August 5, 1999
Mr. Davis M. Young
Pebble Creek Development Corporation
4500 Pebble Creek Parkway
College Station, Texas 77845
Dear Davis:
Thank you for your recent letter of assurance concerning access to the City property
located in the Pebble Creek subdivision. The city has no plans to extend a trail system
through this property in the near future. However, this site is included in the city's long
range plans for trails and greenbelts and access will be through it will be required.
Our planning staff will work with you when the trail system is being developed to ensure
that the access points are developed in the most mutually beneficial locations .possible.
Thanks once again for your time and interest in this matter.
Sinc ,
S eve eachy
Director
Parks & Recreation
Copies: Ric Ploeger, Assistant Director of Parks & Recreation
Jane Kee, City Planner
Home of Texas A&M University
~'
PEBBLE CREEK
August 2, 1999
City of College Station
Attn: Steve Beachy
P.O. Box 9960
College Station, Texas 77842
Dear Mr. Beachy,
It has been brought to my attention that the city may need additional access to the public
park land along Pebble Creek Parkway. At such time that the city develops the park land,
Pebble Creek will be happy to create an additional opening. Currently, there is access to
the park through an existing opening on Pebble Creek Parkway.
If you need anything else, please let me know.
Sincerely,
Davi M. oung
DMY/kal
~~~~~~~
Name of Plat:
. '7-~
Owner(s):
Block Lots
Block
Block
~i' acres out of
thru
thru
thru
abstract
abstract
Y~
1
-..
~' °~~ ~
~o
'~2
__ _ ~ ^ .e w
µ ~ ~ .~r ~
~ e rte.
~ ~, ~...
~°~~ ~ ~ ~'
~~ ~ ~
~~
0E126/1999 12:21 40969060E1 PEBBLE CREEK
AuG. 26 ' 99 ('NED) 12: i 9 wALLACE GROUP 2547728691
1~yA L
t~ R U ,
L
E N G I N E f R S
nRtrtltF.Crs
P l A N N f. R S
5 U R ~ E Y O R 5
August 26, l 949
PAGE 02
PP.GE. 2/2
wnc0
T'F`M ~ ~ ~ Pebble Creek Development Co, .
~ ~ $ T + N 4500 Pebble Cheek Parkway
o~t~r+s
College Station, Texr-s 77845
-----~-
__ ..............." Attn: BobhV Mauldin
--~-" Ro: Pebble Creek Phase 7A
._.. ......... pear Bobby:
--------~- ~• - We have review®d the results of the T.V. teat performed by the city on the sanitary sewer
--~---"~- ~ ~ conctrttctiatt for Phrt9e 1A, The Wa.httce Group Estimates thflt .it will cast $6,GOQ to clean
the sewer pipe to pass the city's inspection.
GelnArnn(d, R.CLS.
Swan Flahnrry, a.P.l.S.
Crnr~ JMrtlt. +1.I./L,
MiknKett~ey, i:i:., R.Rt.S.
June Lykes, I:E.
r]a.id t•arnt. rtf;.
Tlm ulrnrr.lc. R.RL.i.
Da~N11M, i.P.LS.
I•A•'(~tr' te.(~c Ir., P. F..
GhrlaLfb, P.f.
DirlNl Vlrien, A. LA.
Cw. rt~ k, 'led' W~,dknr, Jr., R L,
a.t. roar, wAu,L.,, r.E„ R.r.LS,
Inhn P,++rlnkl~r, RE.
P.O. Ana 7100s
weco, r~:a, 7n:oz
117]5 CPnifat Pert (Drl~n
Sups 1(14
Waco. Tents 76712
(290 772.9277
(900133G-t5d7
Raa(254! 77Fi•292f
With regard to the si.dewallc constriction on Phase 7A, it has teen determined chat there
ig 1,280' remr~ining to he c~mpletod. T1~e cost to completo this work is $29.568 bused on
a rate of $3.85 / S.F.
Sincerely,
dward D. "Jed" Sulak, Ir,, P.E.
Prc?ject Engineer
The Wallace Group,lnc,
EDS:es
cc: File -Project, tt 8803
*~ ,
i: .....................
~,EDWARI~ D. SllUSIC
i'~~_ ~~
ZG, iy49
~~ z~~l
PEBBLE CREEK
July 23, 1999
City of College Station
Attention: Natalie Ruise
Post Office Box 9960
1101 Texas Avenue
College Station, TX 77842-9960
Dear Ms. Ruise,
Enclosed with this letter are the completion forms for Pebble Creek Phase 7A. Please note
that Pebble Creek Development will provide a bond for approximately $35,180.00. This
bond will cover the installation of 21 street lights and the necessary improvements to the
channel behind block 43. If you have any questions please feel free to give me a call at
690-0992.
Sincerely,
Pebble Creek Development Company
Bobby Mauldin
Enc.
FILE NOTE
Pebble Creek Phase 7A
Case #99-204
On Monday, January 4, 1999, I spoke with Jed Walker concerning the above mentioned final plat.
Shirley Volk had agreed to allow them to turn in their construction documents on Monday, January 4th
instead of on the deadline, Wednesday, December 30th. In response to a voice mail from Jed Walker to
Veronica Morgan requesting until Wednesday, January 6th to submit the plans, I informed Jed that we
would not be able to postpone the submittal any further. He agreed to go ahead and turn in the plans on
Wednesday, January 6th; however, he understood that he could no longer make the January 21st P&Z
Meeting. Instead, the final plat will be placed on the next available meeting on February 4th.
On Tuesday, January 5, 1999, I spoke with Nancy with The Wallace Group and left the following
message for Jed Walker: "Staff did not have any comments on the final plat of Phase 7A. Submit the
construction documents by Wednesday, January 13th and 10 copies of the final plat by Friday, January
22nd to be placed on the February 4th P&Z meeting."
iz
Assistant Development Coordinator
January 6, 1999
GTL+
301 ]'1VDUSTRIAL BLVD.
BRYAN, '1'LXAS 77803
LA VERVE AK1N
SR. .DES[GN.L+'R ACCESS DESIGN
449/821-4723
DATE: JANUARY aa, I999
CASE: PEBBLE CR1rEK P.HASL- 7-A
REVI'EWE'D BY: LAVERNE AKIN
AFTER REVIEW OF 'I'T1E ITEM I..lSTED ABOVE, THE TOi,LOWING CONCE1tNS
WERC NO'T'ED: NO PROBLEM WITH THE PLAT. C.U.NDIIIT NECESSARY FO.I2
ROAD CROSSINGS.
A.DDI'I'TONAL COMMCN'rS: CONTACT [,A VERVE AKIN WITft GTE AT 40~/821-
4723 .FOR TELEPHONE RL+'QIJIRF.MFNTS, CONDUIT PLACEMENT, AND
OCC Ul'ANCY DATES.
... _ _
Veronica Mo an - ~ ~ebtile creek 7a ...... ............... ........ ............. .. ~ .-..... - .......-... - ...... ........-... Pa e~ 1
From: Veronica Morgan
To: Bridgette George,
Date: 6/21/99 3:13PM
Subject: pebble creek 7a
filenote
Jeff Tondre, Jessica Jimmerson...
i talked to jed walker with the Wallace group. he wanted to know what he needed to do to change the
ownership and maintenance responsibility on the drainage and conservation easment on the 7a plat. it is
not filed for record yet and i informed him to bring back in a revised plat, we would schedule it for p&z
and put on consent. it would be redrawn with this area as a separate drainage/conservation common
area and a note that it would be maintained by the pebble creek hoa.
v
.:Shirley Volk- Re pebble creek, hase 7 and 8 .. Pa a 1.
From: Veronica Morgan
To: Paul Kaspar, SVOLK~City of College Station.City H...
Date: 2/18/98 4:59PM
Subject: Re: pebble creek phase 7 and 8
I'd have to look at it again but my recollection was that it needed a preliminary plat of some sort but I'm
remembering just outlines of phases, etc. not something huge. but i may be not remembering right.
maybe we can talk about this during our next review session
»> Shirley Volk 02/18/98 09:51AM »>
Have you looked at the most recent master plan to see if it has enough detail to suit the City's needs to
replace the preliminary plat? My recollection is (without looking it up) that it does not, but if you
engineers and planners are comfortable with going right to final plat, it's certainly o.k. with me! Only staff
and P&Z would look at it anyway since Council has already seen the master plan a long time ago.
»> Paul Kaspar 02/17/98 03:11 PM »>
I spoke to Tony Tomchezen with the Wallace Group today regarding the above phases. They want to go
straight to Final plat on those phases since they have done a master preliminary plan already that shows
those phases. I explained to him that is OK as long as that master plan shows the detail we need and
that they are not varying too much from that plan. He thought they were OK and could go straight to
Final plat. If I have told him wrong, would you please let me know soon, or call Tony T. back. He spoke
to you many months ago about it and thought you said they needed to do a preliminary plat. They don't
mind, its just they don't want to do extra work if it is not necessary.
He is planning on submitting a new master plan to us after these two phases are built.
Also, we are supposed to be getting the drainage report that we have been waiting for, soon.
CC: Jane Kee, Natalie Ruiz
The ~ Gale Arnold, R.P.L.S.
George Jezek, A.I.A.
Wallace ~ Mike Keahey, P.E., R.P.L.s.
June E. Lykes, P.E.
Group, Inc. J.A."Jake" Pavlas, Jr., P.E.
Engineers ^ Architects ^ Planners ^ Surveyors 1~ G cnris Ruiz, P.E.
`V~ George E. "Jed" Walker, Jr., P.E.
Waco ^ Killeen ^ Austin R.E. "Bob" Wallace, P.E., R.P. L.S.
Otto E. Wiederhold, P.E.
O ~~~+++ John F. Winkler, P.E.
January 14, 1998
i l~ f
- ~~
City of College Station
P. O. Box 9960
College Station, Texas 77842-0960 ~ r\
Attn: Sheri Volk U
Re: Pebble Creek Phase 7A, Variance Request ~ Q~ ~ v ~~~
Dear Sheri: ~ k~
I
On behalf of the owner of Pebble Creek Development Co., Mr. F.M. Young, we hereby request a ~,
variance to the City of College Station's Subdivision Ordinance. Specifically, the Developer~~
desires not to extend Pebble Creek Parkway nor the 12-inch water line during the construction of
Phase 7A because of the following reasons:
• The extension will not be used by vehicular traffic. ~~~
• The 12-inch waterline will not have any services, and thus the potential for stagnant. ,
water will be high. ,~%~~~'~`,
• The pavement will most likely suffer from surface failures since it will not be
"exercised" by traffic. ~%~'iyr'Y
• The extension is not needed for emergency vehicles.
The Developer understands that he will have to complete the parkway and waterline prior to
opening any lots to the south of Phase 7A (see attached map). If you need any additional
information regarding this issue, please call me.
Sincerely, ~ ~~
a fi ~ i
~j`~%~
eorge E. "Jed" Walker, Jr. P.E.
The Wallace Group, Inc.
IJ
Cc: F.M. Young
Davis Young
File #8803
I
GW:ab