Loading...
HomeMy WebLinkAbout14-287.-1:" C ITY OF C OLLEGE STATION Ho~ ofT=u A&M University" , ..4.}iL . - • ---ro·R:-o'tF'1ceusE ONLY CASE NO.: IL\ , d.81 DATE SUBMITTED: \ \ oa(?· f 4 TIME: 1~: () STAFF: ~~--"""'--~~~- PRELIMINARY PLAN APPLICATION MINIMUM SUBMITTAL REQUIREMENTS: ~ $932 Preliminary Plan Application Fee. ti!._ $233 Waiver Request to Subdivision Regulations Fee (if applicable). 0 Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. ~ Six (6) folded copies of plan. A revised mylar original must be submitted after approval. ~ Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, ~fk encumbrances, etc. l!J _)mpact study (if oversized participation is requested). [i1° The attached Preliminary Plan checklist with all items checked off or a brief explanation as to why they are not. Date of Optional Preapplication Conference ~~~~~~~~~~~~~~~~~~~~~~~- NAME OF PROJECT DM R tkx"'e..s ADDRESS \ ~;f.3(e IJ . °Dou.J\\ 0G_J RJ SPECIFIED LOCATION OF PROPOSED SUBDIVISION: APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name /bi/~-( !Z1te-$/;,/c , E-mail p? l"Vle5,',z/c@ ~s f X '/pV" Street Address Ol 2 o 2 J../0 11de:-I;~ City c:~ //., ?( 568-tz '1~ State "(eX-4 5 Zip Code 7717'C Phone Number 1 07oZ-27J-37£:1.. Fax Number PROPERTY OWNER'S INFORMATION (ALL owners must be identified. Please attach an additional sheet for multiple owners): Name m,Yoc /2, vt?.fi ti Jc Street Address 2. .2 02., WQod C /, 'J__\ E-mail _/Yl_l1_V1_c_.;;.5'._1...LJ4K ..... _.W.....__c_5l_.x_,_,.&/i_'fl._'I/' __ _ ,/ City -=-C°_d_,_//._~y_t"--...,,,,.56/1-o<Fr-'~b.._..._ko/,,__ ____ State _p,_?'_,t_'-=-'-+4~,,,c...5 __ Zip Code Phone Number 0/7q -ZJ7 .--37'(J.... ARCHITECT OR ENGINEER'S INFORMATION: Name t£n-.~t"IJ~u~ C Street Address =er .;.$ Arre E-mail /cu;0e . b11cke,ce_j/jtfienlirikrro.'A I. corn City 73nf an Phone Number ;;/fog -;._ "if1S- State TX Zip Code ....... 7-=-2~~0~3~--- Fax Number fcf/1-BO cf Revised 9/14 Page 1 of6 Total Acreage ~ft;_, 3._~-~-----Total No. of Lots ---'-;?_.__ __ _ R-0-W Acreage 0, Id I ------- Number of Lots By Zoning District A I ~/Q I / Average Acreage Of Each Residential Lot By Zoning District: __ /_, M=--O,J.-1 4/o I ---------'--- Floodplain Acreage __ _.,_"--A ______________________________ _ NOTE: Appropriate zoning for the proposed subdivision must be in place before this application can be considered complete. Are you proposing to dedicate park land by acreage or fee in lieu of land? ---------------~ Are you proposing to I develop the park I dedicate the development fee? (Check one) This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes ~o If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: City Project Number (if known): Date I Timeframe when submitted: Requested wavier to subdivision regulations and reason for same (if applicable): Revised 9/14 Page 2 of6 Regarding the waiver request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. (If~ alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way; 2. r The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan; 3. r A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4. r Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context; 5. r When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestrian, and Greenways Master Plan; Revised 9/14 Page 3 of6 6. I The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7. I The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6, Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. ~L Ow-/f/~/e- Signature and title Date Revised 9/14 Page 4 of6 PRELIMINARY PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Drawn on 24" x 36" sheet to scale of 100' per inch or larger. Include the words "PRELIMINARY PLAN - NOT FOR RECORD" in letters 1/2" high. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. Vicinity map which includes enough of~"""""'~ing area to show general location of subject property in relationship to College Station and its City Lim1 No scale required but include north arrow. vIT Title Block with the following information: J [B--Name and address of subdivider, recorded owner, engineer and surveyor. ~ Proposed name of subdivision (subdivision name & street names will be approved through Brazos County 911 ). ~ Date of preparation (including the date the plat was submitted and the dates of any revisions on the plat). ~ v[g-- co~~Gr­ ~ ~e\F' ~ tJi# ~ D y- Revised 9/14 ~ Engineer's scale in feet. ~ Total area intended to be developed. North Arrow. Location of current city limit lines and current zoning district boundary. The appropriate zoning district(s) must be in place for the proposed land uses before the application for a subdivision. Subdivision boundary indicated by heavy lines. Boundary must include all of parent tract. Descriptions by metes and bounds of the subdivision which shall close within accepted land survey standards. (Labeled on boundary lines, not separate metes and bounds description.) Primary control points or descriptions and ties to such control point, to which , later, all dimensions, angles, bearings, block numbers, and similar data shall be referred. The plat shall be located with respect to a comer of the survey or tract, or an original comer of the original survey of which it is a part. Name of contiguous subdivisions and names of owners of contiguous parcels of unsubdivided land, and an indication whether or not contiguous properties are platted. Location of the 100 Year Floodplain and Floodway, if applicable, according to the most recent available data. Topographic information, including contours at two foot (2 ft.) intervals, wooded areas, and flowline elevation of streams. Proposed land uses (in compliance with existing zoning district). The location and description with accurate dimensions, bearings or deflection angles and radii , area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Page 5 of6 Existing a-- G- ~ D D D w D D D D D D D Proposed D G- D D D D D ~ D w D D D D Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp. turn around unless they are shorter than 100 feet. Public and private R.O .W. locations and widths. (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance. Alleys. Well site locations. Pipelines. If carrying flammable gas or fuel, also show size of line, design pressure and product transported through the line. Utility services (water & sanitary sewer). All existing and proposed utilities of sufficient size/depth to meet the utility master plan and any future growth areas. Easements. Drainage structures and improvements induding underground storm sewer and all overland systems (flow line of existing watercourses) and showing where these will discharge. Proposed channel cross sections, if any. A number or letter to identify each lot or site and each block (numbered sequentially). Parkland dedication/greenbelt area/park linkages. All proposed dedications must be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation provided prior to being scheduled for P&Z Commission consideration. Greenways dedication. Public areas. Other public improvements, induding but not limited to parks, schools and other public facilities. D Proposed phasing. Each phase must be able to stand alone to meet ordinance requirements and infrastructure costs shown to be distributed evenly throughout the subdivision. Phases must be final platted in sequential order as shown or defined on the preliminary plan. D Are there impact fees associated with this development? D Yes D No Revised 9/14 Print Form Page 6 of6 .. TITLE REPORT GF No.: 144643 Certlftcadon Date: October 26, 2014 ExamlDer: DEG Property Description: BEING aU that certain 6.328 acre 118ct of land being situated In the J. CHILDRESS LEAGUE, A-95, Brazos County, Texas and being part of the land described in a Deed to ODie Dewitt Parsons, recorded In Volume 281, Page 184, Deed Records of Brazos County, Teicas, (DRBCT) and being more fully described as follows: · BEGINNING at a 518" Iron rod found In the SouthweSt Right-of-Way (ROW) line of Dowling Road In Northeast line of sald Parson's tract. Said Iron rod bears N 45° 24' 49" E, 350.00' from fence comer post marking East comer of said Parson's tract: · THENCE S 45° 02' og• W, 787.70' along Northwest fine ofTlmbercrest Subdivision recorded In Volume 332, Page 622, DRBCT to a 518" Iron rod found for comer; THENCE N 45° 24' 48" W, 349.73' along common Urie between this tract and David G. and Rose Schmidt 18.16 acre tract described In Deed recorded In Volume 1253, Page 26, Offtclal Records of Brazos County, Texas. (ORBCT) to a 518" Iron rod found for comer;' THENCE N 45° 00' 00" E. along Southeast line of G~rry I. Saum 57.01 acre tract described in a Deed recorded In Volume 2027, Page 236, ORBCT pass ~518" Iron rod found for reference at 782.70' and continue for a total distance of 787. 70' lo a cross-tie fence comer post found for comer In Southwest ROW line of Oowftng ROid; . THENCE S 45° 24' 49" E, 350.22' along said ROW~ to the POINT OF BEGINNING, and containing 6.328 acres or land, more or less. NOTE: The Company Is prohibited from Insuring the!area or quantity of lhe land described herein. Arr/ statement In the above legal description of the area Qr' quantity of land ls not a representation that such area or quantity Is oorrect. but is made only for lnforinationat and/or Identification purposes. Tide Vested In: Michael 0. Ruesink and Denise F. Ruesink Vesting Deed to owners shown herein was daled May 25, 2006 and recorded in Volume 7347, Page 280, Oftlclal Records, Brazos County, TeKaS. · Subtect to: Deed of Trust to secure a Note: Granter: Michael o. Ruesink a/kla Michael David Ruesink and spouse, Denise F. Ruesink a/k/a Denise Fulton Ruesink · Trustee: Ben R. Novosad Beneficiary: Capital Farm Credit, FLCA Amount: $80,000.00 Dated: May 25, 2006 ' Recorded: Volume 7347, Page 284, Oftlcial Records, Brazos County, Texas. Reatrlcdom: None of Record Exceptions: Blanket Easement: From: Vera H. Parsons To: City of Bryan Dated: December 19, 1949 Recorded: Volume 141, Page411 , Deed Records, Brazos County, Texas. Easemenl: From: Ollie Dewitt Parsons To: Wellborn Water Supply Corporation Daled: June 4, 1971 Recorded: Volume 295, Page 412, Deed Records, Brazos County, Texas. Easemenl: From: 0 . D. Parsons To: Producer's Gas Company Daled: June, 1984 Recorded: Volume 770, Page 553, Official Records; Brazos County, Texas. Easement: From: Ollle 0. Parsons To: Proc:lucer'sGasCompany Dated: Oclober 23, 1984 Recorded: Volume 776, Page 536, Official Records; Brazos County, Texas. Easement: From: OHie D. Parsons To: Producer's Gas Company Dated: October 18, 1984 Recorded: Volume 793, Page 136, Offlclal Record~ Brazos County, Texas. Easement: From: Ollie Dewitt Parsons To: Ferguson Crossing Pipe Line Company Dated: May 9, 1984 Recorded: Volume 704, Page 113, Official Records~ Brazos County, Texas. Easement: From: Mk:hael D. Ruesink, et ux To: City of Bryan d/b/a 8ry9'1 Texas utilities Dated: April 30, 2007 Recorded: Volume 8272, Page 115, Official Recorcls. Brazos County, Texas. Mlneral Deed: By: Ollle Dewitt Parsons and Imogene V. Parsons To: John Dewitt Parsons Dated: November 1, 1984 Recorded: Volume 738, Page 807, Official Records, Brazos County, Texas. Tiiie to said Interest has not been lnvesligated subsequenl to the dale of the afoi'alald Instrument Mlneral Deed: By: Ollie Dewitt Parsons and Imogene V. Parsons : To: Dora Jean Maurer · Dated: November 1, 1984 . Recorded: Volume 738, Page 810, Official Records; Brazos County, Texas. Title to said lnlerest has not been Investigated subsequent to the date of the aforesaid Instrument. Mineral Reservation In Deed: By: The Federal Land Bank of Houston To: J. B Adams Dated: August 24, 1935 Recorded: Volume 89, Page 546, Deed Records, Brazos County, Texas. Title to said Interest has not been Investigated subsequenl to lhe date of lhe aforesaid Instrument Mineral Reseivation In Deed: By: Olfie Dewitt Parsons, et ux To: Kermit Drew Naumann, el ux Dated: December 4, 2000 Recorded: Volume 3999, Page 116, Official Records, Brazos County, Texas. Title to said interest has nol been Investigated subsequenl to the dale of the aforesaid Instrument. ! 011 and Gas Lease, and all terms, condttlons and stipulations th8t'ein: Lessor: Ollie Dewitt Pats0ns Lessee: Lone Star Exploration Corporation Dated: May 25, 1983 Recorded: Volume 622, Page 95, Official Records, ~razos County, Texas. Tiiie to said Interest has not been Investigated subsequent to the date of the afof'.esald Instrument. Upoa examluadon of the public records Brazos <tounty, Texas, we fhd no exception to title of the 1ubject property other than those sho'MI above. This Title Report ls fSS1ed wfth the eipreu undentandlng, evideoc:ed by acceptance of sam~ that the UabDlty of the undersigned Is limited to the aclual monetary consideration paid for sami Unlvenfty Tide Company DATE: TO: FROM: SUBJECT: February 9, 2015 C ITY or C OLLEGE STATION Home o/Texas A&M University" MEMORANDUM Mike Ruesink, via ; mruesink@cstx.gov / Jessica Bullock, Staff Planner DMR ACRES (PP) Staff reviewed the above-mentioned preliminary plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting : One (1) Letter from Wellborn SUD One (1) Fire Flow Report Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station . Please note that th is application wi ll expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made. Once your item has been scheduled for the P&Z meeting , the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Kerr Surveying , LLC, via; louise.barker@suddenlinkmail.com / P&DS Project No. 14-00900287 Planning & Development Sel'vices P.O. BOX 9960 • 1101 TEXAS AVENUE ·COLLEGE STAI10N ·TEXAS • 77842 TEL. 979.764.3570 ·FAX. 979.764.:3496 csb<.gov/devservices .. STAFF REVIEW COMMENTS NO. 2 Project: DMR ACRES (PP) -14-00900287 PLANNING 1. The following engineering comments still need to be addressed . Reviewed by: Jessica Bullock Date: 2/2/15 ENGINEERING COMMENTS NO. 2 1. Please provide a letter from Wellborn SUD indicating their intent to serve these properties in the future. 2. Since 1,000 gpm is the required residential fire flow, we will need a copy of the fire flow test indicating that the nearby hydrant can provide this demand . Reviewed by: Erika Bridges Date: 2/6/15 C ITY OF C OLLEGE STATION! ---------------·"""" ... --......... __ ""'-=-------~ Home o/Texas A&M University• ~• e p¢t14 MEMORANDUM DATE: January 22 , 2015 TO: Mike Ruesink, via; mruesink@cstx.gov FROM: Jessica Bullock, Staff Planner SUBJECT: DMR ACRES (PP) Staff reviewed the above-mentioned preliminary plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24" x 36" copy of the revised Preliminary Plan ; and One (1) Letter from Wellborn SUD One (1) Fire Flow Report Upon receipt of the required documents for the Planning & Zoning meeting , your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Kerr Surveying, LLC, via; louise.barker@suddenlinkmail.com P&DS Project No. 14-00900287 Pla11niug & Development Services P.O. BOX 9960 • 110 l TEXAS AVENUE • COLLEGE STATION ·TEXAS • 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 est><. gov I de vs ervi ces STAFF REVIEW COMMENTS NO. 2 Project: DMR ACRES (PP) -14-00900287 PLANNING '4. Please label the city limits on the preliminary plan as well. 2. I am checking with the county to see if they have any additional comments regarding the private cross access easement. Reviewed by: Jessica Bullock Date: 1/21/15 ENGINEERING COMMENTS NO. 2 1. Please provide a letter from Wellborn SUD indicating their intent to serve these properties in the future. 2. Since 1,000 gpm is the required residential fire flow, we will need a copy of the fire flow test _ )ndicating that the nearby hydrant can provide this demand. ~ Note #12 should also include a statement that no structures or fences shall be placed in the easements that could block or restrict drainage. Reviewed by: Erika Bridges Date: 1/20/15 PLANNING & DEVELOPMENT SERVICES CrrY OF CoUEGE ST.l\TlON TRANSMITIAL COVER LETTER Please check one of the options below to clearly define the purpose of your submittal. C Documents for a previous incomplete submittal isting Project Submittal Project Name: I "-D/J.. R. ft1i=e' S Contact Name: j ~ :5.v'<V ~j v::.J Phone No.: j ~01?-c}f Cf~ We are transmitting the following for Planning & Development Services to review and comment. (Please check fill that apply). C Comprehensive Plan Amendment r. Rezoning Application C Master Development Plan ,ereliminary Plat C Final Plat C Development Plat C Site Plan C Special District Site Plan I Special District Building I Sign C Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS D Non-Residential Architectural Standards 0 Irrigation Plan OVariance Request 0 Development Permit D Conditional Use Permit 0 FEMA CLOMA/CLOMR/LOMA/LOMR O Grading Plan O Other -Please specify below All infrastructure documents must be submitted as a complete set The following are included in the complete set: C Waterline Construction Documents [i TxDOT Driveway Permit J; TxDOT Utility Permit C Drainage Letter or Report r: Fire Flow Analysis I Other -Please specify Special Instructions: 29-Aug.08 [J Sewerline Construction Documents Ci Drainage Construction Documents O Street Construction Documents D Easement Application . ........ .. ... j Jessica Bullock From: Jessica Bullock Sent: To: Thursday, January 08, 2015 2:41 PM 'Louise' Subject: RE: DMR Acres (PP) Louise, I have taken a look at the response to staff comments. Please submit the hard copies for review and this email will count as the memo. Let me know if you have any questions, Jessica Bullock Staff Planner Planning & Development Services City of College Station P.O. Box 9960 1101 Texas Avenue College Station, TX 77842 Office: 979 .7 64.37 57 Fax: 979.764.3496 Email: jbullock@cstx.gov Website: www.cstx.gov From: Louise [mailto:louise.barker@suddenlinkmail.com] Sent: Thursday, December 18, 2014 12:47 PM To: Crystal Derkowski; Michael Ruesink Cc: Jessica Bullock; Erika Bridges; 'Gary Arnold' Subject: RE: DMR Acres (PP} All, I received the comments for DMR Acres preliminary plat. I have attached a marked pdf file to address some of the comments at addressed below. Planning .fl. We will add 10' to the ROW dedication and adjust the lot boundary for Lot 2 accordingly to make sure of the 1+ acre size /2. Please see the notes on the original plat addressing the pipeline easements as indicated on the attached pdf file -there are no defined easements crossing this tract and no active pipelines on the tract Brazos County 1. The owner plans to use a shared driveway between Lot 1 and Lot 2 -we will create a "private shared access easements" to cover this 2. We will show the nearest location of the city limits on the vicinity map with the submittal of revisions 3. New addresses will be: lot 1-12234 North Dowling Lot 2 -12236 North Dowling Engineering 1 1. Brazos County Subdivision regulations require a 20' easement centered on all interior lot lines and the boundary of the subdivision. Unless the County will agree to a 10' easement then the 20' will need to remain. 2. We will be sending the field crew back to the property to locate the creek channel(s) on the ground 3. Drainage easement will be created over the creek channel as located on the ground 4. Water lines were already labeled -see the attached marked pdf file for verification 5. The fire hydrant was located on the ground. Note that I have indicated the 750' radius from the fire hydrant on the attached pdf file. This should be more than adequate for the existing and proposed development on Lot 2. 6. A copy of this preliminary plat was sent to Wellborn SUD, 911 and the Health Department for review. These parties should be providing the necessary documentation. 7. See "planning" note 2 -there are no pipelines or easements that cross this tract-all of the defined easements listed on the title report lie southwesterly of this tract. If there are any other comments please contact me to discuss. I will be submitting the revised copies of the preliminary plat once we have the field work done for the drainage issue . Louise Barker Kerr Surveying From: Crystal Derkowski [mailto:cderkowski@cstx.gov] Sent: Wednesday, December 17, 2014 3:28 PM To: Michael Ruesink; 'louise.barker@suddenlinkmail.com' Cc: Jessica Bullock; Erika Bridges Subject: DMR Acres (PP) Good afternoon! Please see the attached memo and comments regarding your project. Thank you! Cry;t;-ab VerkowJ/cl/ Staff Assistant City of College Station Planning and Development Services 979.764.6361 Phone 979. 764.3496 Fax Home of Texas A&M University City of College Station Home of Texas A&M University ® 2 ,.,,, ------"11111i111.l~~ CITY OF CouJEGE STATION~------------------~ Home o/Texas A&M University• -----------------J rrr:zyi2 MEMORANDUM DATE: December 17, 2014 TO: Mike Ruesink, via; mruesink@cstx.gov FROM : Jessica Bullock, Staff Planner SUBJECT: DMR ACRES (PP) Staff reviewed the above-mentioned Preliminary Plan as requested . The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: __ One ( 1) 24" x 36" copy of the revised Preliminary Plan Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid . Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 If you have any questions or need additional information , please call me at 979. 764.3570. Attachments: Staff review comments cc: Kerr Surveying, LLC , via; louise.barker@suddenlinkmail.com Gary Arnold, Brazos County Planning & Traffic, via fax 775.0453 P&DS Project No. 14-00900287 Plt1nning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE· COLLEGE STAfION ·TEXAS · 77842 TEL. 979.764.3570 ·FAX. 979.764 .. '3496 cstx.e:ov/devservices PLANNING Staff Review Comments -No. 1 DMR Acres -14-00900287 1. Please revise the Right-of-Way dedication to show 25 feet. This may effect the boundary for lot 2. Please ensure this lot will meet the 1 acre minimum. 2. In the title report there are easements for Producer's Gas Company and Ferguson Crossing Pipe Line Company. If still active, please label size, design pressure and product type. 3. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. Reviewed by: Jessica Bullock Date: December 15, 2014 BRAZOS COUNTY 1. Is shared access being considered or will existing driveway serving Lot 2 be relocated out of Proposed 20' PUE? Please clarify. 2. Indicate City of College Station City Limits on Preliminary Plan and on Vicinity Map. 3. Items to keep in mind when we move to the Final Plat process, • Add required Certifications for Final Plat Submittal. • With Final Plat submittal, provide adequate Drainage Easements to provide for existing and any developed flows. Contours indicate locations of 2 possible private drainage easements ......... . • Provide Letter of Service from Wellborn SUD (contact Stephen Cast) with Final Plat submittal. • Provide Letter of Acknowledgement from Brazos County Health Department (Don Plitt) with Final Plat Submittal. • With Final Plat Submittal -please provide Letter from Brazos County 911 that new addressing has been provided. (contact Mitchell Reeves) • With Final Plat Submittal -please provide a completed Brazos County Plat Application to this department. Reviewed by: Gary Arnold Date: December 1, 2014 ENGINEERING COMMENTS NO. 1 1. The side lot easements can be reduced to 10-ft. 2. Please show and label Hopes Creek Tributary No.11 crossing Lot 1. 3. A drainage easement is required for water courses crossing the property. Please show and label and/or add a note regarding this easement. 4. Label the existing waterline size. 5. The rural residential fire flow requirement is 1,000 gpm from a fire hydrant within 750-ft of the structure. It appears that the existing fire hydrant is not close enough to cover the existing structures, so a fire hydrant would need to be added. Please show a proposed fire hydrant on-site. 6. Provide a letter from Wellborn SUD indicating their intent to serve these properties in the future. 2 of 3 7. Our records indicate that there is a Southwestern Gas Pipeline crossing the tract. Please verify and show/label the pipeline/easement (if confirmed). Reviewed by: Erika Bridges Date: December 16, 2014 3 of 3 ~ ............. ...., ... __________ CITY OF COLLEGE STATION~--------------·11"" ... -Home of Texas A&M University• ""' MEMORANDUM DATE: December 1, 2014 TO: Mike Ruesink, via ; mruesink@cstx.gov FROM: Jessica Bullock, Staff Planner SUBJECT: DMR ACRES (PP) Thank you for the submittal of your Preliminary Plan application. Erika Bridges, Graduate Engineer 11 , and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, December 15, 2014. If you have questions in the meantime, please feel free to contact us. PC: Kerr Surveying , LLC, via; louise.barker@suddenlinkmail.com P&DS Project No. 14-00900287 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE• COLLEGE STA.rTON ·TEXAS · 77842 TEL. 979.764 . .3570 ·FAX. 979.764.3496 cstM.gov/devservices Jessica Bullock From: Sent: To: Cc: Louise < louise.barker@suddenlinkmail.com > Thursday, December 18, 2014 12:47 PM Crystal Derkowski; Michael Ruesink Subject: Jessica Bullock; Erika Bridges; 'Gary Arnold' RE: DMR Acres (PP) Attachments: DMR-PRELIM .pdf All, I received the comments for DMR Acres preliminary plat. I have attached a marked pdffile to address some of the comments at addressed below. Planning 1. We will add 10' to the ROW dedication and adjust the lot boundary for Lot 2 accordingly to make sure of the 1 + acre size lr--D eel .\a d.a ~Please see the notes on the original plat addressing the pipeline easements as indicated on the attached pdf file -there are no defined easements crossing this tract and no active pipelines on the tract Brazos County 1. The owner plans to use a shared driveway between Lot 1 and Lot 2 -we will create a "private shared access easements" to cover this B/ We will show the nearest location of the city limits on the vicinity map with the sub.mittal of revisions 3. New addresses will be: lot 1 -12234 North Dowling Lot 2 -12236 North Dowling Engineering 1. Brazos County Subdivision regulations require a 20' easement centered on all interior lot lines and the boundary of the subdivision. Unless the County will agree to a 10' easement then the 20' will need to remain. 2. We will be sending the field crew back to the property to locate the creek channel(s) on the ground 3. Drainage easement will be created over the creek channel as located on the ground 4. Water lines were already labeled -see the attached marked pdf file for verification 5. The fire hydrant was located on the ground. Note that I have indicated the 750' radius from the fire hydrant on the attached pdf file. This should be more than adequate for the existing and proposed development on Lot 2. 6. A copy of this preliminary plat was sent to Wellborn SUD, 911 and the Health Department for review. These parties should be providing the necessary documentation. 7. See "planning" note 2 -there are no pipelines or easements that cross this tract-all of the defined easements listed on the title report lie southwesterly of this tract. If there are any other comments please contact me to discuss. I will be submitting the revised copies of the preliminary plat once we have the field work done for the drainage issue. Louise Barker Kerr Surveying From: Crystal Derkowski [mailto:cderkowski@cstx.gov] Sent: Wednesday, December 17, 2014 3:28 PM To: Michael Ruesink; 'louise.barker@suddenlinkmail.com' Cc: Jessica Bullock; Erika Bridges Subject: DMR Acres (PP) Good afternoon! Please see the attached memo and comments regarding your project. 1 Thank you! CryJt-ab VerkowJ/ci/ Staff Assistant City of College Station Planning and Development Services 979.764.6361 Phone 979. 764.3496 Fax Home of Texas A&M University City of College Station Home of Texas A&M University ® 2 Jessica Bullock From: Carol Cotter Sent: To: Tuesday, December 02, 2014 10:25 AM Erika Bridges; Jessica Bullock Subject: FW: DMR Acres_Subdivision Prelim Plat From: Robert A. Munger [mailto:RAMunger@brazoscountytx.gov] Sent: Tuesday, December 02, 2014 9:33 AM To: Louise; 'Brad. kerr' Cc: Karen Tyler; Gary Arnold; Carol Cotter Subject: RE: DMR Acres_Subdivision Prelim Plat Louise: As long as this property remains in the County, there would not be a requirement for further platting in the future on the larger tract. If it was annexed, different plat laws would govern such that further platting would be necessary. I have reviewed the subdivision based on information provided and with the assumption that future platting is not needed. I can't review it based on "intent" as "intent" may always change. I believe the drainage easements need to be addressed and I stand by the original comments. Thanks, Alan From: Louise [mailto:louise.barker@suddenlinkmail.com] Sent: Tuesday, December 02, 2014 8:21 AM To: Robert A. Munger; 'Brad. kerr' Cc: Karen Tyler; Gary Arnold; 'carol Cotter' · Subject: RE: DMR Acres_Subdivision Prelim Plat Alan, Once I receive initial comments from the City of College Station I will address your comments on the preliminary plat along with those from the City, but meanwhile I have one question. Since the larger lot {the remainder tract) is not being developed at this time we hesitate to define specific private drainage easements. Would it be sufficient to make a notation on the plat something to the effect of "There shall be a 40' private drainage easement centered on all existing natural drainage flows." The owner has indicated that sometime in the future they may decide to further divide this area and the drainage issues would be dealt with by an engineer at that time. This would alleviate the need for having to abandon easements on future replats. Please let me know your thoughts on this. Thanks! Louise Barker Kerr surveying From: Robert A. Munger [mailto:RAMunger@brazoscountytx.gov] Sent: Sunday, November 30, 2014 6:44 PM To: louise.barker@suddenlinkmail.com; Brad. kerr (brad.kerr@suddenlinkmail.com) Cc: Karen Tyler; Gary Arnold; carol Cotter (ccotter@cstx.gov) Subject: DMR Acres_Subdivision Prelim Plat 1 Louise/Brad: Attached comments for recent preliminary plat submittal are provided for your further review. Carol: Please forward County comments to assigned City reviewer. Thanks, R. Alan Munger, PE County Engineer Brazos County Road & Bridge 2617 Highway 21 West Bryan, TX 77803 Phone: 979-822-2127 x 3026 2 Jessica Bullock From: Sent: To: Carol Cotter Tuesday, December 02, 2014 9:13 AM Erika Bridges; Jessica Bullock Subject: Fwd : DMR Acres_Subdivision Prelim Plat Attachments: DMR Acres_Subdivision Prelim Plat.doc; ATTOOOOl.htm Fyi Sent from my iPhone Begin forwarded message: From: "Robert A. Munger" <RAMunger@brazoscountytx.gov> Date: November 30, 2014 at 6:44:29 PM CST To: "louise.barker@suddenlinkmail.com" <louise.barker@suddenlinkmail.com>, "Brad. kerr (brad.kerr@suddenlinkmail.com)" <brad.kerr@suddenlinkmail.com> Cc: Karen Tyler <KTyler@brazoscountytx.gov>, Gary Arnold <GArnold@brazoscountytx.gov>, "Carol Cotter (ccotter@cstx.gov)" <ccotter@cstx.gov> Subject: DMR Acres_Subdivision Prelim Plat Louise/Brad: Attached comments for recent preliminary plat submittal are provided for your further review. Carol: Please forward County comments to assigned City reviewer. Thanks, R. Alan Munger, PE County Engineer Brazos County Road & Bridge 2617 Highway 21 West Bryan, TX 77803 Phone: 979-822-2127 x 3026 1 ~ ~ DMR Acres Subdivision Lot 1 & 2 Brazos County Review Prelim Plat Review Comments and Suggestions by Munger, P.E. (979) 822-2127 01 December 2014 Sheet No Description Plat Comment: Is shared access being considered or will existing driveway serving Lot 2 be relocated out of Proposed 20' PUE? Please clarify. Plat Comment: Indicate City of College Station City Limits on Final Plat and on Vicinity Map. Plat Comment: Add required Certifications for Final Plat Submittal. Plat Comment: With Final Plat Submittal -please verify that ROW width will comply with City of College Station requirements of a Major Collector (80' minimum). Yi of required dedication to achieve 80' width is needed (looks close, but a more detailed fence survey may be needed). Plat Comment: With Final Plat submittal, provide adequate Drainage Easements to provide for existing and any developed flows. Contours indicate locations of 2 possible private drainage easements .......... Plat Comment: Provide Letter of Service from Wellborn SUD (contact Stephen Cast) with Final Plat submittal. Plat Comment: Provide Letter of Acknowledgement from Brazos County Health Department (Don Plitt) with Final Plat Submittal. Plat Comment: With Final Plat Submittal -please provide Letter from Brazos County 911 that new addressing has been provided. (contact Mitchell Reeves) Plat Comment: With Final Plat Submittal -please provide a completed Brazos County Plat Application to this department. City of College Station Administrative Approval for Required Parkland Dedications of Less than Five Acres 1. Applicant Name: ______________ M_ik_e_R_u_es_i_n_k ________________ _ Address: ______________ _,_1=22=3=--6~N-'-.=D--=o~w~li~n~g_,_R~o~a~d _______________ _ P hone: _____ .=...97'-"9=---_,_7""""7-'-7 ---=3'-'-7--'4=2______ E-Mai I: mruesink@cstx.gov 2. Development Name: DMR Acres !!fdfn e/pµJ Project#: __ ~14~-2=8~7 __ /-/:- Development Location: ___________ ---'-12=2=3"""'6'-'-'N-'-. =D""""o"""w""'"li'""'ng"'-'-R""'o"""a""'d ____________ _ 3. Dwelling Units: _1_ Single Family ___ Multi-family Units, located in Neighborhood Park Zone _1""""8'---- _1_ Single Family Multi-family Units, located in Community Park Zone B 4. Development Fees and Dedication Requirements: a. Land Dedication or Fee in Lieu of Land (Choose One): Neighborhood Community Single Family: One (1) acre per 117 DU's ____ ac One (1) acre per 128 DU's ___ ac = ______ ac Multi-family: One (1) acre per 117 DU's ____ ac One (1) acre per 128 DU's ___ ac = ______ ac TOTAL = ______ Acres -OR- Fee Paid in Lieu of Land Dedication Neighborhood Community Single Family: @ $274.00 per DU $ _--=2"'-7_,_4 __ @ $250.00 per DU $_--'2=5""'0 __ = $ __ ---=5=24-'---- Multi-family: @$274.00 per DU $ ____ _ @ $250.00 per DU $ ____ _ = $ ____ _ TOTAL (Neighborhood and Community) = $ 524 b. Development Fee: Neighborhood Community Single Family @ $362.00 per DU $ 362 Single Family@ $375.00 per DU $ ~3~7=5 __ = $ 737 Multi-family @ $362.00 per DU $ ___ _ Multi-family@ $750.00 per DU $ __ _ =$ __ _ TOTAL (Neighborhood and Community) = $ 737 5. Comments: Fees are assessed on the addition of one lot with this preliminary plan. The City of College Station agrees to accept: GRAND TOTAL (Neighborhood and Community) 1 Units x $1261 = $ 1261 ------------- Land Dedication ---------- Name Date WINN PROFESSIONAL ENGINEERS AND CONSTRUCTORS, LLC Texas Registered Firm No. F-7846 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT Date: Water System Owner: Development Project: Flow Test Location: Nozzle size (in.): Pitot Reading (psi): Flowrate (gpm): Pressure Gauge Location: Static Pressure (psi): Residual Pressure (psi): 2/11/2015 Wellborn SUD Jeremy Boyd Service Fire Hydrant near 12318 N. Dowling Rd ., College Station, TX 2.5 60 1,300 (from chart) Discharge Coeff: (c) = 0.90 Flowrate Formula: QF = 29.84cd2p112 c =discharge coeff. d =orifice size (in.) p = pitot pressure (psi) Hose bib on nearby house, 4655 Rock Prairie Road, College Station 71-72 63 Computed Discharge at 20 psi Residual Pressure (gpm): QR= 1,994 Discharge Formula: Note: The flow test and report were prepared in accordance with NFPA 291. Testing Witnessed and Recorded by: Report Prepared by: Others Present: William R. Dierksen, P.E. Walter T. Winn, Jr., P.E. Clendon Adams (Wellborn SUD) Jonathan Provazek (Wellborn SUD) February 16, 2015 Mr. Stephen Cast Wellborn Special Utility District P.O. Box 250 Wellborn, Texas 77881 WINN PROFESS IO AL ENGINEERS AND CONSTRUCTORS, LLC via Email and US Mail RE: Jeremy Boyd Fire Flow Test Dear Stephen: Our Mr. Will Dierksen, P.E. witnessed a fire hydrant flow test conducted by Wel lborn Special Utility District personnel, Clendon Adams and Jonathan Provazek. The results of the testing are shown in the attached report prepared in accordance with NFPA 291. Our calculations indicate that approximately 1,994 gpm should be available from the hydrant when operated with a residual pressure of 20 psi. We appreciate the opportunity to provide this information. Please do not hesitate to call if you have any questions or comments. Sincerely yours, Winn Professional Engineers & Constructors, LLC Texas Registered Firm No. F-7846 ~ . Walter~r., P.E. Principal WTW/pkw Attachment e:~e,ROJECIS.102-WE\Jeremy Boyd Service\Fire Flow Test Ltr 021615.doc 505 Padon • P. 0. Box 2727 • Longview, Texas 75606 t. 903-553-0500 • f. 903-553-0555 • www.winnpec.com /4-:J.8 "! PLANNING & DEVELOPMENT SERVICES J-/J-3 /!5 /D.'36. &sr em· oF CoLLEGE ST...r10N TRANS MITT AL COVER LETTER Please check one of the options below to clearly define the purpose of your submittal. C::: Documents for a previous incomplete submittal l[2"6isting Project Submittal Project Name: I J) µ (C__ ~e.-5 Contact Name: j i;i(i J;n.J~ IA.-~ Phone No.: I q\~~ _ -q~ We are transmitting the following for Planning & Development SeNices to review and comment. (Please check fill that apply). C:::Comprehensive Plan Amendment r Rezoning Application C::: Master Development Plan l)tPreliminary Plat tFinal Plat C Development Plat CSite Plan C::: Special District Site Plan I Special District Building I Sign C::: Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS D Non-Residential Architectural Standards 0 Irrigation Plan OVariance Request [j Development Permit D Conditional Use Permit 0 FEMA CLOMNCLOMR/LOMNLOM R O Grading Plan O Other -Please specify below All infrastructure documents must be submitted as a complete set. The following are included in the complete set: [J Waterline Construction Documents fJ TxDOT Driveway Permit J; TxDOT Utility Permit C Drainage Letter or Report r. Fire Flow Analysis I Other -Please specify Special Instructions: 29-Aug-08 0 Sewerline Construction Documents [J Drainage Construction Documents O Street Construction Documents D Easement Application ...................... j PLANNING & DEVELOPMENT SERVICES \4. i,~-'\ O\ \z~)\S \ , .. \0 Cm· OF Col..llGE ST!1:r10N TRANS MITT AL COVER LETTER ~~ Please check one of the options below to clearly define the purpose of your submittal. C Documents for a previous incomplete submittal C:: Existing Project Submittal Project Name: I DMK Aee..t:s Contact Name: I fur= 5JnJQ-{'it'\j Phone No.: I ~0g / 3-tqs-' We are transmitting the following for Planning & Development Services to review and comment. (Please check fill that apply). CComprehensive Plan Amendment r. Rezoning Application C Master Development Plan W Preliminary Plat CFinal Plat C Development Plat C:: Site Plan C Special District Site Plan I Special District Building I Sign C Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS O Non-Residential Architectural Standards 0 Irrigation Plan OVariance Request [j Development Permit D Conditional Use Permit 0 FEMA CLOMA/CLOMR/LOMA/LOMR O Grading Plan D Other -Please specify below All infrastructure documents must be submitted as a complete set The following are included in the complete set: C Waterline Construction Documents [i TxDOT Driveway Permit J; TxDOT Utility Permit C Drainage Letter or Report r. Fire Flow Analysis I Other -Please specify Special Instructions: 29-Aug-08 ----- 0 Sewerline Construction Documents [J Drainage Construction Documents O Street Construction Documents O Easement Application .. ........ .. .. J ------- Wellborn Special Utiliry District February 18, 2015 Jeremy Boyd Re: DMR Acres Development Mr. Boyd: Wellborn Special Utility District has reviewed and approved the DMR Acres Development and wil l provide water service to the property. Please contact my office if additional information is needed. P.O. C3ox 250 • 4118 Greens f'rairie Rd.• Wellborn. TX 77881 • 979.690.9799 •Fax 979.690.1260 February 10, 2015 Mr. Stephen Cast Wellborn Special Utility District P.O. Box 250 Wellborn, Texas 77881 WINN PROFESSIONAL ENGINEERS AND CONSTRUCTORS, LLC RE: Jeremy Boyd Service Study N Dowling Rd. and Rock Prairie Rd. W Development Dear Stephen: The current KYPipe model for the Wellborn SUD Main System was used to perform a water service analysis for a new service for Jeremy Boyd to be located on a one acre tract near the corner of N Dowling Rd. and Rock Prairie Rd. W, in the extraterritorial jurisdiction of College Station, Texas. Our analysis indicates that service is available to this location and that the Wellborn SUD system is capable of providing the minimum fire flow requirements for the City of College Station. The City's fire flow requirement for residential service is to provide 1,000 gpm from a fire hydrant at a minimum operating pressure of 20 psi while supplying the peak demand of 0.76 gpm per connection to the system. Mr. Boyd will need to be sure that the structure(s) to be constructed on the property are within 500' of a fire hydrant. The existing fire hydrants in that area may be used, or a new hydrant may need to be installed on one of the water lines in that area. Depending on the orientation of the property and location of the structures, it appears that the property can be served from existing 8", 12", or 18" lines in that area. We appreciate the orportunity to provide this information. Please do not hesitate to call if you have any questions or comments. Sincerely yours, Winn Professional Engineers & Constructors, LLC Texas Registered Firm No. F-7846 --------------14\PROJEGf.&\02..W~erllmy..Boy.d.SeDli~er.emy..ll.oy.d.Set:Y.il:e..stu!iy..021015.doc SO" PHdon • P 0. Bt x 2727 • L ngview, Texn$ 75606 t. 903-553-05(10 • t. 903-553·0555 • ''''1w.winnpec.co111