Loading...
HomeMy WebLinkAbout14-33CASE NO.: DATE SUBMITIED: r..L...1--f.......,.'---"--1-- TIME: \1)' 1 \ "'3 C1TY OP Cou ... EGE STATION Homt of Texas A&M University• FINAL PLAT APPLICATION STAFF:~ (Check one) D Minor ($700) D Amending ($700) ~inal ($932) D Vacating ($932) D Replat ($932) Is this plat in the ET J? [g] Yes O No Is this plat Commercial D or Residential ~ MINIMUM SUBMITTAL REQUIREMENTS: ~ $700-$932 Final Plat Application Fee (see above). f".fru $233 Waiver Request to Subdivision Regulations Fee (if applicable). ,_1)IB $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ~ Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. @ Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) ~ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ~ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). r'~, Copy of original deed restrictions/covenants for replats (if applicable). $ Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. "® Paid tax certificates from City of College Station, Brazos County and College Station l.S.D. ~The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference ....:.1..:..:01.-='2:....:;41.c.::'2:..::0..::.0.::..5 ___________ _ NAME OF PROJECT Saddle Creek Subdivision Phase 11 ADDRESS Saddle Creek Drive SPECIFIED LOCATION OF PROPOSED PLAT: at Wade Rd & Stousland Rd in Brazos County in College Station ET J. APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Saddle Creek Partners, LTD -ML Schehin E-mail ml@mls-development.com Street Address 4440 Bentwood Drive City College Station State TX Zip Code 77845 ------ Phone Number (979) 690-2642 Fax Number (979) 690-2793 ---------------- 1/11 Page 1 of 9 PROPERTY OWNER'S INFORMA 1.-..J (All owners must be identified. Please hach an additional sheet for multiple owners): Name Saddle Creek Partners, LTD -ML Schehin E-mail ml@mls-development.com Street Address 4440 Bentwood Drive City College Station State TX Zip Code _7_78_4_5 ___ _ Phone Number (979) 690-2642 Fax Number (979) 690-2793 ---------------~ ARCHITECT OR ENGINEER'S INFORMATION: Name Schultz Engineering, LLC -Joe Schultz E-mail joeschultz84@verizon.net Street Address 2730 Longmire Drive, Suite A City College Station State Texas Zip Code _7_78_4_5 ____ _ Phone Number (979) 764-3900 Fax Number (979) 764-3910 ----------------- Do any deed restrictions or covenants exist for this property? D Yes ~ No Is there a temporary blanket easement on this property? If so, please provide the Volume ____ and Page No. __ _ Total No. of Lots 19 ------R-0-W Acreage _5_. 3_2_7 ____ _ Total Acreage _3_4._0_2_5 ______ _ Existing Use _V_a_ca_n_t ___________ _ Proposed Use _R_e_s1_·d_en_t_ia_I ___________ _ Number of Lots By Zoning District nla I I Average Acreage Of Each Residential Lot By Zoning District: 1 ac mi 1 ETJ ___ / __ _ Floodplain Acreage _o _________________________________ _ Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? O Yes fXl No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? [8] Yes D No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: SADDLE CREEK (PP) City Project Number (if known): Date I Timeframe when submitted: 02/14 1/11 Page 2 of 9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): NIA Requested waiver to subdivision regulations and reason for same (if applicable): Regarding the waiver request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. D An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way; 2. D The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan; 3. D A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4. D Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context; 5. D When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestrian, and Greenways Master Plan; 1/11 Page 3 of 9 6. D The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7. D The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6, Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan. -----~-J NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. Total Linear Footage of Proposed Public: Z-:rB~ Streets Sidewalks -- ---Sanitary Sewer Lines z-;, I Water Lines '73 0 Channels 335' Storm Sewers -Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: ___ No. of acres to be dedicated + $ ____ development fee ___ No. of acres in floodplain ___ No. of acres in detention ___ No. of acres in greenways OR FEE IN LIEU OF LAND: ___ No. of SF Dwelling Units X $ = $ -------- (date) Approved by Parks & Recreation Advisory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPL/CATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Sign~ture and title Date 1/11 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Gu idelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE , TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. ~~ J &,// Property Owner(s) Date Engineer Certification: 1/11 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may requ ire a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station ~nd State and Federal Regulations. 4. I, THE ENGINEER, A~.~f13f> ~I CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELO ~Tcf' R~:V-~PLICATION , ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. ~-•• • •0•0<S' ~ • c"fJ Gfli 'I< ~ ·:~I::¥.§Fur~·~ .. ~ rz,,, 7 ,. 11 ~---.J+-+-!__;-i\-__;~~~~::.:.:::!.2~~~~~ ti\~ 65889 /$l? Date ~~;~:,:~CJ_rsrE~<t:;o~00.#' & Page 5 of 9 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances. Engineer Date Initial D * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 1/11 Page 6 of 9 ' Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer I Surveyor Date Commercial Structures: E. I, ----------------, certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Conditions or comments as part of approval: 1 /11 Page 7 of9 Existing [g] 1/11 FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) [g] Drawn on 24" x 36" sheet to scale of 100' per inch. [g] Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. [g] Title Block with the following information: [g] Name and address of subdivider, recorded owner, planner, engineer and surveyor. [g] Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911 .) [g] Date of preparation. [g] Engineer's scale in feet. [g] Total area intended to be developed. [g] North Arrow. [g] Subdivision boundary indicated by heavy lines. [g] If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. [g] All applicable certifications based on the type of final plat. [g] Ownership and Dedication [g] Surveyor and/or Engineer [g] City Engineer (and City Planner, if a minor plat) ~)U Planning and Zoning Commission (delete if minor plat) [g] Brazos County Clerk [g] Brazos County Commissioners Court Approval (ET J Plats only) If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available data. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2). The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Proposed [g] Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O .W. locations and widths. (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance. Page 8 of 9 Existing Proposed D iv)f.r ~ D ,v/ A-Alleys. ~ Easements. ~ D rJP<' ~ A number or letter to identify each lot or site and each block (numbered sequentially). D rJfr Parkland dedication/greenbelt area/park linkages. All proposed dedications must be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation provided prior to being scheduled for P&Z Commission consideration. ~ Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: ~ Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street, alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). Sewer Design Report. Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) Water Design Report and/or Fire Flow Report. Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25 , 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the.subdivision. ~ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. D Letter of completion for public infrastructure or guarantee I surety in accordance with UDO Section 8.6. ~ Drainage Report with a Technical Design Summary. ~ Erosion Control Plan (must be included in construction plans). ~ All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be provided in recordable form to the City prior to being scheduled for P&Z Commission consideration. ~ Are there impact fees associated with this development? D Yes ~ No Impact fees must be paid prior to building permit. ~ Will any construction occur in TxDOT rights-of-way? D Yes ~ No If yes, TxDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing 1111 the plat at the Courthouse. 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to issuance of a development permit. If · Prin! Forf!l'.:: I Page 9 or 9 RESOLUTION OF SADDLE CREEK PARTNERS, LTD. RESOLVED, that M. L. SCHEHIN, MANAGING MEMBER OF SADDLE CREEK PARTNERS, LTD., A TEXAS LIMITED PARTNERSHIP, is authorized and directed to execute and deliver any documents necessary for the platting of property owned by SADDLE CREEK PARTNERS, LTD .. RESOLVED FURTHER, that M. L. SCHEHIN, MANAGING MEMBER OF SADDLE CREEK PARTNERS, LTD., A TEXAS LIMITED PARTNERSHIP, is authorized to execute and accept all documents and instruments necessary to carry said transaction. LIMITED PARTNERS: MICHAEL TODD C:\MO\RE\FORMS\RESOLUTIONS\SAOOLE CREEK TO SCHUL T2 CORPORA TE RESOLUTION SADDLE CREEK PARTNERS, LTD., A TEXAS LIMITED P ARTNERSIDP BY: JUSTLAND DEVELOPMENT, LLC, A TEXAS LIMITED LIABILITY CORPORATION, ITS GENERAL PARTNER BY: M:LSCHiHIN, MANAGING MEMBER MICHAEL TODD, MANAGING MEMBER A.6 .gieland Title · Comp ny GF# 31460 EXAMINER'S REPORT RECORD TITLE AT THE EFFECTIVE DATE HEREOF APPEARS TO BE VESTED IN John A. Malley and Joyce C. Malley, Trustees of the John and Joyce Malley Living Trust dated December 15, 1992; and, Michael G. Todd and Jennifer B. Todd, Trustees of Todd Living Trust dated October 30, 2002 THE LAND REFFERRED TO IN THIS REPORT IS DESCRIBED AS FOLLOWS METES AND BOUNDS DESCRIPTION OF ALL THAT CERTAIN TRACT OR PARCEL OF LAND LYING AND BEING SITUATED IN THE JAMES C. STUTEVILLE LEAGUE, ABSTRACT NO. 216, BRAZOS COUNTY, TEXAS. SAID TRAC'.f BEING A PORTION OF THE REMAINDER OF A CALLED 359.07 ACRE TRACT AS DESCRIBED BY A DEED TO JOHN A. MALLEY .AND JENNIFER B. TODD RECORDED IN VOLUME 7427, PAGE 198 OF THE OFFICIAL PUBLIC RECORDS 01: BRAZOS COUNTY, TEXAS. SAID TRACT BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A Yi INCH IRON ROD FOUND ON THE NORTHWEST LINE OF A CALLED 458.72 ACRE TRACT AS DESCRIBED BY A . DEED TO WELLBORN RESOURCES LP RECORDED' IN VOLUME 11389, PAGE 265 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS, MARKING THE EAST CORNER OF SAID REMAINDER OF 359.07 ACRE TRACT; THENCE: S 42° 41' 05" W ALONG THE COMMON LINE OF SAID REMAINDER OF 359.07 ACRE TRACT AND SAID 458.72 ACRE TRACT FOR A DISTANCE OF 689.51 FEET TO THE SOUTHEAST CORNER OF THIS HEREIN DESCRIBED TRACT; THENCE: THROUGH SAID REMAINDER OF 359.07 ACRE TRACT FOR THE FOLLOWING CALLS: N 44° 52' 09" W FOR A DISTANCE OF 274.92 FEET; S .45° 07' 51" W ACROSS THE END OF THE EXTENSION OF SADDLE CREEK DRIVE FOR A DISTANCE OF 100.00 FEET TO THE BEGINNING OF A COUNTERCLOCKWISE CURVE HAVING A RADIUS OF 25.00 FEET; 3740 Copperfield Drive, Suite 101 • Bryan, Texas 77802 Phone (979) 731~8400 • FAX (979) 731-8408 ,; OF# 31460 ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 92° 26' 45" FOR AN ARC DISTANCE OF 40.34 FEET (CHORD BEARS: S 88° 54' 28" W -36.10 FEET) TO THE END OF SAID CURVE; N 47° 18' 55" W ACROSS THE FUTURE RIGHT-OF-WAY OF BROKEN SPOKE WAY FOR A DISTANCE OF 70.00 FEET; N 42° 41' 05" E ALONG THE FUTURE NORTHWEST LINE OF BROKEN SPOKE WAY FOR A DISTANCE OF 5.13 FEET TO THE BEGINNING OF A COUNTERCLOCKWISE CURVE HA VINO A RADIUS OF 25.00 FEET; ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 87° 33 1 15" FOR AN ARC DISTANCE OF 38.20 FEET (CHORD BEARS : N 01° 05' 32" W -34.59 FEET) TO THE END OF SAID CURVE; N 44° 521 09" W ALONG THE EXTENSION OF THE SOUTHWEST LINE OF SADDLE CREEK DRIVE FOR A DISTANCE OF 284.57 FEET; ..J S 45° 07' 51" W FOR A DISTANCE OF 260.07 FEET; S 54° 01' 28" WFORA DISTANCE OF 313.07 FEET; S 80° 301 54" W FOR A DISTANCE OF 134.74 FEET; S 54° 56' 35" W FOR A DISTANCE OF 373.79 FEET; N 51° 06' 54" W FOR A DISTANCE OF 119.88 FEET TO A POINT ON THE SOUTHEAST LINE OF LOT 199, BLOCK 10, SADDLE CREEK SUBDIVISION, PHASE 10, ACCORDING TO THE PLAT RECORDED IN VOLUME 11471, PAGE 280 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS; THENCE: ALONG THE COMMON LINE OF SAID REMAINDER OF 359.07 ACRE TRACT AND SAID PHASE 10 FOR THE FOLLOWING CALLS: N 04° 37' 26" W FOR A DISTANCE OF 50.51 FEET TO A Y2 INCH IRON ROD FOUND; N 15° 47' 26" E FOR A DISTANCE OF 68.38 FEET TO A Y2 INCH IRON ROD FOUND; N 37° 37' 55" E FOR A DISTANCE OF 54.32 FEET TO A Y2 INCH IRON ROD FOUND; N 10° 501 02" E FOR A DISTANCE OF 108.84 FEET TO AY2 INCH IRON ROD FOUND; N 10° 161 14" W FOR A DISTANCE OF 189.40 FEET TO A~ INCH IRON ROD FOUND; N 35° 45' 41" E FOR A DISTANCE OF 181.89 FEET TO A Y2 INCH IRON ROD FOUND; N 62° 02' 16" E FORA DISTANCE OF 192.10 FEET TO A Y2 INCH IRON ROD FOUND; AGGIELAND TITLE COMP ANY Page2 .; GF# 31460 N 22° 24' 09" E FOR A DISTANCE OF 128.90 FEET TO A Yz INCH IRON ROD FOUND ON THE SOUTHEAST LINE OF LOT 205, BLOCK 10, SADDLE CREEK SUBDIVISION, PHASE 8, ACCORDING TO THE PLAT RECORDED IN VOLUME 11059, PAGE 148 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS; THENCE: ALONG THE COMMON LINE OF SAID REMAINDER OF 359.07 ACRE TRACT AND SAID PHASE 10 FOR THE FOLLOWING CALLS: N 61° 16' 30" E FOR A DISTANCE OF 150.16 FEET TO A Yz INCH IRON ROD FOUND; N 48° 23' 51" E FOR A DISTANCE OF 95.85 FEET TO A Yz INCH IRON ROD FOUND MARKING THE BEGINNING OF A CLOCKWISE CURVE HAVING A RADIUS OF 850.00 FEET; ALONG SAID CURVE, SAME BEING THE EXTENSION OF THE SOUTHWEST LINE OF SADDLE CREEK DRIVE (100' R.O.W.), THROUGH A CENTRAL ANGLE OF 06° 08' 07" FOR AN ARC DISTANCE OF 239.37 FEET (CHORD BEARS: N 30° 32' 45" W -238.58 FEET) TO A Yz INCH IRON ROD FOUND MARKING THE END OF SAID CURVE; N 22° 28' 41" W CONTINUING ALONG THE EXTENSION OF THE SOUTHWEST LINE OF SADDLE CREEK DRIVE FOR A DISTANCE OF 87.32 FEET TO A Yz INCH IRON ROD FOUND; N 67° 31' 19" E ACROSS THE END OF SADDLE CREEK DRIVE FOR A DISTANCE OF 100.00 FEET TO A Yz INCH IRON ROD FOUND; S 22° 28' 41" E ALONG THE EXTENSION OF THE NORTHEAST LINE OF SADDLE CREEK DRIVE FOR A DISTANCE OF 87.32 FEET TO A 1/2 INCH IRON ROD FOUND MARKING THE BEGINNING OF A COUNTERCLOCKWISE CURVE HAVING A RADIUS OF 750.00 FEET; ALONG SAID CURVE, SAME BEING AN EXTENSION OF THE NORTHEAST LINE OF SADDLE CREEK DRIVE, THROUGH A CENTRAL ANGLE OF 15° 20' 45" FOR AN ARC DISTANCE OF 200.88 FEET (CHORD BEARS: S 30° 09' 04" E -200.28 FEET) TO A 1/2 INCH IRON ROD FOUND MARKING THE END OF SAID CURVE; N 54° 21' 21" E FOR A DISTANCE OF 160.15 FEET TO A 112 INCH IRON ROD FOUND; N 06° 52' 18" E FOR A DISTANCE OF 92.72 FEET TO A 1/2 INCH IRON ROD FOUND; N 42° 57' 16" E FOR A DISTANCE OF 405.59 FEET TO A 112 INCH IRON ROD FOUND ON THE SOUTHWEST LINE OF DUCK HA VEN SUBDIVISION, PHASE 3, ACCORDING TO THE PLAT RECORDED IN VOLUME 8240, PAGE 61 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS; AGGIELAND TITLE COMPANY Page3 ' OF# 31460 THENCE: S 47° 03' 30" E ALONG THE COMMON LINE OF SAID REMAINDER OF 359.07 ACRE TRACT AND DUCK HAVE, PHASE 3, FOR A DISTANCE OF 1217.60 FEET TO A 1/2 INCH IRON ROD FOUND MARKING AN ANGLE POINT IN THE COMMON LINE OF SAID REMAINDER OF 359.07 ACRE TRACT AND THE REMAINDER OF A CALLED 188.04 ACRE TRACT AS DESCRIBED BY A DEED TO SMILING MALLARD DEVELOPMENT, LTD RECORDED IN VOLUME 4011, PAGE 142 OF THE OFFICIAL PUBLIC RECORDS OF BRAZOS COUNTY, TEXAS; THENCE: S 45° 21 ' 17" E ALONG THE COMMON LINE OF SAID REMAINDER OF 359.07 ACRE TRACT AND SAID REMAINDER OF 188.04 ACRE TRACT FOR A DISTANCE OF 61.97 FEET TO THE POINT OF BEGINNING CONTAINING 34.025 ACRES OF LAND, MORE OF LESS. BEARING SYSTEM SHOWN HEREIN IS BASED ON THE PLAT CALL BEARINGS OF SADDLE CREEK SUBDIVISION, PHASE 10 (11471/280). AGGIELAND TITLE COMPANY Page4 ; GF# 31460 RESTRICTIVE COVENANTS: None of record SCHEDULE B EXCEPTIONS a. Easements or claims of easements which are not recorded in the public records of Brazos County, Texas. b. Blanket Easement granted to Wellborn Water Supply Corporation by J.C. Wade as set out in instrument dated August 17, 1971, recorded in Volume 303, page 385 of the Deed Records of Brazos County, Texas. c. Pipeline right-of-way granted to Aquila Southwest Pipeline Corporation, a Delaware Corporation from Louise Wade and J.E. Wade as set out in instrument dated October 1, 1992, recorded in Volume 1842, page 337 of the Official Public Records of Brazos County, Texas. d. Royalty interest in all of the oil, gas and other minerals in and under the herein described property assigned to Kenneth M. Robison by Louise Wade, individually and as Executrix of the Estate of J. C. Wade and as Trustee/Guardian, Eugene Wade, individually and as Trustee/Guardian, and AnnaBelle Wade, individually in instrument dated July 7, 1983, recorded in Volume 601, page 417 of the Official Public Records of Brazos County, Texas. Title to this interest not investigated subsequent to date of said instrument. e. Mineral and Mineral Related Easements Reservation as set out in deed dated June 30, 2006 from Minnie Louise Wade aka Louise S. Wade and Annie Belle Wade to John A. Malley and Jennifer B. Todd, recorded in Volume 7427, page 198, Official Public Records Records of Brazos County, Texas. Title to this interest not investigated subsequent to date of said instrument. f. Mineral and Mineral Related Easements Reservation as set out in deed dated June 30, 2006 from Minnie Louise Wade aka Louise S. Wade and Annie Belle Wade to John A. Malley and Jennifer B. Todd, recorded in Volume 7427, page 205, Official Public Records Records of Brazos County, Texas. Title to this interest not investigated subsequent to date of said instrument. g. Release of Surface and Mineral Related Easements as set out in document dated November 20, 2013 executed by Minnie Louise Wade aka Louise S. Wade and Annie Belle Wade and recorded in Volume 11771, page 67, Official Public Records of Brazos County, Texas. AGGIELAND TITLE COMPANY Page 5 ' GF# 31460 h. Estate created by oil, gas and mineral lease granted to Peter Paul Petroleum Company by Louise Wade, individually and as Executrix of the Estate of J. C. Wade and as Trustee/Guardian; Eugene Wade, individually and as Trustee/Guardian; and Annabelle Wade, individually by instrument dated July 1, 1983, recorded in Volume 604, page 437 of the Official Public Records of Brazos County, Texas, and all terms, conditions and stipulations contained therein. Title to this lease has not been investigated subsequent to date thereof. i. Estate created by oil, gas and mineral lease granted to Union Pacific Resources Company by Louise S. Wade, Annie Belle Wade, Steven Ray Wade, Bradley C. Wade, Richard Eugene Wade, individually and as trustee for Laura Audnette Wade by instrument dated July 31, 1990, recorded in Volume 1209, page 244 of the Official Public Records of Brazos County, Texas, and all terms, conditions and stipulations contained therein. Title to this lease has not been investigated subsequent to date thereof. Said lease ratified in instrument dated December 1, 1993, recorded in Volume 1978, page 143 of said Official Public Records. j. Corrected Memorandum of Oil, Gas and Mineral Lease dated February 16, 2001, by and between Louise, S. Wade, James Eugene Wade, Annie Belle Wade, Steven Ray Wade, Bradley C. Wade, Richard Eugene Wade, Laura Audnette Crenshaw and Lometa Petroleum Corporation, recorded in Volume 4313, page 311 of the Official Public Records of Brazos County, Texas. Title to this interest not checked subsequent to date of said instrument. Said lease ratified in instrument dated September 7, 2001, recorded in Volume 4313, page 314 of said Official Public Records. k. Memorandum of Oil, Gas and Mineral Lease dated December 21, 2012, by and between Minnie Louise Wade and Annie Belle Wade and EOG Resources, Inc., recorded in Volume 11175, page 167 of the Official Public Records of Brazos County, Texas. Title to this interest not checked subsequent to date of said instrument. I. Memorandum of Partial Assignment of Royalties in the above Oil, Gas and Mineral Lease dated December 21, 2012 to Kenneth M. Robison by Minnie Louise Wade and Annie Belle Wade by instrument recorded in Volume 11162, page 270 of the Official Public Records of Brazos County, Texas. Title to this interest not checked subsequent to date of said instrument. m. Rights of parties in possession. AGGIELAND TITLE COMP ANY Page 6 GF# 31460 CURATIVE MATTERS a. This report does not cover matters of survey, including, but not limited to discrepancies, conflicts or shortages in area or boundary lines or any encroachments or protrusions or any overlapping improvement. b. Standby fees, taxes and assessments have not been investigated. This report is prepared and delivered with the express understanding and agreement, evidenced by the acceptance hereof, that the undersigned is not rendering an opinion as to the title to the land under investigation herein, and while believing its construction of the records as hereinabove set out to be true and correct, still will incur no liability beyond the fee paid for this report by reason of such construction, nor will it be liable for any error or omission of any kind whatsoever. this report is prepared for informational purposes only, exclusively for the party paying the fee. Preparation Date: Effective Date: Effective Time: February 5, 2014 January 27, 2014 7:00 a.m. AGGIELAND TITLE COMPANY Page? Drainage Report for Saddle Creek Subdivision, Phase 11 Brazos County, Texas January 2014 Engineer: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 Developer: Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 / ENGINEER Schultz Engineering, LLC. P.O. Box 11995 Saddle Creek Subdivision, Phase 11 Drainage Report College Station, Texas 77842 Phone: (979) 764-3900 Fax: (979) 764 OWNER/DEVELOPER Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 GENERAL DESCRIPTION AND LOCATION Location: Description: • Area: • Proposed Land Use: • #of Lots: • Existing Land Use: • Land Description: Primary Drainage Facility: Flood Hazard Information: FEMAFIRM: Floodplain: Saddle Creek Subdivision, Phase 11, is located on the south west side of FM 2154, off of Stousland Rd. 34.025 acres Single Family Residential 19 lots Vacant The terrain slopes towards the southwest. Boggy Creek # 48041C0375E (May 16, 2012) Un-shaded Zone X HYDROLOGIC CHARACTERISTICS The existing site is predominately wooded. The elevations range from 288 to 257, sloping generally in a south westerly direction. The runnoff enters tributaries of Boggy Creek. GENERAL STORMWATER PLAN The drainage plan for this development will involve the construction of ditches, channels and the installation of culvert structures. DRAINAGE DESIGN General Information: Stormwater runoff from Phase 11 of the subdivision will be collected in the ditches along Saddle Creek Drive, Majestic Oak Court and Broken Spoke Way to be discharged into proposed drainage channels. The proposed channels will discharge into existing drainage ways. See Exhibit A for drainage areas and culvert locations. See Exhibit C for drainage areas and locations. Page 1 of3 Tc Methodology: Tc Minimum Design Storm Event: Culvert Materials: Manning's n Value: Runoff Coefficient: TR55 10 minutes 25-year & 100-year -residential street & culvert, drainage channel HDPE Pipe with cement stabilized sand backfill 0.012 0.45 The Rational Equation was used for the ditch and channel design. Design Results -Culvert Pipe: Culvert No. 1101 1102 1103 1104 Culvert Size 2-30" Pipes 1-18" Pipe 1-18" Pipe 1-18" Pipe Top of Road Elev. 268.34 278.23 284.68 284.39 Design Results -Channels: Qzs 52.91 2.31 2.62 1.38 V2s 7.20 3.86 4.02 3.30 HW2s 263.63 276.26 282.89 282.02 Q100 63.25 2.72 3.35 1.62 V100 7.84 4.07 4.38 3.46 HW100 264.11 276.35 283.05 282.08 The data presented above and in the Appendices indicates the culvert size is in accordance with the requirements. The head water elevation for the culvert is less than the top of road elevation for the 100-yr storm runoff. The ditch at the outlet of the proposed culvert will be lined with rock riprap to prevent erosion from high velocities. The velocities in the roadside ditches will be such that grass lined ditches are adequate. Channel No. 1 2 4.11 0.60 3.28 2.80 3.10 1.46 0.46 0.62 100 3.88 3.30 3.23 1.52 D100 0.49 0.66 Channel No. 1 has a V-bottom, 5H:1V side slopes. The channel will have a minimum depth of 1' for adequate freeboard. The design velocity is less than 4.5 fps which allows a grass lined channel. Channel No. 2 has a V-bottom, 5H:1V side slopes. The channel will have a minimum depth of 1.5' for adequate freeboard. The design velocity is less than 4.5 fps which allows a grass lined channel. Page 2 of3 Applicable Exhibits: CONCLUSION CERTIFICATION Exhibit A- ExhibitB - Exhibit C- Appendix A- AppendixB- Appendix C- AppendixD- AppendixE- Drainage Area Map -Culvert Design Drainage Area Map -Ditch Design Drainage Area Map -Channel Design Drainage Area Summary Time of Concentration Pipe Design Summary & Culvert Reports Ditch Design Summary Channel Design Summary and Reports The culverts, roadside ditches, and drainage channel for this subdivision were designed in accordance with appropriate engineering standards. I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Saddle Creek Subdivision, Phase 11, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge Department. Page 3 of3 Exhibit A Drainage Area Map Culvert Design Exhibit B Drainage Area Map Ditch Design Exhibit C Drainage Area Map Channel Design Appendix A Drainage Area Summary Saddle Creek Subdivision -Phase 11 Appendix A Drainage Area Summary Rational Method Area, A c Area# (acres) 11.1 27.30 0.45 11.1A 6.94 0.45 11.18 0.05 0.45 11.1C 0.16 0.45 11.10 0.55 0.45 11 .1 E 0.18 0.45 11.1 F 19.42 0.45 11.2 0.32 0.45 11 .2A 0.05 0.45 11 .28 0.11 0.45 11.2C 0.16 0.45 11.3 0.59 0.45 11 .3A 0.17 0.45 11.38 O.Q7 0.45 11 .3C 0.07 0.45 11 .30 0.28 0.45 11.4 0.52 0.45 11 .4A 0.16 0.45 11 .48 0.18 0.45 11 .4C 0.18 0.45 11.5 0.31 0.45 11 .5A 0.04 0.45 11.58 0.11 0.45 11 .5C 0.16 0.45 11.6A 0.32 0.45 11 .68 0.07 0.45 11 .60 0.06 0.45 11 .6E 0.03 0.45 11.6F 0.17 0.45 11.6G 0.18 0.45 11.7A 0.34 0.45 11 .78 0.40 0.45 11 .8A 0.12 0.45 11 .88 0.23 0.45 11 .8C 0.20 0.45 11 .80 0.16 0.45 The Rational Method: Q = CIA I = b I (tc+d)e tc 25 year storm 125 0 25 (min) (in/hr) (cfs) 47.0 4.307 52.91 47.0 4.307 13.45 10.0 9.861 0.22 10.0 9.861 0.71 10.0 9.861 2.44 10.0 9.861 0.80 47.0 4.307 37.64 10.0 9.861 1.42 10.0 9.861 0.22 10.0 9.861 0.49 10.0 9.861 . 0.71 10.0 9.861 2.62 10.0 9.861 0.75 10.0 9.861 0.31 10.0 9.861 0.31 10.0 9.861 1.24 10.0 9.861 2.31 10.0 9.861 0.71 10.0 9.861 0.80 10.0 9.861 0.80 10.0 9.861 1.38 10.0 9.861 0.18 10.0 9.861 0.49 10.0 9.861 0.71 10.0 9.861 1.42 10.0 9.861 0.31 10.0 9.861 0.27 10.0 9.861 0.13 10.0 9.861 0.75 10.0 9.861 0.80 10.0 9.861 1.51 10.0 9.861 1.78 10.0 9.861 0.53 10.0 9.861 1.02 10.0 9.861 0.89 10.0 9.861 0.71 Q =Flow (cfs) tc =Time of concentration (min) A= Area (acres) C = Runoff Coeff. I = Rainfall Intensity (in/hr) Brazos County: 25 year storm 100 year storm b = 89 b = 96 d = 8.5 d = 8.0 e= 0.754 e= 0.730 100 year storm 1100 0 100 (in/hr) (cfs) 5.150 63.27 5.150 16.08 11 .639 0.26 11 .639 0.84 11.639 2.88 11.639 0.94 5.150 45.01 11.639 1.68 11 .639 0.26 11 .639 0.58 11 .639 0.84 11.639 3.09 11 .639 0.89 11 .639 0.37 11.639 0.37 11 .639 1.47 11.639 2.72 11.639 0.84 11.639 0.94 11.639 0.94 11.639 1.62 11.639 0.21 11.639 0.58 11.639 0.84 11.639 1.68 11.639 0.37 11.639 0.31 11.639 0.16 11.639 0.89 11.639 0.94 11.639 1.78 11.639 2.10 11.639 0.63 11.639 1.20 11.639 1.05 11.639 0.84 tc = L/(V*60) L = Length (ft V =Velocity (ft/sec) Appendix B Time of Concentration I APPENDIX B POST DEVELOPMENT TIME OF CONCENTRATION COMPUTATIONS Saddle Creek Phase 10 T sheet = time of concentration tor sheet flow (hr) L = length (ft) n = Manning's roughness P2 = 2-yr rainfall intensity (in/hr) for Brazos Co. = 4.5 in/hr S = slope (ft/ft) Sheet Flow Drainage n Slope T,._ Area# min. 11.1 11 .1A 11 .1F Concentrated Flow Length Slope Velocity fl % ft/sec TR-55 Method Vconc =water velocity in ditch (ft/sec) S = slope of ditch (ft/ft) V outt•• = water velocity in gutter (ft/sec) S = slope of gutter (ft/ft) Gutter Flow -1 T...,..,.. Slope Velocity min % fVsec T..-Length min fl T = travel time through ditch or gutter (min) L = length of travel path (ft) V = velocity (ft/sec) Gutter Flow - 2 Slope Velocity r.,,.. Total % ttisec min min 47 47 47 Tc Design Appendix C Culvert Design Summary & Culvert Reports Saddle Creek Subdivision -Phase 11 Appendix C Culvert Design Summary Pipe Pipe Size Length Slope Contributing Q25 V2s Q100 V100 Drainage No. (in) (ft) (%) Areas lcfs) (fps) (cfs) (fps) 1101 2-30" 80 1.00 11.1 52.91 7.20 63.27 7.84 1102 18" 59 3.50 11.4 2.31 3.86 2.72 4.07 1103 18" 56 1.50 11.3 2.62 4.02 3.35 4.38 1104 18" 60 1.00 11.5 1.38 3.30 1.62 3.46 Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1101 -25 yr Storm Invert Elev On (ft) = 260.00 Calculations Pipe Length (ft) = 80.00 Qmin (cfs) = 52.91 Slope(%) = 1.00 Qmax (cfs) = 63.27 Invert Elev Up (ft) = 260.80 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 30.0 Shape = Circular Highlighted Span (in) = 30.0 Qtotal ( cfs) = 52.91 No. Barrels = 2 Qpipe (cfs) = 52.91 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 5.95 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.20 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft) = 262.13 HGL Up (ft) = 262.55 Embankment Hw Elev (ft) = 263.63 Top Elevation (ft) = 268.33 Hw/O (ft) = 1.13 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30 .00 Bov(ft) Pipe 1101 -25 yr Stonn HwOeplh (!\) 269.00 S.20 ZSB .. 00 7.20 Z67.00 6.20 266.00 5.20 255.00 ~-20 264.00 3.20 263.00 2.20 262.00 1.ZO 261.00 0.20 260.00 -0.80 259.00 -1.811 0 10 20 120 --Cira.Carcutvert --HGt --Emban~ Reach{ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1101 -100 yr Storm Invert Elev On (ft) = 260.00 Calculations Pipe Length (ft) = 80 .00 Qmin (cfs) = 52.91 Slope(%) = 1.00 Qmax (cfs) = 63.27 Invert Elev Up (ft} = 260.80 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 30 .0 Shape = Circular Highlighted Span (in) = 30.0 Qtotal ( cfs) = 63.25 No. Barrels = 2 Qpipe (cfs) = 63.25 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 6.90 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.84 Coeff. K,M ,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft} = 262.21 HGL Up (ft} = 262.71 Embankment Hw Elev (ft) = 264.11 Top Elevation (ft) = 268.33 Hw/O (ft) = 1.33 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 Bev(ft) Pipe 1101 -100 yr Stonn HwOeplh (ft} 269.00 8.20 268.00 7.20 207.00 6.20 266.00 5.20 265.00 uo 264.00 3.20 263.00 2-ZO 262.00 1.ZO 2.61.00 0.20 260.00 ..O.SO 259.00 -1.80 0 10 20 120 --Circu!areutvert --HGL --Embank Reacl't(ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1102 -25 yr Storm Invert Elev On (ft) = 273.35 Calculations Pipe Length (ft) = 59 .20 Qmin (cfs) = 2.31 Slope(%) = 3.50 Qmax (cfs) = 2.72 Invert Elev Up (ft) = 275.42 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 15.6 Shape = Circular Highlighted Span (in) = 15.6 Qtotal ( cfs) = 2.31 No. Barrels = 1 Qpipe (cfs) = 2.31 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 2.22 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.86 Coeff. K,M ,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft) = 274.30 HGL Up (ft) = 276.02 Embankment Hw Elev (ft) = 276.26 Top Elevation (ft) = 278.23 Hw/O (ft) = 0.64 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 E.v(ft) Pipe 1102 -25 yr Storm 2.79.00 278.00 2.77.00 276.00 275.00 2.74.00 273.00 2.12..00 0 --Circt.tlarcutvert --HGL --Embank Readl {ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Pipe 1102 -100 yr Storm Invert Elev On (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Bev(ft) 279.00 = 273.35 = 59.20 = 3.50 = 275.42 = 15.6 = Circular = 15.6 = 1 = 0.012 = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 278.23 = 30.00 = 30.00 Pipe 1102 -100 yr Storm Wednesday, Jan 22 2014 Calculations Qmin (cfs) = 2.31 Qmax (cfs) = 2.72 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal ( cfs) = 2.72 Qpipe (cfs) = 2.72 Qovertop ( cfs) = 0.00 Veloc Dn (ft/s) = 2.54 Veloc Up (ft/s) = 4.07 HGL Dn (ft) = 274.33 HGL Up (ft) = 276.07 Hw Elev (ft) = 276.35 Hw/D (ft) = 0.72 Flow Regime = Inlet Control 0 5 10 16 20 25 30 35 "° ~5 so 56 60 &5 10 75 ao --Circularruvert --HGl --Embank Reacll {ft) ~('.!o-.~ Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Pipe 1103 -25 yr Storm Invert Elev On (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft} Crest Width (ft) Elev(ft) 285.00 0 5 --Circularruvert = 281.13 = 56.00 = 1.50 = 281 .97 = 15.6 = Circular = 15.6 = 1 = 0.012 = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 284.68 = 30.00 = 30.00 Pipe 1103 -25 yr Sto11n --HGt --Embank Wednesday, Jan 22 2014 Calculations Qmin (cfs) = 2.62 Qmax (cfs) = 3.35 Tailwater Elev (ft) = (dc+0)/2 Highlighted Qtotal ( cfs) = 2.62 Qpipe (cfs) = 2.62 Qovertop ( cfs) = 0.00 Veloc On (ft/s) = 2.47 Veloc Up (ft/s) = 4.02 HGL On (ft) = 282.10 HGL Up (ft) = 282.61 Hw Elev (ft) = 282.89 Hw/O (ft) = 0.71 Flow Regime = Inlet Control ll•ach{ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Pipe 1103 -100 yr Storm Invert Elev On (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M ,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Bev{ft) 285.00 = 281.13 = 56.00 = 1.50 = 281.97 = 15.6 = Circular = 15.6 = 1 = 0.012 , = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 284.68 = 30.00 = 30.00 Pipe 1103 -25 yr Storm Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal ( cfs) Qpipe (cfs) Qovertop ( cfs) Veloc On (ft/s) Veloc Up (ft/s) HGL On (ft) HGL Up (ft) Hw Elev (ft) Hw/O (ft) Flow Regime Wednesday, Jan 22 2014 = 2.62 = 3.35 = (dc+0)/2 = 3.35 = 3.35 = 0.00 = 3.01 = 4.38 = 282.14 = 282.70 = 283.05 = 0.83 -· Inlet Control HwDep!h (ft) 3.03 280.00 --+---+--+----+---+--+----+--+---+-----;~---1----+--+---+---+--+---+--1.97 10 15 20 2s 30 35 40 ~5 ·m 55 m 55 ro 75 0 5 llO --Circu:!arCUlvert --HGL --Embank Roacl\{ft} Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Pipe 1104 -25 yr Storm Invert Elev On (ft) Pipe Length (ft) Slope(%) Invert.Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) · Top Width (ft) Crest Width (ft) Elev (ft) 285.00 0 5 --Circu1arC\Jlvert = 280.79 = 60.00 = 1.00 = 281.39 = 15.6 = Circular = 15.6 = 1 = 0.012 = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 284.39 = 30.00 = 30.00 Pipe 1104 -25 yr Stonn --HGl --Embank Wednesday, Jan 22 2014 Calculations Qmin (cfs) = 1.38 Qmax (cfs) = 1.62 Tailwater Elev (ft) = (dc+0)/2 Highlighted Qtotal ( cfs) = 1.38 Qpipe (cfs) = 1.38 Qovertop ( cfs) = 0.00 Veloc On (ft/s) = 1.44 Veloc Up (ft/s) = 3.30 HGL On (ft) = 281.67 HGL Up (ft) = 281.85 Hw Elev (ft) = 282.02 Hw/O (ft) = 0.49 Flow Regime = Inlet Control R .. dt{ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Pipe 1104 -100 yr Storm Invert Elev Dn (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) SeY(ft) 235.00 0 5 --CircularCUlvert = 280.79 = 60 .00 = 1.00 = 281.39 = 15.6 = Circular = 15.6 = 1 = 0.012 = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 284.39 30.00 = 30.00 Pipe 1104 -100 yr Storm --HGL --Embank Wednesday, Jan 22 2014 Calculations Qmin (cfs) = 1.38 Qmax (cfs) = 1.62 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal ( cfs) = 1.62 Qpipe (cfs) = 1.62 Qovertop ( cfs) = 0.00 Veloc On (ft/s) = 1.65 Veloc Up (ft/s) = 3.46 HGL Dn (ft) = 281.69 HGL Up (ft) = 281.89 Hw Elev (ft) = 282.08 Hw/D (ft) = 0.53 Flow Regime = Inlet Control Reach {fl} Appendix D Ditch Design Summary Saddle Creek Subdivision -Phase 11 Appendix D Ditch Design Summary Street Ditch Location Slope Contributing a,. v,. D2s a, .. v, .. o, .. Street Stations Drainage Areas (RighULeft) (%) (cfs) (fps) (ft) (cfs) (fps) (ft) Saddle Creek Drive 18+66.78 Left 1.02 11.1A 13.45 2.64 1.01 16.08 2.76 1.08 Saddle Creek Drive 18+86.29 Right 1.00 11.8D 0.71 1.23 0.34 0.84 1.30 0.36 Saddle Creek Drive 19+00 Left 5.52 11 .1A, 11.18 13.67 4.99 0.74 16.35 5.24 0.79 Saddle Creek Drive 19+00 Right 5.52 11.8D 0.71 2.27 0.25 0.84 2.49 0.26 Saddle Creek Drive 20+40 Left 2.11 11 .1A, 11.18, 11 .1C 14.38 3.55 0.90 17.18 3.73 0.96 Saddle Creek Drive 20+40 Right 2.11 11.8D, 11.8C 1.60 2.00 0.40 1.89 2.14 0.42 Saddle Creek Drive 21+00 Left 4.00 11.1D, 11.1E 3.24 3.06 0.46 3.82 3.18 0.49 Saddle Creek Drive 21+00 Right 4.00 11 .88, 11.8A, 11.4 3.86 3.22 0.49 4.56 3.37 0.52 Saddle Creek Drive 22+76.10 Right 1.30 11.8A, 11.4 2.84 1.95 0.54 3.35 2.06 0.57 Saddle Creek Drive 24+18.30 Right 4.00 11.48, 11.4C 1.60 2.61 0.35 1.89 2.62 0.38 Saddle Creek Drive 25+74.51 Right 1.39 11.4C 0.80 1.47 0.33 0.94 1.53 0.35 Saddle Creek Drive 25+74.51 Left 1.39 11.1E 0.80 1.47 0.33 0.94 1.53 0.35 Saddle Creek Drive 28+83.97 Right 0.80 11 .6G 0.80 1.17 0.37 0.94 1.24 0.39 Saddle Creek Drive 28+83.97 Left 0.80 11.3A 0.75 1.16 0.36 0.89 1.23 0.38 Saddle Creek Drive 29+44.19 Left 1.75 11.3A, 11 .38 1.07 1.65 0.36 1.26 1.75 0.38 Saddle Creek Drive 30+66.31 Right 1.80 11 .6D 0.27 1.22 0.21 0.31 1.28 0.22 Saddle Creek Drive 30+66.31 Left 0.80 11.6A, 11 .68, 11.3 4.35 1.83 0.69 5.13 1.87 0.74 • Saddle Creek Subdivision -Phase 11 Appendix D / Ditch Design Summary Street Ditch Location Slope Contributing a,. v,. o,. a,oo V100 0100 Street Stations Drainage Areas (Right/Left) (%) (cfs) (fps) (ft) (cfs) (fps) (ft) Majestic Oak Court 0+00 Right 2.70 11 .7A 1.51 2.21 0.37 1.78 2.23 0.40 Majestic Oak Court 0+00 Left 2.55 11 .7B 1.78 2.23 0.40 2.10 2.27 0.43 Majestic Oak Court 4+45.10 Right 1.59 11.4A 0.71 1.48 0.31 0.84 1.54 0.33 Majestic Oak Court 4+50.70 Left 2.98 11 .8A 0.53 1.70 0.25 0.63 1.73 0.27 Broken Spoke Way 15+00 Right 0.60 11 .6E 0.13 0.65 0.20 0.16 0.66 0.22 Broken Spoke Way 15+00 Left 0.60 11 .6G, 11.6F 1.55 1.24 0.50 1.83 1.30 0.53 Broken Spoke Way 16+30.82 Right 0.80 11 .6A 1.42 1.34 0.46 1.68 1.40 0.49 Broken Spoke Way 16+31.43 Left 0.80 11.30 1.24 1.34 0.43 1.47 1.39 0.46 Broken Spoke Way 22+00 Right 1.00 11.5C 0.71 1.23 0.34 0.84 1.30 0.36 Broken Spoke Way 22+00 Left 1.00 11 .2C 0.71 1.23 0.34 0.84 1.30 0.36 Broken Spoke Way 23+26.29 Left 1.34 11.5C, 11.5B 1.20 1.58 0.39 1.41 1.68 0.41 Broken Spoke Way 23+29.46 Right 1.34 11.2C, 11.2B 1.20 1.58 0.39 1.41 1.68 0.41 Broken Spoke Way 23+38.35 Right 0.80 11.5A 0.18 0.82 0.21 0.21 0.79 0.23 Broken Spoke Way 23+41.48 Left 0.80 11.2A 0.22 0.83 0.23 0.26 0.90 0.24 ........... ______ __ Appendix E Channel Design Summary & Reports a Saddle Creek Subdivision -Phase 11 Appendix E Channel Design Summary Street Channel Shape Side Slope Slope Contributing o,. v,. o,. 0100 v, .. o, .. (%) Drainage Areas (cfsl (fps) (ft) (cfs) (fps) (ft) Channel No. 1 V-channel 5:1 4.11 11 .7A, 11.7B 3.28 3.10 0.46 3.88 3.23 0.49 Channel No. 2 V-channel 5:1 0.60 11.2, 11.5 2.80 1.46 0.62 3.30 1.52 0.66 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Channel No 1 -25 yr Storm Triangular Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 0 !'..._ 1 "- = 5.00, 5.00 = 1.00 = 100.00 = 4.11 = 0.035 Known Q = 3.28 !'..._ " ., -' !'... 2 3 4 Section 'Ill: 17 -~ " " / "-/ 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft} Velocity (fUs) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL {ft} / / v / -,, / / 7 8 9 10 Wednesday, Jan 22 2014 = 0.46 = 3.280 = 1.06 = 3.10 = 4.69 = 0.49 = 4.60 = 0.61 / 11 12 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 .......... ________ _ Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 1 -100 yr Storm Triangular Side Slopes (z:1) Total Depth (ft) Invert Elev (ft) Slope (%) N-Value Calculations Compute by: Known Q (cfs) ·Elev (ft) 102.00 101 .50 101.00 100.50 100.00 99.50 0 '-.... .......... = 5.00, 5.00 = 1.00 = 100.00 = 4.1 1 = 0.035 Known Q = 3.88 -. .......... .......... 1-.......... ........ .......... 2 3 4 Section '"" 7 -:: =- '-.... I'... / '-.... / 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim {ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft) / / / / / / I/ 7 8 9 10 Wednesday, Jan 22 2014 = 0.49 = 3.880 = 1.20 = 3.23 = 5.00 = 0.52 = 4.90 = 0.65 / 11 12 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 - ........ _________ _ Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 2 -25 yr Storm Triangular Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q (cfs) Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 0 '-... '-... = 5.00, 5.00 = 1.00 = 100.00 = 0.60 = 0.035 Known Q = 2.80 I'-... """'-. '-... '-... I'-... 2 3 4 "" Section ...._~ -.... Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft) / / / / / / I/ -'-... / '-... I/ 5 6 7 8 9 10 Reach (ft) Wednesday, Jan 22 2014 = 0.62 = 2.800 = 1.92 = 1.46 = 6.32 = 0.46 = 6.20 = 0.65 / -- 11 12 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 2 -100 yr Storm Triangular Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 0 I'... .......... = 5.00, 5.00 = 1.00 = 100.00 = 0.60 = 0.035 Known Q = 3.30 ............ ....... .......... ......... "'- 2 3 4 Section T l'7' -~ ""'-............ / .......... / 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft} Grit Depth, Ye (ft) Top Width (ft) EGL (ft) ,/ / ~ I/ / / / / 7 8 9 10 Wednesday, Jan 22 2014 = 0.66 = 3.300 = 2.18 = 1.52 = 6.73 = 0.49 = 6.60 = 0.70 / 11 12 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Item l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 11 Engineer's Estimate of Street Construction Description Unit Estimated Ouantitv Sitework & Pavement Mobilization/Construction Staking LS l Site Preparation/Clearing and Grubbing AC 7 Topsoil Removal & Replacement LS l Excavation/Grading LS 1 Mixing & incorporation of lime, 6" deep SY 11,800 Hydrated Lime (27 lb/sy) Ton 160 6" Crushed Limestone Base SY 10,580 2" Hot Mix Asphaltic Concrete SY 8,753 Seeding (edge of pavement to ROW & easements) SY 24,500 Unit Price 6,000.00 2,000.00 6,000.00 15,000.00 2.20 170.00 l l.00 11.00 0.30 Sitework and Paving Subtotal Drainage System 18" HDPE Pipe -Structural Backfill LF 30" HDPE Pipe -Structural Backfill LF Silt Fence LF Drainage Channel Excavation and Grading LF Construction Exit EA SWPPP Implementation & Maintenance LS llSTREET ESTIMATED CONSTRUCTION TOT AL ~-123~'1 SCHOLTZ. ENGINEERING~ LLC; 175 56.00 160 72.00 665 2.50 430 15.00 1 1,000.00 1 1,000.00 Drainage Subtotal Total 6,000 14,000 6,000 15,000 25,960 27,200 116,380 96,283 7,350 $314,173 9,800 11,520 1,663 6,450 1,000 1,000 $31,433 $345260~ J Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 11 Engineer's Estimate of Waterline Construction Description Unit Estimated Quantity Water System 8" C900 Water Pipe -Structural Backfill LF 80 8" C900 Water Pipe -Non-Structural Backfill LF 2260 4" C900 Water Pipe -Non-Structural Backfill LF 421 16" PVC Sleeves LF 78 Fire Hydrant Assembly (w/valve, vert. extension) EA 3 8" x 8" M.J. Tee EA 1 8" x 6" M.J. Tee EA 3 8" x 8" M.J. Cross EA 1 12" x 8" M.J. Reducer EA I 8" x 4" M.J. Reducer EA I 8" M.J. Gate Valve EA 7 8" 11.25° M.J. Bend EA I 8" 22.5° M.J. Bend EA 3 8" 45° M.J. Bend EA 4 4" 45° M.J. Bend EA 2 2" Blowoff Assembly EA 4 Connect to Existing Water Line EA 1 I" Water Service -short side EA 3 I" Water Service -long side EA 2 4" PVC Sleeves LF 186 1.5" Water Service -short side EA 3 1.5" Water Service -long side EA 4 Waterline Testing LS 1 Meter Boxes .. EA 19 Unit Price $22 $18 $15 $20 $3,250 $450 $450 $450 $550 $350 $850 $250 $250 $250 $250 $500 $500 $450 $650 $10 $650 $800 $500 $60 ESTIMATED WATERLINE CONSTRUCTIONj SCHULTZ EN~N~NG1 LLC; Page 2 of 4 Total $1,760 $40,680 $6,315 $1,560 $9,750 $450 $1,350 $450 $550 $350 $5,950 $250 $750 $1,000 $500 $2,000 $500 $1,350 $1,300 $1,860 $1,950 $3,200 $500 $1,140 $85146~ Water System Report for Saddle Creek Subdivision Phase 11 Brazos County, Texas January, 2014 Prepared Bv: TBPE Firm Registration No. 12327 2730 Longmire, Suite A College Station, Texas 77845 979.764.3900 F-12321 SCHULTZ ENGIH~NQ. L.LC; General Information Location: General Note: Land Use: Saddle Creek Subdivision, Phase 11, Lots 234, 235, 236A, 236B, 237- 239, Block 10 & Lots 223-226, 227A, 227B & 228, Block 11 The water lines to serve these 19 residential lots will be a 8" & 4" along Saddle Creek Drive, Majestic Oak Court and Broken Spoke Way. The 8" line along Saddle Creek Drive will connect to the 12" line that was constructed in Phase 8 with a reducer. Single family residential Design Criteria/ Analysis Primary Water Supply: Existing 12" water line along Saddle Creek Drive. Existing System Pressure Tests: Flow Hydrant -See Exhibit B Flowrate: 1320 gpm Static Pressure: 90 psi Residual Pressure: 60 psi Exhibits: Exhibit A -Location Map Exhibit B -Hydrant Flow Test Results Appendix A-WaterCAD Analysis Summary -Domestic Demand Appendix B -WaterCAD Analysis Summary-Fire Flow Demand Fire Flow: Domestic Use 1,000 gpm for Single Family Residential 1.5 gpm per lot for Single Family Residential Phase 11 Domestic Demand 19 Lots = 28.5 gpm Phase 12 Domestic Demand 19 Lots= 28.5 gpm Total Domestic Demand 38 Lots= 57 gpm The proposed 8" & 4" waterlines are in accordance with the BCS Water Design Guidelines. This report provides the results of the water system analysis under the fire flow and domestic demand requirements, which produced the lowest pressure in the system. Conclusion Summary of Calculations Pressure 84.1 Domestic Demand Min. Velocity Max 0.36 Pressure 60.7 Domestic Demand & Fire Min. Hydrant 1 Velocity Max 6.75 Pressure 56.3 Domestic Demand & Fire Min. Hydrant 2 Velocity Max 6.75 Pressure 52.2 Domestic Demand & Fire Min. Hydrant 3 Velocity Max 6.75 The minimum pressure (52.2 psi) for this system occurs when a Fire Flow demand is set at Fire Hydrant Number 3. Max Velocity (11.42 fPs, Pipe P-6) for this system occurs when a Fire Flow demand is set at Fire Hydrant Number 1. All of these pressures exceeds the 20 psi and 35 psi minimum pressure requirements, respectively. The maximum pipe velocities are less than 12 fPs. The proposed 8" and 4" water lines meet or exceed all of the design criteria for the City of College Station and the Wellborn Special Utility District except as previously noted. It will provide adequate water pressure, flowrate and velocity for both domestic and fire flow demands. Exhibit A WATER SYSTEM LAYOUT Exhibit B HYDRANT FLOW TEST RESULTS EXHIBIT B SCHULTZ ENGINEERING, LLC FIRM #12327 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT 11 -16-2012 Date: Water System Owner: _Wellborn SUD __________________ _ Saddle Creek Subdivision Development Project: East of the intersection of Latigo Court and Stirrup Drive Flow Test Location: --------------------------- Nozzle size (in .): _2.5 __ 62 Pitot Reading (psi): __ _ 1320 Flowrate (gpm): ___ _ Discharge Coeff: (c) = 0.90 Flowrate Formula: Q=29.84cd2p112 c =discharge coeff. d = orifice size (in) P = pitot pressure (psi) South of the intersection of Saddle Creek Drive and Stirrup Drive Pressure Gauge Location: --------------------------- 90 Static Pressure (psi): 60 Residual Pressure (psi): 2085 Computed Discharge at 20 psi Residual Pressure: QR = ____ _ Note: The flow test and report were prepared in accordance with NFPA 291. Joe Schultz Report Prepared by: Ricky Flores Others Present: Clenden Adams -Wellborn SUD_ _Britt Curless _______ _ F-12327 SCHULTZ ENGINEERING, LLC. Appendix A WATERCAD ANALYSIS SUMMARIES Domestic Demand Pipe Number P-1 P-2 P-3 P-4 P-S P-6 P-7 P-8 P-RES Length (ft) 530 663 100 930 SS 36 443 2S 18 Appendix A WaterCAD Analysis Summary Pipe Analysis -Domestic Demand Size (in) Material Hazen- Williams C 8 PVC lSO 8 PVC lSO 8 PVC 1SO 8 PVC 1SO 8 PVC 1SO 8 PVC 1SO 4 PVC 1SO 8 PVC 1SO 8 PVC 1SO Appendix A WaterCAD Analysis Summary Junction Analysis -Domestic Demand Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 89.7 J-2 276.lS 7 88.3 FH-2 285.35 7 84.3 J-4 283.72 0 8S FH-3 282.25 7 8S.6 J-6 282.24 0 8S.6 FH-1 276.14 0 88.3 J-9 264.89 6 93.1 J-10 28S.83 29 84.1 Flow Velocity (gpm) (ft/s) S7 0.36 44 0.28 ·-· ->---·-----·· 0 0 8 o.os 0 0 6 0.04 6 0.1S 29 0.18 S7 0.36 Appendix B WATERCAD ANALYSIS SUMMARIES Fire Flow Demand Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-RES Length (ft) 530 663 100 930 55 36 443 25 18 Appendix B WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-1) Size (in) Material Hazen- WilliamsC 8 PVC 150 8 PVC 150 ·--- 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 4 PVC 150 8 PVC 150 8 PVC 150 Appendix B WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-1) Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 69.9 J-2 276.15 7 64.9 FH-2 285.35 7 60.9 J-4 283.72 0 61.6 FH-3 282.25 7 62.2 J-6 282.24 0 62.2 FH-1 276.14 1,000 64.6 J-9 264.89 6 69.5 J-10 285.83 29 60.7 Flow Velocity (gom) (ft/s) 1,057 6.75 44 0.28 ---·- 0 0 8 0.05 0 0 1,006 6.42 6 0.15 29 0.18 1,057 6.75 Pipe Number P-1 P-2 P-3 P-4 P-S P-6 P-7 P-8 P-RES Length (ft) S30 663 100 930 SS 36 443 2S 18 Appendix B WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-2) Size (in) Material Hazen- WilliamsC 8 PVC lSO 8 PVC lSO 8 PVC lSO 8 PVC lSO 8 PVC lSO 8 PVC lSO 4 PVC lSO 8 PVC lSO 8 PVC lSO Appendix B WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-2) Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 69.9 J-2 276.lS 7 64.9 FH-2 28S.3S 1,007 S6.5 J-4 283.72 0 S7.2 FH-3 282.25 7 57.9 J-6 282.24 0 S7.9 FH-1 276.14 0 64.9 J-9 264.89 6 69.7 J-10 285.83 29 56.3 Flow Velocity le:om) (ft/s) l ,OS7 6.7S ----- 1,044 6.66 -· ·- 0 0 8 o.os 0 0 6 0.04 6 O.lS 29 0.18 1,0S7 6.7S I • Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-RES Length (ft) 530 663 Appendix B WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-3) Size (in) Material Hazen- WilliamsC 8 PVC 150 8 PVC 150 --· 100 8 PVC 150 930 8 PVC 150 55 8 PVC 150 36 8 PVC 150 443 4 PVC 150 25 8 PVC 150 - 18 8 PVC 150 Appendix B WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-3) Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 69.9 J-2 276.15 7 64.9 FH-2 285.35 7 56.5 J-4 283.72 0 57.2 FH-3 282.25 1,007 52.2 J-6 282.24 0 52.2 FH-1 276.14 0 64.9 J-9 264.89 6 69.7 J-10 285.83 29 56.3 Flow Velocity (gom) (ft/s) 1,057 6.75 1,044 6.66 0 0 1,008 6.43 0 0 6 0.04 6 0.15 29 0.18 1,057 6.75 Water System Report for Saddle Creek Subdivision Phase 11 Brazos County, Texas January, 2014 Prepared Bv: TBPE Firm Registration No. 12327 2730 Longmire, Suite A College Station, Texas 77845 979.764.3900 r-12321 SCHUliZ EN~H~~G, LLC; General Information Location: General Note: Land Use: Saddle Creek Subdivision, Phase 11, Lots 234, 235, 236A, 236B, 237- 239, Block 10 & Lots 223-226, 227A, 227B & 228, Block 11 The water lines to serve these 19 residential lots will be a 8" & 4" along Saddle Creek Drive, Majestic Oak Court and Broken Spoke Way. The 8" line along Saddle Creek Drive will connect to the 12" line that was constructed in Phase 8 with a reducer. Single family residential Design Criteria/ Analysis Primary Water Supply: Existing 12" water line along Saddle Creek Drive. Existing System Pressure Tests: Flow Hydrant -See Exhibit B Flowrate: 1320 gpm Static Pressure: 90 psi Residual Pressure: 60 psi Exhibits: Exhibit A -Location Map Exhibit B -Hydrant Flow Test Results Appendix A -WaterCAD Analysis Summary -Domestic Demand Appendix B -WaterCAD Analysis Summary -Fire Flow Demand Fire Flow: Domestic Use 1,000 gpm for Single Family Residential 1.5 gpm per lot for Single Family Residential Phase 11 Domestic Demand 19 Lots = 28 .5 gpm Phase 12 Domestic Demand 19 Lots= 28.5 gpm Total Domestic Demand 38 Lots= 57 gpm The proposed 8" & 4" waterlines are in accordance with the BCS Water Design Guidelines. This report provides the results of the water system analysis under the fire flow and domestic demand requirements, which produced the lowest pressure in the system. Conclusion Summary of Calculations Pressure 84.1 Domestic Demand Min. Velocity Max 0.36 Pressure 60.7 Domestic Demand & Fire Min. Hydrant 1 Velocity Max 6.75 Pressure 56.3 Domestic Demand & Fire Min. Hydrant 2 Velocity Max 6.75 Pressure 52.2 Domestic Demand & Fire Min. Hydrant 3 Velocity Max 6.75 The minimum pressure (52.2 psi) for this system occurs when a Fire Flow demand is set at Fire Hydrant Number 3. Max Velocity (11.42 fps, Pipe P-6) for this system occurs when a Fire Flow demand is set at Fire Hydrant Number 1. All of these pressures exceeds the 20 psi and 35 psi minimum pressure requirements, respectively. The maximum pipe velocities are less than 12 fps. The proposed 8" and 4" water lines meet or exceed all of the design criteria for the City of College Station and the Wellborn Special Utility District except as previously noted. It will provide adequate water pressure, flowrate and velocity for both domestic and fire flow demands. Exhibit A WATER SYSTEM LAYOUT Exhibit B HYDRANT FLOW TEST RESULTS EXHIBIT B SCHULTZ ENGINEERING, LLC FIRM #12327 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT 11-16-2012 Date: Water System Owner: _Wellborn SUD __________________ _ Saddle Creek Subdivision Development Project: East of the intersection of Latigo Court and Stirrup Drive Flow Test Location: --------------------------- Nozzle size (in .): _2.5 __ 62 Pitot Reading (psi): __ _ 1320 Flowrate (gpm): ___ _ Discharge Coeff: (c) = 0.90 Flowrate Formula: Q=29.84cd2p112 c = discharge coeff. d =orifice size (in) P = pitot pressure (psi) South of the intersection of Saddle Creek Drive and Stirrup Drive Pressure Gauge Location: --------------------------- 90 Static Pressure (psi): 60 Residual Pressure (psi): 2085 Computed Discharge at 20 psi Residual Pressure: QR = ____ _ Note: The flow test and report were prepared in accordance with NFPA 291. Joe Schultz Report Prepared by: Ricky Flores Others Present: Clenden Adams -Wellborn SUD_ _Britt Curless -------- F'-12327 SCHULTZ ENGINEERING, LLC. Appendix A WATERCAD ANALYSIS SUMMARIES Domestic Demand Pipe Number P-1 - P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-RES Length (ft) 530 663 100 930 55 36 443 25 18 Appendix A WaterCAD Analysis Summary Pipe Analysis -Domestic Demand Size (in) Material Hazen- Williams C 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 4 PVC 150 8 PVC 150 8 PVC 150 Appendix A WaterCAD Analysis Summary Junction Analysis -Domestic Demand Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 89.7 J-2 276.15 7 88.3 FH-2 285.35 7 84.3 J-4 283.72 0 85 FH-3 282.25 7 85.6 J-6 282.24 0 85.6 FH-1 276.14 0 88.3 J-9 264.89 6 93 .1 J-10 285.83 29 84.1 Flow Velocity (gpm) (ft/s) 57 0.36 44 0.28 ->------·- 0 0 8 0.05 0 0 6 0.04 6 0.15 29 0.18 57 0.36 ----_______________ __... Appendix B WATERCAD ANALYSIS SUMMARIES Fire Flow Demand Pipe Number P-1 -- P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-RES Length (ft) 530 663 100 930 SS 36 443 25 18 Appendix B WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-1) Size (in) Material Hazen- WilliamsC 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 4 PVC 150 8 PVC 150 8 PVC 150 Appendix B WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-1) Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 69.9 J-2 276.15 7 64.9 FH-2 285.35 7 60.9 J-4 283.72 0 61.6 FH-3 282.25 7 62.2 J-6 282.24 0 62.2 FH-1 276.14 1,000 64.6 J-9 264.89 6 69.5 J-10 285.83 29 60.7 Flow Velocity (gpm) (ft/s) 1,057 6.75 44 0.28 0 0 8 0.05 0 0 1,006 6.42 6 0.15 29 0.18 1,057 6.75 Pipe Number P-1 P-2 P-3 P-4 P-S P-6 P-7 P-8 ~· P-RES Length {ft) S30 663 100 930 SS 36 443 2S 18 Appendix B WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand {FH-2) Size (in) Material Hazen- WilliamsC 8 PVC lSO 8 PVC lSO --· 8 PVC lSO 8 PVC lSO 8 PVC lSO 8 PVC lSO 4 PVC lSO 8 PVC lSO 8 PVC lSO Appendix B WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand {FH-2) Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 69.9 J-2 276.lS 7 64.9 FH-2 28S.3S 1,007 S6.S J-4 283.72 0 S7.2 FH-3 282.2S 7 57.9 J-6 282.24 0 S7.9 FH-1 276.14 0 64.9 J-9 264.89 6 69.7 J-10 28S.83 29 S6.3 Flow Velocity {gom) (ft/s) 1,0S7 6.7S 1,044 6.66 -- 0 0 - 8 o.os 0 0 6 0.04 6 O.lS 29 0.18 1,0S7 6.7S Pipe Number P-1 P-2 .. P-3 P-4 P-5 P-6 P-7 P-8 P-RES Appendix B WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-3) Length (ft) Size (in) Material Hazen- WilliamsC 530 8 PVC 150 ,._ - 663 8 PVC 150 -~-- 100 8 PVC 150 930 8 PVC 150 55 8 PVC 150 36 8 PVC 150 443 4 PVC 150 25 8 PVC 150 18 8 PVC 150 Appendix B WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-3) Junction Junction Elevation Demand Pressure (gpm) (psi) J-1 272.81 0 69.9 J-2 276.15 7 64.9 FH -2 285.35 7 56.5 J-4 283.72 0 57.2 FH-3 282.25 1,007 52.2 J-6 282.24 0 52.2 FH-1 276.14 0 64.9 J-9 264.89 6 69.7 J-10 285.83 29 56.3 Flow Velocity (1rnm) (ft/s) 1,057 6.75 1,044 6.66 0 0 1,008 6.43 0 0 6 0.04 6 0.15 29 0.18 1,057 6.75 FOR OFFICE US,f ONLY CASE NO., ~ :"63 DATE SUBMITTED: • , Q\ l Cf; TIME: ra·. \l3 C1TY OF Cm.LEGE STATION Home o/Texas A&M Univmity0 FINAL PLAT APPLICATION STAFF: ~ (Check one) 0 Minor ($700) 0 Amending ($700) \.~'Final ($932) 0 Vacating ($932) 0Replat ($932) Is this plat in the ET J? [g] Yes D No Is this plat Commercial D or Residential [g] MINIMUM SUBMITTAL REQUIREMENTS: ~ $700-$932 Final Plat Application Fee (see above). I"@ $233 Waiver Request to Subdivision Regulations Fee (if applicable). ,_1)IB $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). ·JXI' Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. @ Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) @ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ~ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). r')@ Copy of original deed restrictions/covenants for replats (if applicable). ~ Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. "® Paid tax certificates from City of College Station, Brazos County and College Station l.S.D. ~The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference 1012412005 --------------~ NAME OF PROJECT Saddle Creek Subdivision Phase 11 ADDRESS Saddle Creek Drive SPECIFIED LOCATION OF PROPOSED PLAT: at Wade Rd & Stousland Rd in Brazos County in College Station ET J. APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Saddle Creek Partners, LTD -ML Schehin E-mail ml@mls-development.com Street Address 4440 Bentwood Drive City College Station State TX Zip Code _7_78_4_5 ___ _ Phone Number (979) 690-2642 Fax Number (979) 690-2793 --------------~ 1/11 Page 1 of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): Name Saddle Creek Partners, LTD -ML Schehin E-mail ml@mls-development.com Street Address 4440 Bentwood Drive City College Station State TX Zip Code _7_78_4_5 ___ _ Phone Number (979) 690-2642 Fax Number (979) 690-2793 ---------------~ ARCHITECT OR ENGINEER'S INFORMATION: Name Schultz Engineering, LLC -Joe Schultz E-mail joeschultz84@verizon.net Street Address 2730 Longmire Drive, Suite A City College Station State Texas Zip Code _7_78_4_5 ___ _ Phone Number (979) 764-3900 Fax Number (979) 764-3910 ----------------- Do any deed restrictions or covenants exist for this property? D Yes [RI No Is there a temporary blanket easement on this property? If so , please provide the Volume ____ and Page No. __ _ Total No. of Lots 19 ------R-0-W Acreage _5_. 3_2_7 ____ _ Total Acreage 34.025 ---------- Existing use _V_a_ca_n_t ___________ _ Proposed Use _R_e_s1_·d_en_t_ia_I ___________ _ Number of Lots By Zoning District nla I I Average Acreage Of Each Residential Lot By Zoning District: 1 ac mi 1 ETJ ---'--- Floodplain Acreage 0 ---------------------------------~ Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? IX No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? 15?} Yes C No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: SADDLE CREEK (PP) City Project Number (if known): Date I Timeframe when submitted: 02/14 1/11 Page 2 of 9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): NIA Requested waiver to subdivision regulations and reason for same (if applicable): Regarding the waiver request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of th e subdivision requlations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. n An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way; 2. D The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan; 3. [] A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4. [J Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate / rural context; 5. []When a sidewalk is required along a street where a multi-use path is shown on the Bicycle, Pedestr;an, and Greenways Master Plan ; 1/1 1 Page 3 of 9 6. D The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7. D The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6, Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan. NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. Total Linear Footage of Proposed Public: Z?-81-Streets Sidewalks -- ---Sanitary Sewer Lines Z1c. I Water Lines CfJo Channels 335' Storm Sewers --Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: ___ No. of acres to be dedicated + $ ____ development fee ___ No. of acres in floodplain ___ No. of acres in detention ---No. of acres in greenways OR FEE IN LIEU OF LAND: __ No. of SF Dwelling Units X $ = $ -------- (date) Approved by Parks & Recreation Advisory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPL/CATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf LIEN HOLDERS identified in the title report are a/so considered owners and the appropriate signatures must be provided as described above. Sign~ture and title Date 1/11 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. v:.22u.;;x;L c:;:/ c:. // Property Owner(s) Date Engineer Certification: 1/11 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ord inances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, J\~~-l~}~~~CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVEL1'~t'_~R~!~;ucATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRU E, AND ACCURATE. a • c ~;;.~~ • (,\ "· c~ fl:.. eo · .. A ,, 0 t~"' ~ ~ ~ ~1 00 e>•o •oftc ~eooeoeec(tae lf'<a.il -l P. SCi-fiJ l'fZ r, Ol"•••fl•eci""'·...... ,. ,.( Date Page 5 of 9 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas . Required for Site Plans, Final Plats, Construction Plans, Fill/ Grading Permits, and Clearing Only Permits:* certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Cod e of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances. Engineer Date Initial D * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date ! I 1/11 Page 6 of 9 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer I Surveyor Date Commercial Structures: E. I, , certify that all new construction or any substantial improvement ~~~~~~~~~~~~~~~~ of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Conditions or comments as part of approval: 1 /11 Page 7 of9 Existing [8] 1/11 FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) [8] Drawn on 24" x 36" sheet to scale of 100' per inch. [8] Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. [8] Title Block with the following information: [8] Name and address of subdivider, recorded owner, planner, engineer and surveyor. [8] Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911.) [8] Date of preparation. [8] Engineer's scale in feet. [8] Total area intended to be developed. North Arrow. Subdivision boundary indicated by heavy lines. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. All applicable certifications based on the type of final plat. [8] Ownership and Dedication [8] Surveyor and/or Engineer [8] City Engineer (and City Planner, if a minor plat) ti)\[] Planning and Zoning Commission (delete if minor plat) [8] Brazos County Clerk [8] Brazos County Commissioners Court Approval (ET J Plats only) If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brnzos County Health Unit under the provisions of the private facility regulations adopted by the Co mmissioner's Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. Location of the 100-Year Floodplain and floodway, if applicable, according to the most rece nt available data. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2). The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Proposed [8] Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O.W. locations and widths. (All existing and proposed RO.W 's sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance. Page 8 of 9 . . Existing Proposed D iv)!f.v [8J D rv) A-Alleys. l8J Easements. [8J D rJI< l8J A number or letter to identify each lot or site and each block (numbered sequentially). 0 rJfr Parkland dedication/greenbelt area/park linkages. All proposed dedications mu st be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation provided prior to being scheduled for P&Z Commission consideration. [8J Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Eng ineer that include the following : (8) Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street, alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). Sewer Design Report. Sanitary sewer plan and profile showing depth and grades. overall sewer layout of the subdivision. (Utilities of sufficient master plan and any future growth areas.) Water Design Report and/or Fire Flow Report. One sheet must s:iow the size/depth to meet the utility Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and an y future growth areas.) Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the.subdivision. (8) Detailed cost estimates for all public infrastructure listed above sealed by Texa s P.E. O Letter of completion for public infrastructure or guarantee I surety in accordance with UDO Section 8.6. (8) Drainage Report with a Technical Design Summary. [8J Erosion Control Plan (must be included in construction plans). l8J All off-site easements necessary for infrastructure construction must be shown on the final piat with a volume and page listed to ind icate where the separate instrument easements were filed . Separate instrument easements must be provided in recordable form to the City prior to being scheduled for P&Z Commission consideration. [8J Are there impact fees associated with this development? 0 Yes [8J No Impact fees must be paid prior to building permit. [8J Will any construction occur in TxDOT rights-of-way? D Yes l8J No If yes, TxDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat at the Courthouse. 1 /11 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to issuance of a development permit. Page 9 or 9 February 7, 2014 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas Office: 979.764.3900 Fax: 979 .764.3910 RE: Letter Acknowledging City Standards -Saddle Creek Subdivision -Phase 11, Brazos County, Texas Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water line, roadway and drainage construction for the above-referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. Si Jos ph P. Schultz, P.E. Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Item l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 11 Engineer's Estimate of Street Construction Description Unit Estimated Ouantitv Sitework & Pavement Mobilization/Construction Staking LS l Site Preparation/Clearing and Grubbing AC 7 Topsoil Removal & Replacement LS 1 Excavation/Grading LS 1 Mixing & incorporation oflime, 6" deep SY 11 ,800 Hydrated Lime (27 lb/sy) Ton 160 6" Crushed Limestone Base SY 10,580 2" Hot Mix Asphaltic Concrete SY 8,753 Seeding (edge of pavement to ROW & easements) SY 24,500 Unit Price 6,000.00 2,000.00 6,000.00 15,000.00 2.20 170.00 11.00 11.00 0.30 Sitework and Paving Subtotal Drainage System 18" HDPE Pipe -Structural Backfill LF 30" HDPE Pipe -Structural Backfill LF Silt Fence LF Drainage Channel Excavation and Grading LF Construction Exit EA SWPPP Implementation & Maintenance LS l~TREET ESTIMATED CONSTRUCTION TOTAL f"-123~~ S.CHOLTZ. EN~INE~.l~G~ LLC; 175 56.00 160 72.00 665 2.50 430 15.00 l 1,000.00 1 1,000.00 Drainage Subtotal Total 6,000 14,000 6,000 15,000 25,960 27,200 116,380 96,283 7,350 $314,173 9,800 11,520 1,663 6,450 1,000 1,000 $31,433 $345260~ Item l 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 11 Engineer's Estimate of Waterline Construction Description Unit Estimated Quantity Water System 8" C900 Water Pipe -Structural Backfill LF 80 8" C900 Water Pipe -Non-Structural Backfill LF 2260 4" C900 Water Pipe -Non-Structural Backfill LF 421 16" PVC Sleeves LF 78 Fire Hydrant Assembly (w/valve, vert. extension) EA 3 8" x 8" M.J. Tee EA I 8" x 6" M.J. Tee EA 3 8" x 8" M.J. Cross EA I 12" x 8" M.J. Reducer EA I 8" x 4" M.J. Reducer EA I 8" M.J. Gate Valve EA 7 8" I 1.25° M.J. Bend EA l 8" 22.5° M.J. Bend EA 3 8" 45° M.J. Bend EA 4 4" 45° M.J. Bend EA 2 2" Blowoff Assembly EA 4 Connect to Existing Water Line EA l l" Water Service -short side EA 3 l" Water Service -long side EA 2 4" PVC Sleeves LP 186 1.5" Water Service -short side EA 3 1.5" Water Service -long side EA 4 Waterline Testing LS l Meter Boxes .. EA 19 Unit Price $22 $18 $15 $20 $3,250 $450 $450 $450 $550 $350 $850 $250 $250 $250 $250 $500 $500 $450 $650 $10 $650 $800 $500 $60 ESTIMATED WATERLINE CONSTRUCTION! SCHULTz ENGINEER1NG9 U.C::. Page 2 of 4 Total $1 ,760 $40,680 $6,315 $1,560 $9,750 $450 $1,350 $450 $550 $350 $5,950 $250 $750 $1,000 $500 $2,000 $500 $1 ,350 $1 ,300 $1,860 $1,950 $3,200 $500 $1,140 $85146~ Drainage Report for Saddle Creek Subdivision, Phase 11 Brazos County, Texas January 2014 Engineer: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 Developer: Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 / ENGINEER Schultz Engineering, LLC. P.O. Box 11995 Saddle Creek Subdivision, Phase 11 Drainage Report College Station, Texas 77842 Phone: (979) 764-3900 Fax: (979) 764 OWNER/DEVELOPER Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 GENERAL DESCRIPTION AND LOCATION Location: Description: • Area: • Proposed Land Use: • #of Lots: • Existing Land Use: • Land Description: Primary Drainage Facility: Flood Hazard Information: FEMAFIRM: Floodplain: Saddle Creek Subdivision, Phase 11, is located on the south west side of FM 2154, off of Stousland Rd. 34.025 acres Single Family Residential 19 lots Vacant The terrain slopes towards the southwest. Boggy Creek # 48041C0375E (May 16, 2012) Un-shaded Zone X HYDROLOGIC CHARACTERISTICS The existing site is predominately wooded. The elevations range from 288 to 257, sloping generally in a south westerly direction. The runnoff enters tributaries of Boggy Creek. GENERALSTORMWATERPLAN The drainage plan for this development will involve the construction of ditches, channels and the installation of culvert structures. DRAINAGE DESIGN General Information: Stormwater runoff from Phase 11 of the subdivision will be collected in the ditches along Saddle Creek Drive, Majestic Oak Court and Broken Spoke Way to be discharged into proposed drainage channels. The proposed channels will discharge into existing drainage ways. See Exhibit A for drainage areas and culvert locations. See Exhibit C for drainage areas and locations. Page I of3 Tc Methodology: Tc Minimum Design Storm Event: Culvert Materials: Manning's n Value: Runoff Coefficient: TR55 10 minutes 25-year & 100-year -residential street & culvert, drainage channel HDPE Pipe with cement stabilized sand backfill 0.012 0.45 The Rational Equation was used for the ditch and channel design. Design Results -Culvert Pipe: Culvert No. 1101 1102 1103 1104 Culvert Size 2-30" Pipes 1-18" Pipe 1-18" Pipe 1-18" Pipe Top of Road Elev. 268.34 278.23 284.68 284.39 Design Results -Channels: Q2s 52.91 2.31 2.62 1.38 V2s 7.20 3.86 4.02 3.30 HW2s 263.63 276.26 282.89 282.02 Q100 63.25 2.72 3.35 1.62 V100 7.84 4.07 4.38 3.46 HW100 264.11 276.35 283.05 282.08 The data presented above and in the Appendices indicates the culvert size is in accordance with the requirements. The head water elevation for the culvert is less than the top of road elevation for the 100-yr storm runoff. The ditch at the outlet of the proposed culvert will be lined with rock riprap to prevent erosion from high velocities. The velocities in the roadside ditches will be such that grass lined ditches are adequate. Channel No. 1 2 Slo e 4.11 0.60 Q2s 3.28 2.80 V2s 3.10 1.46 D2s 0.46 0.62 100 3.88 3.30 V100 3.23 1.52 D100 0.49 0.66 Channel No. 1 has a V-bottom, 5H:lV side slopes. The channel will have a minimum depth of l' for adequate freeboard. The design velocity is less than 4.5 fps which allows a grass lined channel. Channel No. 2 has a V-bottom, 5H:lV side slopes. The channel will have a minimum depth of 1.5' for adequate freeboard. The design velocity is less than 4.5 fps which allows a grass lined channel. Page 2 of3 Applicable Exhibits: CONCLUSION CERTIFICATION Exhibit A - ExhibitB - Exhibit C - Appendix A - AppendixB - AppendixC- AppendixD- Appendix E- Drainage Area Map -Culvert Design Drainage Area Map -Ditch Design Drainage Area Map -Channel Design Drainage Area Summary Time of Concentration Pipe Design Summary & Culvert Reports Ditch Design Summary Channel Design Summary and Reports The culverts, roadside ditches, and drainage channel for this subdivision were designed in accordance with appropriate engineering standards. I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Saddle Creek Subdivision, Phase 11, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge Department. Page 3 of3 Exhibit A Drainage Area Map Culvert Design .~· ••-V-Exhibit B Drainage Area Map Ditch Design Exhibit C Drainage Area Map Channel Design Appendix A Drainage Area Summary Saddle Creek Subdivision -Phase 11 Appendix A Drainage Area Summary Rational Method Area , A c Area# (acres) 11.1 27.30 0.45 11.1A 6.94 0.45 11.18 0.05 0.45 11.1C 0.16 0.45 11.10 0.55 0.45 11 .1E 0.18 0.45 11 .1 F 19.42 0.45 11.2 0.32 0.45 11 .2A 0.05 0.45 11 .28 0.11 0.45 11.2C 0.16 0.45 11.3 0.59 0.45 11 .3A 0.17 0.45 11 .38 0.07 0.45 11 .3C 0.07 0.45 11.30 0.28 0.45 11.4 0.52 0.45 11.4A 0.16 0.45 11.48 0.18 0.45 11 .4C 0.18 0.45 11.5 0.31 0.45 11.5A 0.04 0.45 11.58 0.11 0.45 11 .5C 0.16 0.45 11 .6A 0.32 0.45 11 .68 O.Q7 0.45 11.60 0.06 0.45 11.6E 0.03 0.45 11.6F 0.17 0.45 11.6G 0.18 0.45 11.7A 0.34 0.45 11 .78 0.40 0.45 11.8A 0.12 0.45 11.88 0.23 0.45 11.8C 0.20 0.45 11 .80 0.16 0.45 The Rational Method: Q = CIA I = b I (tc+d)e le 25 year storm 125 0 25 (min) (in/hr) (cfs) 47.0 4.307 52.91 47.0 4.307 13.45 10.0 9.861 0.22 10.0 9.861 0.71 10.0 9.861 2.44 10.0 9.861 0.80 47.0 4.307 37.64 10.0 9.861 1.42 10.0 9.861 0.22 10.0 9.861 0.49 10.0 9.861 . 0.71 10.0 9.861 2.62 10.0 9.861 0.75 10.0 9.861 0.31 10.0 9.861 0.31 10.0 9.861 1.24 10.0 9.861 2.31 10.0 9.861 0.71 10.0 9.861 0.80 10.0 9.861 0.80 10.0 9.861 1.38 10.0 9.861 0.18 10.0 9.861 0.49 10.0 9.861 0.71 10.0 9.861 1.42 10.0 9.861 0.31 10.0 9.861 0.27 10.0 9.861 0.13 10.0 9.861 0.75 10.0 9.861 0.80 10.0 9.861 1.51 10.0 9.861 1.78 10.0 9.861 0.53 10.0 9.861 1.02 10.0 9.861 0.89 10.0 9.861 0.71 Q =Flow (cfs) tc =Time of concentration (min) A = Area (acres) C = Runoff Coeff. I = Rainfall Intensity (in/hr) Brazos County: 25 '{.ear storm 100 '{_ear storm b= 89 b= 96 d= 8.5 d= 8.0 e= 0.754 e= 0.730 100 year storm 1100 0 100 (in/hr) (cfs) 5.150 63.27 5.150 16.08 11 .639 0.26 11 .639 0.84 11.639 2.88 11 .639 0.94 5.150 45.01 11.639 1.68 11 .639 0.26 11 .639 0.58 11 .639 0.84 11.639 3.09 11 .639 0.89 11 .639 0.37 11 .639 0.37 11.639 1.47 11.639 2.72 11 .639 0.84 11 .639 0.94 11 .639 0.94 11.639 1.62 11 .639 0.21 11 .639 0.58 11 .639 0.84 11 .639 1.68 11 .639 0.37 11 .639 0.31 11.639 0.16 11.639 0.89 11.639 0.94 11.639 1.78 11.639 2.10 11.639 0.63 11 .639 1.20 11 .639 1.05 11 .639 0.84 tc = L/(V*60) L = Length (ft V =Velocity (ft/sec) Appendix B Time of Concentration I APPENDIX B POST DEVELOPMENT TIME OF CONCENTRATION COMPUTATIONS Saddle Creek Phase 10 T ..,.., = time of concentration for sheet flow (hr) L = length (ft) n = Manning's roughness P2 = 2-yr rainfall intensity (in/hr) for Brazos Co. = 4.5 in/hr S = slope (tuft) Sheet Flow Drainage n Slope T,._ Area# % min. 11.1 11 .1A 11.1 F Concentrated Flow Length Slope Velocity ft % TR-55 Method Vconc =water velocity in ditch (fUsec) S = slope of ditch (!Ult) V 0u11., = water velocity in gutter (fUsec) S = slope of gutter (tuft) Gutter Flow - 1 T__, Slope Velocity min ft/sec T paved Length min ft T = travel time through ditch or gutter (min) L = length of travel path (ft) V = velocity (ft/sec) Gutter Flow -2 Slope Velocity r .. ,.. Total % ttisec min min 47 47 47 Tc Design min Appendix C Culvert Design Summary & Culvert Reports Saddle Creek Subdivision -Phase 11 Appendix C Culvert Design Summary Pipe Pipe Size Length Slope Contributing 025 V2s 0100 V100 No. Drainage (in) (ft) (%) Areas (cfs) (fps) (cfs) (fps) 1101 2-30" 80 1.00 11.1 52.91 7.20 63.27 7.84 1102 18" 59 3.50 11.4 2.31 3.86 2.72 4.07 1103 18" 56 1.50 11.3 2.62 4.02 3.35 4.38 1104 18" 60 1.00 11.5 1.38 3.30 1.62 3.46 -, Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1101 -25 yr Storm Invert Elev On (ft) = 260.00 Calculations Pipe Length (ft) = 80.00 Qmin (cfs) = 52.91 Slope(%) = 1.00 Qmax (cfs) = 63.27 Invert Elev Up (ft) = 260.80 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 30.0 Shape = Circular Highlighted Span (in) = 30.0 Qtotal ( cfs) = 52.91 No. Barrels = 2 Qpipe (cfs) = 52.91 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 5.95 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.20 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft) = 262.13 HGL Up (ft) = 262.55 Embankment Hw Elev (ft) = 263.63 Top Elevation (ft) = 268.33 Hw/O (ft) = 1.13 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 aev(ftl Pipe 1161 -25 yr Stonn HwOep!h (fO 259.00 8.20 ZSB.00 720 2&7.00 620 266.00 '5.20 265.00 uo 264.00 3.20 263.00 2..211 262.00 1.20 251.00 020 260.00 -0.80 259.00 -1.80 0 10 20 120 --Circtdareutvert --HGl --Embank Reach (ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1101 -100 yr Storm Invert Elev On (ft) = 260.00 Calculations Pipe Length (ft) = 80.00 Qmin (cfs) = 52.91 Slope(%) = 1.00 Qmax (cfs) = 63.27 Invert Elev Up (ft) = 260.80 Tailwater Elev (ft} = (dc+0)/2 Rise (in) = 30.0 Shape = Circular Highlighted Span (in) = 30.0 Qtotal ( cfs) = 63.25 No. Barrels = 2 Qpipe (cfs) = 63.25 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 6.90 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.84 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft} = 262.21 HGL Up (ft) = 262.71 Embankment Hw Elev (ft) = 264.11 Top Elevation (ft) = 268.33 Hw/O (ft) = 1.33 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 Bev(ft) Pipe 1101 -100 yr Stonn HwOepth (ft) 269.00 820 Z68.00 7.20 ZSJ'.00 620 266.00 5.2J) 265.00 ~.zo 264.00 320 263.00 2.ZO 262.00 1.ZO 261.00 0.20 260.00 -0.80 269.00 -1.80 0 10 20 120 --Cira.Carcutvert --HGL --Embank Reach (II.) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 201 4 Pipe 1102 -25 yr Storm Invert Elev On (ft) = 273.35 Calculations Pipe Length (ft) = 59.20 Qmin (cfs) = 2.31 Slope(%) = 3.50 Qmax (cfs) = 2.72 Invert Elev Up (ft) = 275.42 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 15.6 Shape = Circular Highlighted Span (in) = 15.6 Qtotal (cfs) = 2.31 No. Barrels = 1 Qpipe (cfs) = 2.31 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 2.22 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.86 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft) = 274.30 HGL Up (ft) = 276.02 Embankment Hw Elev (ft) = 276.26 Top Elevation (ft) = 278.23 Hw/O (ft) = 0.64 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 Eev (ft) Pipe 1102 -25 yr Sto1111 Hw Oeplh {!\) 279.oo ~---~------~------~-~----~-~~-3.sa 0 5 --CircuJarcutvert --HGL --Embank Read! {ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Pipe 1102 -100 yr Storm Invert Elev On (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft} Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft} Elev (ft) 279.00 = 273.35 = 59.20 = 3.50 = 275.42 = 15.6 = Circular = 15.6 = 1 = 0.012 = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 278.23 = 30.00 = 30.00 Pipe 1102 -100 yr Storm Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal ( cfs) Qpipe (cfs) Qovertop ( cfs) Veloc On (ft/s) Veloc Up (ft/s) HGL On (ft) HGL Up (ft) Hw Elev (ft) Hw/O (ft) Flow Regime Wednesday, Jan 22 2014 = 2.31 = 2.72 = (dc+0)/2 = 2.72 = 2.72 = 0.00 = 2.54 = 4.07 = 274.33 = 276.07 = 276.35 = 0.72 = Inlet Control HwOep!h (ti) 3.58 2n.oo --+----+--+------if---+---+--+---f---+---+--+---f---+---+--+---t-----+--3.42 0 5 10 15 20 2'5 30 35 <40 45 ID 56 60 65 70 75 BO --Circulareutvert --HGL --Embank R•acl!(ft} -~(.!.-. .- Cu Ive rt Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1103 -25 yr Storm Invert Elev Dn (ft) = 281.13 Calculations Pipe Length (ft) = 56.00 Qmin (cfs) = 2.62 Slope(%) = 1.50 Qmax (cfs) = 3.35 Invert Elev Up (ft) = 281.97 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 15.6 Shape = Circular Highlighted Span (in) = 15.6 Qtotal (cfs) = 2.62 No. Barrels = 1 Qpipe (cfs) = 2.62 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 2.47 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.02 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 282.10 HGL Up (ft) = 282.61 Embankment Hw Elev (ft) = 282.89 Top Elevation (ft) = 284.68 Hw/D (ft) = 0.71 Top Width (ft} = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 Elev (ft) Pipe 1103 -25 yr Stonn 1-fN Depth (fl) 285.oo ~---~-~~---~-~~---~-~~~--~-~~-3.03 0 5 --Circularruvert --HGl --Embank Reacll(ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Pipe 1103 -100 yr Storm Invert Elev Dn (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M ,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Elev (ft) 285.00 = 281.13 = 56 .00 = 1.50 = 281.97 = 15.6 = Circular = 15.6 = 1 = 0.012 , = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 284.68 = 30.00 = 30.00 Pipe 1103 -25 yr Storm Wednesday, Jan 22 2014 Calculations Qmin (cfs) = 2.62 Qmax (cfs) = 3.35 Tailwater Elev {ft) = (dc+D)/2 Highlighted Qtotal ( cfs) = 3.35 Qpipe (cfs) = 3.35 Qovertop ( cfs) = 0.00 Veloc Dn (ft/s) = 3.01 Veloc Up (ft/s) = 4.38 HGL Dn (ft) = 282.14 HGL Up (ft) = 282.70 Hw Elev (ft) = 283.05 Hw/D (ft) = 0.83 Flow Regime = Inlet Control 280.00 --+-0--+5---+-10--+t5--21-0 --+-25--+30--+-35--+40--i~l--,.5 --+-.511--+5-5 -60+----+65--i70C----+-75--+80-•1·97 --ClrcUlarCUtvert --HGL --Embank Reach {ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1104 -25 yr Storm Invert Elev On (ft) = 280.79 Calculations Pipe Length (ft) = 60.00 Qmin (cfs) = 1.38 Slope(%) = 1.00 Qmax (cfs) = 1.62 Invert.Elev Up (ft) = 281 .39 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 15.6 Shape = Circular Highlighted Span (in) = 15.6 Qtotal (cfs) = 1.38 No. Barrels = 1 Qpipe (cfs) = 1.38 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 1.44 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.30 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft) = 281.67 HGL Up (ft) = 281 .85 Embankment Hw Elev (ft) = 282.02 Top Elevation (ft) = 284.39 Hw/O (ft) = 0.49 Top Width (ft) = 30 .00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 Bev (n) Pipe 1104 -25 yr Storm Hw Oep!h (ft) 285.00 ~-~-~-~---..-~-~-,.------..-~-~-...-----..-~-~-...-----,.-3.61 0 5 --CircularCulvert --HGl --Embank Reach (It) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Wednesday, Jan 22 2014 Pipe 1104 -100 yr Storm Invert Elev On (ft) = 280.79 Calculations Pipe Length (ft) = 60.00 Qmin (cfs) = 1.38 Slope(%) = 1.00 Qmax (cfs) = 1.62 Invert Elev Up (ft) = 281 .39 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 15.6 Shape = Circular Highlighted Span (in) = 15.6 Qtotal ( cfs) = 1.62 No. Barrels = 1 Qpipe (cfs) = 1.62 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Circular Concrete Veloc On (ft/s) = 1.65 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.46 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL On (ft) = 281 .69 HGL Up (ft) = 281 .89 Embankment Hw Elev (ft) = 282.08 Top Elevation (ft) = 284.39 Hw/O (ft) = 0.53 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 Elev (ft) Pipe 1104 -100 yr Storm Hw Oeplh (l\l 285.00 --.---.-----.---.-----.----.-----.---.------,.---,---.--.------,.---,---,--.----.-3.6t --CirettarCUlvert --HGL --Embank Reacll {ft} Appendix D Ditch Design Summary Saddle Creek Subdivision -Phase 11 Appendix D Ditch Design Summary Street Ditch Location Slope Contributing o,. v,. o,. 0100 V100 0 100 Street Stations Drainage Areas (RighULeft) (%) (cfs) (fps) (ft) (cfs) (fps) (ft) Saddle Creek Drive 18+66.78 Left 1.02 11.1A 13.45 2.64 1.01 16.08 2.76 1.08 Saddle Creek Drive 18+86.29 Right 1.00 11.8D 0.71 1.23 0.34 0.84 1.30 0.36 Saddle Creek Drive 19+00 Left 5.52 11 .1A, 11.18 13.67 4.99 0.74 16.35 5.24 0.79 Saddle Creek Drive 19+00 Right 5.52 11.8D 0.71 2.27 0.25 0.84 2.49 0.26 Saddle Creek Drive 20+40 Left 2.11 11 .1A, 11.18, 11 .1C 14.38 3.55 0.90 17.18 3.73 0.96 Saddle Creek Drive 20+40 Right 2.11 11.8D, 11.8C 1.60 2.00 0.40 1.89 2.14 0.42 Saddle Creek Drive 21+00 Left 4.00 11.10, 11.1E 3.24 3.06 0.46 3.82 3.18 0.49 Saddle Creek Drive 21+00 Right 4.00 11.88, 11 .8A, 11.4 3.86 3.22 0.49 4.56 3.37 0.52 Saddle Creek Drive 22+76.10 Right 1.30 11 .8A, 11.4 2.84 1.95 0.54 3.35 2.06 0.57 Saddle Creek Drive 24+18.30 Right 4.00 11.48, 11.4C 1.60 2.61 0.35 1.89 2.62 0.38 Saddle Creek Drive 25+74.51 Right 1.39 11.4C 0.80 1.47 0.33 0.94 1.53 0.35 Saddle Creek Drive 25+74.51 Left 1.39 11.1E 0.80 1.47 0.33 0.94 1.53 0.35 Saddle Creek Drive 28+83.97 Right 0.80 11.6G 0.80 1.17 0.37 0.94 1.24 0.39 Saddle Creek Drive 28+83.97 Left 0.80 11.3A 0.75 1.16 0.36 0.89 1.23 0.38 Saddle Creek Drive 29+44.19 Left 1.75 11.3A, 11.38 1.07 1.65 0.36 1.26 1.75 0.38 Saddle Creek Drive 30+66.31 Right 1.80 11 .6D 0.27 1.22 0.21 0.31 1.28 0.22 Saddle Creek Drive 30+66.31 Left 0.80 11 .6A, 11.68, 11 .3 4.35 1.83 0.69 5.13 1.87 0.74 Saddle Creek Subdivision -Phase 11 Appendix D ) Ditch Design Summary Street Ditch Location Slope Contributing o,. v,. o,. 0 100 V100 D100 Street Stations Drainage Areas (Right/Left) (%) (cfs) (fps) (ft) (cfs) (fps) (ft) Majestic Oak Court 0+00 Right 2.70 11 .7A 1.51 2.21 0.37 1.78 2.23 0.40 Majestic Oak Court 0+00 Left 2.55 11 .7B 1.78 2.23 0.40 2.10 2.27 0.43 Majestic Oak Court 4+45.10 Right 1.59 11.4A 0.71 1.48 0.31 0.84 1.54 0.33 Majestic Oak Court 4+50.70 Left 2.98 11 .8A 0.53 1.70 0.25 0.63 1.73 0.27 Broken Spoke Way 15+00 Right 0.60 11.6E 0.13 0.65 0.20 0.16 0.66 0.22 Broken Spoke Way 15+00 Left 0.60 11 .6G, 11.6F 1.55 1.24 0.50 1.83 1.30 0.53 Broken Spoke Way 16+30.82 Right 0.80 11 .6A 1.42 1.34 0.46 1.68 1.40 0.49 Broken Spoke Way 16+31.43 Left 0.80 11 .30 1.24 1.34 0.43 1.47 1.39 0.46 Broken Spoke Way 22+00 Right 1.00 11 .5C 0.71 1.23 0.34 0.84 1.30 0.36 Broken Spoke Way 22+00 Left 1.00 11 .2C 0.71 1.23 0.34 0.84 1.30 0.36 Broken Spoke Way 23+26.29 Left 1.34 11 .5C, 11 .5B 1.20 1.58 0.39 1.41 1.68 0.41 Broken Spoke Way 23+29.46 Right 1.34 11 .2C, 11 .2B 1.20 1.58 0.39 1.41 1.68 0.41 Broken Spoke Way 23+38.35 Right 0.80 11 .5A 0.18 0.82 0.21 0.21 0.79 0.23 Broken Spoke Way 23+41.48 Left 0.80 11 .2A 0.22 0.83 0.23 0.26 0.90 0.24 Appendix E Channel Design Summary & Reports Saddle Creek Subdivision -Phase 11 Appendix E Channel Design Summary Street Channel Shape Side Slope Slope Contributing a,. v,, o,. a, .. v, .. o, .. (%) Drainage Areas (cfs) (fps) (ft) (cfs) (fps) (ft) Channel No. 1 V-channel 5:1 4.11 11.7A, 11.78 3.28 3.10 0.46 3.88 3.23 0.49 Channel No. 2 V-channel 5:1 0.60 11 .2, 11.5 2.80 1.46 0.62 3.30 1.52 0.66 ·.' Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 1 -25 yr Storm Triangular Side Slopes (z:1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 102.00 101.50 101 .00 100.50 100.00 99.50 0 ,.........._ 1 "- = 5.00, 5.00 = 1.00 = 100.00 = 4.11 = 0.035 Known Q = 3.28 "-.......... !'... ...... ........ 1"- 2 3 4 Section 'Ir' ..,, -- ,.........._ !'... / ,.........._ / 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) / / / / -I/ / / 7 8 9 10 Wednesday, Jan 22 2014 = 0.46 = 3.280 = 1.06 = 3.10 = 4.69 = 0.49 = 4.60 = 0.61 / 11 12 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 1 -100 yr Storm Triangular Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) ·Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 0 "-.......... = 5.00, 5.00 = 1.00 = 100.00 = 4.11 = 0.035 Known Q = 3.88 -. ~ "" i' ......... .......... 2 3 4 Section ""Iii 7 -= =- .......... ~ / .......... / 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft} 1/ / ./ ./ I/ / / 7 8 9 10 Wednesday, Jan 22 2014 = 0.49 = 3.880 = 1.20 = 3.23 = 5.00 = 0.52 = 4.90 = 0.65 / 11 12 Depth (ft} 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 2 -25 yr Storm Triangular Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 102.00 101.50 101.00 100.50 100.00 99.50 0 .......... j .......... = 5.00, 5.00 = 1.00 = 100.00 = 0.60 = 0.035 Known Q = 2.80 ~ ""' .......... .......... !'... 2 3 4 Section "',. -- " ~ / .......... / 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft} Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft} Top Width (ft) EGL (ft) / / / / I/ / v 7 8 9 10 Wednesday, Jan 22 2014 = 0.62 = 2.800 = 1.92 = 1.46 = 6.32 = 0.46 = 6.20 = 0.65 / 11 12 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 2 -100 yr Storm Triangular Side Slopes (z:1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 102.00 101 .50 101 .00 100.50 100.00 99.50 0 '-... 1 '-... = 5.00, 5.00 = 1.00 = 100.00 = 0.60 = 0.035 Known Q = 3.30 !'.... ' """ """ """ 2 3 4 Section T '7' -- '-... I"'-. / """ / 5 6 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft} Velocity (fUs) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) I/ / ./ / I/ / v 7 8 9 10 Wednesday, Jan 22 2014 = 0.66 = 3.300 = 2.18 = 1.52 = 6.73 = 0.49 = 6.60 = 0.70 / 11 12 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 CITY OF C OLLEGE STATION Home o/Texas A&M University• FOR OFFICE USE ONLY CASE NO.: \t...{ -33 DATE susM1nEo: DY to\\ IL\ TIME: q ·. '60 STAFF: (3.J PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal O Incomplete Project Submittal -documents needed to complete an application. Case No.: ---------(8] Existing Project Submittal. Case No.: 14-00900033 Project Name Saddle Creek Subdivision Phase 11 Contact Name _J_oe_S_c_hu_l_tz __________ _ Phone Number 764-3900 _;_;:,,..;,,,_:,~.::____---------- We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special District Site Plan D Other -Please specify below D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment [8] Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit [8] Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Print Form April 1, 2014 Danielle Singh, P .E. Civil Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Saddle Creek Ph 11 (FP)-14-00900033 Dear Ms. Singh: Attached are four sets of the construction documents for stamping. If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering, LLC. Joe ~-- Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Office: 979.764.3900 Fax: 979.764.3910 CITY OF C or..LEGE STATION Home o/Texas A&M Univmity" FOR OFFICE USE ONLY CASE NO.: \~ -_33 DATE SUBMITTED: Qj f i lfflY TIME: \l ~ 60 STAFF: _....·Af-+""-------- PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application. Case No.: [g] Existing Project Submittal. Case No.: 14-00900033 Project Name Saddle Creek Subdivision Phase 11 Contact Name Joe Schultz ~~~~~~~~~~~~~~~ ~~~~~~~~~ Phone Number 764-3900 ~~~~~~~~~~~~~- We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit [g] Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special Distri ct Site Plan D Other -Please specify below D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment [g] Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit [g] Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: !Mylar and CD containing CAD File 10/10 Print Form ~hultz Engineering, LLC July 23, 2014 Alan Gibbs, P .E. City Engineer Development Services City of College Station College Station, Texas Office: 979.764.3900 Fax: 979.764.3910 RE: Letter Acknowledging Culvert Backfill Requirements -Saddle Creek Subdivision - Phase 11 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction of the storm sewer culverts for the above-referenced project was done in accordance with the approved plans and the HDPE culvert pipe was embedded and backfilled with cement stabilized sand. Sincerely, .Jjt F-123.27 SCHULTZ ENGINEERING, LLC. P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com July 23, 2014 Morgan Hester Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: SADDLE CREEK SUBDIVISION PHASE 11 -14-00900033 Dear Ms. Hester: Attached are the following: • A mylar of the Final Plat • A cd with the Final Plat in a CAD file • A water system fire hydrant flow test report • An email from Wellborn SUD with their acceptance of the waterline Office: 979.764.3900 Fax: 979.764.3910 • An email from BTU that Saddle Creek Partners have paid for electrical service in phase 10 • A letter from Brazos County showing approval of the Final Plat Please let me know if any additional items are needed in order to file the Final Plat. If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. Joe Sc ltz, P.E. Civil ngineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com SCHULTZ ENGINEERING, LLC FIRM #12327 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT 7-23-2014 Date: Water System Owner: _Wellborn SUD ___________________ _ Saddle Creek Subdivision Development Project: Lot 2278 by Canvasback Cove Flow Test Location: ----------------------------- Nozzle size (in .): _2.5 __ 50 Pitot Reading (psi): ___ _ 1190 Flowrate (gpm): ___ _ Discharge Coeff: (c) = 0.90 Flow rate Formula: Q=29.84cd2p1'2 c = discharge coeff. d =orifice size (in) P = pitot pressure (psi) Intersection of Saddle Creek Drive and Canvasback Cove Pressure Gauge Location: ---------------------------- 78 Static Pressure (psi): 50 Residual Pressure (psi): 1763 Computed Discharge at 20 psi Residual Pressure : QR= _____ _ Note: The flow test and report were prepared in accordance with NFPA 291. Report Prepared by: Joe Schultz Ricky Flores Others Present: Clenden Adams -Wellborn SUD_ Britt Curless _______ _ Joe Schultz From: Sent: To: Subject: Joe Schultz, Stephen Cast <wsud.sc@verizon.net> Wednesday, July 23, 2014 2:35 PM 'Joe Schultz' RE: Saddle Creek -Phase 11 Wellborn Special Util ity District has inspected and approved the water lines in Saddle Creek -Phase 11. Please give me a ca ll if you need any addition al information. Stephen Cast Wellborn SUD From: Joe Schultz [mailto:joeschultz84@verizon.net] Sent: Wednesday, July 23, 2014 1:33 PM To: Stephen Cast Subject: Saddle Creek -Phase 11 Stephen, attached is the hydrant flow test report. Has WSUD accepted the waterlines for Phase 11? thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 1 Joe Schultz From: Sent: To: Subject: Confirmed Greg Burkhalter Field Engineering Manager gbu rkhalter@btutilities.com Bryan Texas Utilities 979-821-5773 11rll *********'*'*"* Greg Burkhalter < g bu rkha lter@btuti I ities.com > Wednesday, July 23, 2014 1:28 PM 'Joe Schultz' RE: Saddle Creek Phase 11 From: Joe Schultz [mailto:joeschultz84@verizon.net] Sent: Wednesday, July 23, 2014 1:24 PM To: Greg Burkhalter Subject: Saddle Creek Phase 11 Greg, Please confirm that Saddle Creek Partners has signed a contract and paid for BTU to install the electrical service for Phase 11 or that the electrical service is in place. Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 This e-mail and/or attachment is for the sole use of the intended recipient(s) and may contain confidential and /or legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all electronic and paper copies of the original message and any attachments. 1 BRAZOS COUNTY ROAD AND BRIDGE DEPARTMENT R Alan Munger, PE, CFM, County Engineer Lloyd Wassermann, Commissioner Precinct I Sammy Catalena, Commissioner Precinct 2 Schultz Engineering LLC 2730 Lo ngmire Drive, Suite A College Station, Texas 77845 Duane Peters, County Judge July 16, 2014 Re: Final Pl at of Saddle Creek Subdivision Phase 11 34.025 Acres; James C. Stutevill e League, A-216 College Station ETJ, Brazos County, Texas Dear Sir: Kenny Mallard, Commissioner Precinct 3 Inna Cauley, Commissioner Precinct 4 On Tuesday, July 15, 2014 the Brazos County C€>mmissioners' Court approved the referenced plat as submitted. If further information is required please contact us at (979)822-2127. Best regards, Rf:!!;, :$1 Brazos County Engineer RAM:kt Saddle Creek Ph I I -final plat cc: Office File(s) 26 I 7 Highway 2 I West Bryan, Texas 77803 Office (979)822-2 I 27 I Fax (979)775-0453 C ITY OF C OLLEGE STATION FINAL PLAT for Saddle Creek Ph 11 14-00900033 SCALE: Nineteen acres on approximately 34 acres LOCATION: Generally located west of Duck Haven subdivision , approximately one mile south of Greens Prairie Road in the College Station's Extraterritorial Jurisdiction (ET J). ZONING: N/A (ET J) APPLICANT: M.L. Schehin, Saddle Creek Partners, Ltd. PROJECT MANAGER: Morgan Hester, Staff Planner mhester@cstx.gov RECOMMENDATION: Staff recommends approval of the Final Plat. Planning & Zoning Commission Page 1 of 3 April 17, 2014 Planning & Zoning Commission April 17, 2014 co s w > w O:'. f-z w 2 a_ 0 _J w > w 0 Page 2 of 3 , • > DEVELOPMENT HISTORY Annexation: Zoning: Preliminary Plat: Site Development: COMMENTS Parkland Dedication: Greenways: Pedestrian Connectivity: Bicycle Connectivity: Impact Fees: REVIEW CRITERIA N/A (ET J) N/A (ET J) The Master Plan for Saddle Creek was approved in 2006. The original Preliminary Plat was approved in October 2006 with revisions approved in January 2008, March 2009, August 2010, August 2012, and the latest revision in March 2014. Vacant. Nineteen residential lots are proposed, ranging from 1.05 acres to 3.82 acres. This development was approved as a Master Plan in the ET J prior to parkland dedication requirements being applicable in the ET J; therefore, no parkland dedication is required. No greenway dedication is proposed or required. This tract is located in the ET J and no specific facilities for pedestrian connectivity are proposed or required. This tract is located in the ET J and no specific facilities for bicycle connectivity are proposed or required. N/A 1. Compliance with Comprehensive Plan and Unified Development Ordinance: The subject property is classified as Rural on the Comprehensive Land Use Plan. While the subject property is being developed as a subdivision, the City does not have zoning or land use authority in the Extraterritorial Jurisdiction. 2. Compliance with Subdivision Regulations: The Final Plat is in compliance with the Subdivision Regulations as they apply in the ET J. STAFF RECOMMENDATIONS Staff recommends approval of the Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat Planning & Zoning Commission April 17, 2014 Page 3 of 3 -............... __________ ~CITY OF C OILE.GE STATION Home o/Texa.s A&M University• ---JZ' MEMORANDUM March 14, 2014 / TO: ML Schehin, Saddle Creek Partners, LTD; via email: ml@mls-development.com.V FROM : Morgan Hester, Staff Planner SUBJECT: SADDLE CREEK PH 11 (FP) -Final Plat Staff reviewed the above-mentioned Final Play as requested . The following page is a list of staff review comments detailing items that need to be addressed . If all comments have been addressed and the following information submitted, your project will be placed on the next availble Planning & Zoning Commission meeting in the City Hall Council Chambers, 1101 Texas Avenue: Revised construction documents; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal@cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments / cc: Joe Schultz, Schultz Engineering, LLC: via email: ·oeschultz84 verizon eV Gary Arnold, Brazos County Planning & Traffic, via fax 775.0453 Case file #14-00900033 Planning & Development Services P.O. BOX 9960 • I LO l TEXAS AVENUE • COLLEGE STATION ·TEXAS • 77842 TEL 979.764.3570 ·FAX. 979.764.3496 cs tx. gov I devservices STAFF REVIEW COMMENTS NO. 2 Project: SADDLE CREEK PH 11 (FP) -14-00900033 PLANNING 1. No comments. Reviewed by: Morgan Hester Date: March 14, 2014 ENGINEERING 1. Please submit revised construction documents. Reviewed by: Danielle Singh Date: March 14, 2014 NOTE: A l!JI changes made to the plans, that have 110! been requested f?y the Ciry of College Station, m11sl be explained i11yo11r 11exl lra11smittal letter and "b11bbled" 011 your plans. A i!JI additio11al changes 011 these plans that have 110! been pointed 011! lo the Ciry, will co11stil11te a complete!J 11ew review. 2 of 3 DATE, TI ME FAX NO ./NAME DURATION PAGE (S) RESULT MODE March 14, 2014 TRANSMISSION VERIFICATI ON REPORT 03/14 14:53 97750453 00 :00 :24 02 OK STANDARD ECM MEMORANDUM TIME 03/14/201 4 14 :54 NAME FAX TEL SER.# C0J351119 TO: ML Schehin, Saddle Creek Partners, LTD; via email: ml@mls-development.com FROM: Morgan Hester, Staff Planner SUBJECT: SADDLE CREEK PH 11 (FP) -Final Plat Staff reviewed the above-mentioned Final Play as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted, your project will be placed on the next availble Planning & Zoning Commission meeting in the City Hall Council Chambers, 1101 Texas Avenue: Revised construction documents; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal@cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comrnents contained herein. If all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your oroiect mav be olar.P.rl nn ~ C ITY OF COLLEGE STATIO Home a/Texas A&M University• MEMORANDUM February 25, 2014 / TO: ML Schehin, Saddle Creek Partners, LTD; via email: ml@mls-development.com FROM: Morgan Hester, Staff Planner SUBJECT: SADDLE CREEK PH 11 (FP) -Final Plat Staff reviewed the above-mentioned Preliminary Plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted, your project will be placed on the next available Planning & Zoning Commission meeting in the City Hall Council Chambers, 1101 Texas Avenue: One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17 " copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal@cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting . http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments J cc: Joe Schultz, Schultz Engineering , LLC: via email: ·oeschultz84 verizon.net Gary Arnold , Brazos County Planning & Traffic, via fax 775.0453 Case file #14-00900033 Planning & Development Se1·vices P.O. BOX 9960 • 1101 TEXAS AVENUE · COLLEGE STATION ·TEXAS • 77842 TEL 979.7Ci4.3570 ·FAX. 979.764.34% cst>t.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: SADDLE CREEK PH 11 (FP) -14-00900033 PLANNING 1. Please revise the following information according to BCAD's data: • The property formerly owned by Wellborn Resources LP (to the southeast of Saddle Creek Ph 11) is shown to be owned by BCR Ranch . 2. Please note that you, the applicant, are responsible for scheduling the plat for consideration by the County Commissioner's Court and for getting the County Judge's signature on the Mylar after they approve the plat. 3. Please note that any changes made to the plans, which have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Morgan Hester Date: February 17, 2014 ENGINEERING COMMENTS NO. 1 1. Please tie a corner to a City of College Station control monument. 2. There is a large pond shown on the aerials. What is the plan for this? 3. Per discussions, please revise the road alignment of Broken Spoken Way to connect with Duck Haven Phase 6's road realignment and revise the name of the road. 4. What are the plans to preserve the existing ponds ori the property? Are private drainage easements needed? Reviewed by: Danielle Singh Date: February 24, 2014 ADDRESSING 1. The proposed street names have been preliminarily approved and will be re-verified prior to filing any plats to ensure no duplicate street names are being created within Brazos County. Reviewed by: Robin Krause Date: February 19, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. This project location is outside of CSU certification area. CSU will not provide electric service to this project location. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979. 764. 6255. Reviewed by: Gilbert Martinez Date: February 25, 2014 TRANSMISS I ON VERIF ICATI ON REPORT TIME 02/25/201 4 17:15 DATE, TIME FAX NO./NAME DURATION PAGE(S) RESULT MODE February 25, 2014 02/25 17:14 9775045 3 00:00 :35 02 DK STANDARD ECM CITY oF C ou.EGE STATION Hom( ofTexas A&M Univmity" ,; ...... ,, ,•, :• .... MEMORANDUM NAME FAX TEL SER.# C0J351119 TO: ML Schehin, Saddle Creek Partners, LTD; via email: ml@mls-development.com FROM: Morgan Hester, Staff Planner SUBJECT: SADDLE CREEK PH 11 (FP) -Final Plat Staff reviewed the above-mentioned Preliminary Plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted, your project will be placed on the next available Planning & Zoning Commission meeting in the City Hall Council Chambers, 1101 Texas Avenue: One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to 2.Qsdigitalsubmittal@cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your :J. ..... -1--.-. L ---__ 1__ I I I~ •• --------------------------- C ITY OF C OLLEGE STATION Home of Texas A&M University" MEMORANDUM / ~ February 12, 20141/ C TO: Saddle Creek Partners, LTD -ML Schehin, via: ml@mls-development.com FROM: Morgan Hester, Staff Planner SUBJECT: SADDLE CREEK PH 11 (FP) Thank you for the submittal of your FINAL PLAT -RESIDENTIAL application. Danielle Singh and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Tuesday, February 25, 2014. If you have questions in the meantime, please feel free to contact us PC: Schultz Engineering , LLC -Joe Schultz, via : joeschultz84@verizon .net P&DS Project No. 14-00900033 Planning & Development Services P.O. BOX 9960 • 11 Ol TEXAS AVENUE • COL! .. F.CE STATTON • Tl'.XAS • 77842 oni ng Districts s s -1B Rural Estate Restricted Sub urban General Suburban Single Family Residential Duplex Townhouse R-4 R-6 MHP 0 SC GC Cl BP DEVELOPMENT REVIEW Multi-F amliy High Density Multi-Family Manufactured Ho me Park Office Suburban Commercial Gener al Commercial C ommercia~ Industrial Business Park BPI NAP C-3 M -1 M-2 C-U R&D P-MUD Business Park Industrial Natural Are as Protected Light Commercial Light Industrial Heavy Industrial Co liege and University Research and Development Planned Mixed-Use Develo ment SADDLE CREEK 18128 SADDLE CREEK OR Case : 14-033 PDD Planned Development District WPC Wolf Pen Creek Dev. Corridor NG - 1 Core North gate NG -2 Transitional Northgate NG -3 ResidentialNorthgate OV Corridor Overlay RD D Redevelopment District KO Krenek Ta Overla FINAL PLAT DEVELOPMENT REVIEW SADDLE CREEK 18128 SADDLE CREEK DR Case: 14-033 FINAL PLAT N ;/ l \ Scale: 1 Inch= 373 Feet ~, ! ,)j Area: 34.033 Acres (1,482,488.00 Square Feet) 14-033 FINAL PLAT SADDLE CREEK PH 11 Area: 34.033 Acres (1,482,488.00 Square Feet) Perimeter: 6577.323 Feet Gap= 0.167 (North 56° 6' 36" East) I. S47°03'30"E 476.59' 2. S47°03'30"E 70.00' 3. S47°03'30"E 397.54' 4. S47°03'30"E 273.47' 5. S45°21'17"E 61.97' 6. S42°41'05"W 305.51' 7. S42°41'05"W 214.04' 8. S42°41'05"W 169.96' 9. N44°52'09"W 274.92' 10. 845°07'5 l "W 100.00' 1 I. S88°54'28"W Ch36.10' Rad25.00!L N04°37'26"W 50.51' 12. N47°18'55"W 70.00' 22. Nl5°47'26"E 68.38' 13. N42°51'05"E 5.13' 23. N37°37'55"E 54.32' 14. N01°05'32"W Ch34.59' Rad25.0Cl'4RN10°50'02"E 108.84' 15. N44°52'09"W 284.57' 25. Nl0°16'14"W 189.40' 16. S45°07'5l"W 260.07' 26. N35°45'4l"E 181.89' 17. S54°01'28"W 313.07' 27. N62°02'16"E 192.10' 18. S80°30'54"W 134.74' 28. N22°24'09"E 128.90' 19. S54°56'35"W 373.79' 29. N61°16'30"E 150,16' 20. N51°06'54"W 119.88' 30. N48°23'5l"E 95.85' 31. N30°32'45"W Ch238.5 8' Rad850.00 32. N22°28'4l"W 87.32' 33. N67°31'19"E 100.00' 34. 822°28'4 l "E 87 .32' 35. S30°09'04"E Ch200.28' Rad750.00' • 36. N54°21'2l"E 160.15' 37. N06°52'18"E 92.72' 38. N42°57'16"E 405.59' N / l ·~ Scale: 1 Inch= 373 Feet \ ! / Area: 34.033 Acres (1,482,488.00 Square Feet) 14-033 FINAL PLAT SADDLE CREEK PH 11 Area: 34.033 Acres (1,482,488.00 Square Feet) Perimeter: 6577.323 Feet Gap = 0.167 (North 56° 6' 36" East) I. S47°03'30"E 476.59' 2. S47°03'30"E 70.00' 3. S47°03'30"E 397.54' 4. S47°03'30"E 273.47' 5. S45°21'17"E 61.97' 6. S42°41'05"W 305 .51' 7. S42°4!'05"W 214.04' 8. S42°4!'05"W 169.96' 9. N44°52'09"W 274.92' IO. S45°07'5l"W 100.00' 11 . S88°54'28"W Ch36.10' Rad25.0CI! L N04°37'26"W 50.51' 12. N47°!8'55"W 70.00' 22. Nl5°47'26"E 68.38' 13. N42°51'05"E 5.13' 23. N37°37'55"E 54.32' 14. NOl 0 05'32"W Ch34.59' Rad25.0Q'4RN10°50'02"E 108.84' 15. N44°52'09"W 284.57' 25. Nl0°16'14"W 189.40' 16. S45°07'5l"W 260.07' 26. N35°45'41"E 181.89' 17. S54°0!'28"W 313.07' 27. N62°02'16"E 192.10' 18. S80°30'54"W 134.74' 28. N22°24'09"E 128.90' 19. S54°56'35"W 373.79' 29. N61°16'30"E 150,16' 20. N51°06'54"W 119.88' 30. N48°23'5I"E 95 .85' 31. N30°32'45"W Ch238.58' Rad850.00 32. N22°28'4l"W 87.32' 33. N67°3 1'19"E 100.00' 34. 822°28'41 "E 87 .32' 35. S30°09'04"E Ch200.28' Rad750.00' • 36. N54°21'21"E 160.15' 37. N06°52'18"E 92.72' 38. N42°57'16"E 405.59'