HomeMy WebLinkAbout14-39FOR OFFICE USE O~
CASENO. 1~-3v/ tj
DATE SUBMITTED: • 11 · I
C ITY OF Cou.EGE STATION
Home of Texas A&M Universiry• SITE PLAN APPLICATION
GENERAL
TIME: I~
STAFF: ~
j rgj
D
D
%
D
D
MINIMUM SUBMITTAL REQUIREMENTS:
$932 Site Plan Application Fee. ~·vusy-i{t-:gq;
$350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable).
$600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
Application completed in full . This application form provided by the City of College Station must be used
and may not be adjusted or altered.
Fourteen (14) folded copies of site plan. t1t1ly JJe-t:i) j ,,.ft e~h
One (1) folded copy of the landscape plan. ;J /ft
One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate
Building Review (if applicable).
D Building elevations to scale for all buildings.
D A list of building materials for all facade and screening.
D Color samples for all buildings or list colors to be used from the approved color palette.
D Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov.
D Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
D Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
D Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
D The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference -=;(_'_-_/ti-'----/_</ ___________ _
NAME OF PROJECT Sfr1Div..M. \J 1 '-W affir-p.,___
ADDRESS 400 ty\ (.\<lAOA-:t>wa h CL s . 7J&c/o
LEGAL DESCRIPTION (Lot, Block, Subdivision) _______________________ _
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name .Le.S ;;;<.;k.< E-mail US -~"£+-Y:=~ ~~r'\.S?G4A~, l'c,/>-1
Street Address "11~ $,.f-~Dn ?'1Jh
City t},;1¥= $/g~
Phone Number ~3-'537-t51 72&
PROPERTY OWNER'S INFORMATION:
Name F\<;?ed ~uAM: ~d~r
Street Address 3M UA . O'f'... CS+-,
City ule,<;J-~ I~
Phone Number 41;-, 39~ t> 3S S"""
1/11
State
Fax Number
State (I/A
Fax Number
Zip Code 0/089
<-/13-78)-12. 77
Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION:
Name
Street Address
City _________ Zip Code
Phone Number Fax Number -----------------
OTHER CONTACTS (Please specify type of contact):
Name E-mail
Street Address
City ------------------State _________ Zip Code
Phone Number Fax Number
Current zoning ---------------------------~---------
Present use of property
Proposed use of property
Number of parking spaces required Number of parking spaces proposed _______ _
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes I No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
L Yes
~No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known):
Date I Timeframe when submitted:
1/11 Page 2 of 11
MUL Tl-FAMILY RESIDENTIAL
Total Acreage S, 8 £>
Floodplain Acreage ____ _
Housing Units _/_5i_& ___ _
q& # of 1 Bedroom Units
{JO #of 2 Bedroom Units
0 # of 3 Bedroom Units
0 #of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
# Bedrooms = 132 sq . ft.
IZO # Bedrooms < 132 sq . ft.
PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
#of Multi-Family Dwelling Units
X$1636=$
# of acres in floodplain
# of acres in detention
# of acres in greenways
Date dedication approved by Parks &
____ Recreation Advisory Board
COMMERCIAL
Total Acreage
Building Square Feet ___ _
Floodplain Acreage ____ _
* Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
Date
1/11 Page 3of11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked , all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local , state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction .
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is requ ired , including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11 . The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
J-17 -llf
Property Owner(s)
Engineer Certification:
1/11
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction
including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer Date
Page 4 of 11
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only
Permits:*
A. I, certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
D * If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits:
B. I, , certify to the following :
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I,
~~~~~~~~~~~~~~~~
, certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
1/11 Page 5 of11
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre-pour) and post construction.
Engineer I Surveyor Date
Commercial Structures:
E. I, , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
Engineer I Surveyor Date
Conditions or comments as part of approval:
1/11 Page 6of11
SITE PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
Sheet size -24" x 36" (minimum).
D A key map (not necessarily to scale).
0 Title block to include:
D Name, address, location, and legal description
0 Name, address, and telephone number of applicant
D Name, address, and telephone number of developer/owner (if differs from applicant)
D Name, address, and telephone number of architecUengineer (if differs from applicant)
0 Date of submittal
D Total site area
0 North arrow.
D Scale should be largest standard engineering scale possible on sheet.
D Ownership and current zoning of parcel and all abutting parcels.
0 The total number of multi-family buildings and units to be constructed on the proposed project site.
D The density of dwelling units per acre of the proposed project.
D The gross square footage of all buildings and structures and the proposed use of each. If different uses are to be
located in a single building, show the location and size of the uses within the building. Building separation is a
minimum of 15 feet w/o additional fire protection.
Locations of the following on or adjacent to the subject site:
Designate between existing and proposed
O The density of dwelling units per acre of the proposed project.
D Phasing. Each phase must be able to stand alone to meet ordinance requirements.
O Buildings (Existing and Proposed).
0 Setbacks according to UDO, Article 5.
Geography
0 Water courses.
O 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site. Please note if there is none
on the site with confirming FEMA/FIRM map number.
0 Existing topography (2' max or spot elevations) and other pertinent drainage information. (If plan has too much
information, show drainage on separate sheet.)
D Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information. (If plan has too
much information, show drainage on separate sheet.)
1/11 Page 7 of 11
Streets, Parking, and Sidewalks
D Existing streets and sidewalks (R.O.W.).
D Existing Driveways, both opposite and adjacent to the site according to UDO, Article 7.
D Proposed drives. Minimum drive aisle width according to UDO, Article 7
D Indicate proposed driveway throat length according to UDO, Article 7
D Proposed curb cuts.
D For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts on the same and
opposite side of the street to determine separation distances between existing and proposed curb cuts.
D Proposed curb and pavement detail.
D A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include island,
planting areas, access ways, dumpster locations, utility pads, etc.) No exception will be made for areas
designated as "reserved for future parking".
D Proposed medians.
D Proposed sidewalks (both public and private).
D Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO, Article 7).
D Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned.
D Designate number of parking spaces required by ordinance and provided by proposal.
D Handicap parking spaces.
D Parking Islands drawn and dimensioned with square footage calculated according to UDO, Section 7.2 or 7.9 fornon-
residential buildings.
D Parking setback from R.O.W. to curb of parking lot as required.
D Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be
conflict with pedestrian or bike facilities, handicap accessible routes or above ground utilities, signs or other conflicts.
D Security gates, showing swing path and design specs with colors.
D Guardrails. Include design and colors.
D Traffic Impact Analysis for non-residential development (UDO, Article 7).
D Please note if none is required.
D Will there be access from a TxDOT R.O.W.? D Yes D No
If yes, then TxDOT permit must be submitted with this application.
Easements and Utilities
D Easements -clearly designate as existing or proposed and type (utility, access, etc.)
D Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings, and drainage inlets.
D Sewer Design Report (if applicable).
D Water Design Report and/or Fire Flow Report (if applicable).
D Drainage Report with a Technical Design Summary.
D Meter locations, existing and proposed (must be located in public R.O.W. or public utility easement).
D Provide a water and sanitary sewer legend to include
D Minimum water demands
D Maximum water demands
D Average water demands in gallons per minute, and
D Maximum sewer loadings in gallons per day
D Will there be access from a TxDOT R.O.W.? D Yes D No
If yes, then TxDOT permit must be submitted with this application.
1/11 Page 8 of 11
Fire Protection
D Show fire lanes. Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be
established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a
public street or highway.
D Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street as a
project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1,
R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or designated fire
lane.
NOTE: Fire hydrants must be operable and accepted by the City, and drives must have an all weather surface before a
building permit can be issued.
D Will building be sprinkled? D Yes D No
If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted. If Yes,
D Show fire department connections. FDC's should be within 150' of the fire hydrant. In no case shall they be any
further than 300' apart, and they shall be accessible from the parking lot without being blocked by parked cars or
a structure.
Landscaping
D Landscape plans as required in Article 7 of the Unified Development Ordinance. The landscaping plan can be shown
on a separate sheet if too much information is on the original site plan . If requesting protected tree points, then those
trees need to be shown appropriately barricaded on the landscape plan. Attempt to reduce or eliminate plantings in
easements.
Include information on the plans such as:
D required point calculations
D additional streetscape points required . Streetscape compliance is required on all streets.
D calculations for # of street trees required and proposed (proposed street tree points will accrue toward total
landscaping points.)
D proposed new plantings with points earned
D proposed locations of new plantings
D screening of parking lots, 50% of all shrubs used for screening shall be evergreen.
D screening of dumpsters, concrete retaining walls, off street loading areas, utility connection points, or other
areas potentially visually offensive.
D existing landscaping to remain
D show existing trees to be barricaded and barricade plan. Protected points will only be awarded if barricades are
up before the first development permit is issued.
D Buffer as required in Article 7 of the Unified Development Ordinance.
D Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to issuance of C.
0 .) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular water
systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must
include backflow prevention protection.
D Is there any landscaping in TxDOT R.O .W.? D Yes D No
If yes, then TxDOT permit must be submitted at the time of application.
Other
D Common open spaces sites
D Loading docks
D Detention ponds
D Retaining walls
D Sites for solid waste containers with screening. Locations of dumpsters are accessible but not visible from streets or
residential areas. Gates are discouraged and visual screening is required. (Minimum 12 x 12 pad required.)
D Are there impact fees associated with this development? D Yes D No
NOTE: Signs are to be permitted separately.
1/1 1 Page 9 of 11
CITY OF COLJJ'.<,GE STATION
Homr of TexllJ A&M Univrrsfry•
NRA BUILDING REVIEW MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
Refer to UDO Section 7.9 Non-Residential Architectural Standards, as appropriate.
D Sheet size -24" x 36" (minimum).
D Title block to include:
D Name, address, location, and legal description
D Name, address, and telephone number of applicant
D Name, address, and telephone number of developer/owner (if differs from applicant)
D Name, address, and telephone number of architecUengineer (if differs from applicant)
D Date of submittal
D Scale should be largest standard scale possible on sheet.
D List of colors from the City of College Station color palette to be utilized or proposed equivalents.
D Color samples.
D List of materials to be utilized.
O Elevations of each non-residential building and screening structure. Show placement of materials and colors on
the facades according to UDO Section 5.6.B or 7.9.
D Include the following dimensions:
D Total vertical square footage minus openings (for each fa9ade separately)
D Total vertical square footage of transparency (for each fa9ade separately in Northgate)
D Total vertical square footage of each building material (for each fa9ade separately)
D Total vertical square footage of each color (for each fa9ade separately)
0 Graphic representation and/or description of existing buildings in building plot to show material, color, and
architectural harmony.
1/11 Page10of 11
•
C ITY Of' C m-LEGE STATION
Home ofTexa.r A&M University•
1/11
NORTHGATE BUILDING REVIEW MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
Refer to UDO Section 5.6. Design Districts, B. Northgate Districts (NG)
D Sheet size ;; 24" ~ 36" (minimum).
D Title block to include:
D Name, address, location , and legal description
D Name, address, and telephone number of applicant
O Name, address, and telephone number of developer/owner (if differs from applicant)
D Name, address, and telephone number of architect/engineer (if differs from applicant)
D Date of submittal
D Scale should be largest standard engineering scale possible on sheet.
D List of colors from the City of College Station Northgate color palette to be utilized or proposed
equivalents with color samples.
D List of materials to be utilized.
D Elevations of each building and screening structure. Show placement of materials and colors
on the facades and identify public entrances.
Include the following dimensions:
D Total vertical square footage minus openings (for each fa9ade separately)
D Total vertical square footage of each building material (for each fa9ade separately)
D Total vertical square footage of each color (for each fa9ade separately)
O Total vertical square footage of transparency between zero and eight feet (0-8') above ground
level (for each non-residential fa9ade)
D Graphic representation and/or description of existing buildings in building plot to show material,
color, and architectural harmony.
I · Print Form Page 11 of 11
Issue Date
Expiration Date
Parcel Number .
Property Address
Subdivision Name
Legal Description
Property Zoning
Owner ...
Contractor
Application number
Description of Work
Construction type .
Occupancy type
Flood Zone . . . .
Special conditions
City of College Station
1101 TEXAS AVENUE
COLLEGE STATION TX 77840
TEMPORARY CO
T E M P 0 R A R Y
1/05/15
2/27/15
617500-0000-0030
400 MARION PUGH DR MSTR
COLLEGE STATION TX 77840
TREEHOUSE
TREEHOUSE, LOT 3, ACRES 5.88 &
ASSOCIATED BPP
& ASSOCIATED BPP
UNKNOWN
SH POOL A TREEHOUSE II LP
ASPEN SQUARE MANAGEMENT
413 537-2726
14-00000509 000 000
COMMERCIAL, REMODEL/RENOVATION
COMBUSTIBLE (UNPROTECTED)
ASSEMBLY ( IBC) .
1.) Need to establish ground cover in all areas disturbed by
activity.
2.) Need to complete landscaping .
3.) Submit revised site plan showing the subtraction of
parking spaces.
4.) Clean sidewalks.
Approved ~ . . . . . . . BUlg OffiCiai
VOID UNLESS SIGNED BY BUILDING OFFICIAL
CITY OF COJJE GE STATION
Home o/Texas A&M Univmity• ..----
MEMORANDUM
February 19, 2014
TO : Les Foster, via: les foster@aspensquare.com ~
FROM: Jenifer Paz, Staff Planner
SUBJECT: STADIUM VIEW OFFICE ADDITION (SP-MINOR)
Thank you for the submittal of your SITE PLAN -AMENDMENT (MINOR) application. Erika
Bridges, Graduate Civil Engineer, and I have been assigned to review this project. It is
anticipated that the review will be completed and any staff comments returned to you on or
before Tuesday, March 4, 2014. If you have questions in the meantime, please feel free to
contact us.
P&DS Project No. 14-00900039
Planning & D evelopment Ser11ices
P.O. BOX 9960 · 11 01 TEXAS AVENUE · COU .F.CF. STATIO N · ·n~XAS • 77842
TEL 979.764.3570 ·FAX. 979.764.34%
cstx.gov/devservices
DEVELOPMENT PERMIT
PERMIT NO. 14-39
Ci'!Y OF COLLEGE STATION
Pl.wt.ilt;f d-nn.m,,mns1 Sr-ri.i.-o
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Stadium View Office
DATE OF ISSUE: 3/4/14
OWNER:
Aspen Square Management (c/o Les Foster)
380 Union St.
West Springfield, MA 01089
SITE ADDRESS:
400 Marion Pugh Dr.
DRAINAGE BASIN:
Bee Creek Trib. "B"
VALID FOR 24 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond lim its covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to , paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
l,_L~e_S __ .:....;~:;_S-""'-'+_e-".r ________ , the Contractor, hereby agree to comply with all conditions herein.
Phone number
:3-7-1'/
Date
L~s-.fks~t€. <=:<sp1;i~u .. ..--.. c().-
E-mail
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginnin construction for scheduling required Inspections.