Core Northg•t• T11,,sltlon1 I Otthgate Re$ idential «thgate Corrie! Overlay Redevelopment District Krenti: Tap Overlay DEVELOPMENT PLAT DICK'S IRON DUKES ADDITION Case: OEVEL OPM ENT PLAT DEVELOPMENT REVIEW 15-15 '; -. V/' PLANNING & DEVELOPMENT SERVICES Cm· OF Coll.EGE Sr...:r10N TRANSMITTAL COVER LETTER Please check one of the options below to clearly define the purpose of your submittal. I Documents for a previous incomplete submittal ')Ii Existing Project Submittal Project Name: ID l&:.'.s ~ Dukes Contact Name: I ~ Sxv8-f'1~ Phone No.: §~5?-~q S-- We are transmitting the following for Planning & Development SeNices to review and comment. (Please check fill that apply). C Comprehensive Plan Amendment r. Rezoning Application C Master Development Plan C Preliminary Plat CFinal Plat ~evelopment Plat CSite Plan C Special District Site Plan I Special District Building I Sign C Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS D Non-Residential Architectural Standards 0 Irrigation Plan OVariance Request 0 Development Permit D Conditional Use Permit 0 FEMA CLOMA/CLOMR/LOMA/LOMR D Grading Plan D Other -Please specify below All infrastructure documents must be submitted as a complete set The following are included in the complete set: C Waterline Construction Documents [i TxDOT Driveway Permit J; TxDOT Utility Permit C Drainage Letter or Report I Fire Flow Analysis I Other -Please specify Special Instructions: QS 29-Aug-OB 0 Sewerline Construction Documents [j Drainage Construction Documents O Street Construction Documents O Easement Application .. .... .. ....... . . .. j PLANNING & DEVELOPMENT SERVICES Cm· OF Coll.EGE ST...r10N TRANS MITT AL COVER LETTER Please check one of the options below to clearly define the purpose of your submittal. C::: Documents for a previous incomplete submittal C::: Existing Project Submittal Project Name: I »1Cf..S JrCTY\ D ukes ContactName:j Kdf ;5.vt\f~ i"§ Phone No.: !;?Gg / :;Jqs:: We are transmitting the following for Planning & Development SeNices to review and comment. (Please check all that apply). C:::Comprehensive Plan Amendment ['Rezoning Application C::: Master Development Plan ?Z'reliminary Plat ,.A::= Final Plat C:: Development Plat C::: Site Plan C::: Special District Site Plan I Special District Building I Sign C::: Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS O Non-Residential Architectural Standards 0 Irrigation Plan OVariance Request [J Development Permit O Conditional Use Permit 0 FEMA CLOMA/CLOMR/LOMA/LOMR O Grading Plan O Other -Please specify below All infrastructure documents must be submitted as a complete set The following are included in the complete set: [J Waterline Construction Documents [i TxDOT Driveway Permit J; TxDOT Utility Permit C Drainage Letter or Report r Fire Flow Analysis I Other -Please specify Special Instructions: 29-Aug-08 0 Sewerline Construction Documents [J Drainage Construction Documents D Street Construction Documents O Easement Application ..................... j WRITTEN CONSENT OF THE MANAGERS OF STRIPESLLC ON BEHALF OF ITSELF SUSSER PETROLEUM COMPANY LLC STRIPES ACQUISITION LLC SSP BEVCO II, LLC CORPUS CHRISTI REIMCO, LLC C&G INVESTMENTS, LLC SUSSER FINANCIAL SERVICES LLC The undersigned, being a majority of the managers (the "Managers") of Stripes LLC, a Texas limited liability company ("Stripes LLC"), acting in (i) its individual capaCity, (ii) its capacity as sole member of Susser Petroleum Company LLC, a Texas limited liability company ("Susser Petroleum Company LLC"), (iii) its capacity as sole member of Stripes Acquisition LLC, a Texas limited liability company ("Stripes Acquisition LLC"), (iv) its capacity as sole member of SSP Bevco II, LLC, a Texas limited liability company ("SSP Bevco II. LLC"), (v) its capacity as sole member of Corpus Christi Reimco, LLC, a Texas limited liability company ("Corpus Christi Reimco, LLC"), (vi) its capacity as sole member of C&G Investments, LLC, a Delaware limited liability company ("C&G Investments, LLC"), and (vii) its capacity as sole member of Susser Financial Services LLC, a Texas limited liability company ("Susser Financial Services LLC") (collectively, the "Companies"), hereby authorize, approve and adopt, by written consent, the following resolutions: WHEREAS, Stripes LLC owns, directly or indirectly, 100% of the outstanding equity interests in each of the Companies (other than itself) and is authorized pursuant to the respective organizational documents of the Companies to act for and on behalf of the Companies in the manner set forth in the following resolutions; " Removal of Officers of Stripes LLC 'WHEREAS, the Managers deem it advisable and in the best interests of Stripes LLC to remove Sam L. Susser, E.V. Bonner, Jr., Mary Sullivan, Rocky Dewbre, David Wishard, Kevin Mahany, Otis Peaks, Richard Sebastian, Bob Swan, Eduardo Pereda, George Mrvos, Jerry Susser and Sid Keswani from their current offices with Stripes LLC. NOW, THEREFORE BE IT RESOLVED, that Sam L. Susser, E.V. Bonner, Jr., Mary Sullivan, Rocky Dewbre, David Wishard, Kevin Mahany, Otis Peaks, Richard Sebastian, Bob Swan, Eduardo Pereda, George Mrvos, Jeny Susser and Sid Keswani are hereby removed as officers of Stripes LLC with respect to all of their respective offices, effective as of August 29, 2014. Appointment of Officers of Stripes LLC US 2870712v.4 • WHEREAS, the Managers, for an on behalf of Stripes LLC, deem it advisable and in the best interests of Stripes LLC to elect the persons set forth immediately below to the offices of Stripes LLC set forth opposite the name of such individual. NOW, THEREFORE, BE IT RESOLVED, that, effective as of August 29, 2014, each of the individuals set forth below be, and each of them hereby is, elected and confirmed to the offices of Stripes LLC set forth opposite the name of such individual, to serve in accordance with applicable law and the organizational documents of Stripes LLC, as each may be amended from time to time, until his or her respective successor is appointed and qualified or until his or her earlier resignation, death, or removal; and that all acts and deeds taken by each such individual in such capacity since August 29, 2014 that are within the authority conferred upon such officers pursuant to applicable law and the organizational documents of Stripes LLC, each as may be amended from time to time, are hereby approved, ratified, and confirmed in all respects. Name of Officer Robert W. Owens Mary E. Sullivan Rocky B. Dewbre Cynt)}ia Archer Blake Heinemann Clare P. McGrory Gail S. Workman Brad Williams Christopher R. Curia Kevin Mahany Richard Sebastian Karl Fails Boyd Foster Teresa Gavigan George Mrvos Brian Hand Eduardo Pereda Otis Peaks Cal Mcintosh Marvin David Wishard Steve Van Osten Patrick Albro Office of the Company President and Chief Executive Officer Executive Vice President, Chief Financial Officer and Treasurer Executive Vice President-Channel Operations Executive Vice President and Chief Marketing Officer Executive Vice President-Retail Operations East Senior Vice President-Finance & Investor Relations Senior Vice President-Sales and Operations Senior Vice President-Retail Operations West Senior Vice President-Human Resources Senior Vice President-Merchandising Senior Vice President-Facilities Senior Vice President-Supply and Trading Senior Vice President-Manufacturing and Business Development Vice President-Human Resources Vice President-Information Technology Chief Procurement Officer and Vice President-Facilities Vice President-Marketing Vice President-Human Resources Vice President-Business Development (Wholesale) Vice President-Business Development (Retail) Vice President-Pricing Vice President-Dealer Operations Name of Officer Les Phelps Wes Scott Jerry Susser James Traylor Leta McKinley Lee Rahmberg Christopher B. Dial Wimam J. Healy Office of the Company Vice President-Supply Vice President-Commercial Fuels Vice President-Real Estate Vice President-Transportation Vice President and Controller (Wholesale) Vice President-Wholesale Unbranded Fuels Associate General Counsel and Secretary Assistant Secretary Removal of Officers of Corpus Christi Reimco, LLC WHEREAS, the Managers deem it advisable and in the best interests of Corpus Christi Reimco, LLC to remove Sam L. Susser, E.V. Bonner, Jr. and Mary Sullivan from their current offices with Corpus Christi Reimco, LLC. NOW, THEREFORE BE IT RESOLVED, that Sam L. Susser, E.V. Bonner, Jr. and Mary Sullivan are hereby removed as officers of Corpus Christi Reimco, LLC with respect to all of their respective offices, effective as of August 29, 2014. Appointment of Officers of Corpus Christi Reimco, LLC WHEREAS, the Managers, for an on behalf of Corpus Christi Reimco, LLC, deem it advisable and in the best interests of Corpus Christi Reimco, LLC to elect the persons set forth immediately below to the offices of Corpus Christi Reimco, LLC set forth opposite the name of such individual. NOW, THEREFORE, BE IT RESOLVED, that, effective as of August 29, 2014, each of the"'individuals set forth below be, and each of them hereby is, elected and confirmed to the offices of Corpus Christi Reimco, LLC set forth opposite the name of such individual, to serve in accordance with applicable law and the organizational documents of Corpus Christi Reimco, LLC, as each may be amended from time to time, until his or her respective successor is appointed and qualified or until his or her earlier resignation, death, or removal; and that all acts and deeds taken by each such individual in such capacity since August 29, 2014 that are within the authority conferred upon such officers pursuant to applicable law and the organizational documents of Corpus Christi Reimco, LLC, each as may be amended from time to time, are hereby approved, ratified, and confirmed in all respects. Name of Officer Robert W. Owens Mary E. Sullivan ,, -~ -- Office of the Company President and Chief Executive Officer Executive Vice President, Chief Financial Officer and Treasurer Name of Officer Cynthia Archer ii~; Clare P. McGrory Brad Williams Richard Sebastian Jerry Susser Christopher B. Dial William J. Healy Office of the Company Executive Vice President and Chief Marketing Officer Senior Vice President-Finance & Investor Relations Senior Vice President-Retail Operations West Senior Vice President-Facilities Vice President-Real Estate Associate General Counsel and Secretary Assistant Secretary Removal of Managers of Susser Petroleum Company LLC WHEREAS, the Managers, for an on behalf of Susser Petroleum Company LLC, deem it advisable and in the best interests of Susser Petroleum Company LLC for the Managers to remove Sam L. Susser and E.V. Bonner, Jr. as managers of Susser Petroleum Company LLC. NOW, THEREFORE BE IT RESOLVED, that Sam L. Susser and E.V. Bonner, Jr. are hereby removed as managers of Susser Petroleum Company LLC effective as of August 29, 2014. Appointment of Managers of Susser Petroleum Company LLC WHEREAS, the Managers, for an on behalf of Susser Petroleum Company LLC, deem it advisable and in the best interests of Susser Petroleum Company LLC to elect Robe1t W. Owens and Rocky B. Dewbre as managers of Susser Petroleum Company LLC. NOW, THEREFORE, BE IT RESOLVED, that, effective as of August 29, 2014, Robert W. Owens and Rocky B. Dewbre be, and each of them hereby is, appointed as manager of Susser Petroleum Company LLC, to serve in accordance with applicable law and the organizational documents of Susser Petroleum Company LLC, as each may be amended from time to time, until his or her respective successor is appointed and qualified or until his or her earlier resignation, death, or removal; and that all acts and deeds taken by each such individual in such capacity since August 29, 2014 that are within the authority conferred upon such managers pursuant to applicable law and the organizational documents of Susser Petroleum Company LLC, each as may be amended from time to time, are hereby approved, ratified, and confirmed in all respects. Removal of Managers of Stripes Acquisition LLC . WHEREAS, the Managers, for an on behalf of Stripes Acquisition LLC, deem it advis~ble and in the best interests of Stripes Acquisition LLC for the Managers to remove Sam L. Susser and E.V. Bonner, Jr. as managers of Stripes Acquisition LLC. NOW, THEREFORE BE IT RESOLVED, that Sam L. Susser and E.V. Bonner, Jr. are hereby removed as managers of Stripes Acquisition LLC effective as of August 29, 2014. Appointment of Managers of Stripes Acquisition LLC WHEREAS, the Managers, for an on behalf of Stripes Acquisition LLC, deem it advisable and in the best interests of Stripes Acquisition LLC to elect Mary E. Sullivan, Brad Williams and Marvin D. Wishard as managers of Stripes Acquisition LLC. NOW, THEREFORE, BE IT RESOLVED, that, effective as of August 29, 2014, Mary E. Sullivan, Brad Williams and Marvin D. Wishard be, and each of them hereby is, appointed as manager of Stripes Acquisition LLC, to serve in accordance with applicable law and the organizational documents of Stripes Acquisition LLC, as each may be amended from time to time, until his or her respective successor is appointed and qualified or until his or her earlier resignation, death, or removal; and that all acts and deeds taken by each such individual in such capacity since August 29, 2014 that are within the authority conferred upon such managers pursu~µt to applicable law and the organizational documents of Stripes Acquisition LLC, each as may be amended from time to time, are hereby approved, ratified, and confirmed in all respects. Removal of Managers of SSP Bevco II, LLC WHEREAS, the Managers, for an on behalf of SSP Bevco II, LLC, deem it advisable and in the best interests of SSP Bevco II, LLC for the Managers to remove Sam L. Susser, E.V. Bonner, Jr. and Marvin D. Wishard as managers of SSP Bevco II, LLC. NOW, THEREFORE BE IT RESOLVED, that Sam L. Susser, E.V. Bonner, Jr. and Marvin D. Wishard are hereby removed as managers of SSP Bevco, II LLC effective as of August 29, 2014. Appointment of Managers of SSP Bevco II, LLC WHEREAS, the Managers, for an on behalf of SSP Bevco II, LLC, deem it advisable and in the best interests of SSP Bevco II, LLC to elect Mary E. Sullivan, Brad Williams and Marvin D. Wishard as managers of SSP Bevco II, LLC. NOW, THEREFORE, BE IT RESOLVED, that, effective as of August 29, 2014, Mary E. Sullivan, Brad Williams and Marvin D. Wishard be, and each of them hereby is, appointed as manager of SSP Bevco II, LLC, to serve in accordance with applicable law and the organizational documents of SSP Bevco II, LLC, as each may be amended from time to time, until his or her respective successor is appointed and qualified or until his or her earlier resignation, death, or removal; and that all acts and deeds taken by each such individual in such capacity since August 29, 2014 that are within the authority conferred upon such managers pursuant to applicable law and the organizational documents of SSP Bevco II, LLC, each as may be amended from time to time, are hereby approved, ratified, and confirmed in all respects. Removal of Managers of C&G Investments, LLC WHEREAS, the Managers, for an on behalf of C&G Investments, LLC, deem it advisable and in the best interests of C&G Investments, LLC for the Managers to remove E. V. Bonner, Jr. as manager of C&G Investments, LLC. NOW, THEREFORE BE IT RESOLVED, that E.V. Bonner, Jr. is hereby removed as manager of C&G Investments, LLC effective as of August 29, 2014. Appointment of Manager of C&G Investments, LLC WHEREAS, the Managers, for an on behalf of C&G Investments, LLC, deem it advisable and in the best interests of C&G Investments, LLC to elect Mary E. Sullivan as sole manager of C&G Investments, LLC. NOW, THEREFORE, BE IT RESOLVED, that, effective as of August 29, 2014, Mary E. Sullivan be, and hereby is, appointed as sole manager of C&G Investments, LLC, to serve in accordance with applicable law and the organizational documents of C&G Investments, LLC, as each may be amended from time to time, until her successor is appointed and qualified or until her earlier resignation, death, or removal; and that all acts and deeds taken by such individual in such capacity since August 29, 2014 that are within the authority conferred upon such a sole manager pursuant to applicable law and the organizational documents of C&G Investments, LLC, each as may be amended from time to time, are hereby approved, ratified, and confirmed in all respects. Removal of Managers of Susser Financial Services LLC ~( ~ WHEREAS, the Managers, for an on behalf of Susser Financial Services LLC, deem it advisable and in the best interests of Susser Financial Services LLC for the Managers to remove Sam L. Susser and E.V. Bonner, Jr. as managers of Susser Financial Services LLC. NOW, THEREFORE BE IT RESOLVED, that Sam L. Susser and E.V. Bonner, Jr. are hereby removed as managers of Susser Financial Services LLC effective as of August 29, 2014. Appointment of Manager of Susser Financial Services LLC WHEREAS, the Managers, for an on behalf of Susser Financial Services LLC, deem it advisable and in the best interests of Susser Financial Services LLC to elect Mary E. Sullivan as sole manager of Susser Financial Services LLC. NOW, THEREFORE, BE IT RESOLVED, that, effective as of August 29, 2014, Mary E. Sullivan be, and hereby is, appointed as sole manager of Susser Financial Services LLC, to serve in accordance with applicable law and the organizational documents of Susser Financial Services LLC, as each may be amended from time to time, until her successor is appointed and qualified or until her earlier resignation, death, or removal; and that all acts and deeds taken by such individual in such capacity since August 29, 2014 that are within the authority conferred upon such a sole manager pursuant to applicable law and the organizational documents of Susser Financial Services LLC, each as may be amended from time to time, are hereby approved, ratified, and confirmed in all respects; and be it further General Authority and Ratification RESOLVED, that, with respect to each of the Companies, any officer or manager of any such respective Company (each, an "Authorized Person") be, and each of them hereby is (acting alone), authorized and empowered to prepare, execute, deliver and perform such agreements, amendments, powers of attorney, documents and other instruments and take such other action, in the name and on behalf of such respective Company, which any such Authorized Person, in his, her or its discretion, shall deem necessary or advisable to effect and carry out the intent of the foregoing resolutions and the transactions contemplated thereby, and the taking of such action and the preparation, execution, delivery and performance of any such agreements, amendments, documents and other instruments or the performance of any such act shall be conclusive evidence of the approval of the Managers thereof and all matters relating thereto; and be it further ~~;RESOLVED, that . any lawful act heretofore taken by any Authorized Person in connection with the matters contemplated in the foregoing recitals and resolutions be, and it hereby is, in all respects approved, adopted, ratified and confirmed as an act of the Companies; and be it further RESOLVED, that delivery of an executed counterpart of a signature page to this Written Consent by facsimile or pdf attachment to electronic mail shall be effective as delivery of a manually executed counterpart to this Written Consent. [Remainder of page intentionally left blank] . . IN WITNESS WHEREOF, the undersigned have duly executed this Written Consent as of the date first set forth above, effective as of the date first set forth above. Robert W. Owens : \~~c£ll-· Brad Williams SIGNATURE PAGE TO WRITTEN CONSENT or STRIPES LLC