Loading...
HomeMy WebLinkAboutStaff ReportsSTAFF REVIEW COMMENTS No. 1 Project: ALEXANDRIA PHASE 4A (FP)-FINAL PLAT (0-175) PLAT 1. When the plat for Phase 3-13 is recorded, the Volume and Page number needs to be filled in for reference on the Phase 4-A plat. Reviewed by: Thomas V. Vennochi Jr. Date: 10/4/00 ENGINEERING 1. Make a general reference statement to the specific sections of the City of College Station Water and Sewer Specifications for the utility connections. Reviewed by: Thomas V. Vennochi Jr. Date: 10/3/00 ELECTRICAL 1. Developer responsible for installing conduit per city specifications and design. 2. Developer responsible for providing and installing street lights per city spec. and design 3. Developer responsible for providing easements to cover all primary electrical lines and equipment. 4. Developer responsible for providing 5' easements to cover streetlight light services as needed Reviewed by: Jennifer Reeves LAND MANAGEMENT 1. No comments. Reviewed by: Melissa Rodgers Date: 09/28/00 Date: 10/02/00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 2 STAFF REPORT Item: Consideration of a Final Plat for Alexandria Phase 4-A (7.060 acres) located west of Phase 2-13 and Alexandria Avenue and north of Phase 3-13. (00- 175) Applicant: Edward Froehling Item Summary: This is part of the fourth of five phases of the Alexandria Subdivision west of and adjacent to the existing Springbrook-Oakgrove Subdivision. Phase 4 will be completed in two parts, Phase 4-A and Phase 4-13. The plat is for 30 single-family lots with an average lot size of 0.20 acres. The subdivision is in conformance with the Comprehensive Plan land use assumptions which shows the area as medium density single-family residential (3-6 dwelling units per acre). Parkland dedication for this phase has already been credited to the developer for previous dedications. There will be a greenway and storm water detention area in the floodplain of Lick Creek which runs along the north border of the Alexandria Subdivision. Item Background: Council approved a preliminary plat for this property on January 14, 1999. The final plat is in compliance with the approved preliminary plat. Staff Recommendations: Staff recommends approval of the final plat as submitted. Commission Action Options: The Commission has final authority over the final plat. The options are approval as submitted or denial. Defer action or table only at the applicants request. Supporting Material: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Final Plat INFRASTRUCTURE AND FACILITIES Water: Water is provided by a 12" water line along Alexandria Avenue. New infrastructure will be extended within the subdivision to serve the residential development. Sewer: Sewer will be provided by the extension of a 6" line from the adjacent phase. Streets: Markham Lane and Danville Lane will be constructed as residential streets. Off-site Easements: None required. Drainage: A drainage plan for the entire subdivision has been previously submitted and approved by Staff. This phase meets the drainage plan. Floodplain: None in this phase Oversize request: None Impact Fees: None