Loading...
HomeMy WebLinkAboutMisc• FINAL PLAT Date Submitted: Final Plat: ~~~~~ ~~ Engineering Firm/Surveyor: /~l'/ C L~ Owner: PRC P&Z ~ l~ ~~~ Case # ~~ " ~C~ '~ C Council /V t7 Approved _ Denied s Approved ~ Denied _ ... ~, Conditions: ~~ G~..`; ~~~~~ <,~~~~-.~~~ C~C,~~;=~~~~' ~~~=5 ~T~i~~',~E~_` . ~' /' ,~ ~' Required Utility Plans: _ Water _ Sewer Streets _ Drainage ~ EI t. V SWalks Parkland Dedication:~r\~ ~~ -\ ~, ~(~~~ r~-(~'~ •• Construction Plans Approved: ~1 Letter of Guarantee/Credit: ~ C • Utilities Constructed & Ap ro Letter of Acceptance: Corrections as per cil: °'~ ~'Z ~~\ ~-~ C Plat Signed: Mayor 'f~~ P & Z City En i er •- ~~~ Filed at County Clerk s ~ffic ~ Retriev~ Copies distributed: V ~^ Microfilmed: _I._nnpACT ~~ ~~ ~~~~~~~ Name of Plat: ~ f-e~ les.l~~se S u.~ ~ Owner(s): Block Lots Block Block acres out of tl~~,~ thru thru ~~~~ abstract abstract. 1 ~J~~~'`t~~G }~ '-t i Filed for Record in: 8R19I~ LbLNTY, tln: Apr '1,1949 at 04:01P As a Plats Docuarrtt I~a6er: i~6A3'48~ Aaount 55.00 Receipt Nua6er - 123501 Karen Mcl~ueen 5TA1E ff ~ CIwMiV ff I hereby certify that this instrwent was filtd oa the date a~ tine stanped hereon hY u and was duly recorded in the rellnte ~d page of the nand reeds of: B~iOS CQR(iY, as stanped hereon hY oe. Apr' cl, 1999 Ilf I~R'1 {1N i~@, CaN1Y CI.ERi ~iAlOS CglflY, COLLEGE STRTION P. O. Box 9960 1101 Texas Avenue Tel: 409 764 3500 MEMORANDUM College Station, TX 77842 February 9, 1999 TO: Michael McClure, McClure Engineering, Inc. FROM: Bridgette George, Asst. Development Coordinat SUBJECT: Final Plat ~ Steeplechase Subdivision Phase Three Staff has reviewed the fi al lat bmitted and the following changes need to be made: --~ Me C~v« S~Q ~ n£ .y'~r~~ S S S b t~ _~/ Under "General Notes" p se remove "3. No lot sha have driveway access to Navarro Drive." Block 11 is not included on the Final approved Preliminary Plat. Please Preliminary Plat to reflect the change. Plat for Phase Three, as shown on the include on Final Plat or revise the Please make the changes listed above and submit the following information by Monday, February 22, 1999 to be included on the next available Planning & Zoning meeting: A revised mylar original of the final plat with the owner's signature; and, Ten copies of the revised final plat. The Planning & Zoning Commission meeting is scheduled for 7:00 p.m. on Thursday, March 4, 1999 in the City Hall Council Chambers at 1101 Texas Avenue South, College Station, TX. If you have any questions or need additional information, please call me at 764-3570. Thank you. cc: Mr. John Duncum, Brazos Triad Land Development Partnership 4100 Highway 6 South, Bryan, TX 77802 (Case file 99-207) Home of Texas A&M University ~~~~ M~(ALMLJC TY OUI2DINAN ES MUST BE MET TS INCLLJ~TNG BUT NOT LIMITED TO THE FOLL~WING: (Requirements based on field survey and marked by monuments and markers) t/Q/ 1. Drawn on 24" x 36" sheet to scale of 100' per inch. ,/I~ a_ vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale requred but include north arrow. Q' 2. Name & address of subdivider, recorded owner, planner, engineer and surveyor. ~ IP Q~ 3. Name & address of all lenders on the property. atP~ ~1' 4. Name & address of all easement holders. / ~ 5. Proposed name of subdivision (not spelled or pronounced similarly to any other subdivision in Brazos County, Texas). '~ C~ 6. Date of preparation, scale in feet and north arrow. ,~ C~ 7. Application fee. ,~ Q~ 8. Construction documents on 24" x 36" sheets. ~ 9. Paid tax certificates from City of College Station, Brazos County and the C.S.I.S.D. C~- 10. Total area intended to be developed. (~- ®1. Subdivision boundary lines indicated by heavy lines. CCU 12. certificate of Ownership & Dedication; Certificate of Surveyorship and/or Engineer; '~ Certificate of City Engineer; -/Approval of Commission- ouncil; ertificate of the County Clerk. (Owner(s)' signature(s) must be in place before taking plat to PBrZ for consideration). .~0~ 13. Number of lots. c/ C~- a. number of lots by Zoning District. ~ t/ 0 b. average acreage of each residential lot by Zoning District. / (~"~ 14. t.7 15. ~" 16. /~ /~`" 18. Approximate area of street right-of--way. Proposed parkland dedication information. Requested oversize participation items, if any. Location of the One Hundred Yr. Floodplain according to the most recent available date. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch. / ~ 19. Exact location, dimensions, name and legal description of all existing or recorded streets, alleys, reservations, easements or other R.O.W. within the subdivision, intersecting or contiguous~with boundary or forming boundary with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves. / / . 20. Same information for proposed streets, alleys, etc. as preliminary plats. L ~ 21. Lot corner markers and survey monuments (by symbol) and tied to basic survey data. - / ltd' 22. ~ Street, alley, and sidewalk plans, profiles and sections, with specifications and detail cost estimates. / ~ 23. Sanitary sewer plat with 2 foot contours, plan and profile lines, showing depth and grades, with cost estimates. ~% C'3' 24. Water line plat showing fire hydrants, valves, etc. with specifications and a detailed cost estimate. (~ 25. Storm drainage system plat with 2 foot contours, street lines, inlets, storm sewer and drainage channels, with profiles and sections, and showing drainage and runoff areas, and runoff based on 5, 10, and 25 year rain intensity. Detail drainage structure design and ~ ~ ~ channel lining design if used, with specification and detail cost estimate. ,~ 26. Street lighting plan showing location of lights, design, and with specifications and detail cost i est mate. / ~ 27. Submit a statement addressing any differences between the final plat and approved Master Preliminary Plat & Plan. / ~°'-' 28. Indicate any variances requested and reasons for same. t~- 30. Are there impact fees associated with this development? ~/ ~ 31. Add a general note that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the :provisions of the private facility regulations adopted by the Commissioners Court of Brazos County, pursuant to the provisions of Section 21.004 of the Texas Water Code. ~~