HomeMy WebLinkAbout15-27Drainage Report
for
Polo Estates Subdivision
Brazos County, Texas
January 2015
Prepared By:
, Scholtz Engineering, LLC
TBPE Firm No. 12327
P.O. Box 11995
College Station, TX 77842
2730 Longmire Drive, Suite A
College Station, Texas 77845
(979) 764-3900
Developer:
Malechek & Westmoland Family LP
3850 Corporate Center Drive
College Station, Texas 77845
Phone: (979) 690-2642
ENGINEER
Schultz Engineering, LLC.
P.O. Box 11995
Polo Estates Subdivision
Drainage Report
College Station, Texas 77842
Phone: (979) 764-3900
Fax: (979) 764
OWNER/DEVELOPER
Malechek & Westmoland Family LP
3850 Corporate Center Drive
College Station, Texas 77845
Phone: (979) 690-2642
GENERAL DESCRIPTION AND LOCATION
Location:
Description:
• Area:
• Proposed Land Use:
• #of Lots:
• Existing Land Use:
• Land Description:
Primary Drainage Facility:
Flood Hazard Information:
FEMAFIRM:
Floodplain:
Polo Estates Subdivision is located east of South Dowling Road and North Graham Road.
34.069 acres
Single Family Residential
21 lots
Vacant
The terrain slopes towards the southwest.
Boggy Creek
# 48041C0375E (May 16, 2012)
Un-shaded Zone X
HYDROLOGIC CHARACTERISTICS
The existing site is predominately wooded. The elevations range from 238 to 302, sloping generally in a south
easterly direction. The runoff enters tributaries of Boggy Creek.
GENERALSTORMWATERPLAN
The drainage plan for this development will involve the construction of ditches, channels and the installation of
culvert structures.
DRAINAGE DESIGN
General Information: Stormwater runoff from this project will be collected in the ditches along Mallet Way and
Mallet Court to be discharged into proposed drainage channels. The proposed channels will
discharge into existing drainage ways. See Exhibit A for drainage areas for the culvert
design locations and the channel design locations. See Exhibit B for drainage areas for the
ditch design.
Page 1 of3
Tc Methodology:
Tc Minimum
Design Storm Event:
Culvert Materials:
ManningJs n Value:
Runoff Coefficient:
TR55
10 minutes
25-year & 100-year -residential street & culvert, drainage channel
HDPE Pipe or ADS HP Pipe with cement stabilized sand backfill
0.012
0.45
The Rational Equation was used for the culvert, ditch and channel design.
Design Results -Culvert Pipe:
Design Results -Channels:
Culvert No. 2
Culvert Size 1-18" Pipe s 1-18"Pipe
Top of Road Elev. 288.59 290.18
Q2s 9.49 6.36
V2s 6.32 5.24
HW2s 287.44 288.29
Q100 11.25 7.56
V100 7.00 5.64
HW100 287.90 288.50
The data presented above and in the Appendices indicates the culvert sizes are in
accordance with the requirements. The head water elevation for the culverts is less than the
top of road elevation for the 100-yr storm runoff. The ditch at the outlet of the proposed
culverts will be lined with rock riprap to prevent erosion from high velocities. The
velocities in the roadside ditches are such that the ditches will not need rock riprap or
erosion control blankets to control erosion.
Channel No. 2
2.35 2.00
12.9S 13.02
3.40 3.2S
O.S6 O.S8
lS.34 15.42
3.S7 3.42
0.61 0.63
Channel No. 1 is a trapezoid channel, SH: 1 V side slopes. The channel will have a
minimum depth of 1.6' for adequate freeboard. The design velocity is 3.6 fps which is less
than 4.S fps which would require curlex blankets to be installed the length of the drainage
channels. Channel No. 2 is a trapezoid channel, SH: 1 V side slopes. The channel will have
a minimum depth of 1.6' for adequate freeboard. The design velocity is 3.4 fps which is
less than 4.S fps which would require curlex blankets to be installed the length of the
drainage channels.
Page 2of3
Applicable Exhibits: Exhibit A -
Exhibit B -
AppendixA-
Appendix B-
Appendix C-
Appendix D-
Appendix E -
Drainage Area Map -Culvert and Channel Design
Drainage Area Map -Roadside Ditch Design
Drainage Area Summary
Time of Concentration Computations
Culvert Design Summary & Culvert Reports
Ditch Design Summary
Channel Design Summary and Reports
CONCLUSION The culverts, roadside ditches, and drainage channel for this subdivision were designed in
accordance with appropriate engineering standards.
CERTIFICATION
I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design
for Polo Estates Subdivision, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge
Department.
f'.:..·12327
SCHOLTZ: StGlN~lNQ, u.c;
Page 3 of3
Exhibit A
Drainage Area Map
Culvert and Channel Design
Exhibit B
Drainage Area Map
Roadside Ditch Design
Appendix A
Drainage Area Summary
Polo Estates Subdivision
Appendix A Drainage Area Summary
Rational Method
Area, A
Area#
(acres)
310 3.27
311 2.07
312 0.43
313 0.77
320 2.49
321 1.03
322 1.45
330 0.78
331 0.39
332 0.10
333 0.13
334 0.16
340 1.50
341 0.11
342 0.04
343 0.21
344 0.33
345 0.21
346 0.36
347 0.23
The Rational Method:
Q =CIA
Q =Flow (cfs)
A = Area (acres)_
C = Runoff Coeff.
I = Rainfall Intensity (in/hr)
Brazos County:
c tc 25 year storm
125 0 25
(min) (in/hr) (cfs)
0.45 24.0 6.448 9.49
0.45 24.0 6.448 6.01
0.45 18.0 7.521 1.46
0.45 10.0 9.861 3.42
0.45 30.0 5.675 6.36
0.45 30.0 5.675 2.63
0.45 27.0 6.033 3.94
0.45 10.0 9.861 3.46
0.45 10.0 9.861 1.73
0.45 10.0 9.861 0.44
0.45 10.0 9.861 0.58
0.45 10.0 9.861 0.71
0.45 10.0 9.861 6.66
0.45 10.0 9.861 0.49
0.45 10.0 9.861 0.18
0.45 10.0 9.861 0.93
0.45 10.0 9.861 1.46
0.45 10.0 9.861 0.93
0.45 10.0 9.861 1.60
0.45 10.0 9.861 1.02
I = b I (tc+d)0
tc =Time of concentration (min)
25 vear storm 100 year storm
b = 89 b = 96
d = 8.5 d = 8.0
e= 0.754 e= 0.730
100 year storm
1100 0 100
(in/hr) (cfs)
7.647 11.25
7.647 7.12
8.899 1.72
11.639 4.03
6.746 7.56
6.746 3.13
7.163 4.67
11.639 4.09
11.639 2.04
11.639 0.52
11.639 0.68
11.639 0.84
11.639 7.86
11.639 0.58
11 .639 0.21
11.639 1.10
11 .639 1.73
11 .639 1.10
11 .639 1.89
11 .639 1.20
tc = U(V*60)
L = Length (ft
V = Velocity (ft/sec)
Appendix B
Time of Concentration Computations
APPENDIX B
POST DEVELOPMENT TIME OF CONCENTRATION COMPUTATIONS
Polo Estates Subdivision
T ,,_ = time of concentration for sheet flow (hr)
L = length (ft)
n = Manning's roughness
P2 = 2-yr rainfall intensity (in/hr) for Brazos Co. = 4.5 in/hr
S =slope (ft/fl)
Sheet Flow Drainage n Length Slope T,._ Araa# fl % min.
310 "i· 0:24!1h:· ··~·1>200'" ,~ i""'r;1t3 "M 22
311 ,. •oa4 . \•"200\ ... 1:8 •• 22
312 0:24 " ""' 200: . 3> ~-~ 18
320 0.24 ·"' 200· 1'• .... 28
321 0.24 •1 •• 200 . : 1· . 28
322 CJ.21' ·."200. ~-1.3 25
Concentrated Flow
Length Slope Velocity
fl % fl/sec
'''-'4:132 "" 2..71 .• 2.1
I '21 132' ,·;,·2.,71 . • ,,, '2.7 iii
,, ,f• , •• '"i' ,..,. ···~··""""' ':'--'¥· .,
;;,j.120-(.' ,, 1,7 • ~;1
"120"·, .... 1.t •. ''2.1
165 f." 1:3: 1.8
TR-55 Method
V.,,.., = water velocity in ditch (ft/sec)
S = slope of ditch (ft/fl)
v.,._ =water velocity in gutter (ft/sec)
S = slope of gutter (ft/fl)
Gutter Flow -1
T.._ Length Slope Velocity
min fl % fl/sec
1 .. :128 ·'''0.83 1.9 .,
1 +~""!''' >,;;'OJl3."1f 1?1?'1.9 •. ,.
'"' ;7J'''Ji! U.29!"' :u··
1 •• 1"116 '; .. 0.8':7 1.8
1 " -118 . :;.: •.0.8 f· ~~1;·1.8
1 '1:'18 " to-•; 1.73 ·'· 2.7
T-
min
1
1
0
1
1
1
Length
fl
"' :
T =travel time through ditch or gutter (min)
L = length of travel path (ft)
V =velocity (ft/sec)
Gutter Flow -2
Slope Velocity T-Total
% ft/sec min min
" .• 24 ' .·;r ····iil >.1\1 "ll!:\11/ifii. :.•\. ;,;k 24
1; •••. ;• . ".: .. ~, . 18
'"" ...• ,; .' .. " 30
. lZ: . *'' .. · . .c ¢. 30
.; .,.., 27
T.
Design
min
24
2A ·•
"18 ..
30 ' 30
'Z1 .
Appendix C
Culvert Design Summary
& Culvert Reports
Polo Estates Subdivision
Appendix C
Culvert Design Summary
Pipe Pipe Size Length Slope Contributing Q25 V25 Q100 V100
No. Drainage
(in) {ft) (Oft) Areas (cfs) (fps) (cfs) (fps)
1 18w 56 2.07 310 9.49 6.32 11.25 7.00
2 18w 54 0.80 320 6.36 5.24 7.56 5.64
Appendix D
Ditch Design Summary
Polo Estates Subdivision
AppendixD
Ditch Design Summary
Street Ditch Location Slope Contributing Q25 v .. o,. Q, .. v, .. o, ..
Street Stations Drainage Areas (Right/Left) (%) (cfs) (fps) (ft) (cfs) (fps) (ft)
Mallet Way 0+00 Right 0.80 320,341,342 7.02 1.79 0.99 8.34 1.86 1.06
Mallet Way 0+62.66 Left 0.80 321 2.63 1.38 0.69 3.13 1.47 0.73
Mallet Way 0+62.66 Right 2.05 341 0.49 1.27 0.31 0.58 1.33 0.33
Mallet Way 0+62.66 Left 1.73 322 3.94 2.07 0.69 4.67 2.13 0.74
Mallet Way 6+64.36 Right 1.08 331 1.73 1.38 0.56 2.04 1.47 0.59
Mallet Way 6+64.36 Left 0.83 311 6.01 1.74 0.93 7.12 1.82 0.99
Mallet Way 6+64.36 Right 3.34 332,333 1.02 1.86 0.37 1.20 1.97 0.39
Mallet Way 6+64.36 Left 2.29 312,313 4.87 2.42 0.71 5.75 2.49 0.76
Mallet Way 7+75 Right 3.52 333 0.58 1.61 0.30 0.68 1.66 0.32
Mallet Way 7+75 Left 3.52 313 3.42 2.54 0.58 4.03 2.71 0.61
Mallet Court 2+50 Right 1.11 347 1.02 1.26 0.45 1.20 1.30 0.48
Mallet Court 2+80 Left 0.80 320,341,342,343 7.96 1.84 1.04 9.44 1.92 1.11
Mallet Court 6+71.78 Right 1.88 346,347 2.62 1.88 0.59 3.09 2.01 0.62
Mallet Court 6+71.78 Left 1.88 320:341,342,343,344 9.42 2.67 0.94 11 .17 2.79 1.00
*Note: Refer to plans for rock nprap and erosion control blanket locations 'I
Appendix E
Channel Design Summary
& Reports
Polo Estates Subdivision
Appendix E
Channel Design Summary
Street Channel Shape Side Slope Slope Contributing Q25 v .. o .. Q, .. v, .. o, ..
("lo) Drainage Areas (cfs) (fps) (ft) (cfs) (fps) (ft)
Channel No. 1 V-channel 5:1 2.35 310,330 12.95 3.40 0.56 15.34 3.57 0.61
Channel No. 2 V-channel 5:1 2.00 320,340 13.02 3.25 0.58 15.42 3.42 0.63
Channel Report
, Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 1 -25 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z:1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
278.00
277.50
277.00 '\..
'\..
276.50
276.00
275.50
275.00
0 2
'\..
'\
'\..
= 4.00 = 5.00, 5.00
= 1.50
= 275.62
= 2.35
= 0.035
Known Q
= 12.95
' '\..
'\
'\..
" '\..
'\
'\..
4 6 8
Section
"'7
-
'\.. v
" /
10 12 14
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
v
/
/
/ v
/
/
/ ,
/
/
/
16 18 20
/
Thursday, Jan 15 2015
= 0.56
= 12.95
= 3.81 = 3.40 = 9.71
= 0.55 = 9.60
= 0.74
22 24
Depth (ft
2.38
1.88
1.38
0.88
0.38
-0.12
-0.62
Channel Report
• Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 1 -100 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z:1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
278.00
277.50
277.00
276.50
276.00
275.50
275.00
0
'
2
' ' ' I'\.
4
= 4.00
= 5.00, 5.00
= 1.50
= 275.62
= 2.35
= 0.035
Known Q
= 15.34
' ' ' I"
' ' ' ' '\.
'"
6 8
Section
-v -
v
/
10 12 14
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
/
/
17
/
/
~
17
/
/
/
16 18
/
17
/
20
Thursday, Jan 15 2015
= 0.61
= 15.34
= 4.30
= 3.57
= 10.22
= 0.60
= 10.10
= 0.81
22 24
Depth (ft
2.38
1.88
1.38
0.88
0.38
-0.12
-0.62
Channel Report
.. Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 2 -25 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
275.00
274.50
274.00
273.50
273.00
272.50
0
~
\..
2
\..
'\
'
= 4.00
= 5.00, 5.00
= 1.50
= 273.04
= 2.00
= 0.035
Known Q
= 13.02
\..
'\
' ' \.
'\.
' \..
' "" '\
'\
"
4 6 8
Section
v -
10 12
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
I
/ ,
/
/
/ , ,
/
/
/ x
/
/
/ ,
J ,,
14 16 18 20
Thursday, Jan 15 2015
= 0.58
= 13.02
= 4.00
= 3.25
= 9.91
= 0.55
= 9.80
= 0.74
22 24
Depth (ft
1.96
1.46
0.96
0.46
-0.04
-0.54
Channel Report
, Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 2 -100 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
275.00
274.50 \.
\.
\.
'
274.00
273.50
273.00
272.50
0 2
= 4.00
= 5.00, 5.00
= 1.50
= 273.04
= 2.00
= 0.035
Known Q
= 15.42
"' \.
\.
'\
'"' " \.
\.
' " \.
\.
"
4 6 8
Section
~ --
10 12
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
~
I
7 ,
7
7
I
.I
' I
I
7
/
' I
I
/ ,
' ,,
14 16 18 20
Thursday, Jan 15 2015
= 0.63
= 15.42
= 4.50
= 3.42
= 10.42
= 0.60
= 10.30
= 0.81
22 24
Depth {ft
1.96
1.46
0.96
0.46
-0.04
-0.54
Drainage Report
for
Polo Estates Subdivision
Brazos County, Texas
January 2015
Revised March 2015
Prepared By:
Schultz Engineering, LLC
TBPE Firm No. 12327
P.O. Box 11995
College Station, TX 77842
2730 Longmire Drive, Suite A
College Station, Texas 77845
(979) 764-3900
Developer:
Get Real, LLC
3850 Corporate Center Drive
College Station, Texas 77845
Phone: (979) 690-2642
-
Drainage Report
for
Polo Estates Subdivision
Brazos County, Texas
January 2015
Revised March 2015
Prepared By:
~-==--Schultz Engineerin g, LLC
TBPE Firm No. 12327
P.O. Box 11995
College Station, TX 77842
2730 Longmire Drive, Suite A
College Station, Texas 77845
(979) 764-3900
Developer:
Get Real, LLC
3850 Corporate Center Drive
College Station, Texas 77845
Phone: (979) 690-2642
-
ENGINEER
Schultz Engineering, LLC.
P.O. Box 11995
Polo Estates Subdivision
Drainage Report
College Station, Texas 77842
Phone: (979) 764-3900
Fax: (979) 764
OWNER/DEVELOPER
Get Real, LLC
3850 Corporate Center Drive
College Station, Texas 77845
Phone: (979) 690-2642
GENERAL DESCRIPTION AND LOCATION
Location:
Description:
• Area:
• Proposed Land Use:
• #of Lots:
• Existing Land Use:
• Land Description:
Primary Drainage Facility:
Flood Hazard Information:
FEMAFIRM:
Floodplain:
Polo Estates Subdivision is located east of South Dowling Road and North Graham Road.
34.069 acres
Single Family Residential
22 lots
Vacant
The terrain slopes towards the southwest.
Hopes Creek
# 48041 C0325E (May 16, 2012)
Un-shaded Zone X
HYDROLOGIC CHARACTERISTICS
The existing site is predominately wooded. The elevations range from 266 to 294, sloping generally in a south
easterly direction. The runoff enters tributaries of Hopes Creek.
GENERALSTORMWATERPLAN
The drainage plan for this development will involve the construction of ditches, channels and the installation of
culvert structures.
DRAINAGE DESIGN
General Information: Stormwater runoff from this project will be collected in the ditches along Mallet Way and
Mallet Court to be discharged into proposed drainage channels. The proposed channels will
discharge into existing drainage ways. See Exhibit A for drainage areas for the culvert
design locations and the channel design locations. See Exhibit B for drainage areas for the
ditch design.
Page 1 of3
-
Tc Methodology:
Tc Minimum
Design Storm Event:
Culvert Materials:
Manning 's n Value:
Runoff Coefficient:
TR55
10 minutes
25-year & 100-year -residential street & culvert, drainage channel
Culvert pipe material per Brazos County
0.012
0.45
The Rational Equation was used for the culvert, ditch and channel design.
Design Results -Culvert Pipe:
Culvert No. 2 3
Culvert Size 1-18" Pipe 1-18" Pipe 1-24" Pipe
Top of Road Elev. 288.59 288 .59 276.43
Design Results -Channels:
Q 25 9.49 8.89 13.33
V 2s 6.32 6.10 6.10
HW2s 287.44 287.24 275.06
Q 100 11.25 10.57 15.81
V 100 7.00 6.71 6.57
HW100 287.90 287.65 275.34
The data presented above and in the Appendices indicates the culvert sizes are in
accordance with the requirements. The head water elevation for the culverts is less than the
top of road elevation for the 100-yr storm runoff. The ditch at the outlet of the proposed
culverts will be lined with rock riprap to prevent erosion from high velocities. The
velocities in the roadside ditches are such that the ditches will not need rock riprap or
erosion control blankets to control erosion.
Channel No. 2
2.35 0.80 ~ 12.95 18.17 ----1 3.53 2.66 __,
0.58 0.90 ----1 21.52 __, 100 15.34
2.77 ----1 V100 3.73
D100 0.63 0.98
Channel No. 1 is a trapezoid channel, 4H: 1 V side slopes. The channel will have a
minimum depth of 1.6' for adequate freeboard. The design velocity is 3.73 fps which is
greater than 3.0 fps and less than 4.5 fps which requires curlex blankets to be installed the
length of the drainage channels. Channel No. 2 is a trapezoid channel, 4H: 1 V side slopes.
The channel will have a minimum depth of 2.0' for adequate freeboard. The design
velocity is 2. 77 fps which is less than 4.5 fps which would require curlex blankets to be
installed the length of the drainage channels.
Page 2 of3
Applicable Exhibits: Exhibit A -
Exhibit B -
Appendix A-
Appendix B -
Appendix C -
Appendix D-
Appendix E -
Drainage Area Map -Culvert and Channel Design
Drainage Area Map -Roadside Ditch Design
Drainage Area Summary
Time of Concentration Computations
Culvert Design Summary & Culvert Reports
Ditch Design Summary
Channel Design Summary and Reports
CONCLUSION The culverts, roadside ditches, and drainage channel for this subdivision were designed in
accordance with appropriate engineering standards.
CERTIFICATION
I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design
for Polo Estates Subdivision, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge
Department.
F;,..1~~11
SCHULl't ~GtNE~INC~ l.l.C.
s
Page 3of3
Exhibit A
Drainage Area Map
Culvert and Channel Design
-
Exhibit B
Drainage Area Map
Roadside Ditch Design
-
Appendix A
Drainage Area Summary
-
Polo Estates Subdivision
Appendix A Drainage Area Summary
Rational Method
Area, A c le
25 year storm
Area# 125 0 25
(acres) (min) (in/hr) (cfs)
310 3.27 0.45 24.0 6.448 9.49
311 2.07 0.45 24.0 6.448 6.01
312 0.43 0.45 18.0 7.521 1.46
313 0.77 0.45 10.0 9.861 3.42
320 3.55 0.45 31.0 5.566 8.89
321 2.19 0.45 31.0 5.566 5.49
322 1.35 0.45 27.0 6.033 3.66
330 0.78 0.45 10.0 9.861 3.46
331 0.39 0.45 10.0 9.861 1.73
332 0.10 0.45 10.0 9.861 0.44
333 0.13 0.45 10.0 9.861 0.58
334 0.16 0.45 10.0 9.861 0.71
340 1.00 0.45 10.0 9.861 4.44
341 0.22 0.45 10.0 9.861 0.98
342 0.33 0.45 10.0 9.861 1.46
343 0.45 0.45 10.0 9.861 2.00
350 1.09 0.45 10.0 9.861 4.84
351 0.10 0.45 10.0 9.861 0.44
352 0.25 0.45 10.0 9.861 1.11
353 0.50 0.45 10.0 9.861 2.22
354 0.24 0.45 10.0 9.861 1.07
The Rational Method:
Q = CIA I = b I (tc+d)0
Q =Flow (cfs) tc =Time of concentration (min)
A = Area (acres)
C = Runoff Coeff.
I = Rainfall Intensity (in/hr)
Brazos County:
25 '{.ear storm 100 '{.ear storm
b= 89 b = 96
d= 8.5 d = 8.0
e= 0.754 e= 0.730
100 year storm
1100 0 100
(in/hr) (cfs)
7.647 11.25
7.647 7.12
8.899 1.72
11.639 4.03
6.619 10.57
6.619 6.52
7.163 4.35
11.639 4.09
11 .639 2.04
11 .639 0.52
11 .639 0.68
11 .639 0.84
11.639 5.24
11 .639 1.15
11 .639 1.73
11.639 2.36
11.639 5.71
11 .639 0.52
11 .639 1.31
11 .639 2.62
11 .639 1.26
1c = L/(V*60)
L = Length (ft
V =Velocity (ft/sec)
-
Appendix B
Time of Concentration Computations
APPENDIX B
POST DEVELOPMENT TIME OF CONCENTRATION COMPUTATIONS
Polo Estates Subdivision
T,,,.., =time of concentration for sheet flow (hr)
L = length (ft)
n = Manning's roughness
P2 = 2-yr rainfall intensity (in/hr) for Brazos Co. = 4.5 in/hr
S = slope (ft/ft)
Drainage
Area # n
Sheet Flow
Length Slope T,._
ft % min.
310 0.24 200 1.8 22
311 0.24 200 1.8 22
312 0.24 200 3 18
320 0.24 200 1 28
321 0.24 200 1 28
322 0.24 200 1.3 25
Concentrated Flow
Length Slope Velocity
ft % ft/sec
132 2.77 2.7
132 2.77 2.7
96 1.4 1.9
96 1.4 1.9
165 1.3 1.8
TR-55 Method
Vconc =water velocity in ditch (ft/sec)
S = slope of ditch (ft/ft)
VguttB• =water velocity in gutter (ft/sec)
S = slope of gutter (ft/ft)
Gutter Flow -1
T..,.._, Length Slope Velocity
min ft % ft/sec
1 128 0.83 1.9
1 128 0.83 1.9
77 2.29 3.1
1 238 0.8 1.8
1 238 0.8 1.8
1 116 1.73 2.7
r.,,.. Length
min ft
1
1
0
2
2
1
T =travel time through ditch or gutter (min)
L = length of travel path (ft)
V = velocity (ft/sec)
Gutter Flow - 2
Slope Velocity T ,.,.. Total
% ft/sec min min
24
24
18
31
31
27
T,
Design
min
24
24
18
31
31
27
Appendix C
Culvert Design Summary
& Culvert Reports
~----------------------------------------
Polo Estates Subdivision
Appendix C
Culvert Design Summary
Pipe Pipe Size Length Slope Contributing 0 2s V2s 0 100 V100
No. Drainage
(in) (ft) (%) Areas (cfs) (fps) (cfs) (fps)
1 18" 56 2.07 310 9.49 6.32 11.25 7.00
2 18" 62 0.80 320 8.89 6.10 10.57 6.71
3 24" 54 0.80 320,340 13.33 6.10 15.81 6.57
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Culvert No. 1 -25 year Storm
Invert Elev Dn (ft)
Pipe Length (ft)
Slope(%)
Invert Elev Up (ft)
Rise (in)
Shape
Span (in)
No. Barrels
n-Value
Culvert Type
Culvert Entrance
Coeff. K,M ,c,Y,k
Embankment
Top Elevation (ft)
Top Width (ft)
Crest Width (ft)
Elev (ft>
= 284.14
= 56.00
= 2.07
= 285.30
= 18.0
= Circular
= 18.0
= 1
= 0.012
= Circular Concrete
= Square edge w/headwall (C)
= 0.0098, 2, 0.0398, 0.67, 0.5
= 288.59
= 24.00
= 24.00
Culvert No. 1 -25 year Stonn
Calculations
Qmin (cfs)
Qmax (cfs)
Tailwater Elev (ft)
Highlighted
Qtotal ( cfs)
Qpipe (cfs)
Qovertop (cfs)
Veloc Dn (ft/s)
Veloc Up (ft/s)
HGL Dn (ft)
HGL Up (ft)
Hw Elev (ft)
Hw/D (ft)
Flow Regime
Friday, Dec 12 2014
= 9.49
= 11.25
= (dc+D)/2
= 9.49
= 9.49
= 0.00
= 5.68
= 6.32
= 285.48
= 286.49
= 287.44
= 1.42
= Inlet Control
!-----+-----+-1.7ll
!-----+-----+-0.70
233.00 --+---+--+-----+--+---+----1--+---+---+----+--+--+-----+--+---+-----4--2.30
0 10 16 20 26 30 36 40 60 66 60 70 75 00
--CircU!a.rCtlvert --HGL --Embank
Reich (ft)
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Culvert No. 1 -100 year Storm
Invert Elev Dn (ft)
Pipe Length (ft)
Slope(%)
Invert Elev Up (ft)
Rise (in)
Shape
Span (in)
No. Barrels
n-Value
Culvert Type
Culvert Entrance
Coeff. K,M,c,Y,k
Embankment
Top Elevation (ft)
Top Width (ft)
Crest Width (ft)
Elev(ft)
239Jl0
= 284.14 = 56.00
= 2.07 = 285.30
= 18.0
= Circular
= 18.0
= 1
= 0.012
= Circular Concrete = Square edge w/headwall (C)
= 0.0098, 2, 0.0398, 0.67, 0.5
= 288.59
= 24.00 = 24.00
Culvert No. 1 -100 year Storm
Calculations
Qmin (cfs)
Qmax (cfs)
Tailwater Elev (ft)
Highlighted
Qtotal ( cfs)
Qpipe (cfs)
Qovertop (cfs)
Veloc Dn (ft/s)
Veloc Up (ft/s)
HGL Dn (ft)
HGL Up (ft)
Hw Elev (ft)
Hw/D (ft)
Flow Regime
Friday, Dec 12 2014
= 9.49
= 11.25
= (dc+D)/2
= 11.25
= 11.25
= 0.00
= 6.58
= 7.00
= 285.53
= 286.58
= 287.90
= 1.74
= Inlet Control
!----+---+-1.70
I---+---+-0.70
233.00 -t---t--+---t--+---+------1-----1--+--+--+----+--+--+---t--+---+-----ll---2.30 10 16 20 25 30 3fi 40 46 60 65 60 66 70 75 BO
--Circu'la.rCldvert --HGL --Embank
Resch (ft)
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Sunday, Mar 22 2015
Culvert No. 2 -25 year Storm
Invert Elev Dn (ft) = 284.73 Calculations
Pipe Length (ft) = 62.00 Qmin (cfs) = 8.89
Slope(%) = 0.81 Qmax (cfs) = 10.57
Invert Elev Up (ft) = 285.23 Tailwater Elev (ft) = (dc+D)/2
Rise (in) = 18.0
Shape = Circular Highlighted
Span (in) = 18.0 Qtotal ( cfs) = 8.89
No. Barrels = 1 Qpipe (cfs) = 8.89
n-Value = 0.012 Qovertop ( cfs) = 0.00
Culvert Type = Circular Concrete Veloc Dn (ft/s) = 5.38
Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.10
Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 286.06
HGL Up (ft) = 286.38
Embankment Hw Elev (ft) = 287.24
Top Elevation (ft) = 288.59 Hw/D (ft) = 1.34
Top Width (ft) = 24.00 Flow Regime = Inlet Control
Crest Width (ft) = 24.00
BOY C•) Culvert No. 2 -25 year Storm Hw Depltl <•>
2'1900 -------~-------~-------~-----3.77
1---+--+--o.n
zas.oo -+------L J__,__,.-. ........ 9····F--=-=-F·-=·····::: ... r: ... :::::: ........ :::::: .. -.1--·=·-.. ·=-·-1--=·--=·---1 .... -r-.. ===-f·-=·--= ...... f ... -=-.. -=·-f-·--=--·= ........ ~ ...... :::: .. ·-~-.. 1--·-~·-··-~---+=t--0.
23
2~ 00 --+---+----t---+--+----+---+----t---+--+----+---+----t---+--+----+---+----t--1.23
2a3.00 --+---+-----+---+--+----+---+-----+---+--+----+---+-----+---+--+----+---+-----+--223
--CircUlarCulvert --HGL --Embank
Re1cnf•I
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Sunday, Mar 22 2015
Culvert No. 2 -100 year Storm
Invert Elev Dn (ft) = 284.73 Calculations
Pipe Length (ft) = 62.00 Qmin (cfs) = 8.89
Slope(%) = 0.81 Qmax (cfs) = 10.57
Invert Elev Up (ft) = 285.23 Tailwater Elev (ft) = (dc+D)/2
Rise (in) = 18.0
Shape = Circular Highlighted
Span (in) = 18.0 Qtotal ( cfs) = 10.56
No . Barrels = 1 Qpipe (cfs) = 10.56
n-Value = 0.012 Qovertop ( cfs) = 0.00
Culvert Type = Circular Concrete Veloc Dn (ft/s) = 6.23
Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.71
Coeff. K,M ,c,Y,k = 0.0098, 2, 0.0398, 0.67 , 0.5 HGL Dn (ft) = 286.10
HGL Up (ft) = 286.48
Embankment Hw Elev (ft) = 287.65
Top Elevation (ft) = 288.59 Hw/D (ft) = 1.61
Top Width (ft) = 24.00 Flow Regime = Inlet Control
Crest Width (ft) = 24.00
Bow (ft) Culvert No. 2 -100 year S!Drm Hw Depth (ft)
2-39.oo -------~-------~-------~-----J.n
I-----+--+-1.77
1-----+--+-o.n
2as.oo -t::----{__j _ _,....-r-~.,..--r-::':'.:--:='.--=J ... ::: __ --::-. T-r=:--r=:t=-:===_=f_ ==::_=J=_==:.-~. ~~;.,_f==i--0.23
233.00 --+---+----t--+--+-----+----+----t--+--+-----+----+----t--+--+-----+----+----t--2.23
--Cireu1a.rCUlvert --HGL --Embank
Reoc'1(ft)
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Sunday, Mar 22 2015
Culvert No. 3 -25 year Storm
Invert Elev On (ft) = 272.57 Calculations
Pipe Length (ft) = 54.00 Qmin (cfs) = 13.33
Slope(%) = 0.80 Qmax (cfs) = 15.81
Invert Elev Up (ft) = 273.00 Tailwater Elev (ft) = (dc+0)/2
Rise (in) = 24.0
Shape = Circular Highlighted
Span (in) = 24.0 Qtotal ( cfs) = 13.33
No. Barrels = 1 Qpipe (cfs) = 13.33
n-Value = 0.012 Qovertop ( cfs) = 0.00
Culvert Type = Circular Concrete Veloc On (ft/s) = 4.79
Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.10
Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67' 0.5 HGL On (ft) = 274.23
HGL Up (ft) = 274.31
Embankment Hw Elev (ft) = 275.06
Top Elevation (ft) = 276.43 Hw/O (ft) = 1.03
Top Width (ft) = 24 .00 Flow Regime = Inlet Control
Crest Width (ft) = 24.00
Culvert No. 3 -25 year Storm 61N(ft)
2noo~-~-~-~~~~-~-~-~-~~-~-~-~-~~-•.oo
H\tt Depth (ft)
2'7'.00 1.00
273.00 000
2noo --+---+---+---+----t--------+---+---+----+---+----+---+----+---+---+------i--1.00
.............................................................................................. _______ ....................... , .......................... ..
:m.oo ---+----+----+---+------"f----+--+---+----+---+----+--+----+---+---+------4-.2.00
10 15 20 25 30 35 40 45 70 75
--Circula.rCU!vert --HGL --Embank
Reacli (ft)
Culvert Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Culvert No. 3 -100 year Storm
Invert Elev On (ft)
Pipe Length (ft)
Slope(%)
Invert Elev Up (ft)
Rise (i n)
Shape
Span (in)
No. Barrels
n-Value
Culvert Type
Culvert Entrance
Coeff. K,M,c,Y,k
Embankment
Top Elevation (ft)
Top Width (ft)
Crest Width (ft)
8BY(ft)
2n.oo
274.00 --+---I
= 272.57
= 54.00
= 0.80
= 273.00
= 24.0
= Circular
= 24.0
= 1
= 0.012
= Circular Concrete
= Square edge w/headwall (C)
= 0.0098, 2, 0.0398, 0.67, 0.5
= 276.43
= 24.00
= 24.00
Culvert No. 3 . 100 year Storm
Calculations
Qmin (cfs)
Qmax (cfs)
Tailwater Elev (ft)
Highlighted
Qtotal ( cfs)
Qpipe (cfs)
Qovertop ( cfs)
Veloc On (ft/s)
Veloc Up (ft/s)
HGL On (ft)
HGL Up (ft)
Hw Elev (ft)
Hw/O (ft)
Flow .Regime
= =
=
= = = =
=
=
= = = =
Sunday, Mar 22 2015
13.33
15.81
(dc+0)/2
15.81
15.81
0.00
5.51
6.57
274.29
274.43
275.34
1.17
Inlet Control
HwOep\11 (ft)
~.00
11-t---+--2.00
!-+---+-1 00
273.00 --+--1-l-.,--~r--r--=r=---r-:--~=--r=i::=::~-=-==-=p-=-=----1··=------1-=i-000
2noo --+---+---+--+-----+---+---+---+--+---f----+---+---+---+--+-----+-.1.00
271.00 --+---+---+--+-----+---+---+---+--+---f----+---+---+---+--+-----+-·2.00
10 15 20 25
--CirCWarCulvert --HGL --Emblnk
Reacl1 {ft)
Appendix D
Ditch Design Summary
Polo Estates Subdivision
Appendix D
Ditch Design Summary
Street Ditch Location Slope Contributing 02s v,. D2s 0100 v, •• o, •• Street Stations Drainage Areas (Right/Left) (%) (cfs) (fps) (ft) (cfs) (fps) (ft)
Mallet Way 1+42.20 Right 0.80 341 0.98 1.06 0.48 1.15 1.11 0.51
Mallet Way 2+03.77 Left 0.80 321 5.49 0.90 1.69 6.52 1.77 0.96
Mallet Way 2+03.77 Right 3.87 351 0.44 1.63 0.26 0.52 1.66 0.28
Mallet Way 2+03.77 Left 3.44 322 3.66 2.63 0.59 4.35 2.74 0.63
Mallet Way 7+82.47 Right 1.08 331 1.73 1.38 0.56 2.04 1.47 0.59
Mallet Way 7+82.47 Left 0.83 311 6.01 1.74 0.93 7.12 1.82 0.99
Mallet Way 7+82.47 Right 3.35 332,333 1.02 1.86 0.37 1.20 1.97 0.39
Mallet Way 7+82.47 Left 2.36 312,313 4.87 2.42 0.71 5.75 2.56 0.75
Mallet Way 9+00 Right 3.52 333 0.58 1.61 0.30 0.68 1.66 0.32
Mallet Way 9+00 Left 3.52 313 3.42 2.54 0.58 4.03 2.71 0.61
Chukker Lane 3+39.79 Right 0.80 341 ,342 2.44 1.36 0.67 2.88 1.43 0.71
Chukker Lane 4+11.66 Left 0.80 351, 352, 320 10.45 1.98 1.15 12.41 2.05 1.23
Chukker Lane 9+21 .93 Right 1.88 341,342,343 4.44 2.20 0.71 5.24 2.27 0.76
Chukker Lane 9+21 .93 Left 1.88 351, 352, 353,320 12.66 2.87 1.05 15.03 3.00 1.12
*Note: Refer to plans for rock nprap and erosion control blanket locations
**Note: The left ditch of Mallet Court has atleast 2' of depth for the entire length of street.
Appendix E
Channel Design Summary
& Reports
Polo Estates Subdivision
Appendix E
Channel Design Summary
Street Side Slope Slope Contributing a,. v,. 025 Q 100 V100 D100 Channel Shape Drainage Areas (%) (cfs) (fps) (ft) (cfs) (fps) (ft)
Channel No. 1 V-channel 4:1 2.35 310,330 12.95 3.53 0.58 15.34 3.73 0.63
Channel No. 2 V-channel 4:1 0.80 320,340,350 18.17 2.66 0.90 21.52 2.77 0.98
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 1 -25 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
278.00
277.50
277.00
276.50
276.00
275.50
275.00
'\.
0 2
'\.
'\.
'\.
= 4.00
= 4.00, 4.00
= 1.50
= 275.62
= 2.35
= 0.035
Known Q
= 12.95
' I'\.
'\.
'\.
'\.
" I'\.
'\.
'\.
4 6
Section
°"V -= =-
'\.
"
8 10
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
I/
/
/
/
/
17
7
/
/
/
I/
12 14 16
/
7
7
Sunday, Mar 22 2015
= 0.58
= 12.95
= 3.67
= 3.53
= 8.78
= 0.57
= 8.64
= 0.77
/
18 20
Depth (ft
2.38
1.88
1.38
0.88
0.38
-0.12
-0.62
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 1 -100 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
278.00
277.50
277.00
276.50
276.00
275.50
275.00
0
I'
2
" " "
= 4.00
= 4.00, 4.00
= 1.50
= 275.62
= 2.35
= 0.035
Known Q
= 15.34
' " " '\.. .... ....
"\
"" " "
4 6
Section
~ '71'
" "
8 10
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
v
/
/
/
I
I v
/
/
/
/
/
12 14 16
/
/
/
Sunday, Mar 22 2015
= 0.63
= 15.34
= 4.11
= 3.73
= 9.20
= 0.63
= 9.04
= 0.85
/
18 20
Depth (ft
2.38
1.88
1.38
0.88
0.38
-0.12
-0.62
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 2 -25 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
272.00
271 .50
271.00
270.50
270.00
269.50
\.
\.
\.
0 2
\.
'
= 4.00
= 4.00, 4.00
= 1.50
= 270.01
= 0.80
= 0.035
Known Q
= 18.17
I'\
\.
\.
\.
' ~
\.
\.
4 6
Section
""-V
-= i;:;-
\.
\
8 10
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
/
I
/
I
I
17
7
7
7
/ v
12 14 16
Sunday, Mar 22 2015
= 0.90
= 18.17
= 6.84
= 2.66
= 11.42
= 0.69
= 11.20
= 1.01
7
7
/
/
18
Depth (fi
1.99
1.49
0.99
0.49
-0.01
-0.51
20
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 2 -100 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
272.00
271.50
271 .00
270.50
270.00
269.50
\.
\.
\.
\.
0 2
= 4.00
= 4.00, 4.00
= 1.50
= 270.01
= 0.80
'
= 0.035
Known Q
= 21.52
I\.
\.
\.
\.
' ~
\.
\.
4 6
Section
~ 17 -= =-
\.
\
8 10
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
/
7
/
I
I
17
7
7
7
/ v
12 14 16
/
/
I
Sunday, Mar 22 2015
= 0.98
= 21.52
= 7.76
= 2.77
= 12.08
= 0.75
= 11.84
= 1.10
I
18 20
Depth (ft
1.99
1.49
0.99
0.49
-0.01
-0.51
J
Item
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Polo Estates Subdivision
Engineer's Estimate of Street Construction
Description Ii Unit i Estimated J Unit Price
i Quantity i
Sitework & Pavement
Total
-···-·· __ . -~-~b.!~.i~~-t-~~!:1ff<>.~~~tic>.t?:_~-~i. ____ " ... ·-. ····-··. ___ . _ . ___ . . ~~ .. -_ .. __ ........ J -··-·· . . ? .59_0...:99 ·-···-· ____ 7.~?_0_o
_____ 2 _____ ~_i!_~_P_r~p~~~tio~g-~~~~-~d qru~~~~--.... __ ··--··-.,·-· ·-·-. _ ..... 1\c;.. ···-·--··-·· .? ...... _____ }_2Q9.:QO ... _____ _7,1~9
...... ~ ....... j.T.':?~s?.!!B-.~~Y..~!.~ .13-:~P~~~~~~L. __ . _ . _____ .. _ -·· __ -........ ··---~~-.......... --· ... ·-_l_ ·-·-·-··· ... ~ROO .OQ_ --·-· -~!.q_o_Q
:=J=~l~;.~~~~~~~t:,!l?_~if.l~i~}~.d~ie··-·:·:~~-==~-·-:·:~:-~_-.:= ... _:J~~ -·----·-·s.47~ · -· · ·---1-!7-~li6 .... · ----1~~%j
6 I Hydrated Lime (27 lb/sy) Ton -.. ---.. ··· T15 ·-·-···----.. -·ii6:0o ____ io,7oo
~:-·x~.: i§.~~~¢~~~~ILn.;j;_s_t~.~~!3.~~~~-~-~:-.=.=·:.~·~: .. ·:=· :=-~::.:.=~:~:=·::~·.:·~~---= ~$.y_ : :· ~:~~= .. ?. ~~Ii :--~--~~--~_!_(QQ ~:-~:~~I:lI~
....... ~-.... t ~o~<>.~~~:~E~!l~!!~--~~~~~~~~---· ---........ ._ ..... --------......... ~---~{-· .. ··-·· ____ 6, ~~¥ ·-·-.... ··--!~:~~ .... ,, .... 7 !:~6
-·····--··r=-··----·-·----·---···· ···--·~ -~-.. ------·-'"•••• ····---·-·· .. ·· ~ ................ _____ . ·-~····--···-· ... --·-----·--------·j....-·---·-·--·-··--------···---~·· -·
10 :ErosionControlBlanket SY 355 3.00 1,065 ~-.. _ _. ...... ,. -·····------.--......... ---------··"""----·-···------·-··-·--·-·"·-·-----·-·-.... .. . -· ··----·-.... ·-------. -· .. -·--· .. -----.. -· ··-. -., ______ , ...... _ 11 '.Seeding (edge of pavement to ROW & easements) SY 18,800 0.25 4,700
Sitework and Paving Subtotal $230,259
Drainage System
12 i 18" ADS HP Pipe -Structural Backfill LF 118 40.00 4,720 >---.. -·-·-i----·----------·-------·----...... --····----······-->-·----. -----·---------·-------··-13 ,24" ADS HP Pipe -Structural Backfill LF 54 50.00 2,700 --·--+-----· ----·----·----------· -·----·----· ---------·· -··-··-·---·-14 !Drainage Channel Excavation and Grading LF 599 8.00 4,792 -·-i5Ts\VPrifuij,!e;~t;ti~~-&Mam~ail~c~~~"ctk;ilF:~it ··· f--Ls--··-___ .. ______ i ~-2,000-:00 ---·2.ooo
Drainage Subtotal $14,212
!!STREET ESTIMATED CONSTRUCTION TOTAL $244,4711
F'-12327
S.CH\JLTZ ENGINEERING, LI.Cf
;
"
I
Item I
I
2
3
4
5
6
7
8
9
10
11
12
13
14
14
15
15
16
17
18
19
20
21
22
23
24
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No.12327
Polo Estates Subdivision
Engineer's Estimate of Waterline Construction
Description Unit Estimated
Quantity
Water System
8" C900 Water Pipe -Non-Structural Backfill LF 1467
8" C900 Water Pipe -Structural Backfill LF 40
6" C900 Water Pipe -Non-Structural Backfill LF 829
Fire Hydrant Assembly (w/valve, vert. extension) EA 4
6" Tee - cut into existing line EA 2
8" x 8" M.J. Tee EA I
8" x 6" M.J. Tee EA 3
6" x 6" M.J. Tee EA I
8" x 6" M.J. Reducer EA 2
8" M.J. Gate Valve EA 4
6" M.J. Gate Valve EA 5
8" 11.25° M.J. Bend EA 2
8" 22.5° M.J. Bend EA 3
8" 45° M.J. Bend EA 9
6" 11.25° M.J. Bend EA 6
6" 22.5° M.J. Bend EA I
2" Blowoff Assembly EA I
Connect to Existing Water Line EA 2
I" Water Service -long side EA I
4" PVC Sleeves EA 5
16" PVC Sleeve EA I
1.0" Water Service -short side EA 5
1.5" Water Service -short side EA 4
1.5'' Water Service -long side EA 4
Waterline Testing LS I
Meter Boxes EA 22
Unit Price
$24
$28
$22
$3,250
$2,000
$450
$450
$450
$450
$1,250
$950
$350
$350
$350
$275
$275
$1 ,250
$2,500
$850
$200
$500
$1,300
$1,300
$1 ,500
$1,000
$100
ESTIMATED WATERLINE CONSTRUCTION I
Page 1 of 1
Total
$35,208
$1 ,120
$18,238
$13,000
$4,000
$450
$1 ,350
$450
$900
$5,000
$4,750
$700
$1 ,050
$3,150
$1 ,650
$275
$1 ,250
$5,000
$850
$1 ,000
$500
$6,500
$5,200
$6,000
$1 ,000
$2,200
$120,7911
July 29, 2014
Mr. Stephen Cast
Wellborn Special Utility District
P.O. Box 250
Wellborn, Texas 77881
WINN PROFESSIONAL ENGINEERS
AND
CONSTRUCTORS, LLC
RE: Graham Rd. and South Dowling Rd. Proposed Subdivision Service Study
Dear Stephen:
The current KYPipe. model for the Wellborn SUD Main System was used to perform a water
service analysis for a proposed residential development located at the corner of Graham Rd.
and South Dowling Rd. in the extraterritorial jurisdiction of College Station, Texas. According
to a July 23, 2014 letter from the developer's engineerr the proposed residential
development would serve 21 new connections within a 31.5 acre subdivision.
Our analysis indicates that service is available for the proposed development to meet TCEQ
requirements for residential use of 1.5 gpm per connection and a minimum residual pressure
of 35 psi. Our analysis also indicates that service is available to provide the minimum fire
flow requirements for the City of College Station. The City's fire flow requirements are to
provide 1,000 gpm from two adjacent fire hydrants at a minimum operating pressure of 20
psi while supplying the maximum demand of 0.76 gpm per connection. Any dead end water
lines within the proposed development providing supply to a fire hydrant need to be a
minimum of 8" in diameter. lie-in to the Wellborn SUD water system can be made at the
existing 6" line along Graham Rd. If a fire hydrant is required to provide service to the
proposed lots numbered 15 and 16, it can be placed on the existing Wellborn SUD 6" line
along South Dowling Rd. or Graham Rd.
We appreciate the opportunity to provide this information. Please do not hesitate to call if
you have any questions or comments.
Sincerely yours,
Winn Professional Engineers & Constructors, LLC
Texas Registered Firm No. F-7846
Walt~P.E.
Principal
WTW/pkw
505 Padon • P. 0. Box 2727 • Longview, Texas 75(>06
t. 903-553-0500 • F. 903 -553-0555 • www:winnpec.com
DATE:
TO:
FROM:
SUBJECT:
February 18, 2015
CITY OF COUEGE STATION
Home a/Texas A&M University•
MEMORANDUM
Louis A Malechek, Ill, via; malechek@thepaynelawgroup.com /
Jessica Bullock, Staff Planner
POLO ESTATES (FP-REPLAT)
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) 24"x36" copy of the revised final plat;
One (1) set of revised construction documents;
Parkland Dedication in the amount of $$26,481 must be submitted prior to the
filing of the final plat;
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station . Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid . Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979. 764.3570.
Attachments: Staff Review Comments j
PC: Joe Schultz, Schultz Engineering, LLC , via; joeschultz84@verizon.net
P&DS Project No. 15-00900027
Planning & Development Services
P.O. BOX 9960 • l l 01 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842
TEL. 979.764.3570 ·FAX. 979.764.3496
cstx.gov/devservices
STAFF REVIEW COMMENTS NO. 1
Project: Polo Estates (FP-Replat) (15-00900027)
PLANNING
1. Meets and bounds do not close, please revise.
2. Right-of-way on N. Graham should be 77'. Half of the deficiency should be dedicated with
this plat.
3. Please project a public street to the unplatted lots to the south, east, and west with a 70-foot
right-of-way. As proposed the block length currently exceeds 1500 feet as the cul-de-sac
does not break block length.
4. The proposed Mallet Court and Mallet Way all count as a cul-de-sac. The cul-de-sac cannot
exceed cannot exceed 750 feet in length.
5. Lots around cul-de-sacs need to meet the 75-foot lot width as measured at the street. Lots
13-17 should be revised to meet the requirement of 100-foot lot width as measured at the
street,
6. Lots platted adjacent to straight right of way (S. Dowling, Mallet Way, and Mallet Court) shall
be substantially right angles.
7. Parkland in the amount of $26,481 ($1261x21) will be due upon filing of the final plat.
8. Please move the Certificate of the County Clerk to the other side of sheet two with the other
certifications.
9. Please remove the Certificate of City Planner and add Certificate of Planning and Zoning
Commission.
10. The building setback identified in note 15 are different from building setbacks on the original
plat. Please confirm that this is current standards.
11 . All structures will need to be removed prior to the filing of the plat.
12. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
13. Please note that any changes made to the plans that have not been requested by the City of
College Station, must be explained in your next transmittal letter.
14. County comments are still being worked on and will follow.
Reviewed by: Jessica Bullock Date: February 16, 2015
ENGINEERING COMMENTS NO. 1
1. Add a note on the Replat stating whose responsibility it is to maintain, and stating that
fences, grading, and landscape cannot impede the flow of the private drainage easement.
2. Add a note on the Replat and construction documents regarding requirement for compaction
of fill or engineered slab for affected lots that have greater than 2 feet of fill. Also list the lots
that would require this.
3. Add a note on the Replat stating that the proposed lots can't be located further than 500'
from a fire hydrants which is based on the lay of the hose along the street.
4. Remove FEMA Map with ending numbers, 375-E, from the Replat note. Subdivision
appears to be not located on that map.
5. Cul-de sac's length is exceeding the allowed length in the UDO.
6. Please provide a private drainage easement for the estimated 100-year storm & the creek.
Please show this on the Replat & Construction documents.
7. Change construction note #6 regarding Wickson SUD to Wellborn SUD.
8. Is the Overhead electric line a BTU line that is to remain or be relocated? Does it have an
easement? If it does please show it on the Replat.
9. Please increase the symbol size for hydrants and gate valves on the overall plan.
10. Adjust Mallet Way grade at intersection with North Graham Road to have no more than plus
or minus 2% grade.
11 . Provide horizontal curves for Mallet Way.
12. Entire Rock Rip Rap needs to be in a private drainage easement. See Chanel No . 1.
13. Provide erosional control measurements such as silt fences, hay bales, etc.
14. Provide an additional gate valve between Fire hydrant No 1 & 2. The gate valve spacing
currently exceeds 800'.
15. Provide additional easement on lot 14, or realign the waterline W-2 in such a way that
there's at least 5.5' clearance between the waterline's centerline & edge of PUE.
16. Please verify and place a note on plans that water services will be left between 2 & 3 feet
deep at the point of terminus by developer's contractor.
17. According to the letter address to Stephen Cast, Fire hydrants need to be connected via 8"
lines. What's the reason for connecting Fire hydrant No. 2 to only a 6" line?
18. Please provide a written correspondence with Wellborn SUD regarding the 1700' dead end
line.
19. Please provide a Water system report.
20 . Please change Primary Drainage Facility to Hopes Creek & Firm panel# to 48041C0325E
in the General description of the drainage report.
21 . Provide sealed engineer cost estimate, erosion control details.
Reviewed by: Kevin Ferrer Date: February 16, 2015
ADDRESSING
1. Please change Mallet Way to Mallet Court. The street name should be continuous.
Reviewed by: Robin Krause, Permit Technician Date: February 4, 2015
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: February 4, 2015
"" ·~ ·~-......... -----C ITY OF C OllEGE STATION
Home of Texas A&M University"
MEMORANDUM
DATE: February 2, 2015
TO: Louis A. Malecheck, 111 , via; malecheck@thepaynelawgroup.com \/
FROM: Jessica Bullock, Staff Planner
SUBJECT: POLO ESTATES (FP-REPLAT)
Thank you for the submittal of your Final Plat -Residential application. Kevin Ferrer, Graduate
Engineer, and I have been assigned to review this project. It is anticipated that the review will be
completed and any staff comments returned to you on or before Monday, February 16, 2015. If
you have questions in the meantime, please feel free to contact us.
PC : Joe Schultz, Schultz Engineering, LLC, via ; joeschultz84@verizon.net v'
P&DS Project No. 15-00900027
Pla11ni11g & Development Services
P.O. BOX 9960 • 11 OJ TEXAS AVENUE · COllEGE STATlON ·TEXAS • 77842
TEL. 979.764.3570 ·FAX. 979.764.3496
csb1.gov/devservices
<lgchultz Engineering, LLC
January 16, 2015
Alan Gibbs, P .E.
City Engineer
Development Services
City of College Station
College Station, Texas
Office: 979.764.3900
Fax: 979.764.3910
RE: Letter Acknowledging City Standards -Polo Estates, Brazos County, Texas
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the water line,
roadway and drainage construction for the above-referenced project, to the best of my
knowledge, do not deviate from the B/CS Design Guideline Manual.
seph P. Schultz, P .E.
Civil Engineer
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
1
Zoning Districts
R -4
R R 91 R-6 e Estate: MHP
RS Ru lct•d Subu b•n 0
GS Gene al Subu ba SC
R - 1B Sing I• Family Res idential GC
0 Duplex Cl
T Tcwnh'l>use BP vr DEVE LOPMENT REVIEW
(./
f
/
Multi-Famliy
y
/ ·~
0..
BPI
Hjgh Density Multi-Family NAP
M1nuf1ctu e:d me:P1 C-l
Offlc M-1
Subu bin C me clal M -2
Gene al C ommscial C -ll
Commscial-lndustrisl R& 0
8 us in ess PSilc P-MllD
PO LO ESTATES
t
/\ / / I .r / ( // ~ ~~,~
' /,,,... ( " OUTSIDE Cl.l\HIMIT
\!Jrj / "\ ~~ )-_____ / /\~i
\ ;\\N')
'/ \ \ ' \
IVY /\
I ~ (v ' /\'\_,
Business Pa Industrial
Na.tun I Areas Protecte-d
l..lght Commetcisl
l..lg ht lnduttJlal
Heavy Indus ial
College and llniv!!fS ity
Research and Development
\ ~~\ /\ v \ ./'\ \',. \\ \ i./ \ \ \ ~\ \ \\ \ "
POD
W PC
G-1
G-2
G -3
ov
ROD
Pla nned Development Dis trict
Wolf Pen t ee' Dev. C tid
CCI orthget
T11nslllon1 I 0tthg1ta
Residential N thgate
C'° id Ove lay
Redev·elopm.ent Dist ict
Planned Mixed-llse Development KO Kre nek Tap Overlay
Case· FINA L PLAT
15-27
POLO ESTATES Case: FINA L PLAT
DEVELOPMENT REV IEW 15-27
FOR OFFIC1 USE ~L
CASE NO .: \
DA TE SUBMITTED: ......_....._.._.....'---'.__,,_..,___
C nv oF C oll.EGE STr\TION
Home o/Texas A&M University•
TIME:~
STAFF:~
FINAL PLAT APPLICATION
(Check one) 0 Minor
($700)
0 Amending
($700)
[gj Final
($932)
0 Vacating
($932)
0Replat
($932)
Is this plat in the ET J? [81 Yes O No Is this plat Commercial D or Residential D
/ MINIMUM SUBMITTAL REQUIREMENTS:
~~ $700-$932 Final Plat Application Fee (see above).
D $233 Waiver Request to Subdivision Regulations Fee (if applicable).
D $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
j6e prior to the issuance of any plans or development permit).
~Application completed in full. This application form provided by the City of College Station must be used and
/lay not be adjusted or altered. Please attach pages if additional information is provided .
~ Six (6) folded copies of plat. (A signed mylar original must be submitted after approval.)
[81 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
[81 Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
[81 5 opy of original deed restrictions/covenants for replats (if applicable).
J g Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within ninety (90) days. The report must include applicable information such as ownership, liens,
. .1ncumbrances, etc. v [8( Paid tax certificates from City of College Station, Brazos County and College Station l.S.D.
[81 The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not.
NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered
complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the
preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff
to be correct, the final plat application will be considered incomplete.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT Polo Estates
~-------------------------------~
ADDRESS North Graham Road
SPECIFIED LOCATION OF PROPOSED PLAT:
East of the intersection of North Graham Road and South Dowling Road
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Louis A Malechellk, Ill E-mail malechefl<@thepaynelawgroup.com
Street Address 3850 Corporate Center Drive
City Bryan State Texas Zip Code 77802 ------
Phone Number 979. 776.9800 Fax Number 979. 731.8333
~---------------
Revised 4/14 Page 1 of 9
PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple
owners):
Name Get Real, LLC E-mail malecheck@thepaynelawgroup.com
Street Address 3850 Corporate Center Drive
City Bryan State Texas Zip Code _7_78_0_2 ____ _
Phone Number 979. 776.9800 Fax Number 979. 731 .8333 -----------------
ARCHITECT OR ENGINEER'S INFORMATION:
Name Schultz Engineering, LLC -Joe Schultz E-mail joeschultz842verizon.net
Street Address 2730 Longmire Drive, Suite A
City College Station State Texas Zip Code _7_7_84_5 ____ _
Phone Number (979) 764-3900 Fax Number (979) 764-3910
----------------~
Do any deed restrictions or covenants exist for this property? D Yes [8J No
Is there a temporary blanket easement on this property? If so, please provide the Volume ____ and Page No. __ _
Total No. of Lots 21 ------R-0-W Acreage 2. 762 --------Total Acreage 34.069 ----------
Existing Use horse stables Proposed Use _R_e_s1_·d_e_n_tia_I ____________ _
--------------~
Number of Lots By Zoning District nla
Average Acreage Of Each Residential Lot By Zoning District:
1.491 I ETJ
Floodplain Acreage _o __________________________________ _
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes IX No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
IX Yes
r No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: Foxworth Subdivision
City Project Number (if known):
Date I Timeframe when submitted:
Revised 4/14 Page 2 of 9
A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable):
Re uested waiver to subdivision re ulations and reason for same (if a licable :
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision re ulations will deprive the applicant of the reasonable use of his land.
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
1. I An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way,
2. I The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. I A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
4. I Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I
rural context;
5. l When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestrian, and
Greenways Master Plan;
Revised 4/14 Page 3 of9
6. I The proposed development is within an older residential subdivision meeting the criteria in Platting and
Replatting within Older Residential Subdivisions Section of the UDO; or
7. I The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6,
Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan.
Detailed explanation of condition identified above:
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning & Zoning Commission.
Total Linear Footage of
Proposed Public:
1637 Streets
NIA Sidewalks
NIA Sanitary Sewer Lines
1715 Water Lines
519 Channels
110 Storm Sewers
NIA Bike Lanes I Paths
Parkland Dedication due prior to filing the Final Plat:
ACREAGE:
___ No. of acres to be dedicated + $ ____ development fee
___ No. of acres in floodplain
No. of acres in detention ---
---No. of acres in greenways
OR
FEE IN LIEU OF LAND:
__ No. of SF Dwelling Units X $ = $ ---------
(date) Approved by Parks & Recreation Advisory Board ----
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are
true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application
must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN
HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as
described above.
Date
Revised 4/14 Page 4 of 9
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP.
7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11 . The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE , AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPM T P RMIT AP I ATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
AC URATE.
Date
Revised 4/14 Page 5 of 9
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only
Permits:*
certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
D * If a platting-status exemption to this requ irement is asserted, provide written justification under separate
letter in lieu of certification .
Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits:
B. I, , certify to the following:
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm .
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction, improvement, or fill covered by th is
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
Revised 4/14 Page 6 of 9
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction.
Engineer I Surveyor Date
Commercial Structures:
E. I, , certify that all new construction or any substantial improvement
of any commercial , industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
Engineer I Surveyor Date
Conditions or comments as part of approval:
Revised 4/14 Page 7 of 9
Existing
[8J
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
[8J Drawn on 24" x 36" sheet to scale of 100' per inch .
[8J Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
[8J Title Block with the following information:
[8J Name and address of subdivider, recorded owner, planner, engineer and surveyor.
[8J Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos
County 911 .)
[8J Date of preparation.
[8J Engineer's scale in feet.
[8J Total area intended to be developed.
[8J North Arrow.
[8J Subdivision boundary indicated by heavy lines.
[8J If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or
larger.
[8J All applicable certifications based on the type of final plat.
[8J Ownership and Dedication
[8J Surveyor and/or Engineer
[8J City Engineer (and City Planner, if a minor plat)
0 Planning and Zoning Commission (delete if minor plat)
[8J Brazos County Clerk
[8J Brazos County Commissioners Court Approval (ET J Plats only)
0 If submitting a replat where there are existing improvements, submit a survey of the subject property
showing the improvements to ensure that no encroachments will be created.
[8J If using private septic systems, add a general note on the plat that no private sewage facility may be
installed on any lot in this subdivision without the issuance of a license by the Brazos County
Health Unit under the provisions of the private facility regulations adopted by the Commissioner's
Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code.
[8J Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available
data.
[8J Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data.
[8J Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2).
The location and description with accurate dimensions, bearings or deflection angles and radii, area, center
angle, degree of curvature, tangent distance and length of all curves for all of the
following: (Show existing items that are intersecting or contiguous with the boundary of or forming a
boundary with the subdivision, as well as , those within the subdivision).
Proposed
[8J Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp
turn around unless they are shorter than 100 feet.
Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s
sufficient to meet Thoroughfare Plan.)
Street offsets and/or intersection angles meet ordinance.
Revised 4/14 Page 8 of 9
Existing
D
~
~
D
Proposed
D
~
~
D
Alleys.
Easements.
A number or letter to identify each lot or site and each block (numbered sequentially).
Parkland dedication/greenbelt area/park linkages. All proposed dedications must be
reviewed by the Parks and Recreation Advisory Board and documentation of their
recommendation provided prior to being scheduled for P&Z Commission consideration.
~ Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly
sealed by a Licensed Texas Professional Engineer that include the following:
D
D
Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall
street, alley and/or sidewalk layout of the subdivision. (may be combined with other
utilities).
Sewer Design Report.
Sanitary sewer plan and profile showing depth and grades.
overall sewer layout of the subdivision. (Utilities of sufficient
master plan and any future growth areas.)
Water Design Report and/or Fire Flow Report.
One sheet must show the
size/depth to meet the utility
Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing
depth and grades. One sheet must show the overall water layout of the subdivision.
(Utilities of sufficient size/depth to meet the utility master plan and any future growth
areas.)
Storm drainage system plan with contours, street profile, inlets, storm sewer and
drainage channels, with profiles and sections. Drainage and runoff areas, and runoff
based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design,
channel lining design & detention if used. One sheet must show the overall drainage
layout of the subdivision.
~ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E.
O Letter of completion for public infrastructure or guarantee I surety in accordance with UDO
Section 8.6.
~ Drainage Report with a Technical Design Summary.
~ Erosion Control Plan (must be included in construction plans).
~ All off-site easements necessary for infrastructure construction must be shown on the final plat with a
volume and page listed to indicate where the separate instrument easements were filed .
Separate instrument easements must be provided in recordable form to the City prior to being scheduled
for P&Z Commission consideration.
~ Are there impact fees associated with this development? 0 Yes ~ No
Impact fees must be paid prior to building permit.
~ Will any construction occur in TxDOT rights-of-way? 0 Yes ~ No
If yes, TxDOT permit must be submitted along with the construction documents.
NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing
Revised 4/14
the plat at the Courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to
issuance of a development permit.
Print Form
Page 9 of9
Date:
File No.:
Lawyers Title Company· of Brazos County
1450 Copperfield Parkway
College Station, TX 77845
Phone: 979-776-3600
Fax: 979-776-2383
UPDATED TITLE REPORT
January 22, 2015
GF No. M2448
Record Title at the Effective Date Hereof is Vested in:
Get Real, LLC, a Texas limited liability company
The Land Referred to In this Report is Described as Follows:
All that certain lot, tract or parcel of land lying and situated in Brazos County, Texas,
being Lot One (1), Foxworth Subdivision, a subdivision in Brazos County, Texas,
according to the plat recorded in Volume 6050, Page 67, Official Records of Brazos
County, Texas. ·
Exceptions:.
Building lines, and any and all easements as reserved on plat recorded in Volume 6050,
Page 67, Official Records of Brazos County, Texas.
Right-of-Way Easement executed by Joseph S. Osoba, et al to The City of Bryan, dated
October 18, 1976, recorded in Volume 361, Page 226, Deed Records of Brazos County,
Texas. (Blanket)
Easement executed by Connie Gail Hearne to Wellborn Water Supply Corporation,
dated January 23, 1998, recorded in Volume 3020, Page 67, Official Records of Brazos
County, Texas.
Interest in coal, lignite, oil, gas and other minerals, and all rights incident thereto,
contained in instrument dated February 3, 1940, recorded on July 1, 1940, in Volume
103, Page 611, Deed Records of Brazos County, Texas. Reference to which
instrument is here made for particulars. No further search of title has been made as to
the interest(s) evidenced by this instrument, and the Company makes no representation
as to the ownership or holder of such interest(s).
Interest in and to all coal, lignite, oil, gas and other minerals, and all rights incident
thereto, contained in instrument dated May 5, 1984, recorded on May 31, 1984, in
Volume 686, Page 837, Official Records of Brazos County, Texas. Reference to which
instrument is here made for particulars. No further search of title has been made as to
the interest(s) evidenced by this instrument, and the Company makes no representation
as to the ownership or holder of such interest(s).
Interest in and to all coal, lignite, oil, gas and other minerals, and all rights incident
thereto, contained In instrument dated October 30, 1984, recorded on October 30, 1984,
in Volume 737, Page 214, Official Records of Brazos County, Texas. Reference to
which instrument is here made for particulars. No further search of title has been made
as to the interest(s) evidenced by this instrument, and the Company makes no
representation as to the ownership or holder of such interest(s).
Interest in coal, lignite, oil, gas and other minerals, and all rights incident thereto,
contained in instrument dated November 26, 1990, recorded on November 30, 1990, in
Volume 1224, Page 187, Official Records of Brazos County, Texas. Reference to
which instrument is here made for particulars. No further search of title has been made
as to the interest(s) evidenced by this instrument, and the Company makes no
representation as to the ownership or holder of such interest(s).
Oil, Gas and Mineral Lease executed by C. N. Hielscher, et al to Threshold Exploration,
Inc., dated December 1990, January 1991 and February 1991, recorded in Volume
1238, Pages 847, 861, 870, 873 and 875; Volume 1239, Pages 154 and 868; Volume
1246, Page 794, Official Records of Brazos County, Texas. No further search of title
has been made as to the interest(s) evidenced by this instrument, and the Company
makes no representation as to the ownership or holder of such interest(s).
Oil, Gas and Mineral Lease executed by Connie Hearne, et al to Baker Exploration,
dated December 17, 1993, recorded in Volume 2020, Pages 235, 238 and 241, Official
Records of Brazos County, Texas. No further search of title has been made as to the
interest(s) evidenced by this instrument, and the Company makes no representation as
to the ownership or holder of such interest(s).
All leases, grants, exceptions or reservations of coal, lignite, oil, gas and other minerals,
together with all rights, privileges, and immunities relating thereto, appearing in the
Public Records whether listed herein B or not. There may be leases, grants,
exceptions or reservations of mineral interest that are not listed.
Rights of parties in possession.
Curative Matters:
Vendor's lien retained in Deed executed by Bill Foxworth and wife, Gabriela Foxworth to
Malechek & Westmoland Family, LP., a Texas limited partnership, dated October 1,
2007, recorded in Volume 8268, Page 20, Official Records of Brazos County, Texas;
and additionally secured by a Deed of Trust executed by Malechek & Westmoland
Family, L.P., a Texas limited partnership to Robert L. Upchurch, Ill, Trustee, for the
benefit of First State Bank of Bedias, dated October 1, 2007, recorded in Volume 8268,
Page 23, Official Records of Brazos County, Texas (in the amount of $300,000.00).
Extension of Note and Lien executed by and between Malechek & Westmoland Family,
LP., a Texas limited partnership (Borrower) and First State Bank of Bedias (Lender),
with effective date of December 1, 2008, recorded in Volume 9272, Page 91, Official
Records of Brazos County, Texas.
Extension of Note and Lien executed by and between Malechek & Westmoland Family,
LP., a Texas limited partnership (Borrower) and First State Bank of Bedias (Lender),
with effective date of December 1, 2013, recorded in Volume 11817, Page 249, Official
Records of Brazos County, Texas.
Mechanic's Lien Contract executed by Get Real, LLC, a Texas limited liability company
to Texcon Gneral Contractors, a Texas corporation, dated December 15, 2014,
recorded in Volume 12435, Page 79, Official Records of Brazos County, Texas (in the
amount of $500,000.00).
Deed of Trust executed by Get Real, LLC to Walter S. Campbell, Trustee for the benefit
of Malechek & Westmoland Family, L.P., dated December 15, 2014, recorded in
Volume 12461 , Page 60, Official Records of Brazos County, Texas (in the amount of
$1,000,000.00).
THIS REPORT IS ISSUED WITH THE EXPRESS UNDERSTANDING, EVIDENCED
BY THE ACCEPTANCE OF SAME, THAT THE UNDERSIGNED, LAWYERS TITLE
COMPANY OF BRAZOS COUNTY DOES NOT UNDERTAKE HEREIN TO GIVE OR
EXPRESS ANY OPINION AS TO THE VALIDITY OF THE TITLE TO THE PROPERTY
ABOVE DESCRIBED, NOR AS TO THE VALIDITY OF ANY OF THE INSTRUMENTS
REPORTED HEREIN, INCLUDING THE PURPORTED DEED(S) ESTABLISHING THE
RECORD OWNER(S) CITED ABOVE, BUT IS SIMPLY REPORTING BRIEFLY
HEREIN, AS TO THE INSTRUMENTS FOUNDS OF RECORD PERTAINING TO THE
SUBJECT PROPERTY, AND IT IS EXPRESSLY UNDERSTOOD AND AGREED
THAT THIS REPORT IS NEITHER A GUARANTY OR WARRANTY OF THE TITLE. Y
ACCEPTANCE OF THIS TITLE REPORT, IT IS UNDERSTOOD THAT THE LIABILITY
OF THE ISSUER HEREOF IS EXPRESSLY LIMITED TO $ THIS
SEARCH HAS BEEN LIMITED TO THE ABOVE MATTERS AND THE ABOVE TIME
PERIOD AND LAWYERS TITLE COMPANY OF BRAZOS COUNTY HAS NOT
SEARCHED FOR, NOR HAS REFLECTED HEREIN, ANY EXAMINATION AS TO
TAX SUITS, SPECIAL ASSESSMENTS, CONFLICTS OR OTHER INSTRUMENTS
WHICH MAY AFFECT TITLE TO THE SUBJECT PROPERTY. IF TITLE
INSURANCE COVERAGE, WHICH IS NOT PROVIDED BY THIS REPORT, IS
NEEDED, SAID COVERAGE IS AVAILABLE THROUGH THE APPLICABLE
PROMULGATED POLICY{IES), AT THE SPECIFIED PROMULGATED PREMIUM.
OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, HAVE BEEN
CHECKED THROUGH January 12, 2015@7:00 a.m.
Lawyers Title Company of Brazos County
Through Tax Year
2014 TAX CERTIFICATE Certificate #
42808
Issued By:
KRISTEEN ROE, CTA PH# (979) 361-4470
BRAZOS COUNTY TAX ASSESSOR COLLECTOR
300 E. WM . J BRYAN PKWY
BRYAN, TX 77803
Owner ID: 434236 100.00%
MALECH EK & WESTMOLAND FAMILY LP
3850 CORPORATE CENTER DR
BRYAN , TX 77802-3696
Property ID:
Legal Acres:
Legal Desc:
Situs:
OBA:
Exem tions:
Property Information
300402 Geo ID: 277800-0000-0010
34.0820
FOXWORTH, LOT 1, ACRES 34.082
N GRAHAM RD ,
For Entities
BRAZOS COUNTY
COLLEGE STATION ISO
EMG SVCS DIST #1
Value Information
Improvement HS:
Improvement NHS:
Z REFUND ENTITY Land HS:
Land NHS:
Productivity Market:
Productivity Use:
Assessed Value
0
37,530
0
613,480
0
0
651,010
Current/Delinquent Taxes
This is to certify that, after a careful check of the tax records of this office, the following delinquent taxes, penalties, interes
and any known costs and expenses as provided by Tax Code §33.48, are due on the described property for the following
taxing unit{s):
Year Entity
Totals:
Effective Date: 01/14/2015
Tax Certificate Issued for:
EMG SVCS DIST #1
BRAZOS COUNTY
COLLEGE STATION ISD
Taxable
Taxes Paid in 2014
181.67
3,157.40
8,983.93
Tax Due
0.00
Disc./P&I
0.00
Attorney Fee
0.00
Total Due if paid by: 01/31/2015
This certificate is issued on real
estate only. It does not include
minerals and/or personal property.
Total Due
0.00
0.00
If applicable, the above-described property has/is receiving special appraisal based on its use, and additional rollback taxes may become
due based on the provisions of the special appraisal (Comptroller Rule 9.3040) or property omitted from the appraisal roll as described
under Tax Code Section 25.21 is not included in this certificate [Tax Code Section 31.0S(b)].
Pursuant to Tax Code Section 31.08, if a person transfers property accompanied by a tax certificate that erroneously indicates that no
delinquent taxes, penalties or interest are due a taxing unit on the property or that fails to include property because of its omission from an
appraisal roll, the unit's tax lien on the property is extinguished and the purchaser of the property is absolved of liability to the unit for
delinquent taxes, penalties or interest on the property or for taxes based on omitted property. The person who was liable for the tax for the
ear the tax was im osed or the ro e was omitted remains ersonall liable for the tax and for an enalties or interest.
A tax certificate issued through fraud or collusion is void.
This certificate does not clear abuse of granted exemptions as defined in Section 11.43 Paragraph(1) of the Texas Property Tax Code.
May Be Subject to Court Costs if Suit is Pending Date of Issue:
Requested By:
Fee Amount:
Reference #:
01/14/2015
SCHULTZ ENGINEERING LLC
10.00
Page: 1
TrueAutom1tion,lnc.
UNANIMOUS WRITTEN CONSENT IN LIEU OF
ORGANIZATIONAL MEETING OF MANAGERS OF
GET REAL, LLC
A LIMITED LIABILITY COMPANY
The undersigned, being the Managers named in GET REAL, LLC's (hereinafter the
"Company") Certificate of Fonnation filed with the Secretary of State of Texas, hereby adopt the
following resolutions in lieu of an organizational meeting of the Managers.
CERTIFICATE OF FORMATION
RESOLVED, that the acknowledgment of filing issued by the Secretary of State of
Texas, and the ce1iified copy of the Certificate of Fonnation filed on December 17, 2014, are
accepted and approved in all respects; and the Secretary is directed to place same in the
Company record book.
COMPANY AGREEMENT
RESOLVED, that the form of the company agreement for regulating and managing
Company affairs submitted to the undersigned is approved and adopted as the Company
Agreement of the Company.
RESOLVED, that the Secretary is directed to place the Company Agreement in the
Company record book, and maintain a copy of the Company Agreement at the Company's
principal office.
PRINCIPAL OFFICE
RESOLVED, that the Company's principal office be established and maintained at 3850
Corporate Center Drive, Bryan, Texas 77802, and that meetings of the Managers from time to
time may be held either at the Company's principal office or at such other place as the Managers
may select.
MANAGERS
RESOLVED, that the following persons are designated as Managers of the Company:
Louis A. Malechek, III
Louis A. Malechek, III, is authorized to borrow funds in the name of the Company for
the operation and real estate purchases. The Manager is authorized to handle the day to day
operations of the Company, including payment of debts and obligations, and purchases on behalf
of the Company as needed. The Manager is authorized to issue and write check's on the
Company's bank account( s ). The Manager is authorized to approve and sign any and all
paperwork, real estate contracts, plats, real estate developmental documentation, necessary for
the Company.
MEMBERSHIP INTEREST CERTIFICATES
RESOLVED, that the specimen membership interest certificate proposed for use as the
Company's certificate for membership interest is adopted as the Company's fonn of Membership
Interest Certificate; and
RESOLVED FURTHER, that the specimen Membership Interest Certificate be
appended to the minutes of the meeting.
COMPANY RECORD BOOK
RESOLVED, that the Company, through its Secretary, shall maintain and authenticate in
the Company record book the appropriate business records, including but not limited to
originals, copies or certified copies of the Company's Certificate of Formation, the
Acknowledgment of Filing, the Company Agreement, the Membership Interest transfer ledger,
minutes of the meetings and of other proceedings of the Members, Managers, and any committee
established by the Managers; and
RESOLVED FURTHER, that the Secretary is to maintain in the Company record book
records pertaining to the issuance and transfer of Membership Interest in the Membership
Interest Certificate stubs and Membership Interest transfer ledger respectively.
MEMBERSHIP INTEREST ISSUED
RESOLVED, that the Manager is authorized to issue from time to time authorized
Membership Interests of the Company for money paid, labor done, promissory note, or personal
property or real estate or leases thereof actually acquired and upon such te1ms as the Manager in
his discretion may detennine; and
RESOLVED FURTHER, than an offer be issued to the following to purchase one
hundred percent (100%) of the Membership Interest of the Company in the percentages and for
the consideration indicated opposite each name:
Member's Name Member's Interest Consideration
Louis A. Malechek, III 100%
RESOLVED, that the Manager is authorized to issue additional Membership Interest to
appropriately qualified purchasers.
COMMENCING BUSINESS
RESOLVED, that consideration has been received for the issuance of Membership
Interest, and that the Company consequently is able to commence and transact business and to
incur indebtedness.
ORGANIZATIONAL EXPENSES
RESOLVED, that the Manager is authorized to pay all charges and expenses incident to
or arising out of the organization of and to reimburse any person who has made any
disbursement therefor.
BANK ACCOUNT
RESOLVED, that the Manager is hereby authorized to open a bank account on the
Company's behalf with any banks he deems appropriate.
LICENSES AND PERMITS
RESOLVED, that Company officers are directed to obtain in the Company's name such
other licenses and tax permits as may be required for the conduct of Company business by any
federal, state, county, 01· municipal governmental statute, ordinance, or regulations, and are
directed and authorized to do all things necessary or convenient to qualify to transact Company
business in compliance with the laws and regulations of any appropriate federal, state, or
municipal governmental authority.
OTHER STATES
RESOLVED, that for the purpose of authorizing the Company to do business in any
state, tenitory or dependency of the United States or any foreign country in which it is necessary
or expedient for the Company to transact business, the proper Company officers are hereby
authorized to appoint and substitute all necessary agents or attorneys for service of process, to
designate and change the location of all necessary statutory offices and to make and file all
necessary ce1tificates, reports, powers of attorney and other instruments as may be required by
the laws of such state, territory, dependency or country to authorize the Company to transact
business therein.
TAX MATTERS PARTNER
RESOLVED, that Louis A. Malechek, III, is designated as the 11Tax Matters Pai1ner"
pursuant to Code Section 6231 (a)(7) for the Company.
FISCAL YEAR
..
RESOLVED1 that the Company fiscal year shall begin on January 1, and end on
December 31, subject to change by resolution, as appropriate, at the discretion of the Manager.
CARRY ON BUSINESS
RESOLVED, that the signing of these minutes shall constitute full consent,
confirmation, ratification,. adoption and approval of the holding of the above meeting, the actions
hereby taken,. the resolutions herein adopted and waiver of notice of the meeting by the
signatories.
Dated: December 17, 2014
Louis A. Malechek, ill, Manager
A true copy of each of the following papers referred to in the foregoing minutes is appended
hereto;
Specimen Membership Intei·est Certificate
F:\L.A WIMOORE\l U,C\l~fs\.\iafe<hek-Gct Ru! LLC-tS.0027\Co Docs\t1naniJ119UsWrillen Consent-OrganiutloJ\11 Mt<tlnir!LLC).wpd
Drainage Report
for
Polo Estates Subdivision
Brazos County, Texas
January 2015
Prepared By:
. -',Schultz Eng:ineering, LLC
TBPE Firm No. 12327
P.O. Box 11995
College Station, TX 77842
2730 Longmire Drive, Suite A
College Station, Texas 77845
(979) 764-3900
Developer:
Malechek & Westmoland Family LP
3850 Corporate Center Drive
College Station, Texas 77845
Phone: (979) 690-2642
ENGINEER
Schultz Engineering, LLC.
P.O. Box 11995
Polo Estates Subdivision
Drainage Report
College Station, Texas 77842
Phone: (979) 764-3900
Fax: (979) 764
OWNER/DEVELOPER
Malechek & Westmoland Family LP
3850 Corporate Center Drive
College Station, Texas 77845
Phone: (979) 690-2642
GENERAL DESCRIPTION AND LOCATION
Location:
Description:
• Area:
• Proposed Land Use:
• #of Lots:
• Existing Land Use:
• Land Description:
Primary Drainage Facility:
Flood Hazard Information:
FEMAFIRM:
Floodplain:
Polo Estates Subdivision is located east of South Dowling Road and North Graham Road.
34.069 acres
Single Family Residential
21 lots
Vacant
The terrain slopes towards the southwest.
Boggy Creek
# 48041C0375E (May 16, 2012)
Un-shaded Zone X
HYDROLOGIC CHARACTERISTICS
The existing site is predominately wooded. The elevations range from 238 to 302, sloping generally in a south
easterly direction. The runoff enters tributaries of Boggy Creek.
GENERALSTORMWATERPLAN
The drainage plan for this development will involve the construction of ditches, channels and the installation of
culvert structures.
DRAINAGE DESIGN
General Information: Stormwater runoff from this project will be collected in the ditches along Mallet Way and
Mallet Court to be discharged into proposed drainage channels. The proposed channels will
discharge into existing drainage ways. See Exhibit A for drainage areas for the culvert
design locations and the channel design locations. See Exhibit B for drainage areas for the
ditch design.
Page 1 of3
Tc Methodology:
Tc Minimum
Design Storm Event:
Culvert Materials:
Manning 's n Value:
Runoff Coefficient:
TR55
10 minutes
25-year & 100-year -residential street & culvert, drainage channel
HDPE Pipe or ADS HP Pipe with cement stabilized sand backfill
0.012
0.45
The Rational Equation was used for the culvert, ditch and channel design.
Design Results -Culvert Pipe:
Design Results -Channels:
Culvert No. 2
Culvert Size 1-18" Pipes 1-18" Pipe
Top of Road Elev. 288.59 290.18
Q2s 9.49 6.36
V2s 6.32 5.24
HW2s 287.44 288.29
Q100 11 .25 7.56
V100 7.00 5.64
HW100 287.90 288.50
The data presented above and in the Appendices indicates the culvert sizes are in
accordance with the requirements. The head water elevation for the culverts is less than the
top of road elevation for the 100-yr storm runoff. The ditch at the outlet of the proposed
culverts will be lined with rock riprap to prevent erosion from high velocities. The
velocities in the roadside ditches are such that the ditches will not need rock riprap or
erosion control blankets to control erosion.
Channel No. 1 2
Slope 2.35 2.00
02~ 12.95 13 .02
V2s 3.40 3.25
D2s O.S6 O.S8
0100 lS.34 lS.42
V100 3.S7 3.42
D100 0.61 0.63
Channel No. 1 is a trapezoid channel, SH: 1 V side slopes. The channel will have a
minimum depth of 1.6' for adequate freeboard. The design velocity is 3.6 fps which is less
than 4.S fps which would require curlex blankets to be installed the length of the drainage
channels. Channel No. 2 is a trapezoid channel, SH: 1 V side slopes. The channel will have
a minimum depth of 1.6' for adequate freeboard. The design velocity is 3.4 fps which is
less than 4.S fps which would require curlex blankets to be installed the length of the
drainage channels.
Page 2of3
Applicable Exhibits: Exhibit A -
Exhibit B -
AppendixA-
Appendix B -
Appendix C -
Appendix D-
Appendix E-
Drainage Area Map -Culvert and Channel Design
Drainage Area Map -Roadside Ditch Design
Drainage Area Summary
Time of Concentration Computations
Culvert Design Summary & Culvert Reports
Ditch Design Summary
Channel Design Summary and Reports
CONCLUSION The culverts, roadside ditches, and drainage channel for this subdivision were designed in
accordance with appropriate engineering standards.
CERTIFICATION
I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design
for Polo Estates Subdivision, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge
Department.
f,';,..1:2327
SCHULTZ' .~Gi,..EEslNG, Li.;C;
Page 3of3
Exhibit A
Drainage Area Map
Culvert and Channel Design
Exhibit B
Drainage Area Map
Roadside Ditch Design
Appendix A
Drainage Area Summary
Polo Estates Subdivision
Appendix A Drainage Area Summary
Rational Method
Area, A
Area#
(acres)
310 3.27
311 2.07
312 0.43
313 0.77
320 2.49
321 1.03
322 1.45
330 0.78
331 0.39
332 0.10
333 0.13
334 0.16
340 1.50
341 0.11
342 0.04
343 0.21
344 0.33
345 0.21
346 0.36
347 0.23
The Rational Method:
Q=CIA
Q =Flow (cfs)
A= Area (acres)
C = Runoff Coeff.
I = Rainfall Intensity (in/hr)
Brazos County:
c le 25 year storm
125 0 25
(min) (in/hr) (cfs)
0.45 24.0 6.448 9.49
0.45 24.0 6.448 6.01
0.45 18.0 7.521 1.46
0.45 10.0 9.861 3.42
0.45 30.0 5.675 6.36
0.45 30.0 5.675 2.63
0.45 27.0 6.033 3.94
0.45 10.0 9.861 3.46
0.45 10.0 9.861 1.73
0.45 10.0 9.861 0.44
0.45 10.0 9.861 0.58
0.45 10.0 9.861 0.71
0.45 10.0 9.861 6.66
0.45 10.0 9.861 0.49
0.45 10.0 9.861 0.18
0.45 10.0 9.861 0.93
0.45 10.0 9.861 1.46
0.45 10.0 9.861 0.93
0.45 10.0 9.861 1.60
0.45 10.0 9.861 1.02
I = b I (tc+d)9
tc =Time of concentration (min)
25 vear storm 100 vear storm
b = 89 b = 96
d = 8.5 d = 8.0
e= 0.754 e= 0.730
100 year storm
1100 0 100
(in/hr) (cfs)
7.647 11.25
7.647 7.12
8.899 1.72
11 .639 4.03
6.746 7.56
6.746 3.13
7.163 4.67
11.639 4.09
11.639 2.04
11.639 0.52
11.639 0.68
11.639 0.84
11.639 7.86
11.639 0.58
11.639 0.21
11.639 1.10
11.639 1.73
11.639 1.10
11.639 1.89
11.639 1.20
le= U(V*60)
L = Length (ft
V = Velocity (ft/sec)
Appendix B
Time of Concentration Computations
APPENDIX B
POST DEVELOPMENT TIME OF CONCENTRATION COMPUTATIONS
Polo Estates Subdivision
T .._. = time of concentration for sheet flow (hr)
L = length (ft)
n = Manning's roughness
P2 = 2-yr rainfall intensity (in/hr) for Brazos Co. = 4.5 in/hr
S =slope (ft/ft)
Sheet Flow Drainage n Length Slope r_ Areal
ft % min.
310 0.24 200-· f•, 1.8 ";' 22
311 1"':1''Q..24 0·" 'llil!!l(·200:%!1 I~ {.f:&•oii"" 22
312 if 0;24 :· -::~ 1.:· .'3 .,_. 18
320 " 0.24 X200• I;> , ... 28
321 7· 0.24 · •,;.;•200 ,. I'·· 1 .' 28
322 Q..24 ' 200'" .1.3 25
Concentrated Flow
Length Slope Velocity
ft % ft/sec .. '132 ¥ i' 2.TT ~; 2.7 ;;:
JiJfl\'132 •"11 ·* 12.'n f. '>i!lll'2.7 "ii>'
J '" ''i!i ·~ .;: '• '"' .. ,~,
0.1'2G • 1.1•: • 2:1 .
,. '120·''••' .,,.,,7.~ ' 2.1 ""
165;.i .· 1.3; ~ •. t.8 J'
TR-55 Method
V.,,.. =water velocity in ditch (ft/sec)
S = slope of ditch (ft/ft)
v..-=water velocity in gutter (ft/sec)
S = slope of gutter (ft/ft)
Gutter Flow - 1
T..-Length Slope Velocity
min ft % ft/sec
1 ,;''· 128 ·~·o.83 · , .. 1.9 ·, .,
1 i.'>+'128'. i l'ij4'#.83>1· ''""'·1~
'!!_•d-7'»> .. •.2.,29··· 3.1"''
1 :· ''116.::.. 11.8':7:\ :1.e· .
1 1°•""' 118'" \ ..0.8 "" '•'1.8"
1 I-'" 118·. ;;> ':o.t.13 .,. 2.7'
r-
min
1
1
0
1
1
1
Length
ft
'·~' ··~ •Nt"~P'-
'':>!'~ . .;:
l•O: "" "·
~ ~"''·
' '-'·"J
I., 5
T =travel time through ditch or gutter (min)
L = length of travel path (ft)
V =velocity (fVsec)
Gutter Flow - 2
Slope Velocity T-Total
% ft/sec min min
.,.,!)-hk -· .. ,. .. . 24
--··•%.<' . .,,,, .. 24
·,;,~""" ·~ 18
30
·~ ... >~ ;; •: 30
·' . 27
r.
Design
min
? 24 ,.
24
18
30
"• 30
ZI
Appendix C
Culvert Design Summary
& Culvert Reports
Polo Estates Subdivision
Appendix C
Culvert Design Summary
Pipe Pipe Size Length Slope Contributing Qzs Vzs Q100 V100
No. Drainage
(in) {ft) ('Yt) Areas (cfs) (fps) (cfs) (fps)
1 18" 56 2.07 310 9.49 6.32 11.25 7.00
2 18" 54 0.80 320 6.36 5.24 7.56 5.64
Appendix D
Ditch Design Summary
Polo Estates Subdivision
AppendixD
Ditch Design Summary
Street Ditch Location Slope Contributing a .. v .. o .. a, .. v, .. o, .. Stniet Stations Drainage Areas (Right/Left) (%) (cfs) (fps) (ft) (cfs) (fps) (ft)
Mallet Way 0+00 Right 0.80 320,341,342 7.02 1.79 0.99 8.34 1.86 1.06
Mallet Way 0+62.66 Left 0.80 321 2.63 1.38 0.69 3.13 1.47 0.73
Mallet Way 0+62.66 Right 2.05 .. 341 0.49 1.27 0.31 0.58 1.33 0.33
Mallet Way 0+62.66 Left 1.73 322 3.94 2.07 0.69 4.67 2.13 0.74
Mallet Way 6+64.36 Right 1.08 331 1.73 1.38 0.56 2.04 1.47 0.59
Mallet Way 6+64.36 Left 0.83 311 6.01 1.74 0.93 7.12 1.82 0.99
Mallet Way 6+64.36 Right 3.34 332,333 1.02 1.86 0.37 1.20 1.97 0.39
Mallet Way 6+64.36 Left 2.29 312,313 4.87 2.42 0.71 5.75 2.49 0.76
Mallet Way 7+75 Right 3.52 333 0.58 1.61 0.30 0.68 1.66 0.32
Mallet Way 7+75 Left 3.52 313 3.42 2.54 0.58 4.03 2.71 0.61
Mallet Court 2+50 Right 1.11 347 1.02 1.26 0.45 1.20 1.30 0.48
Mallet Court 2+80 Left 0.80 320,341,342,343 7.96 1.84 1.04 9.44 1.92 1.11
Mallet Court 6+71.78 Right 1.88 346,347 2.62 1.88 0.59 3.09 2.01 0.62
Mallet Court 6+71.78 Left 1.88 320,341,342,343,344 9.42 2.67 0.94 11 .17 2.79 1.00
*Note: Refer to plans for rock nprap and erosion control blanket locations
Appendix E
Channel Design Summary
& Reports
Polo Estates Subdivision
Appendix E
Channel Design Summary
Street Channel Shape Side Slope Slope Contributing Q,. v,. o,. Q, .. v, .. o, ..
(%) Drainage Areas (cfs) (fps) (ft) (cfs) (fps) (ft)
Channel No. 1 V-channel 5:1 2.35 310,330 12.95 3.40 0.56 15.34 3.57 0.61
Channel No. 2 V-channel 5:1 2.00 320,340 13.02 3.25 0.58 15.42 3.42 0.63
Cl:lannel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 1 -25 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
278.00
277.50
277.00
276.50
276.00
275.50
275.00
0
."\.
2
" " ' I"-.
4
= 4.00
= 5.00, 5.00
= 1.50 = 275.62
= 2.35
= 0.035
Known Q
= 12.95
" "\.
' I"\.
'-"\..
' "\..
6 8
Section
'7
-
" v
'-/
10 12 14
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
7
/
II'
/
/
/
7
7
/
/
16 18
/
II'
/
20
Thursday, Jan 15 2015
= 0.56
= 12.95
= 3.81
= 3.40
= 9.71
= 0.55
= 9.60
= 0.74
22 24
Depth (ft
2.38
1.88
1.38
0.88
0.38
-0.12
-0.62
C~annel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 1 -100 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
278.00
277.50
277.00
276.50
276.00
275.50
275.00
0
1'-
2
' ' ' 1'-
4
= 4.00
= 5.00, 5.00
= 1.50
= 275.62
= 2.35
= 0.035
Known Q
= 15.34
' ' ' 1'-
' ' ' "'
6 8
Section
-v -
' v
' /
10 12 14
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Grit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
7
/
I/
/
7
~
I/
7
/
/
16 18
/
I/
/
20
Thursday, Jan 15 2015
= 0.61
= 15.34
= 4.30
= 3.57
= 10.22
= 0.60
= 10.10
= 0.81
22 24
Depth (ft
2.38
1.88
1.38
0.88
0.38
-0.12
-0.62
Cl:lannel Report
~ Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 2 -25 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft)
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft)
275.00
274.50
274.00
273.50
273.00
272.50
0
~
'\
2
'\
'\
' \.
= 4.00
= 5.00, 5.00
= 1.50
= 273.04
= 2.00
= 0.035
Known Q
= 13.02
'\
'\
'\
' \.
'\.
\.
\.
' "' \.
\.
"
4 6 8
Section
v -
10 12
Reach (ft)
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft)
,
/
JI/'
/
/
/ ,
/
/
/ ,
/
/
/ x
J
14 16 18 20
Thursday, Jan 15 2015
= 0.58
= 13.02
= 4.00
= 3.25
= 9.91
= 0.55
= 9.80
= 0.74
22 24
Depth (ft
1.96
1.46
0.96
0.46
-0.04
-0.54
C.hannel Report
~ Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc.
Polo Estates Subdivision -Channel No. 2 -100 Year Storm
Trapezoidal
Bottom Width (ft)
Side Slopes (z: 1)
Total Depth (ft)
Invert Elev (ft}
Slope(%)
N-Value
Calculations
Compute by:
Known Q ( cfs)
Elev (ft}
275.00
"' 274.50 \.
'\
'\
'
274.00
273.50
273.00
272.50
0 2
= 4.00 = 5.00, 5.00
= 1.50
= 273.04 = 2.00
= 0.035
Known Q
= 15.42
'\
'\
'\
'
" \.
\.
' "" '\
'\
"
4 6 8
Section
"'7 --
/
10 12
Reach (ft)
Highlighted
Depth (ft}
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft}
Crit Depth, Ye (ft)
Top Width (ft)
EGL (ft}
'
I
/ ,
/
/
/ .v
/
7
/
:~
I
I
/
,v
14 16 18 20
Thursday, Jan 15 2015
= 0.63
= 15.42
= 4.50
= 3.42
= 10.42
= 0.60
= 10.30
= 0.81
22 24
Depth (ft
1.96
1.46
0.96
0.46
-0.04
-0.54
FOR OFFIC
CASE NO.:
TIME: CITY OF C OLLEGE ST1\TION
Homt of Texas A&M Univmiry'
(I '.
STAFF: ~----=---,--~---~
'f.evtseP
FINAL PLAT APPLICATION
(Check one) D Minor
($700)
D Amending
($700)
[XI Final
($932)
D Vacating
($932)
0Replat
($932)
Is this plat in the ET J? [81 Yes D No Is this plat Commercial D or Residential D
MINIMUM SUBMITTAL REQUIREMENTS:
[81 $700-$932 Final Plat Application Fee (see above).
j8J $233 Waiver Request to Subdivision Regulations Fee (if applicable).
D $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
[81 Application completed in full. This application form provided by the City of College Station must be used and
may not be adjusted or altered. Please attach pages if additional information is provided .
[81 Six (6) folded copies of plat. (A signed mylar original must be submitted after approval.)
[81 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
[81 Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
[81 Copy of original deed restrictions/covenants for replats (if applicable).
[81 Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within nin ety (90) days. The report must include applicable information such as ownership, liens,
encumbrances, etc.
~ Paid tax certificates from City of College Station, Brazos County and College Station l.S.D.
~ The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not.
NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered
complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the
preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff
to be correct, the final plat application will be considered incomplete.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT Polo Estates
~~--~~~--~~~~~~~~~~~~-~~~~~~~~~~~
ADDRESS North Graham Road
SPECIFIED LOCATION OF PROPOSED PLAT:
East of the intersection of North Graham Road and South Dowling Road
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Louis A Malecheck, Ill E-mail malecheck@thepaynelawgroup.com
Street Address 3850 Corporate Center Drive
City Bryan State Texas Zip Code _7_78_0_2 ___ _
Phone Number 979. 776.9800 Fax Number 979. 731.8333
~~~-~~~~~~--~-~~
Revised 4/14 Page 1 of9
PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple
owners):
Name Get Real, LLC E-mail malecheck@thepaynelawgroup.com
Street Address 3850 Corporate Center Drive
City Bryan state Texas Zip Code 77802 -------
Phone Number 979. 776.9800 Fax Number 979. 731.8333 -----------------
ARCHITECT OR ENGINEER'S INFORMATION:
Name Schultz Engineering, LLC -Joe Schultz E-mail joeschultz842verizon.net
Street Address 2730 Longmire Drive, Suite A
City College Station State Texas Zip Code 77845 -------
Phone Number (979) 764-3900 Fax Number (979) 764-3910
----------------~
Do a~y deed restrictions or covenants exist for this property? O Yes [8) No
Is there a temporary blanket easement on this property? If so, please provide the Volume ____ and Page No. __ _
Total No. of Lots 21 ------R-0-W Acreage 2. 762 --------Total Acreage _34_._0_69 _______ _
Existing Use _h_or._s_e_s_ta_b_l_es _________ _ Proposed Use _R_e_s1_·d_e_nt_ia_I ____________ _
Number of Lots By Zoning District n/a I
Average Acreage Of Each Residential Lot By Zoning District:
1.491 I ETJ I __
Floodplain Acreage _o __________________________________ _
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels} on the property? r Yes IX No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
JX Yes
r No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: Foxworth Subdivision
City Project Number (if known):
Date I Timeframe when submitted:
Revised 4/14 Page 2 of 9
A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable):
ength
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision re ulations will de rive the a licant of the reasonable use of his land.
ee Attached
2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant.
ree Attached
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
ISee Attached
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
ISee Attached
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
1. O An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way;
2. O The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. O A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
4. O Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I
rural context;
s. O When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestrian, and
Greenways Master Plan;
Revised 4/14 Page 3 of 9
6. I The proposed development is within an older residential subdivision meeting the criteria in Platting and
Replatting within Older Residential Subdivisions Section of the UDO; or
7. I The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6,
Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan.
Detailed explanation of condition identified above:
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning & Zoning Commission.
Total Linear Footage of
Proposed Public:
1637 Streets
. NIA Sidewalks
NIA Sanitary Sewer Lines
1715 Water Lines
519 Channels
__!_!..!!_Storm Sewers
NIA Bike Lanes I Paths
Parkland Dedication due prior to filing the Final Plat:
ACREAGE:
___ No. of acres to be dedicated + $ ____ development fee
___ No. of acres in floodplain
___ No. of acres in detention
___ No. of acres in greenways
OR
FEE IN LIEU OF LAND:
__ No. of SF Dwelling Units X $ ___ = $ _______ _
(date) Approved by Parks & Recreation Advisory Board ----
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are
true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application
must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN
HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as
described above.
Date
Revised 4/14 Page 4 of 9
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked , all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP.
7. If requ ired , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion , and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11 . The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATIACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATIACHMENTS
FOR THE DEVELOPM T P RMIT ~~ l~~TION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
AC URATE. --~~ OF ~\\~ ~--<..I'-.~········ ~-t: n.~ •• t;O OCJ~O ~{'\ ~~
* • 0 \). 0 . . ';) • ... * ~i) ;,o••J•O••S••E•s·•••••••o1110.o~ooc••o••~•"i~-qjJ. Date $. .. 0 ...... f.tl .. ~ .. SCHUL Tl ~9
""O ~ "•· llOll••r.flf*o••Cl~~-e.
Revised 4/1 4 Page 5 of 9
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill/ Grading Permits, and Clearing Only
Permits:*
certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. Th is area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
D *If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits:
8. I, , certify to the following:
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of th is application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
Revised 4/14 Page 6 of 9
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction.
Engineer I Surveyor Date
Commercial Structures:
E. I, ---------------- , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
Engineer I Surveyor Date
Conditions or comments as part of approval:
Revised 4/14 Page 7 of 9
Existing
[8J
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
[8J Drawn on 24" x 36" sheet to scale of 100' per inch.
[8J Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
[8J Title Block with the following information:
[8J Name and address of subdivider, recorded owner, planner, engineer and surveyor.
[8J Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos
County 911 .)
[8J Date of preparation .
[8J Engineer's scale in feet.
[8J Total area intended to be developed.
[8J North Arrow.
[8J Subdivision boundary indicated by heavy lines.
[8J If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or
larger.
[8J All applicable certifications based on the type of final plat.
[8J Ownership and Dedication
[8J Surveyor and/or Engineer
[8J City Engineer (and City Planner, if a minor plat)
D Planning and Zoning Commission (delete if minor plat)
[8J Brazos County Clerk
[8J Brazos County Commissioners Court Approval (ET J Plats only)
D If submitting a replat where there are existing improvements, submit a survey of the subject property
showing the improvements to ensure that no encroachments will be created.
[8J If using private septic systems, add a general note on the plat that no private sewage facility may be
installed on any lot in this subdivision without the issuance of a license by the Brazos County
Health Unit under the provisions of the private facility regulations adopted by the Commissioner's
Court of Brazos County, pursuant to the provisions of Section 21 .084 of the Texas Water Code.
[8J Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available
data.
[8J Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data.
[8J Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2).
The location and description with accurate dimensions, bearings or deflection angles and radii, area, center
angle, degree of curvature, tangent distance and length of all curves for all of the
following: (Show existing items that are intersecting or contiguous with the boundary of or forming a
boundary with the subdivision, as well as, those within the subdivision).
Proposed
[8J Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp
turn around unless they are shorter than 100 feet.
Public and private R.O.W. locations and widths. (All existing and proposed R.O .W.'s
sufficient to meet Thoroughfare Plan .)
Street offsets and/or intersection angles meet ordinance.
Revised 4/14 Page 8 of 9
Existing
D
(8)
(8)
D
Proposed
D
(8)
(8)
D
Alleys.
Easements.
A number or letter to identify each lot or site and each block (numbered sequentially}.
Parkland dedication/greenbelt area/park linkages. All proposed dedications must be
reviewed by the Parks and Recreation Advisory Board and documentation of their
recommendation provided prior to being scheduled for P&Z Commission consideration.
(8) Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly
sealed by a Licensed Texas Professional Engineer that include the following:
(8) Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall
street, alley and/or sidewalk layout of the subdivision. (may be combined with other
utilities).
D
D
Sewer Design Report.
Sanitary sewer plan and profile showing depth and grades . One sheet must show the
overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility
master plan and any future growth areas.)
Water Design Report and/or Fire Flow Report.
Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing
depth and grades. One sheet must show the overall water layout of the subdivision.
(Utilities of sufficient size/depth to meet the utility master plan and any future growth
areas.)
Storm drainage system plan with contours , street profile, inlets, storm sewer and
drainage channels, with profiles and sections. Drainage and runoff areas, and runoff
based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design,
channel lining design & detention if used. One sheet must show the overall drainage
layout of the subdivision .
~ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E.
0 Letter of completion for public infrastructure or guarantee I surety in accordance with UDO
Section 8.6.
~ Drainage Report with a Technical Design Summary.
~ Erosion Control Plan (must be included in construction plans).
~ All off-site easements necessary for infrastructure construction must be shown on the final plat with a
volume and page listed to indicate where the separate instrument easements were filed.
Separate instrument easements must be provided in recordable form to the City prior to being scheduled
for P&Z Commission consideration.
~ Are there impact fees associated with this development? 0 Yes ~ No
Impact fees must be paid prior to building permit.
~ Will any construction occur in TxDOT rights-of-way? 0 Yes ~ No
If yes, TxDOT permit must be submitted along with the construction documents.
NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing
Revised 4/14
the plat at the Courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to
issuance of a development permit.
Page 9 of9
Polo Estates Subdivision Waiver Request
Waiver to Section 12-8.3.E.3. Street Projections and Waiver to Section 12-8.3.G. Blocks. 2.
Block Length
Justification for Waiver:
Polo Estates consists of the previously platted 34 acre Lot 1, Block 1 of the Foxworth
Subdivision. This lot was platted in 2004 with no streets required to break the block length or
projected to adjacent tracts. This waiver request is to allow the development of the Subdivision
as shown on the plat with a street extension to the south, but not to the west or east and with a
block length exceeding 1,500'. A street is extended to the largest adjacent tract which would be
the only tract likely to subdivide for development.
The justification for not extending a street to the west is that the adjacent tracts are already
developed as single residential lots. The Wootan and Bass tracts as shown on Exhibit A were
subdivided out of the larger tract but were not platted since each tract is greater than 10 acres.
To the south of the Bass tract are platted lots so a street through the Wootan and Bass tracts
could not be a through street unless it connected back to South Dowling Road on one of these
tracts. It is not likely that a street extended to the Wootan tract would ever be extended since the
house and barn locations as shown on Exhibit B occupy a large part of the tract and any future
subdividing would be to add one or two homesites which can be accomplished by taking access
of South Dowling Road. Also, attached is an email from Chad Wootan which he stated that he
does not desire to have a street extended to his property.
A street is not proposed to the unplatted tract to the east since it would have to cross a significant
drainage way and the 7.5 acre tract is already developed as a fraternity house. The tract between
the 7 .5 acre tract and I&GN Road is already developed and is only 2.1 acres so it is unlikely that
a street would extend through that tract. The location of the drainage way is shown on Exhibit C
and the existing structures on the tracts are shown on Exhibits B and C. Future subdivision of
the tract could occur with access only from North Graham Road.
1. There are special circumstances or conditions affecting the land involved such that strict
application of the subdivision regulations will deprive the applicant of the reasonable use
of his land.
Strict application of the ordinance will result in extensions of streets that may never be
extended therefore requiring the Developer to construct streets that are not necessary
for this development or future development.
2. The wavier is necessary for the preservation and enjoyment of substantial property right
of the applicant.
The property owner desires to develop the property without the additional expense and
disturbance that would results from extending streets to the west and east.
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare,
or injurious to other property in the area, or to the City in administering subdivision
regulations.
The granting of the waivers for this development will not be detrimental to the public
health, safety, or welfare, or injurious to other property as the development will comply
with all other standards and requirements.
4. The granting of the waiver will not have the effect of preventing the orderly subdivision
of other land in the area in accordance with the previsions of the Unified Development
Ordinance.
The granting of this waiver will not affect the subdivision of other land since the
proposed plan provides an extension of a street and utilities to the largest adjacent tract
which may develop in the future. The other adjacent and nearby tracts are already
developed.
Joe Schultz
From:
Sent:
To:
Subject:
Joe,
Chad Wootan <chad@lonestarbcs.com>
Wednesday, February 25, 2015 12:59 PM
'Joe Schultz'
street extension to Wootan 11 acres
As per our discussion concerning the development of the Polo Estates property, adjacent to my personal residence, I
have no desire to have a road extended to my property line. I have no future interest in developing my 11.S acres. I
have no need to connect or have access thru said property. I think it is even against my deed restrictions to subdivide
my property. It will devalue my property and my privacy by adding this extension to my boundary.
Thanks
Chad Wootan
1
CITY or C rn..LEGE STATION
Home o/Texas A&M Univmity"
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
0 New Project Submittal
D Incomplete Project Submittal -documents needed to complete an application. Case No.:
Existing Project Submittal. Case No.: (15-00900027)
Project Name Polo Estates (FP-REPLA T)
Contact Name ~~~~~~~~~~~~~~~
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
D Comprehensive Plan Amendment
0 Rezoning Application
D Conditional Use Permit
0 Preliminary Plan
~ Final Plat
0 Development Plat
D Site Plan
D Special District Site Plan
D Special District Bu ilding I Sign
0 Landscape Plan
D Non-Residential Architectural Standards
0 Irrigation Plan
D Variance Request
0 Development Permit
0 Development Exaction Appeal
D FEMA CLOMA/CLOMR/LOMA/LOMR
0 Grading Plan
D Other -Please specify below
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Comprehensive Plan Amendment D Waterline Construction Documents
D TxDOT Driveway Permit D Sewerline Construction Documents
D TxDOT Utility Permit D Street Construction Documents
D Drainage Letter or Report D Easement Application
D Fire Flow Analysis D Other -Please specify
Special Instructions:
10/10 [ Printfbrm
May 26, 2015
Jessica Bullock
Staff Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Polo Estates (FP-REPLAT) -(15-00900027)
Dear Ms. Bullock:
Attached are the following items for the project referenced above:
• Thirteen (13) 11"xl7" copies of the revised Final Plat
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
Joe Schultz, P .E.
Manager/Civil Engineer
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
Office: 979.764.3900
Fax: 979.764.3910
FOR OFFIC~ USE ~~
CASE NO. \ 6 .--,
DATESUBMITTED: OE2'\~~
TIME:~~
STAFF: ·
Cnv OF C oll.EGE STATION
Home ofT=zs A&M University" ~~--~~~~~~
FINAL PLAT APPLICATION
(Check one) D Minor
($700)
D Amending
($700)
~Final
($932)
D Vacating
($932)
0Replat
($932)
Is this plat in the ET J? [8J Yes O No Is this plat Commercial O or Residential O
/ MINIMUM SUBMITTAL REQUIREMENTS: i~ $700-$932 Final Plat Application Fee (see above).
0 $233 Waiver Request to Subdivision Regulations Fee (if applicable).
0 $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
j6e prior to the issuance of any plans or development permit).
~Application completed in full. This application form provided by the City of College Station must be used and
/lay not be adjusted or altered. Please attach pages if additional information is provided.
~ Six (6) folded copies of plat. (A signed mylar original must be submitted after approval.)
[8J Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
~ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
~ _,Popy of original deed restrictions/covenants for replats (if applicable).
g Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within n·inety (90) days. The report must include applicable information such as ownership, liens,
. )itncumbrances, etc.
[8f Paid tax certificates from City of College Station, Brazos County and College Station l.S.D.
~ The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not.
NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered
complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the
preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff
to be correct, the final plat application will be considered incomplete.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT Polo Estates
~~------------~-----------------~
ADDRESS North Graham Road
SPECIFIED LOCATION OF PROPOSED PLAT:
East of the intersection of North Graham Road and South Dowling Road
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
. Name Louis A Malecheck, Ill E-mail malecheck@thepaynelawgroup.com
Street Address 3850 Corporate Center Drive
City Bryan State Texas Zip Code _7_78_0_2 ___ _
Phone Number _9_79_._77_6_.9_B_o_o _________ _ Fax Number 979. 731.8333
Revised 4/14 Page 1 of 9
PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple
owners):
Name Get Real, LLC E-mail malecheck@thepaynelawgroup.com
Street Address 3850 Corporate Center Drive
City Bryan State Texas Zip Code 77802 ------
Phone Number 979. 776.9800 Fax Number 979. 731.8333
---------------~
ARCHITECT OR ENGINEER'S INFORMATION:
Name Schultz Engineering, LLC -Joe Schultz E-mail joeschultz842verizon.net
Street Address 2730 Longmire Drive, Suite A
City College Station State Texas Zip Code 77845 ------
Phone Number (979) 764-3900 Fax Number (979) 764-3910 -----------------
Do any deed restrictions or covenants exist for this property? O Yes (8] No
Is there a temporary blanket easement on this property? If so , please provide the Volume ____ and Page No. __ _
Total No. of Lots 21 ----R-0-W Acreage 2. 762 -------Total Acreage _34_._0_69 _______ _
Existing Use _h_or._s_e_s_ta_b_le_s _________ _ Proposed Use Re_s_id_e_n_t1_·a_I ___________ _
Number of Lots By Zoning District nla /
Average Acreage Of Each Residential Lot By Zoning District:
1.491 I ETJ
Floodplain Acreage 0 -------------------
1 s there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
IX Yes
t No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: Foxworth Subdivision
City Project Number (if known): ---------------
Date I Timeframe when submitted:
Revised 4/14 Page 2 of 9
Re uested waiver to subdivision re ulations and reason for same if a:>plicable): -'--~~'--~~~~~~~~~~~~~
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision re ulations will de rive the applicant of the reasonable use of his land .
~~~~~~~~~~~~~~~~~
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
~~~~~~~~~~~~~~~~
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
~~~~~~~~~~~~~~~---,
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
1. I An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way;
2. I The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. I A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
4. I Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I
rural context;
5. r When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestrian, and
Greenways Master Plan;
Revised 4/14 Page 3 of 9
6. r The proposed development is within an older residential subdivision meeting the criteria in Platting and
Replatting within Older Residential Subdivisions Section of the UDO; or
7. r The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6.
Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan.
Detailed explanation of condition identified above:
NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the
same time by the Planning & Zoning Commission.
Total Linear Footage of
Proposed Public:
1637 Streets
NIA Sidewalks
NIA Sanitary Sewer Lines
1715 Water Lines
519 Channels
~Storm Sewers
NIA Bike Lanes I Paths
Parkland Dedication due prior to filing the Final Plat:
ACREAGE:
___ No. of acres to be dedicated + $ ____ development fee
___ No. of acres in floodplain
No. of acres in detention ---
---No. of acres in greenways
OR
FEE IN LIEU OF LAND:
__ No. of SF Dwelling Units X $ = $ ------------
(date) Approved by Parks & Recreation Advisory Board ----
NOTE: DIGIT AL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are
true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE
PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more
than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application
must be accompanied by proof of authority for the company's representative to sign the application on its behalf LIEN
HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as
described above. ----·--·
Date
Revised 4/14
Page 4 of9
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked , all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11 . The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE , AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPM T P RMIT ~~~~~TION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
AC URATE. ..,.-eo1;t:. OF I:~,~
Revised 4/14
-~.-<.. ~ .......... ~-f: ~~
"" ~· eo -"' ~i\ •• "• y\Sl !;',, * e ·~-o \·1
I QfJ • O~ jt;' c .. ,
~00•0••0,.·~···· . Q l\· "4 ~ Josr:pr..i ·r·=·5·~;:~·u·····!1-..:···.i;1 Date t+ ~•o~••u .. 0~ .... • \,1fl ~ /.. (.:! ~'""(} O ~ ""0110'-i>•,;.o~oooo~o•c:Y
Page 5 of 9
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill/ Grading Permits, and Clearing Only
Permits:*
certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
D *If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits:
B. I, , certify to the following:
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
Revised 4/14
Page 6 of 9
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction.
Engineer I Surveyor Date
Commercial Structures:
E. I, ----------------, certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
Engineer I Surveyor Date
Conditions or comments as part of approval:
Revised 4/14
Page 7 of 9
Existing
181
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
181 Drawn on 24" x 36" sheet to scale of 100' per inch.
181 Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
181 Title Block with the following information:
181 Name and address of subdivider, recorded owner, planner, engineer and surveyor.
181 Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos
County 911.)
181 Date of preparation.
181 Engineer's scale in feet.
181 Total area intended to be developed.
181 North Arrow.
181 Subdivision boundary indicated by heavy lines.
181 If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or
larger.
181 All applicable certifications based on the type of final plat.
181 Ownership and Dedication
181 Surveyor and/or Engineer
181 City Engineer (and City Planner, if a minor plat)
0 Planning and Zoning Commission (delete if minor plat)
181 Brazos County Clerk
181 Brazos County Commissioners Court Approval (ET J Plats only)
0 If submitting a replat where there are existing improvements, submit a survey of the subject property
showing the improvements to ensure that no encroachments will be created.
181 If using private septic systems, add a general note on the plat that no private sewage facility may be
installed on any lot in this subdivision without the issuance of a license by the Brazos County
Health Unit under the provisions of the private facility regulations adopted by the Commissioner's
Court of Brazos County, pursuant to the provisions of Section 21 .084 of the Texas Water Code.
181 Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available
data.
181 Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data.
181 Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2).
The location and description with accurate dimensions, bearings or deflection angles and radii , area, center
angle, degree of curvature, tangent distance and length of all curves for all of the
following: (Show existing items that are intersecting or contiguous with the boundary of or forming a
boundary with the subdivision, as well as, those within the subdivision).
Proposed
181 Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp
turn around unless they are shorter than 100 feet.
Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s
sufficient to meet Thoroughfare Plan.)
Street offsets and/or intersection angles meet ordinance.
Page 8 of 9
Revised 4/14
Existing
D
[8]
[8]
D
Proposed
D
[8]
[8]
D
Alleys.
Easements.
A number or letter to identify each lot or site and each block (numbered sequentially).
Parkland dedication/greenbelt area/park linkages. All proposed dedications must be
reviewed by the Parks and Recreation Advisory Board and documentation of their
recommendation provided prior to being scheduled for P&Z Commission consideration.
[8] Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly
sealed by a Licensed Texas Professional Engineer that include the following:
[8] Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall
street, alley and/or sidewalk layout of the subdivision. (may be combined with other
utilities).
D
D
Sewer Design Report.
Sanitary sewer plan and profile showing depth and grades. One sheet must show the
overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility
master plan and any future growth areas.)
Water Design Report and/or Fire Flow Report.
Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing
depth and grades. One sheet must show the overall water layout of the subdivision .
(Utilities of sufficient size/depth to meet the utility master plan and any future growth
areas.)
Storm drainage system plan with contours, street profile, inlets, storm sewer and
drainage channels, with profiles and sections. Drainage and runoff areas, and runoff
based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design,
channel lining design & detention if used. One sheet must show the overall drainage
layout of the subdivision.
[8] Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E.
D Letter of completion for public infrastructure or guarantee I surety in accordance with UDO
Section 8.6.
[8] Drainage Report with a Technical Design Summary.
[8] Erosion Control Plan (must be included in construction plans).
[8] All off-site easements necessary for infrastructure construction must be shown on the final plat with a
volume and page listed to indicate where the separate instrument easements were filed .
Separate instrument easements must be provided in recordable form to the City prior to being scheduled
for P&Z Commission consideration.
[8] Are there impact fees associated with this development? D Yes [8] No
Impact fees must be paid prior to building permit.
[8] Will any construction occur in TxDOT rights-of-way? D Yes [8] No
If yes, TxDOT permit must be submitted along with the construction documents.
NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing
Revised 4/14
the plat at the Courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to
issuance of a development permit.
Prin(Form
Page 9 of 9
yt~5' ~s ,
J NQLltt~ \
PLANNING
RESPONSE TO STAFF REVIEW COMMENTS NO. 1
Project: Polo Estates (FP-Replat) (15-00900027)
Meets and bounds do not close, please revise.
A call was missing on the northwest boundary line. It has been added to the Final
Plat. ~-Right-of-way on N. Graham should be 77'. Half of the deficiency should be dedicated with
this plat.
3.5' of right-of-way was added to the tract. In addition, 3.5' of pue was added to
the lots so that there is a total of 20' of PUE. .h. Please project a public street to the unplatted lots to the south, east, and west with a 70-foot
right-of-way. As proposed the block length currently exceeds 1500 feet as the cul-de-sac
does not break block length.
A street was extended to the south. A waiver is being requested for block length
and street extensions to the east and west. J The proposed Mallet Court and Mallet Way all count as a cul-de-sac. The cul-de-sac cannot
exceed cannot exceed 750 feet in length.
The alignment of the subdivision streets changed so that the cul-de-sac is less ~
than 750 feet. (hv\<...\£.,.er \o..o e 1 s /4;) .'}.'"\ \'5 t--1.Cille.\ ~ "o l~lU a ~-d~-· vE -Lots around cul-de-sacs need to meet the 75-foot lot width as measured at the street. Lots
13-17 should be revised to meet the requirement of 100-foot lot width as measured at the
street.
All cul-de-sac lots meet the 75' width and all other lots are 100' in width.
Lots platted adjacent to straight right of way (S. Dowling, Mallet Way, and Mallet Court) shall
be substantially right angles.
The lots are "substantially" at right angles in our opinion. LD4 51 lot 1'3.1 1 ot" I~ .1 t ~ t 7
Parkland in the amount of $26,481 ($1261 x21) will be due upon filing of the final plat.
Noted. FYI, there are 22 lots on this Final Plat. With there being 1 lot in the
Foxworth Subdivision already, only 21 are being added so $1261x21 should be the ?
amount due. µor v5 eel a6 re..'O'cl efr•Cl.4 f2' Be.tea~ Ca ~ P'iY'\ f'U>< <c: t;Qu:1 cvb •
./ 8. Please move the Certificate of the County Clerk to the 6tner side of sheet two with the other
certifications.
The certificate of the county clerk has been moved .
./ 9. Please remove the Certificate of City Planner and add Certificate of Planning and Zoning
Commission.
The certificate of City Planner has been removed and the certificate of planning
and zoning commission has been added.
/1 O. The building setback identified in note 15 are different from building setbacks on the original
plat. Please confirm that this is current standards.
Note 15 has been revised to match the original plat .
.;1 1. All structures will need to be removed prior to the filing of the plat.
Noted.
Jl-2. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Noted.
L/13. Please note that any changes made to the plans that have not been requested by the City of
College Station, must be explained in your next transmittal letter. .. t-Jot-e t6 ~
Noted. o.,~c.J\-o..c..c..es~ tu ~
R.fJ l Qof-l CO I t° ,.i_f'
1,.td ~(Of°S & (J.)l.1-l be-t-0 "'f
· d '\--p \>I.)~ ? ~ t.Y-S :1 -ffo "'>-O<P-'"'8 IJ
l_}JQ.. 0 " ~c),Jt • \..) 0~€ ~.J;.. Cf> '50
9'0-
·detd ~n«25
~ \t \~ t-\-kc 8 lotS
14. County comments are still being worked on and will follow.
Noted.
ENGINEERING COMMENTS NO. 1
1. Add a note on the "Replat stating whose responsibility it is to maintain, and stating that
fences, grading, and landscape cannot impede the flow of the private drainage easement.
Note 17 was added to the plat.
2. Add a note on the Replat and construction documents regarding requirement for compaction
of fill or engineered slab for affected lots that have greater than 2 feet of fill. Also list the lots
that would require this.
Note 19 was added to the plat. There isn't any grading proposed on the lots near
the buildab/e area of the future homes. Therefore, we cannot tell which lots are
going to require greater than 2 feet of fill. The note was left as a general statement
to include any lots that require greater than 2 feet of fill.
3. Add a note on the Replat stating that the proposed lots can't be located further than 500'
from a fire hydrants which is based on the lay of the hose along the street.
Note 20 was added to the final plat.
4. Remove FEMA Map with ending numbers, 375-E, from the Replat note. Subdivision
appears to be not located on that map.
Note revised.
5. Cul-de sac's length is exceeding the allowed length in the UDO.
The alignment of the subdivision streets has been revised so that the cul-de-sac is
less than 750.
6. Please provide a private drainage easement for the estimated 100-year storm & the creek.
Please show this on the Replat & Construction documents.
A private drainage easement is shown on the plat and the construction plans.
7. Change construction note #6 regarding Wickson SUD to Wellborn SUD.
Note 6 has been revised.
8. Is the Overhead electric line a BTU line that is to remain or be relocated? Does it have an
easement? If it does please show it on the Replat.
It is g'oing to be removed.
9. Please increase the symbol size for hydrants and gate valves on the overall plan.
The symbol size was changed on the overall plan.
10. Adjust Mallet Way grade at Intersection with North Graham Road to have no more than plus
or minus 2% grade.
The Grade was changed.
11 . Provide horizontal curves for Mallet Way.
Horizontal curves are provided for Mallet Way. -alignment has been revised
12. Entire Rock Rip Rap needs to be in a private drainage easement. See Chanel No. 1.
All of the Rock Rip Rap is now in a private drainage easement.
13. Provide erosional control measurements such as silt fences, hay bales, etc.
Silt fence is provided. It is shown on the Overall plan. In addition, erosion control
blankets are proposed.
14. Provide an additional gate valve between Fire hydrant No 1 & 2. The gate valve spacing
currently exceeds 800'.
The alignment of the Waterlines changed, but the gate valve spacing is less than
800' on the new layout.
15. Provide additional easement on lot 14, or realign the waterline W-2 in such a way that
there's at least 5.5' clearance between the waterline's centerline & edge of PUE.
CITY OF COLLEGE STATION
Home o/Texas A&M Univmity•
FOR OFFICE USE ONLY
CASE NO.: \ts.. d I
DATE SUBMITTED: z:.xr,a 0115
TIME: eJ,@ •
STAFF:~
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
D New Project Submittal
D Incomplete Project Submittal -documents needed to complete an application. Case No.:
-~~~~~~~~ [8] Existing Project Submittal. Case No.: (15-00900027)
Project Name Polo Estates (FP-REPLA T)
Contact Name ______________ _
We are transmitti ng the following for Planning & Development Services to review and comment (check all that apply):
D Comprehensive Plan Amendment D Non-Residential Architectural Standards
D Rezoning Application D Irrigation Plan
D Conditional Use Permit D Variance Request
D Preliminary Plan D Development Permit
[8] Final Plat D Development Exaction Appeal
D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR
D Site Plan D Grading Plan
D Special District Site Plan D Other -Please specify below
D Special District Building I Sign
D Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Comprehensive Plan Amendment [8] Waterline Construction Documents
D TxDOT Driveway Permit D Sewerline Construction Documents
D TxDOT Utility Permit [8] Street Construction Documents
[8] Drainage Letter or Report D Easement Application
[8] Fire Flow Analysis D Other -Please specify
Special Instructions:
10/10 Print Form
cgg_chultz Engineer ing, LLC
April 3, 2015
Jessica Bullock
Staff Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Polo Estates (FP-REPLAT) -(15-00900027)
Dear Ms. Bullock:
Attached are the following items for the project referenced above:
• One (1) 24" x 36" copy of the revised Final Plat
• One (1) set of the revised construction documents
• One (1) copy of the Engineer's Estimate
• One (1) copy of the revised Drainage Report
• One (1) copy of the Water Report
• Revised Final Plat Application
• Waiver Request
• Response to Staff Comments
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
Joe chultz, P.E.
M ager/Civil Engineer
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com
Office: 979.764.3900
Fax: 979.764.3910
...
' . ( ·~
PLANNING
RESPONSE TO STAFF REVIEW COMMENTS NO. 1
Project: Polo Estates (FP-Replat) (15-00900027)
1. Meets and bounds do not close, please revise.
A call was missing on the northwest boundary line. It has been added to the Final
Plat.
2. Right-of-way on N. Graham should be 77'. Half of the deficiency should be dedicated with
this plat.
3.5' of right-of-way was added to the tract. In addition, 3.5' of pue was added to
the lots so that there is a total of 20' of PUE.
3. Please project a public street to the unplatted lots to the south, east, and west with a 70-foot
right-of-way. As proposed the block length currently exceeds 1500 feet as the cul-de-sac
does not break block length.
A street was extended to the south. A waiver is being requested for block length
and street extensions to the east and west.
4. The proposed Mallet Court and Mallet Way all count as a cul-de-sac. The cul-de-sac cannot
exceed cannot exceed 750 feet in length.
The alignment of the subdivision streets changed so that the cul-de-sac is less
than 750 feet.
5. Lots around cul-de-sacs need to meet the 75-foot lot width as measured at the street. Lots
13-17 should be revised to meet the requirement of 100-foot lot width as measured at the
street.
All cul-de-sac lots meet the 75' width and all other lots are 100' in width.
6. Lots platted adjacent to straight right of way (S. Dowling, Mallet Way, and Mallet Court) shall
be substantially right angles.
The lots are "substantially" at right angles in our opinion.
7. Parkland in the amount of $26,481 ($1261 x21) will be due upon filing of the final plat.
Noted. FYI, there are 22 lots on this Final Plat. With there being 1 lot in the
Foxworth Subdivision already, only 21 are being added so $1261x21 should be the
amount due.
8. Please move the Certificate of the County Clerk to the other side of sheet two with the other
certifications.
The certificate of the county clerk has been moved.
9. Please remove the Certificate of City Planner and add Certificate of Planning and Zoning
Commission.
The certificate of City Planner has been removed and the certificate of planning
and zoning commission has been added.
1 O. The building setback identified in note 15 are different from building setbacks on the original
plat. Please confirm that this is current standards.
Note 15 has been revised to match the original plat.
11. All structures will need to be removed prior to the filing of the plat.
Noted.
12. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Noted.
13. Please note that any changes made to the plans that have not been requested by the City of
College Station, must be explained in your next transmittal letter.
Noted.
14. County comments are still being worked on and will follow.
Noted.
ENGINEERING COMMENTS NO. 1
/-Add a note on the Replat stating whose responsibility it is to maintain, and stating that
fences, grading, and landscape cannot impede the flow of the private drainage easement.
Note 17 was added to the plat.
,,7. Add a note on the Replat and construction documents regarding requirement for compaction
of fill or engineered slab for affected lots that have greater than 2 feet of fill. Also list the lots
that would require this.
Note 19 was added to the plat. There isn't any grading proposed on the lots near
the buildable area of the future homes. Therefore, we cannot tell which lots are
going to require greater than 2 feet of fill. The note was left as a general statement
to include any lots that require greater than 2 feet of fill.
/. Add a note on the Replat stating that the proposed lots can't be located further than 500'
from a fire hydrants which is based on the lay of the hose along the street.
Note 20 was added to the final plat.
/. Remove FEMA Map with ending numbers, 375-E, from the Replat note. Subdivision
appears to be not located on that map.
Note revised. y Cul-de sac's length is exceeding the allowed length in the UDO.
. The alignment of the subdivision streets has been revised so that the cul-de-sac is
less than 750.
jl/. Please provide a private drainage easement for the estimated 100-year storm & the creek.
Please show this on the Replat & Construction documents.
A private drainage easement is shown on the plat and the construction plans.
T Change construction note #6 regarding Wickson SUD to Wellborn SUD.
Note 6 has been revised.
8. Is the Overhead electric line a BTU line that is to remain or be relocated? Does it have an
easement? If it does please show it on the Replat.
It is going to be removed. ?. Please increase the symbol size for hydrants and gate valves on the overall plan.
The symbol size was changed on the overall plan. )ef. Adjust Mallet Way grade at intersection with North Graham Road to have no more than plus
or minus 2% grade.
The Grade was changed.
d}.;Provide horizontal curves for Mallet Way.
Horizontal curves are provided for Mallet Way. -alignment has been revised yi. Entire Rock Rip Rap needs to be in a private drainage easement. See Chanel No. 1.
All of the Rock Rip Rap is now in a private drainage easement. ~ovide erosional control measurements such as silt fences, hay bales, etc. P ' '. Silt fence is provided. It is shown on the Overall plan. In addition, erosion control
blankets are proposed.
).K. Provide an additional gate valve between Fire hydrant No 1 & 2. The gate valve spacing
currently exceeds 800'.
The alignment of the Waterlines changed, but the gate valve spacing is less than
800' on the new layout.
/.Provide additional easement on lot 14, or realign the waterline W-2 in such a way that
there's at least 5.5' clearance between the waterline's centerline & edge of PUE.
. (
The alignment of the Waterlines changed, and now the waterline has adequate
spacing from the edge of the PUE.
~· Please verify and place a note on plans that water services will be left between 2 & 3 feet
deep at the point of terminus by developer's contractor.
Note 9 was added to the water sheets . .,1. According to the letter address to Stephen Cast, Fire hydrants need to be connected via 8"
lines. What's the reason for connecting Fire hydrant No. 2 to only a 6" line?
A complete water report is attached to this submittal. yf. Please provide a written correspondence with Wellborn SUD regarding the 1700' dead end
line.
The water line is now looped and is extended to the adjacent property so that it
can be looped in the future.
1-9. Please provide a Water system report.
A water report is attached to this submittal. 'pf Please change Primary Drainage Facility to Hopes Creek & Firm panel # to 48041 C0325E
in the General description of the drainage report.
The drainage report has been revised. A copy of the revised drainage report is
included in this submittal.
}"'f. Provide sealed engineer cost estimate, erosion control details.
A sealed engineer cost estimate is included in this submittal.
ADDRESSING
f 1. Please change Mallet Way to Mallet Court. The street name should be continuous.
The street alignments changed.
SANITATION
j 1. Sanitation is ok with this project.
Noted.
Fire Flow Analysis Report
for
Polo Estates Subwdivision
Brazos County, Texas
March 2015
Prepared Bv: •
TBPE Firm Registration No. 12327
2730 Longmire, Suite A
College Station, Texas 77845
979.764.3900
SCHULTZ ENGINEERINC. LLC.
Fire Flow Analysis Report
for
Polo Estates Subwdivision
Brazos County, Texas
March 2015
Prepared Bv: .
:;;;;;:::.;;,....__
Schultz Engineering, LLC
TBPE Firm Registration No. 12327
2730 Longmire, Suite A
College Station , Texas 77845
979.764.3900
SCHULTZ ENGINEERING. LLC.
General Information
Location:
General Note:
The Polo Estates Subdivision is a 34.069-acre residential
subdivision being developed immediately at the existing Foxworth
Subdivision, in Brazos County, Texas. The Final Plat shows a
total of 22 lots.
The water lines to serve these 22 residential lots will be an 8" & 6"
along Mallet Way, Mallet Court and Chukker Lane with an 8" line
that connects to the 6" line on South Dowling Road. The 6" line
along Mallet Way will loop and connect to the 6" line along North
Graham Road.
Primary Water Supply:
Land Use:
Water service is provided by an existing 6" line on North Graham
Road and a 6" line on South Dowling Road. This development is
providing an 8" loop and a 6" line stubbed out to the adjacent tract.
Single family Residential.
Design Criteria/ Analysis
Primary Water Supply: Existing 6" water lines along North Graham Road and South
Dowling Road.
Existing System Pressure Tests:
Flow Hydrant -See Exhibit B
Flowrate: 1,320 gpm
Static Pressure: 95 psi
Residual Pressure: 58 psi
Exhibits: Exhibit A-Water Layout
Exhibit B-Hydrant Flow Test Results
Exhibit C -Pipe & Junction Analysis Summary -Domestic Flow
Exhibit D -Pipe & Junction Analysis Summary -Fire Flow
Domestic Use 1.5 gpm per lot for Single Family Residential
22 Lots = 33 gpm
The proposed 6" & 8" waterlines are in accordance with the BCS
Water Design Guidelines with the exception of 6" waterline W-1
which does not connect to an 8" line on each end. This report
provides the results of the water system analysis under the fire
flow and domestic demand requirements, (1033 gpm) which
produced the lowest pressure in the system.
Water System Summary
Summary of Calculations
Domestic Demand
w/ Minimum Required Line Sizes
Pressure Min.
Velocity Max.
80.1 psi
0.24 fps
39.5 psi
Fire Flow Demand FH 1
Pressure Min.
Velocity Max. 6.99 fps
41.3 psi
8.25 fps
41.3 psi
8.25 fps
Pressure Min.
Fire Flow Demand FH 2
Fire Flow Demand FH 3
Velocity Max.
Pressure Min.
Velocity Max.
Pressure Min.
Fire Flow Demand FH 4
41.8 psi
9.24 fps
Conclusion
Velocity Max.
As shown above the system exceeds the minimum required
pressures of 35 psi for domestic flow and 20 psi for fire flow in
both analyses. The maximum velocity of 9 .24 fps is less than the
required maximum of 12 fps.
The proposed water lines and fire hydrants provide the required
fire flow. The proposed 6" & 8" waterlines meets or exceeds all of
the design criteria for the City of College Station and the Wellborn
Special Utility District with the exception of 6" waterline W-1
which does not connect to an 8" line on each end. They will
provide adequate water pressure, flowrate and velocity for
domestic demands and fire flow.
-
EXHIBIT A
WATER LAYOUT
EXHIBITB
FLOW TEST REPORT
FIRM #12327
WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT
Date: 03-13-2015
Water System Owner: Wellborn SUD
Development Project: Polo Estates
Flow Test Location: 500' Southeast of Country Meadows and South Dowling
Nozzle Size (inch): 2.5 ----
Pitot Reading (psi): _6_2 __ _
Flowrate (gpm): 1320
Discharge Coeff (c) = 0.90
Flowrate Forula: Q=29.84cd2p112
c =discharge coeff.
d = orifice size
p = pitot pressure (psi)
Pressure Gauge Location: Country Meadows and South Dowling
Static Pressure (psi): _9_5 __ _
Residual Pressure (psi): _5_8 __ _
Compute Discharge at 20 psi Residential Pressure: QR= _1_93_3 __ _
Discharge Formula: OR= OF x (hr0·54/ht°54)
Note: The Flow Test and Report were prepared in accordance with NFPA 291
Report Prepared By: _J_o_e_S_c_h_u_ltz ________ _
Ricky Flores
Others Present: Glendon Adams
EXHIBITC
PIPE & JUNCTION ANALYSIS -DOMESTIC FLOW
Pipe
Number
P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-RES
Length (ft)
1,036
987
495
1,291
1,099
1,302
4,328
1,336
380
451
231
282
7
175
810
16
Exhibit C
WaterCAD Analysis Summary
Pipe Analysis -Domestic Demand
Size (in) Material Hazen-
Williams C
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
12 PVC 150
8 PVC 150
6 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
12 PVC 150
WaterCAD Analysis Summary
Junction Analysis -Domestic Demand
Junction
Junction Elevation Demand Pressure
(gpm) (psi)
J-1 274 0 91.3
J-2 254 0 100
J-3 266 0 94.8
J-4 272 0 92.2
J-5 289 0 84.8
J-6 294 2 82.6
J-7 300 0 80.1
J-8 292 0 83.5
FH-1 290 7 84.4
J-10 288 6 85.2
J-11 289 3 84.8
FH-4 289 2 84.8
FH-2 284 6 87
FH-3 275 7 90.9
Flow Velocity
(gpm) (ft/s)
-13 0.15
-13 0.15
20 0.23
20 0.23
-1 0.01
-13 0.15
-13 0.04
-13 0.08
10 0.11
3 0.03
-16 0.1
-19 0.12
-21 0.24
13 0.08
7 0.04
33 0.09
EXHIBITD
PIPE & JUNCTION ANALYSIS -FIRE FLOW
Pipe
Number
P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-RES
-
Length (ft)
1,036
987
495
1,291
1,099
1,302
4,328
1,336
380
451
231
282
7
175
810
16
Exhibit D
WaterCAD Analysis Summary
Pipe Analysis -Fire Flow Demand (FH-1)
Size (in) Material Hazen-
Williams C
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
12 PVC 150
8 PVC 150
6 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
12 PVC 150
WaterCAD Analysis Summary
Junction Analysis -Fire Flow Demand (FH-1)
Junction
Junction Elevation Demand Pressure
(gpm) (psi)
J-1 274 0 58
J-2 254 0 71.7
J-3 266 0 71.4
J-4 272 0 63.8
J-5 289 0 43.5
J-6 294 2 40.7
J-7 300 0 44.5
J-8 292 0 48.7
FH-1 290 1,007 39.5
J-10 288 6 43
J-11 289 3 43
FH-4 289 2 43.4
FH-2 284 6 44.8
FH-3 275 7 48.7
Flow Velocity
(e:om) (ft/s)
-417 4.73
-417 4.73
616 6.99
616 6.99
126 1.43
-417 4.73
-417 1.18
-417 2.66
541 6.13
-466 5.29
-485 3.1
-488 3.12
-490 5.56
13 0.08
7 0.04
1,033 2.93
Pipe
Number
P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-RES
-
Length (ft)
1,036
987
495
1,291
1,099
1,302
4,328
1,336
380
451
231
282
7
175
810
16
Exhibit D
WaterCAD Analysis Summary
Pipe Analysis -Fire Flow Demand (FH-2)
Size (in) Material Hazen-
Williams C
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
12 PVC 150
8 PVC 150
6 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
12 PVC 150
WaterCAD Analysis Summary
Junction Analysis -Fire Flow Demand (FH-2)
Junction
Demand Pressure Junction Elevation
(gpm) (psi)
J-1 274 0 58.4
J-2 254 0 71.9
J-3 266 0 71.4
J-4 272 0 63.7
J-5 289 0 43.l
J-6 294 2 41.3
J-7 300 0 44.9
J-8 292 0 49
FH-1 290 7 42
J-10 288 6 41.7
J-11 289 3 42
FH-4 289 2 43
FH-2 284 1,006 42.3
FH-3 275 7 46.2
Flow Velocity
(gpm) (ft/s)
-410 4.65
-410 4.65
623 7.07
623 7.07
-103 1.17
-410 4.65
-410 1.16
-410 2.61
304 3.45
297 3.37
-722 4.61
-725 4.63
-727 8.25
1,013 6.47
7 0.04
1,033 2.93
Pipe
Number
P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-RES
Length (ft)
1,036
987
495
1,291
1,099
1,302
4,328
1,336
380
451
231
282
7
175
810
16
Exhibit D
WaterCAD Analysis Summary
Pipe Analysis -Fire Flow Demand (FH-3)
Size (in) Material Hazen-
WilliamsC
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
12 PVC 150
8 PVC 150
6 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
12 PVC 150
WaterCAD Analysis Summary
Junction Analysis -Fire Flow Demand (FH-3)
Junction
Junction Elevation Demand Pressure
(gpm) (psi)
J-1 274 0 58.4
J-2 254 0 71.9
J-3 266 0 71.4
J-4 272 0 63.7
J-5 289 0 43.1
J-6 294 2 41.3
J-7 300 0 44.9
J-8 292 0 49
FH -1 290 7 42
J-10 288 6 41.7
J-11 289 3 42
FH-4 289 2 43
FH -2 284 6 42.3
FH-3 275 1,007 41.3
Flow Velocity
(gpm) (ft/s)
-410 4.65
-410 4.65
623 7.07
623 7.07
-103 1.17
-410 4.65
-410 1.16
-410 2.61
304 3.45
297 3.37
-722 4.61
-725 4.63
-727 8.25
1,013 6.47
1,007 6.43
1,033 2.93
Pipe
Number
P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-RES
•
Length (ft)
1,036
987
495
1,291
1,099
1,302
4,328
1,336
380
451
231
282
7
175
810
16
Exhibit D
WaterCAD Analysis Summary
Pipe Analysis -Fire Flow Demand (FH-4)
Size (in) Material Hazen-
Williams C
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
6 PVC 150
12 PVC 150
8 PVC 150
6 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
6 PVC 150
8 PVC 150
8 PVC 150
12 PVC 150
WaterCAD Analysis Summary
Junction Analysis -Fire Flow Demand (FH-4)
Junction
Junction Elevation Demand Pressure
(gpm) (psi)
J-1 274 0 58.6
J-2 254 0 72
J-3 266 0 71.4
J-4 272 0 63.6
J-5 289 0 42.8
J-6 294 2 41.8
J-7 300 0 45.2
J-8 292 0 49.3
FH-1 290 7 43
J-10 288 6 43.2
J-11 289 3 42.7
FH-4 289 1,002 42.6
FH-2 284 6 44.9
FH-3 275 7 48.8
Flow Velocity
(gpm) (ft/s)
-404 4.58
-404 4.58
629 7.14
629 7.14
-185 2.1
-404 4.58
-404 1.15
-404 2.58
217 2.46
210 2.38
191 1.22
188 1.2
-814 9.24
13 0.08
7 0.04
1,033 2.93
FOXWORTH SUBDIVISION
CLOSES
Scale = 1: 424 (Feet)
1 N 05° 01' 19" E 398.83
2 N 40° 59' 53" E 75.31
3 N 42° 39' 37" E 371 .56
4 N 42° 23' 40" E 398.43
5 N 48° 14' 17" E 22.91
6 N 41 ° 22' 54" E 242.48
7 N41°29'12"E128.78
9
/
/
/
10
11
/
/
/
8 N 43° 03' 12" E 37.40
9 S 47° 41' 48" E 705.74
10 S43°23'59"W100.13
11 S 4 7° 42' 11" E 526 .12
12 s 44° 47' 19" w 769.57
13 N 84° 57' 11" W 1197.77
Scale = 1: 424 (Feet)
1 N 05° 01' 19" E 398.83
2 N 40° 59' 53" E 75.31
3 N 42° 39' 37" E 371 .56
4 N 48° 14' 17" E 22.91
5 N 41° 22' 54" E 242.48
6 N41°29'12"E128.78
7 N 43° 03' 12" E 37.40
3
8
/
6
/
9
10
/
/
/
/
12
8 S 47° 41 ' 48" E 705.74
9 s 43° 23' 59" w 100.13
10 S 47° 42' 11" E 526.12
11 s 44° 47' 19" w 769.57
12 N 84°57'11"W 1197.77
11