June 3, 1999
'D
City of College Station
P.O. Box 960 1
College Station, TX 77842
Attn: Development Services
Veronica J.B. Morgan, P.E.
Re: 1019-001, College Station Independent School District
Drainage Study Reflecting Impact of Installation
of Temporary Buildings
Veronica,
C~C~D~JG
AIN igss D.
At the request of the College Station Independent School District, we have reviewed the drainage
studies prepared for the City of College Station to check any impact created by the installation of
temporary buildings, as reflected on the site plans included, to the water surface elevations in the
tributaries adjacent and as to any upstream or downstream impact.
The sites are:
Exhibit A
College Station Jr. High
Exhibit B
College Hills Elementary
Exhibit C
Pebble Creek Elementary
Exhibit D A & M Consolidated High School
Since the maximum run off from the temporary buildings, using two as a criteria, is less than 1 cfs,
we can state that no rise in water surface will be noticeable and probably beyond computation.
All of the drainage studies prepared over the years, for the referenced school sites which the City has
copies of, are for all design frequencies and have 1 foot of freeboard available. Each location in
question discharges into a major tributary or a chain of detention facilities, therefore it is our opinion
that no downstream or upstream impact or noticeable rise in water surface elevation will occur.
Cheatham and Associates
Eddie Cheatham, P.E.
F:\WORD\cou.EC,E\001utr.Morgan.drainaEE-r4O,INEERS • PLANNERS • SURVEYORS
A Subsidiary Firm of Southwest Planning and Design, Inc.
1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011
817/548-0696 • Metro 265-8836 • Fax 817/265-8532
All buildings will have covered porches with ADA quality access ramps including an
accessible sidewalk access to each building. Handrails will be provided in conformance
with ADA requirements. The fire alarms will be equipped with both audio and visual
alarms.
A copy of Cheatham & Associates' letter and site plans for each school is forwarded
herewith. Their evaluation of the effect of the relocation of these buildings as shown
appears to have minimal effect on respective rising water surface elevations.
The location of the building at College Hills encroaches upon the utility easement behind
the multi-purpose building. We feel this encroachment is minor and provides ample space
for maintenance of the utility lines. Should it become necessary to move this building in
the future for maintenance of this line, the school district will cooperate fully.
All of these buildings are temporary. At this time we anticipate the junior high school
building to be in use until the opening of A & M Consolidated Middle School in August
2000. The buildings at Pebble Creek Elementary and College Hills Elementary are for
potential peak student enrollment between now and 2003 when we anticipate opening
Forrest Ridge Elementary School, our next elementary school. The building located at the
athletic office is anticipated to be a permanent facility and will be replaced in the future
only when we fund a project to increase the field house facilities.
Please call me if there are any questions. I can be available for a hearing should it be
necessary. Thank you for your assistance in this issue.
Yours truly,
J.
Construction Manage
WJS/b
Enclosure
cc: D. Neal
R. Thomas
File UP
G yy~G6 ST~'~2
T
V
d
M a
Fy ,5
0
O~'YT S C 1101
College Station Independent School District
EXceQence In Education... t Investment In Th Future
June 8, 1999 Letter No. 1931
Ms. Natalie Ruiz
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Subject: Temporary Classroom Buildings
Relocation from A & M Consolidated High School
Dear Ms. Ruiz:
In 1997 we received City approval to locate five temporary double classroom buildings in
our parking lot West of the high school building along Welsh Street. We will no longer
need these building and plan to move these buildings to the following schools:
College Hills Elementary School
1101 Williams
College Station Junior High School
900 Rock Prairie Road
Pebble Creek Elementary School
200 Parkview
Athletic Office
2118 Welsh
1 - 24'x 64' Double Classroom Building
1 - 24'x 64' Double Classroom Building
2 - 24'x 64' Double Classroom Buildings
1 - 24'x 64' Double Classroom Building
All of the above buildings are to be connected with electrical power, telephone, technology,
video fire alarms, school communication and security where available. The building at the
junior high school, 900 Rock Prairie Road, will require a change in City transformer voltage
rating and the building at College Hills will connect directly to an existing City pad mount
transformer for service. All other utilities and services mentioned will be extensions of
existing services that are currently in service at each location and will not require
additional utilities from the City, telephone company, cable vision, etc. There will be no
need of water, sewer or gas services for any of these buildings.
Construction Services
1812 Welsh Street
College Station, TX 77840
409-694-5610 FAX 409-694-5612
JIM SCALES, Ph.D.
Superintendent of Schools
STAFF REVIEW COMMENTS
No. 1
Project: CSISD Portable Buildings
cage letter, regarding all sites, needs to be sealed.
2. For all sites, show floodway and floodplain. If there is none, then state that
and reference the applicable FEMA map. If a building is to be within the
floodplain, then show finished floor elevation.
3. For each site, state whether the building will be raised or at grade. If at
grade, we will need grading information.
4. It appears that in some instances the building separation will be less than 15
feet. Coordinate with Building Official to determine the additional
requirements for separation distances of < 15 feet.
5. The College Hills Elementary Site shows the portable building encroaching
into a utility easement. We cannot allow that unless a license to encroach
has been granted.
Reviewed by: Jessica Jimmerson
staff Review Comments pw i of 1 0022/88
STAFF REVIEW COMMENTS
No. 2
Project: CSISD Portable Buildings
1. The addition of the portable buildings to the existing school sites is not
considered a significant change and will not require new conditional use
permits.
2. The site plans and information submitted were only reviewed in regards to
the proposed changes.
3. The building department has been notified that the proposed building
placements may have less than 15 feet of separation distance and will be
looking for necessary fire compliance.
4. Pebble Creek Elementary and College Station Jr. High are approved at this
time.
5. The Site Plan for the A&M Consolidated High School Athletics Facility
requires an elevation certificate. The elevation certificate will be issued
based upon the regulatory floodplain at the time of permitting. The Morrison
Hydrology Study has not been submitted to FEMA at this time.
Reviewed by: Jessica Jimmerson Date: 7/19/99
Staff Review Comments Page 1 of 1
We will engage a moving contractor to move this building to the new location. A local
general contractor will be contracted to construct install underpinning, a covered porch,
access ramp connected to existing sidewalks and provide the necessary handrails, etc.
required for TAS and ADA accessible facilities. An electrical contractor will connect and
energize electrical service to this building, install and extend services from existing fire
alarms, telephones, school intercommunication system, technology wiring for computer
and video education devices.
Electrical service is proposed to be supplied from the metered bus between the
Kindergarten and Cafeteria buildings. We have reviewed this with the City of College
Station Public Utility Department.
The above requirements have been reviewed with the City Building Official and Fire
Department for their familiarization only. Their final approval will be secured along with
the respective moving, building and occupancy permits.
Please advise us of all fees that may be due, our participation in any hearings or meetings
required and of any additional information you may require. We are available to assist you
in any way that will expedite the issuance of the conditional use permit for this temporary
classroom building.
Yours truly,
Constructio nager
WJS/ceb
Enclosure - City of College Station Memorandum dated June 23, 1999 (1 Copy)
Cheatham Exhibit B letter dated July 2, 1999 (2 Copies)
Cheatham Site Plan Exhibit B (2 copies)
A & M Consolidated High School Temp. Building Layout (2 copies)
cc: D. Neal
File UP
College Station Independent School District
E.xceffence In Education... An Investment in 9 he future
July 15, 1999 Letter No. 2084
Ms. Natalie Ruiz
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Subject: College Station Junior High School
Conditional Use Permit for Temporary Classroom Building
Dear Ms. Ruiz:
In our letter No. 2024 requesting a Conditional Use Permit for the temporary classroom building proposed
to be located at College Station Junior High School we promised you a corrected site plan deleting a 10
foot which was accidently left on the plan. We received the corrected site plan (2 copies attached) and
found that the proposed separation of 16 feet between buildings was omitted. We have marked the drawing
to indicate the 16" separation.
We regret this omission and are requesting that Cheatham & Associates forward another set of drawings
including this dimension. As soon as the corrected drawing arrives we will forward two copies to you.
Any consideration toward issuing a Conditional Use Permit for this building based upon this letter and
marked drawing will be appreciated. This building is needed for start of school. If we do not have it in
place and ready for use our only recourse is to bus students to two classrooms which will be very
disruptive.
I
enclosure: Cheatham Revised Site Plan Exhibit A (2 copies)
WJS/ceb
cc: David Neal
File UP
Construction Services
1812 Welsh Street
College Station, TX 77840
409-694-5610 FAX 409-694-5612
JIM SCALES, Ph.D.
Superintendent of Schools
College Station Independent School District
EXcellence In Education.....An Investment In The Future
July 9, 1999
Ms. Natalie Ruiz
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Letter No. 2049
Subject: A & M Consolidated High School Athletic Facilities
Conditional Use Permit for Temporary Building
Dear Ms. Ruiz:
In 1997 we received City approval to locate five temporary double classroom buildings in
our parking lot West of the high school building along Welsh Street. We will no longer
need these buildings and plan to move them to other locations within the District.
College Station ISD requests a Condition Use Permit to relocate Building No. "E" from its
present location at A & M Consolidated High School to a new location at A & M
Consolidated High School Athletic Office, 2118 Welsh, College Station, Texas. The
location of this building at A & M Consolidated High School Athletic Office is shown on the
enclosed site plan titled Exhibit "D" prepared by Cheatham & Associates.
Cheatham has modified and sealed their letter (2 copies) and has incorporated information
on the site plan drawing (2 copies) requested in City of College Station Memorandum
dated June 23, 1999 (copy attached). Also included are maps showing the existing and
proposed conditions of Bee Creek Tributary B Flood Plain and Floodway as requested.
The building is on a raised pier and beam foundation, wood framing, metal siding and roof,
insulated suspended ceilings, prefinished wood paneling interior walls, carpeted floors,
has a 150 A 120/240 volt primary electrical service panel, flourescent lighting, grounded
duplex electrical outlets, electrical HVAC thru wall units for each of two rooms.
This building was constructed at the A & M Consolidated High School site and was fully
inspected by the City of College Station Building Inspection Department. Records of the
City inspection of the construction of this building should be on file.
Construction Services
1812 Welsh Street
College Station, TX 77840
409-694-5610 FAX 409-694-5612
JIM SCALES, Ph.D.
Superintendent of Schools
College Station Independent School District
E,xce!lence In Education... .An Investment In'ZTie Future
July 9, 1999
Ms. Natalie Ruiz
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Letter No. 2049
Subject: Pebble Creek Elementary School
Conditional Use Permit for Temporary Buildings
Dear Ms. Ruiz:
In 1997 we received City approval to locate five temporary double classroom buildings in
our parking lot West of the high school building along Welsh Street. We will no longer
need these buildings and plan to move them to other locations within the District.
College Station ISD requests a Condition Use Permit to relocate Buildings No. "C" and No.
"D" from their present location at A & M Consolidated High School to a new location at
Pebble Creek Elementary School, 200 Parkview, College Station, Texas. The location of
these buildings at Pebble Creek Elementary School is shown on the enclosed site plan
titled Exhibit "C" prepared by Cheatham & Associates.
Cheatham has modified and sealed their letter (2 copies) and has incorporated information
on the site plan drawing (2 copies) requested in City of College Station Memorandum
dated June 23, 1999 (copy attached). Please note that the location of these buildings is
different from the initial issue of the site plan.
Each building is on a raised pier and beam foundation, wood framing, metal siding and
roof, insulated suspended ceilings, prefinished wood paneling interior walls, carpeted
floors, has a 150 A 120/240 volt primary electrical service panel, flourescent lighting,
grounded duplex electrical outlets, electrical HVAC thru wall units for each of two rooms.
These buildings were constructed at the A & M Consolidated High School site and were
fully inspected by the City of College Station Building Inspection Department. Records of
the City inspection of the construction of this building should be on file.
Construction Services
1812 Welsh Street
College Station, TX 77840
409-694-5610 FAX 409-694-5612
JIM SCALES, Ph.D.
Superintendent of Schools
G ti~~GF STA k'~y
z
d
o a
ANT scH0
College Station Independent School District
E,xcelfence In Education... .An Investment In The Future
July 9, 1999
Ms. Natalie Ruiz
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Letter No. 2046
Subject: College Station Junior High School
Conditional Use Permit for Temporary Classroom Building
Dear Ms. Ruiz:
In 1997 we received City approval to locate five temporary double classroom buildings in
our parking lot West of the high school building along Welsh Street. We will no longer
need these buildings and plan to move them to other locations within the District.
College Station ISD requests a Condition Use Permit to relocate Building No. "B" from its
present location at A & M Consolidated High School to a new location at College Station
Junior High School, 900 Rock Prairie Road, College Station, Texas. The location of this
building at College Station Junior High School is shown on the enclosed site plan titled
Exhibit "A" prepared by Cheatham & Associates.
Cheatham has modified and sealed their letter (2 copies) and has incorporated information
on the site plan drawing (2 copies) requested in City of College Station Memorandum
dated June 23, 1999 (copy attached). A dimension of 10' was accidently left on the
drawing and has been deleted in red and initialed by the undersigned. We are requesting
a corrected site plan. Due to the urgent need of this classroom we request that the City
consider this request from these two altered plans. Every attempt will be made to forward
corrected drawings as soon as possible.
This building is on a raised pier and beam foundation, wood framing, metal siding and roof,
insulated suspended ceilings, prefinished wood paneling interior walls, carpeted floors,
has a 150 A 120/240 volt primary electrical service panel, flourescent lighting, grounded
duplex electrical outlets, electrical HVAC thru wall units for each of two classrooms.
Construction Services
1812 Welsh Street
College Station, TX 77840
409-694-5610 FAX 409-694-5612
JIM SCALES, Ph.D.
Superintendent of Schools
This building was constructed at the A & M Consolidated High School site and was fully
inspected by the City of College Station Building Inspection Department. Records of the
City inspection of the construction of this building should be on file.
We will engage a moving contractor to move this building to the new location. A local
general contractor will be contracted to construct install underpinning, a covered porch,
access ramp connected to existing sidewalks and provide the necessary handrails, etc.
required for TAS and ADA accessible facilities. An electrical contractor will connect and
energize electrical service to this building, install and extend services from existing fire
alarms, telephones, school intercommunication system, technology wiring for computer
and video education devices. City electrical transformer change out has been arranged
for with the City of College Station Public Utility Department and a request has been
issued for the change.
The above requirements have been reviewed with the City Building Official and Fire
Department for their familiarization only. Their final approval will be secured along with
the respective moving, building and occupancy permits.
Please advise us of all fees that may be due, our participation in any hearings or meetings
required and of any additional information you may require. We are available to assist you
in any way that will expedite the issuance of the conditional use permit for this temporary
classroom building.
This temporary classroom building is essential to the start of school. Please advise me
of the anticipated schedule of reviews, hearings, meetings, etc. so we may evaluate our
need to make other arrangements for the classes scheduled for this building.
WJS/b
Enclosure - City of College Station Memorandum dated June 23, 1999 (1 Copy)
Cheatham Exhibit A letter dated July 2, 1999 (2 Copies)
Cheatham Site Plan Exhibit A (2 copies)
A & M Consolidated High School Temp. Building Layout (2 copies)
Sketches of Proposed Building and Electrical (2 copies)
cc: D. Neal
File UP
G yyEG F. STgCollege Station Independent School District
o ~
Exre!lence In Education... .sin Investment In glue Future
c^'J'd O
FNT Sc"O'
July 22, 1999 Letter No. 2101
Ms. Natalie Ruiz
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Subject: College Hills Elementary School
Conditional Use Permit for Temporary Classroom Building
Dear Ms. Ruiz:
In 1997 we received City approval to locate five temporary double classroom buildings in
our parking lot West of the high school building along Welsh Street. We will no longer
need these buildings and plan to move them to other locations within the District.
College Station ISD requests a Condition Use Permit to relocate Building No. "B" from its
present location at A & M Consolidated High School to a new location at College Hills
Elementary School, 1101 Williams Street, College Station, Texas. The location of this
building at College Hills Elementary School is shown on the enclosed site plan titled
Exhibit "B" prepared by Cheatham & Associates.
Cheatham has modified and sealed their letter (2 copies) and has incorporated information
on the site plan drawing (2 copies) requested in City of College Station Memorandum
dated June 23, 1999 (copy attached). Please note that the location of this building has
been moved to avoid the utility easement as shown on the site plan.
This building is on a raised pier and beam foundation, wood framing, metal siding and roof,
insulated suspended ceilings, prefinished wood paneling interior walls, carpeted floors,
has a 150 A 120/240 volt primary electrical service panel, flourescent lighting, grounded
duplex electrical outlets, electrical HVAC thru wall units for each of two classrooms. There
will be no gas, water or sewer connections to this building.
This building was constructed at the A & M Consolidated High School site and was fully
inspected by the City of College Station Building Inspection Department. Records of the
City inspection of the construction of this building should be on file.
Construction Services
1812 Welsh Street
College Station, TX 77840
409-694-5610 FAX 409-694-5612
JIM SCALES, Ph.D.
Superintendent of Schools
C~~EGE ST,,T'oy College Station Independent School District
• F
Y U
a
A F
y EXceffence In Education-An Investment In The Future
Fy Q
d~NT Sc"00
July 22, 1999 Letter No. 2102
Ms. Natalie Ruiz
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Subject: College Station Junior High School
Corrected Site Plan for Temporary Classroom Building
Dear Ms. Ruiz:
Attached are two copies of the corrected site plans for subject school indicating the sixteen
feet separation between buildings. This corrected copy is for your records.
Yours truly,
Constructio anager
WJSIceb
Enclosure
cc: D. Neal
File UP
Construction Services
1812 Welsh Street
College Station, TX 77840
409-694-5610 FAX 409-694-5612
JIM SCALES, Ph.D.
Superintendent of Schools
We will engage a moving contractor to move this building to the new location. A local
general contractor will be contracted to remove and replace fencing, install underpinning,
construct a covered porch, access ramp connected to existing sidewalks and provide the
necessary handrails, etc. required for TAS and ADA accessible facilities. An electrical
contractor will connect and energize electrical service to this building, install and extend
services from existing fire alarms, telephones and technology wiring for computers.
The above requirements have been reviewed with the City Building Official and Fire
Department for their familiarization only. Their final approval will be secured along with
the respective moving, building and occupancy permits.
Please advise us of participation in any hearings or meetings that may be required, of all
fees that may be due and of any additional information you may require. We are available
to assist you in any way that will expedite the issuance of the conditional use permit for
these temporary classroom buildings.
Yours truly,
W. J. a e
Construction Manager
WJS/b
Enclosure - Copy of City of College Station Memorandum June 23, 1999 (1 copy)
Cheatham Sealed Drainage Impact Letter July 2, 1999 (2 copies)
Cheatham Site Plan Exhibit D (2 Copies)
Bee Creek Tributary B Flood Map - Existing Conditions (2 copies)
Bee Creek Tributary B Flood Map - Proposed Conditions (2 copies)
Sketch - A&M Consolidated High School Temp. Classroom Plan -(2 copies)
Sketches - Proposed Building and Electrical Installation (2 copies)
cc: D. Neal
File UP
Date
*1 If
City of College Station
Public Utilities Department
Electrical Division
P.O. Box 9960
College Station. TX 77842
4091764-3438
4091764-3452 FAX
Contacts:
Tony Michaisky, Operations Coordinator, 409-764-3438
Ray Havens, Superintendent, 409-764-3502
We the undersigned of hereby request, The City of College Station Electrical Division to:
S.er r T2our.~o•~.nyt T T s~ri.~. <<.~r2w„ ~.o....rr
~O~ ~~...y~a ~er ~.~oac. T i0 y •Si~uitt ~~r ~~et~cr
Business name /&"02rz.&cr fn~~! f-r/-7 - e:UEQr 1,q ►i ~~•d~ 00~cw
Location 'VDO /4fcr
Owners name .occ a -e f~•~~' .1jo0 -
Billing address /w4x-v
GoGL x ee -Tessa.. ,
Phone
Fax number
Estimated needed complete
6/zs /94 -
-45-C.
We further understand that we are to pay the City of College Station for the total cost {10 60193
,4axW services performed for the following project. • ,
Thank you,
Owner (Letter ftst-be signed)
MAIL OR FAX TO ABOVE ADDRESS