Loading...
HomeMy WebLinkAbout14-285FOR OFFICE USE O~L Y CASE NO.: \L\-Z0<6 DATE SUBMITIED: I l / 2<P I ( L-1 TIME: \ '. 2.D C!TY o F Coll.EGE STATION Home ofT= A&M Univmity' SITE PLAN APPLICATION GENERAL STAFF: -+f1_.°0 _______ _ MINIMUM SUBMITIAL REQUIREMENTS: [8] $932 Site Plan Application Fee. [8] $350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable). [8] $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). [8] Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. [8] Six (6) folded copies of site plan. [8] One (1) folded copy of the landscape plan. [8] One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate Building Review (if applicable). [8] Building elevations to scale for all buildings. [8] A list of building materials for all facade and screening. [8] Color samples for all buildings or list colors to be used from the approved color palette. [8] Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. [8] Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. [8] Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). [8] Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). [8] The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference NAMEOFPROJECT ~Jo~n~e~s_L~a_w_F_1_rm~O_ffi_k_e _________________________ _ ADDRESS 2800 Earl Rudder Freeway LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 1E-R2 North Forest Subdivision -----------------------~ APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Steve Broussard -SteNt Assets, LLC E-mail ~----------------- Street Address P. 0. Box 9262 ~---------------------------------~ City College Station State _T_ex_a_s ______ Zip Code _7_78_4_2 ____ _ Phone Number 713-967-6573 Fax Number ---------------~ PROPERTY OWNER'S INFORMATION: Name SteNt Assets, LLC Street Address P. 0 . Box 9262 ----------------------------------~ City College Station State _T_ex_a_s ______ Zip Code _7_78_4_2 ____ _ Phone Number 713-967-6573 Fax Number ~--------------~ Revised 4/14 Page 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION: Name Schultz Engineering, LLC -Deven Doyen, P.E. E-mail deven@schultzengineeringllc.com Street Address 2730 Longmire Drive, Suite A City College Station State Texas Zip Code 77845 --------------- Phone Number 979. 764.3900 Fax Number 979. 764.3910 ---------------- 0 THE R CONTACTS (Please specify type of contact): Name NoackLittle -Chris Noack E-mail chris@noacklittle.com Street Address 1300 Guadalupe St., Suite 101 City Austin State Texas Zip Code _78_7_0_1 ____ _ Phone Number 512.851 .1900 Fax Number 512.851.1901 -----------------------------~ Current zoning _O_ffi_ic_e _________________________________ _ Present use of property _V_a_ca_n_t _____________________________ _ Proposed use of property _O_ffi_ic_e_IM_e_d_ic_a_l_O_ffi_ic_e ________________________ _ Number of parking spaces required 30 Number of parking spaces proposed 11 PROP! 19 EXIST Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes IX No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: City Project Number (in known): Date I Timeframe when submitted: Revised 4/14 Page 2 of 11 MULTl-FAMIL Y RESIDENTIAL Total Acreage -'N--''./A-'----- Floodplain Acreage _N_'.IA ___ _ Housing Units _N_'.IA ____ _ ___ #of 1 Bedroom Units ___ #of 2 Bedroom Units ___ # of 3 Bedroom Units #of 4 Bedroom Units --- FOR 2 BEDROOM UNITS ONLY # Bedrooms = 132 sq. ft. --- #Bedrooms< 132 sq. ft. --- PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) #of Multi-Family Dwelling Units NIA x $1636 = $ -------- # of acres in floodplain #of acres in detention # of acres in greenways Date dedication approved by Parks & ____ Recreation Advisory Board COMMERCIAL Total Acreage -=-0'-". 3....:..7..:....7 ___ _ Building Square Feet ..::.5z...::8c::.9..::..8 __ Floodplain Acreage ..:..O ___ _ * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. ) Date Revised 4/14 Page 3of11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local , state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ~/ ~~M?* e J ~ Date Property Owner(s) Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGRE RTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPM ~ l ICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. c} •• ··*· ··· ... tS' •t. f .· . 1r r, ... l .: .. ~.~ ·~·=···v·eN·c·C?§9.·~.. _, _,1 /t-i._44/,_1_~~-------- Engineer Date Revised 4/14 Page 4of11 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill/ Grading Permits, and Clearing Only Permits:* A. I, certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances. Engineer Date Initial D * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits: B. I, , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction, improvement, or fill covered by this ~~~~~~~~~~~~~~~~ permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date Revised 4/14 Page 5 of 11 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer I Surveyor Date Commercial Structures: E. I, ----------------, certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Conditions or comments as part of approval: Revised 4/14 Page 6 of11 CITY or CoLl..EGE STATION Home o/Texas A&M Univmiry• SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Sheet size -24" x 36" (minimum). ~ A key map (not necessarily to scale). ~ Title block to include: ~ Name, address, location, and legal description Ill Name, address, and telephone number of applicant ~ Name, address, and telephone number of developer/owner (if differs from applicant) ~ Name, address, and telephone number of architecUengineer (if differs from applicant) l! Date of submittal [8J Total site area ,~ North arrow. ~ Scale should be largest standard engineering scale possible on sheet. [8J Ownership and current zoning of parcel and all abutting parcels. · 1'{81 The total number of multi-family buildings and units to be constructed on the proposed project site. \JfO The density of dwelling units per acre of the proposed project. ~ The gross square footage of all buildings and structures and the proposed use of each. If different uses are to be located in a single building, show the location and size of the uses within the building. Building separation is a minimum of 15 feet w/o additional fire protection. Locations of the following on or adjacent to the subject site: Designate between existing and proposed tftJ The density of dwelling units per acre of the proposed project. ~ Phasing. Each phase must be able to stand alone to meet ordinance requirements. ~ Buildings (Existing and Proposed). [8J Setbacks according to UDO, Article 5. Geography ~Q., [8J Water courses. J~ ~ 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site. Please note if there is none Cf' U on the site with confirming FEMA/FIRM map number. ~ Existing topography (2' max or spot elevations) and other pertinent drainage information. (If plan has too much information , show drainage on separate sheet.) ~ Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information. (If plan has too much information, show drainage on separate sheet.) Revised 4/14 Page 7 of 11 Streets, Parking, and Sidewalks ./[8] Existing streets and sidewalks (R.O.W.). 'tJ//iZJ Existing Driveways, both opposite and adjacent to the site according to UDO, Article 7. \J/l>IBJ Proposed drives. Minimum drive aisle width according to UDO, Article 7 Indicate proposed driveway throat length according to UDO, Article 7 1 [8J Proposed curb cuts. ~ fr" [8J For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts on the same and opposite side of the street to determine separation distances between existing and proposed curb cuts. ~ Proposed curb and pavement detail. [8J A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include island, planting areas, access ways, dumpster locations, utility pads, etc.) No exception will be made for areas designated as "reserved for future parking". ~/pgi Proposed medians. [8J Proposed sidewalks (both public and private). [8J Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO, Article 7). fl Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned. [8J Designate number of parking spaces required by ordinance and provided by proposal. ~ Handicap parking spaces. ~ Parking Islands drawn and dimensioned with square footage calculated according to UDO, Section 7.2 or 7.9 fornon- 1 residential buildings. l-1/fllEJ Parking setback from R.O.W. to curb of parking lot as required. rJl [8J Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be f? conflict with pedestrian or bike facilities, handicap accessible routes or above ground utilities, signs or other conflicts. ~ Security gates, showing swing path and design specs with colors. ~ Guardrails. Include design and colors. [8J Traffic Impact Analysis for non-residential development (UDO , Article 7). [8J Please note if none is required. i/I8J Will there be access from a TxDOT R.O.W.? D Yes [8J No If yes, then TxDOT permit must be submitted with this application. Easements and Utilities [8J Easements -clearly designate as existing or proposed and type (utility, access, etc.) [8J Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site, including building transformer locations, above ground and underground service connections to buildings, and drainage inlets. [8J Sewer Design Report (if applicable). [8J Water Design Report and/or Fire Flow Report (if applicable). [8J Drainage Report with a Technical Design Summary. [8J Meter locations, existing and proposed (must be located in public R.O.W. or public utility easement). [8J Provide a water and sanitary sewer legend to include [8J Minimum water demands [8J Maximum water demands [8J Average water demands in gallons per minute, and [8J Maximum sewer loadings in gallons per day [8J Will there be access from a TxDOT R.O.W.? D Yes [8J No If yes, then TxDOT permit must be submitted with this application. Revised 4/14 Page 8 of 11 Fire Protection [8J Show fire lanes. Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway. [8J Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street as a project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1, R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or designated fire lane. NOTE: Fire hydrants must be operable and accepted by the City, and drives must have an all weather surface before a building permit can be issued. [8J Will building be sprinkled? O Yes [8J No If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted. If Yes, O Show fire department connections. FDC's should be within 100' of the fire hydrant. They shall be accessible from the parking lot without being blocked by parked cars or a structure. Landscaping [8J Landscape plans as required in Article 7 of the Unified Development Ordinance. The landscaping plan can be shown on a separate sheet if too much information is on the original site plan . If requesting protected tree points, then those trees need to be shown appropriately barricaded on the landscape plan. Attempt to reduce or eliminate plantings in easements. Include information on the plans such as: [8J required point calculations [8J additional streetscape points required. Streetscape compliance is required on all streets. [8J calculations for # of street trees required and proposed (proposed street tree points will accrue toward total landscaping points.) [8J proposed new plantings with points earned [8] proposed locations of new plantings [8] screening of parking lots, 50% of all shrubs used for screening shall be evergreen. 1v1 screening of dumpsters, concrete retaining walls, off street loading areas, utility connection points, or other ~ areas potentially visually offensive. [8J existing landscaping to remain 1v1 show existing trees to be barricaded and barricade plan. Protected points will only be awarded if barricades are ~ up before the first development permit is issued. [8] Buffer as required in Article 7 of the Unified Development Ordinance. [8] Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to issuance of C. 0.) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular water systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must include backflow prevention protection. [8J Is there any landscaping in TxDOT R.O.W.? O Yes [8] No If yes, then TxDOT permit must be submitted at the time of application. Other ,fj Common open spaces sites ~ Loading docks ~ Detention ponds "l!J Retaining walls [8] Sites for solid waste containe~s with screening '. Locations of d~mpste:s are a.c~essible but not visible.from streets or residential areas. Gates are discouraged and visual screening 1s required. (Minimum 12 x 12 pad required.) ~ Are there impact fees associated with this development? O Yes [8J No NOTE: Signs are to be permitted separately. Revised 4/14 Page 9 of 11 C1TY or C oll.EGE STATION Home ofT= A&M University' NRA BUILDING REVIEW MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Refer to UDO Section 7.9 Non-Residential Architectural Standards, as appropriate. [8] Sheet size -24" x 36" (minimum). [8] Title block to include: [8] Name, address, location, and legal description [8] Name, address, and telephone number of applicant [8] Name, address, and telephone number of developer/owner (if differs from applicant) [8] Name, address, and telephone number of architecUengineer (if differs from applicant) [8] Date of submittal [8] Scale should be largest standard scale possible on sheet. [8] List of colors from the City of College Station color palette to be utilized or proposed equivalents. [8] Color samples. [8] List of materials to be utilized. [8] Elevations of each non-residential building and screening structure. Show placement of materials and colors on the facades according to UDO Section 5.6.B or 7.9. [8] Include the following dimensions: [8] Total vertical square footage minus openings (for each fa9ade separately) [8] Total vertical square footage of transparency (for each fa9ade separately in Northgate) [8] Total vertical square footage of each building material (for each fa9ade separately) [8] Total vertical square footage of each color (for each fa9ade separately) [8] Graphic representation and/or description of existing buildings in building plot to show material, color, and architectural harmony. Revised 4/14 Page 10 of 11 CITY OF Coll.EGE STATION Homt o/Texas A&M Univmity0 NORTHGATE BUILDING REVIEW MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Refer to UDO Section 5.6. Design Districts, B. Northgate Districts (NG) D Sheet size ; 24" ~ 36" (minimum). D Title block to include: Name, address, location, and legal description Name, address, and telephone number of applicant Name, address, and telephone number of developer/owner (if differs from applicant) Name, address, and telephone number of architecUengineer (if differs from applicant) Date of submittal Scale should be largest standard engineering scale possible on sheet. D D D D D D D List of colors from the City of College Station Northgate color palette to be utilized or proposed equivalents with color samples. D List of materials to be utilized. D Elevations of each building and screening structure. Show placement of materials and colors on the facades and identify public entrances. Include the following dimensions: D Total vertical square footage minus openings (for each fac;:ade separately) D Total vertical square footage of each building material (for each fac;:ade separately) D Total vertical square footage of each color (for each fac;:ade separately) D Total vertical square footage of transparency between zero and eight feet (0-8') above ground level (for each non-residential fac;:ade) D Graphic representation and/or description of existing buildings in building plot to show material, color, and architectural harmony. Revised 4/14 Page 11 of 11 -.......... ..,,.. __________ ~CITY OF CoLU~GE STATION"-----------------Home of Texas A&M Univmity" _ DATE : TO: FROM: MEMORANDUM January 7, 2015 Steve Broussard, SteNt Assets, LLC, via USPS; P.O. Box 9262 College Station j TX, 77845 Jessica Bullock, Staff Planner SUBJECT: JONES LAW FIRM OFFICE (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. City of College Station Transmittal Letter Eight (8) revised site plans (one will be returned to you, please submit additional copies if you want more than one approved copy) One ( 1) landscaping plan One (1) 24x36 grading and erosion control plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979. 764.3570. Attachments: Staff review comments PC: Deven Doyen, Schultz Engineering, LLC, via; deven@sc~ltzengineeringllc.com Chris Noack, Noacklittle, via; chris@noacklittle.com '7 P&DS Project No. 14-00900285 Planning & Development Services P.O. BOX 9960 • l 101 TEXAS AVENUE · COLLEGE STATION · TEXAS · 77842 TEL 979.764.3570 ·FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: Jones Law Firm Office (SP) -14-00900285 PLANNING 1. No comments. Reviewed by: Jessica Bullock Date: January 7, 2015 ENGINEERING COMMENTS NO. 2 1. Please relocate the private Suddenlink line outside the PUE. Reviewed by: Kevin Ferrer Date: December 30, 2014 STAFF REVIEW COMMENTS NO. 1 Project: Jones Law Firm Office (SP) 14-00900285 PLANNING /.Please verify the use of this property. If there is a portion that is medical and a portion that is office, parking calculation should show both 1 :200 and 1 :250. The use of this property is office with future lease space that could potentially be medical clinic space. Parking calculations were done using the more intense use to show the parking could be a more intense use. The building has been labeled to show the office space and future lease space. -./ The table shows that 11 shared parking spaces are left for future development. Please verify that does not include parking spaces for this site. The 11 shared parking spaces will be provided with development of Lot 1 E-R3. g,/ Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Noted. Reviewed by: Jessica Bullock Date: December 15, 2014 LANDSCAPING/STREETSCAPING/BUFFER /Please either revise the landscape plan to show the new points provided or the trees should be added back to the site. Landscape plan has been revised. Reviewed by: Jessica Bullock Date: December 15, 2014 ENGINEERING COMMENTS NO. 1 1. This is College Station Water CCN, please fix the note on Erosion Control Notes# 6 which is stating Wellborn SUD Staff. Also this note seems more appropriate as a General Note instead of Erosion Control Note. Erosion control note #6 revised. 2. Please move the sewer service line out of the PUE. The sewer service has been relocated out of the PUE where possible. 3. Please Provide City of Bryan/College Station Standard details. Standard details have been added to the construction drawings. Reviewed by: Kevin Ferrer Date: December 9, 2014 SANITATION u( Sanitation is ok with this project. Noted. Reviewed by: Wally Urrutia Date: December 3, 2014 FIRE /.Building will need Knox Box. Site specific note #17 has been added to the site plan. Reviewed by: Steve Smith Date: December 9, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION C/SITE PLAN/PL~T: Developer will p~~vide ~SU with a .digital, A:utoCAD dwg forr:nat, version of plat and I or site plan as soon as 1t 1s available. Email to: swe1do@cstx.gov. Site plan has been sent to CSU. '?:} LOAD DAT A: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. Electrical load data has been provided to CSU. O EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. Noted. 0f If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. Noted. :5".' Current service conduit routing shown is not acceptable. Contact CSU for service conduit design and routing. CSU has been contacted about conduit routing and conduit routing has been revised. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. Noted. 2. CSU will provide drawings for electrical installation. Noted. 3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Noted. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. Noted. 5. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. Noted. 6. To discuss any of the above electrical comments please contact Sam Weide at 979.764.6314. Noted. Reviewed by: Sam Weide Date: December 2, 2014 Jessica Bullock From: Benjamin Mccarty Sent: To: Tuesday, December 30, 2014 11:03 AM Jessica Bullock Subject: Chad Jones Law Office Building Jess, The building has two tenant spaces, one for the law office and the second to be finished out at a later date by a tenant. The 2,000 sq ft unfinished tenant space will probably require to exit doors, which will require an additional sidewalk from that side exit door. So a side exit door will be on both sides (west and east sides) of the proposed building, with a necessary Accessible Route sidewalk from both side exit doors. Please have this reflected on the Site Plan. Thank you, Benjamin McCarty Plans Examiner (Commercial & Multi-Family Projects) Building Division Planning & Development Services Dept. P: 979.764.3754 F: 979.764.3496 City Website: www.cstx.gov P.O. Box 9960 1101 Texas Avenue College Station, Texas 77842 CITY or Cou1:GE ST\TI< :" H41m< ~J TfXllJ A6.'I U1111YT'Jiry· 1 DATE: TO: FROM: SUBJECT: MEMORANDUM December 16, 2014 Steve Broussard, SteNt Assets, LLC , via USPS; P.O. Box 9262 College Station TX, 77845 Jessica Bullock, Staff Planner JONES LAW FIRM OFFICE (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: City of College Station Transmittal Letter Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment) One (1) complete sets of site civil construction documents One ( 1) 24x36 revised site plan One (1) 24x36 revised landscape plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Jessica Bullock at 979.764.3570. Attachments: Staff Review Comments PC : Deven Doyen, Schultz Engineering, LLC, via; deven@schultzengineeringllc.com Chris Noack, Noacklittle, via; chris@noacklittle.com P&DS Project No. 14-00900285 Planning & .Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE ·COLLEGE SB.T!ON ·TEXAS • 77842 TEL. 979.764 .. ?570 ·FAX. 979.764.3496 cst><.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Jones Law Firm Office (SP) 14-00900285 PLANNING 1. Please verify the use of this property. If there is a portion that is medical and a portion that is office, parking calculation should show both 1 :200 and 1 :250. 2. The table shows that 11 shared parking spaces are left for future development. Please verify that does not include parking spaces for this site. 3. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Reviewed by : Jessica Bullock Date: December 15, 2014 LANDSCAPING/STREETSCAPING/BUFFER 1. Please either revise the landscape plan to show the new points provided or the trees should be added back to the site. Reviewed by: Jessica Bullock Date: December 15, 2014 ENGINEERING COMMENTS NO. 1 1. This is College Station Water CCN, please fix the note on Erosion Control Notes # 6 which is stating Wellborn SUD Staff. Also this note seems more appropriate as a General Note instead of Erosion Control Note. 2. Please move the sewer service line out of the PUE. 3. Please Provide City of Bryan/College Station Standard details. Reviewed by: Kevin Ferrer Date: December 9, 2014 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: December 3, 2014 FIRE 1. Building will need Knox Box. Reviewed by: Steve Smith Date: December 9, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and I or site plan as soon as it is available. Email to: sweido@cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 4. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 5. Current service conduit routing shown is not acceptable. Contact CSU for service conduit design and routing. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 6. To discuss a·ny of the above electrical comments please contact Sam Weide at 979.764.6314. Reviewed by: Sam Weide Date: December 2, 2014 DATE: TO: FROM : SUBJECT: MEMORANDUM December 1, 2014 Steve Broussard, SteNt Assets, LLC, via USPS; P.O. Box 9262 College Station TX, 77845 Jessica Bullock, Staff Planner JONES LAW FIRM OFFICE (SP) Thank you for the submittal of your Site Plan -Commercial application. Kevin Ferrer, Graduate Engineer I, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, December 15, 2014. If you have questions in the meantime, please feel free to contact us. PC: Deven Doyen, Schultz Engineering , LLC, via; deven@schultzengineeringllc.com Chris Noack, Noacklittle, via ; chris@noacklittle.com P&DS Project No. 14-00900285 Pla11ni11g & Development Services P.O. BOX 9960 • l 101 TEXAS AVENUE · COLLEGE STATION · TEXAS · 77842 TEL. 9797 64.3570 ·FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: Jones Law Firm Office (SP) -14-00900285 PLANNING 1. No comments. Noted. Reviewed by: Jessica Bullock Date: January 7, 2015 ENGINEERING COMMENTS NO. 2 1. Please relocate the private Suddenlink line outside the PUE. The Sudden/ink line has been relocated outside the PUE. Reviewed by: Kevin Ferrer Date: December 30, 2014 CITY OF C OLLEGE STATION Home of Texas A&M University" FOR OFFICE USE ONLY CASE NO.: \4-k~ s DATE SUBMITTED: \2 11 q IN TIME: 2_,: 56 STAFF: _f\~j-...,.__ _____ _ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application. Case No.: -~~~~~~~~ [8] Existing Project Submittal. Case No.: 14-00900285 Project Name Jones Law Firm Office (SP) Contact Name _D_e_ve_n_D_o~ye_n __________ _ Phone Number 979. 764.3900 -------------- We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR [8] Site Plan D Grading Plan D Special District Site Plan [8] Other -Please specify below D Special District Building I Sign Response to Comments [8] Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Print Form November 25 , 2014 Development Services City of College Station College Station, Texas RE: LANDSCAPE DESIGN Office: 979.764.3900 Fax: 979.764.3910 JONES LAW FIRM OFFICE NORTH FOREST SUBDIVISION (BLOCK 1, LOT 1E-R2) COLLEGE STATION, To whom it my concern: Accompanying this letter are the construction plans for the Jones Law Firm Office North Forest Subdivision and the Constructed North Forest Professional Park Phase 2 Landscape Plan (City of College Station Project # 7-500257). The overall landscape plan required 5,757 total landscape points. The Constructed North Forest Professional Park Phase 2 Landscape Plan (City of College Station Project# 7-500257) provides 7,040 total landscape points. We have field verified that the existing landscaping is as was proposed on the previously approved plan. The BV Plastic Surgery project removed 6 non-canopy trees for total points removed of 240. The BV Plastic Surgery improvements resulted in 6,800 total landscape points which is greater than the 5,757 required, therefore the Jones Law Firm Office landscaping is in compliance with the overall site requirements. Sincerely, Deven Doyen, P .E. Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com CITY OP C OLLEGE STATION Home o/Texas A&M University" CASE NO.: PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application. Case No.: Existing Project Submittal. Case No.: 14-00900285 Project Name Jones Law Firm Office (SP) Contact Name .::cO..o:.e...:...ve=n_;_.::;;_D...:;.o,,_ye"-'n-'------------Phone Number...:...9_79'"-._76_4_.3_9'"""'0-'0 ________ _ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment lg] Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special District Site Plan lg] Other -Please specify below D Special District Building I Sign Response to Comments lg] Landscape Plan Plans for Stamping & Approval INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Ir : P~i~ Form January 8, 2015 Jessica Bullock Staff Planner Development Services City of College Station College Station, Texas Re: Jones Law Firm Office (SP) 14-00900285 & (NRA) 14-00900286 Dear Ms. Bullock: Attach is the response to comments for the Site Plan and the following: /8 -Sets of Civil Drawings V 1 -24"x36" Erosion Control Plan ~ 1 -24"x36" Grading Plan t' / 1 -Revised Landscape Plan V 5 -Copies of the NRA Drawings Sincerely, . \~ ~ v Deven L. Doyen, P.E. Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Office: 979.764.3900 Fax: 979.764.3910 Jessica Bullock From: Jessica Bullock Sent: To: Wednesday, January 07, 2015 8:15 AM 'Benjamin Mccarty' Subject: RE: Chad Jones Law Office Building Ok. From: Benjamin Mccarty Sent: Tuesday, January 06, 2015 5:19 PM To: Jessica Bullock Subject: RE : Chad Jones Law Office Building Jess, I spoke to the architect today about the additional sidewalk, and it won't be required at this time. Thank you, Benjamin McCarty Plans Examiner (Commercial & Multi-Family Projects) Building Division Planning & Development Services Dept. P: 979.764.3754 F: 979.764.3496 City Website: www.cstx.gov P .0. Box 9960 1101 Texas Avenue College Station, Texas 77842 C1n· of Cc u1:c;E STATION H•1111< efTou Ad-.\f URit'<f"li'1• From: Jessica Bullock Sent: Tuesday, January 06, 2015 4:49 PM To: Benjamin Mccarty Subject: RE: Chad Jones Law Office Building Got it, I am looking at the SP now and will add that comment. From: Benjamin Mccarty Sent: Tuesday, December 30, 2014 11:03 AM To: Jessica Bullock Subject: Chad Jones Law Office Building Jess, 1 The building has two tenant spaces, one for the law office and the second to be finished out at a later date by a tenant. The 2,000 sq ft unfinished tenant space will probably require to exit doors, which will require an additional sidewalk from that side exit door. So a side exit door will be on both sides {west and east sides) of the proposed building, with a necessary Accessible Route sidewalk from both side exit doors. Please have this reflected on the Site Plan. Thank you, Benjamin McCarty Plans Examiner {Commercial & Multi-Family Projects) Building Division Planning & Development Services Dept. P: 979.764.3754 F: 979.764.3496 City Website: www.cstx.gov P.O. Box 9960 1101 Texas Avenue College Station, Texas 77842 CITY Of COJJJ~GESTATI ON H~'"' efTn<AJ Ad-M Unit'Miry· 2 December 19, 2014 Jessica Bullock Staff Planner Development Services City of College Station College Station, Texas Re: Jones Law Firm Office (SP) 14-00900285 Dear Ms. Bullock: Attach is the response to comments for the Site Plan and the following: • 1 ~ Sets of Civil Drawings • 1 ~ Revised Site Plans • 1 ~ Revised Landscape Plan Sincerely, Deven L. Doyen, P .E. Civil Engineer - P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Office: 979.764.3900 Fax: 979.764.3910