Loading...
HomeMy WebLinkAboutMiscName of Plat: Owner(s): Block Lots thru Block tbru Block thru acres out of abstract ~~~~~~~ abstract F;j~ ~~ ,Ford in: ' On: May P8,1999 at ii:I4AM As a Plats ~. Docwent Nu~ber: a69f~14 Aeount 55.E ,~ CITY OF CDLLEGE STATION DPER: MRDDGERSSTOMER RECEIPT ~** DATE: 4/Bb/99 ggCT DRAWER: 1 RECEIPT: 8818624 FIL NG FEE/DS/bI QTY AMDUNI TP 1 3288.88 *D7 CK KLING ENGINEERING-CK26488 FINAL PLAT FEE TENDER DETAIL CK 26488 3288.88 TOTAL PEkSDNAL CHECKINE• 13:46:88 AMOUNT TENDERED 3288.88 3288.88 THANK YOU Receipt Nusber - 131788 n' Fla Worksa 51A1E if ~ CQlllr ff I herehy certify that this itstrntent Ma; filed at the date and tine stayed hereo 6 n y ae and nas duly recorded in the volute and pie of the oared rec~~ds af: BigIGS Ca1ffY, as statped hereon by te. May c8, 19'3'3 BAA105 C8lN1Y ~ ~' CaUTy l1EAII ~- J ~, '~~~ .~ ~J y1 7~ S .J ~ ~._~ ,~ v -1 ~J ~,~ COLLEGE STATION P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Teh. 409 764 3500 March 2, 1999 LevTex Hotel Ventures ,/y~~ ~`' `~,, ~_,; (~, / ~~; ~ ~~ ~ , ~r~( 7660 Woodway Drive, Suite 460 Houston, Texas 77063 Attn.: Mike Harp Via Fax (713) 268-3723 Re: Proposed Baymont Inn on University Drive in College Station. Dear Mike, Below is a punch list of items that need to be addressed prior to issuance of a Development Permit and Certificate of Occupancy on the above mentioned Baymont Inn. Development Permit: (Prior to issuance of a development permit, the following items must be addressed) (1) Issuance of the TxDOT Permit for the work to be done in the University Drive right-of--way. (Staff submitted this permit along with the approved civil site plans on Monday, Marc 1, 19 to the local OT offices ~~. ~._ ~,GL4t.JZ~ R. . ~' Certificate of Occupancy rior to issuance certi rcate of occupancy, the following items must be addressed) (1) Dedicate the off-site private drainage easement for the detention ea. (At this time the developer must also include the maintenance entity of this facility.) ~' tI 0(,(l12(/2,~~ ,~~5 . 2) LOMR must be approved by FEMA. (In discussions with FEMA per Veronica Morgan's letter to you dated November 5, 1998, FEMA has indicated LOMR approval should be a condition of a C.O. The LOMR has beef n,~eviewed by Ci staff and will be F x'd to MA on Tu ~ a , F~b ~~y 23, 199 .) ~ ~,~,c,~Q¢~ ,.,,,,.~, , •°E- ~C~ (3) D~'dicate the 15 private access s ment on the reserv tract f the ro osed drivewaS~.. ''~ P P Y - (This easement is being returned to you by our Legal Derartment. Since this is a rrivlte / easement that does not contain any public infrastructure, it is your responsibility to file. Once filed, provide a copy of the easement and/or the volume and page number on the approved site plan.) ~ . _ ~ ~ ~~ (4) Dedicate a 30' public access easement to the creek for maintenance. ~ ' _ ~ ~/ `-~-~,-- ~l'C~~-tit., ,y~• ~-~ _ u0 t - _: _ ~~ Hom s Hive i l~ca-~~~w~.P Baymont Checklist Mike Harp Case #98-225 Page 2 of 2 Certificate of Occupancy cont.): (5) Dedicate anoff--site public drainage easement to cover the creek in its proposed location. (6) Dedicate the off-site public utility easement for the waterline. (Stewart Kling submitted the metes and bounds description and associated drawing of the utility easement. Once the Easement Information Sheet is submitted with the necessary attachments, staff will process the easement and file it for record.) Once staff has reviewed the architectural plans for the new hotel, I will be able to put together a punch list for the issuance of a building permit. We also suggest having a preconstruction meeting with staff to discuss the off-site elements and how they will impact the issuance of a Certificate of Occupancy for Baymont Inn. Issues that need to be addressed are when will the channel be constructed, who will do it and how will it tie into the pond work for Levtex. (The pond cannot be constructed prior to the channel work because the proposed pond location is in the middle of the existing creek.) Staff has time available on the afternoon of Tuesday, March 2, 1999 to meet with yourself, a representative of the Wheeler property and appropriate engineering staff. If you have any questions or need additional information, please contact me at (409) 764-3570. Sincerely, i talie m uiz Development Coordinator cc: Case Bile #98-225 I.J h.tt.f.~r `~~ltv~.~. `~ .4vx-~Q ~~2,~ U ~0~+-Q-Lwt~4 a..Q~lx~ (,(-~/u-U-c 1,~~-QQ b.~ d.eK.Q u-~~ ~' ~d ~6Ce-U-a-eP~~ Q-~o-x~~a / c~v~,, ~r-a re-r~~ v~ c.+..Q so ~F-G4 ~-c4 ~ j?d . ~ . M1- J ~ cL1- ~rn=~ d~ ~ tic Q(a-~-~ 4~.c,~ .2~v~c~u~-~ µi.,1 n,fi ./ ~.-.f! /i.-h ~` 5 L..~57u,~ vu~-~Q.o ~ fie- 1~ -~~r~- !~~ ~.. ~ . ~ • Urr. c~ ~-Ca~ c}~ O ~t-2/1261~ hu,(~G~iu~ ~vx-'v .~`C4YG~ G~vacJv~c~ u ~',~~~~.~,~(~. ~ ~, 1 ? Gam. u C~S~ ~veD ~~ ~h MEMORANDUM April 14, 1999 TO: Stacy King, Kling Engineering and Surveying (Via fax 846-8252) FROM: Bridgette George, Asst. Development Coordinator SUBJECT: Wheeler Subdivision Phase Two -Final Plat Staff reviewed the above-mentioned site plan as requested. The following is a list of items that need to be addressed: Sidewalks along University Drive will be done with widening project; sidewalks along Lincoln are required at time of Site Plan; More clearly note that the end of the channel improvements is also the end of the Public Drainage Easement; At time of Site Plan, the remainder of the drainage channel will need to be addressed; Extend the 10-foot Public Utility Easement along the west property line to University Dr. Rem+~ve the second line of note #5 referring to the University Drive Overlay District; and Remove the building lines from the drawing. Please address the above-mentioned items and submit the following information by Monday, April 19, 1999 to be placed on the next available Planning & Zoning Commission agenda: 10 copies of the revised final plat; and The Mylar original of the revised final plat. The next available Planning and Zoning Commission meeting is scheduled for Thursday, May 6, 1999 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue South. If you have any questions or need additional information, please call me at 764-3570. Thank you! cc: LevTex Hotel Ventures, Inc., 7660 Woodway Drive, Ste. 460, Houston, Texas, 77063 Mae Dean Wheeler, 1000 Shady Drive, College Station, Texas, 77840 Case file no. 99-217 DEVELOPMENT SERVICES TRANSMITTAL LETTER Name/Firm: G Date: /~ f Address: ~-// 0 ,3 ~ J Phone: ~~p q) ~ t{(p- ~ 1 ~ ~~r~a.~ T~ -7~7~7-~- Fax: rt-l(?~!~~"~~D-~ods~2 We are transmitting the following for Development Services to review and comment: (Check all that apply.): ^ Master Development Plan ^ Preliminary Plat Final Plat ~ 3 b l~.e t; ~ ^ FEMA CLOMA/CLOMR/LOMA/LOMR ^ Site Plan ^ Grading Plan ^ Landscape Plan ^ Irrigation Plan ^ Building Construction Documents w/ ^ Redlines ^ Development Permit App. w/ ^ Redlines ^ Conditional Use Permit w/ ^ Redlines ^ Rezoning Application w/ ^ Redlines ^ Variance Request w/ ^ Redlines ~ Other -Please specify w/ ^ Redlines G~.PP ~; [:~~~ -fGt X w/ ^ Redlines ~~_~ ct~ ~~~p.00 w/ ^ Redlines Shp cIC . w/ ^ Redlines INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ^ Waterline Construction Documents w/ ^ Redlines ^ Sewerline Construction Documents w/^ Redlines ^ Drainage Construction Documents w/ ^ Redlines ^ Street Construction Documents w/ ^ Redlines ^ Easement application with metes & bo unds decsription ^ Drainage Letter or Report w/ ^ Redlines ^ Fire Flow Analysis w/ ^ Redlines Special Instructions: ^ TxDOT Driveway Permit ^ TxDOT Utility Permit ^ Other -Please specify TRANSMrITAL LETTER i of 1 TRANSMIT.DOC 03/23/99 Whu,l,,,- `~/e ~e~ SUBMIT APPLICATION AND THIS LIST CHECI~D OFF WITH 13 FOLDED COPQS OF PLAT FOR REVIEW FINAL PLAT 1VIINIMUM REQUIlZEMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIlVIITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments rntd markers) 1. Drawn on 24" x 36" sheet to scale of 100' per inch or larger. 2. Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. 3. Title Block with the following information: Name and address of subdivider, recorded owner, planner, engineer and surveyor. ~ Proposed name of subdivision. (Subdivision name & street names will be approved through ,..,/ Brazos County 911.) (Replats need to retain original subdivision name.) ~ ~ Late of preparation. p' Engineer's scale in feet. Total area intended to be developed. 4. North Arrow. 5. Subdivision boundary indicated by heavy lines. ~I ~ 6. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. P1anning and Zomng Comrrusslon (delete If minor plat) Brazos County Clerk / ~' Brazos County Commissioners Court Approval (ETJ Plats only) [B' E. raid tax ccrtificatcs. ~~ 9. If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. All applicable certifications based on the type of final plat. Ownership and Dedication ~ Surveyor and/or Engineer City Engineer (and City Planner, if a minor plat) 10. If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.004 of the Texas Water Code. ~" 11. Location of the 100 Year Floodplain and floodway, if applicable, according to the most recent available data. 12. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. `- FINAL PLAT CHECKLIST 1 of 2 FNLPCK.DOC 03!25/99 .- 13. Matches the approved preliminary plat and/or master development plan. ^ 14. The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of tbe following: (Show existing items that are intersecting or contiguous with the boundary of or fornung a boundary with the subdivision, as well as, those within the subdivision). Existing Pro sect ^ Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp. turn around unless they are shorter than 100 feet. ^ ~ Public and private RO.W. locations and widths. (All existing and proposed RO.W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance. Alleys. Easements. A number or letter to identify each lot or site and each block. Greenbelt area/park linkages/parkland dedication (All proposed dedications must be reviewed by the Parks and Recreation Board prior to P & Z Commission consideration.) ^ 15. Construction documents for all public infrastructure drawn on 24" x 36" sheets and p y sealed by a Li used Texas Professional Engineer that include the following: Street, alley and sidewalk Mans, profiles and sections. One sheet must show a overall stree alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any ~ future growth areas.) Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) ~^ Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoff based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the subdivision. ^ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. ^ Drainage Report. ^ Erosion Control Plan (must be included in construction plans). 16. All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be filed prior or concurrently with Final Plat. 17. Are there impact fees associated with this development? O Yes ~No Impact fees for R-1, R-2, & R-3 zoned final plats, must be paid prior to filing. ~~ 18. Will any construction occur in TexDOT rights~f--way? ^ Yes O No If yes, TexDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat at the Courthouse. 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOn must be submitted prior to issuance of a development permit. F[NAL PLAT CIiECKLIST 2 of 2 `~ `. Z ` ~ ~ x `, '. ice, ` G .~ ~ ~ ~ ~~ `. 1 ~ .~ .~ ~\ ~~ `~ / ,o t ` y~,e. ` ~ '~i ~, _ \ ~ ~ FZ>. `\ ` ~` _ __ _ J ,~ ..~ .._ ~~ ~ --l ~ `. ~. ~` `~ `. ~ ~ ,~ ` h ' ~ ` / ` ~ / 30' ` ` ., ., ., so ~ '`, P .~ ~,\` N BRIG pRAINAGf ~~ S 9 ~~ ¢3 E'... ~ 30' ~~ ~~ 5' \, 6)B , ~, N 39'59"45'E _ _ ~-- 70.45" 'Y ' ~,~, SCALE: 1'=20' ~` ~~ ~` v W ~v nNr__ v v, (Zj~t+lO ~w$ ~v ~+ . i Vi ~ ,_. ti 1 '" . ~ -- " ~71r~~ .~ S 16'47'191 17.36' Z #~ C>n ~ ~r~ 525 SQ. FT. -~` ~' __,~__ ~ Pueuc uTiuTY °f Yi ,, _ ~ _ EASEMENT ~~ 1 ` ` ` ` ~ ~ ~------------------------------~'-i ___ .' NOTES: ~~~~ ~ 1) Basis of Bearings is the monumented southeast line of the 13.727 acre tract described in Volume 444, Page 800, with a record bearing of S 43' 21' 22" W. PUBLIC UTILITY EASEMENT AT SOUTHWEST CORNER OF LINCOLN & UNIVERSITY DRIVE RICHARD CARTER SURVEY, A-8 COLLEGE STATION, BRAZOS COUNTY, TEXAS SCALE: 1 "=20' FEBRUARY, 1999 ,. j,~0' ~, ~~O ~~~Ohti ~~kry~~~ ~ ~ P~cP J~,~,QP~ ~~~ ~ Pv111~ ~~~v~~ J`' `-~ KLING ENGINEERING & SURVEYING BRYAN, TEXAS Bridgette Geor e . Re:_ New :Develo merit list.....::. ........... ..: .:. .. .. ...::.:.......... ... .-...........:....::........:... Page::..: From: Tony Michalsky To: BGEORGE~CITY OF COLLEGE STATION.CITY HALL Date: 4/9/99 10:50AM Subject: Re: New Development List Wheeler Subdivision Phase II (99-217) We would like a 10 ft easement along the west property line. Barker's Heating 8< Cooling, Inc. (99-415) No Comments L.acour Subdivision Replat (98-222) You sent this one in the mail. Everything looks good on this one. Is this my copy or do you need it back? »> Bridgette George 04/08/99 09:06AM »> Attached is this week's list. j d((1 dy /~L~ ~'~~ ~t ~,~ : - Q ~ ( Sf~~-•~fc ~~5~/u-~~...l~S~ .s~~-~,,~~ `rat- u /~ ^~ b - s ~,s~c,c_, ~ o .~ ~ rid ~- a T ~ ~"~-~- ° f s<~ ~o la.~ ~,ou~e~~,,,0 ~ d In ~-rs ~-~v,c. at,~-~- ~~~ C.~.z~, ~. ~` ~ ~ 8l ~~~ ~ ~ Z~w ~~ ~o ~¢ r S ~~.~- ~~ PGA .~ ? ~ ~,..~ ~ ~ ~~.~ sue- ~y~ T.... ~. k ,(, pyll.. !' ... . / fr /j / / ! f n ~ l j. ~ ~ ~ 1rr [~ r','a'. ~I .ti.~l S'~~.cT~litlrE. y~.~,v~_,,,~ d !e Ct f ~e ~. (~y~ f t'rq ' ~. / , !~ ~ ~ 2 ~~ • •