Loading...
HomeMy WebLinkAboutStaff ReportsSTAFF REPORT Item: Consideration of the re-submittal of a final plat for Edelweiss Estates Phase 16 (14.752 acres) located west of Phase 12 and south of Phase 14. The property is located adjacent to and immediately east of Welborn Road and north of Edelweiss Business Center Blk. 5. (00-174) Applicant: Steve Arden representing Begonia Corporation. Item Summary: The Phase 16 final plat includes 53 single family (0.21 ac. avg.) lots and is in substantial compliance with the Edelweiss Master Development Plan which was approved in September 1997. The only change from the plat approved May 04,2000 by the Planning and Zoning Commission is the establishment of a 42'+/- common area buffer zone between Welborn Road and the rear of the lots along the west side of this subdivision. This area which will be maintained by the Home Owner's Association currently contains a 36" City of College Station water transmission line (20' easement). Budgetary & Financial Summary: N/A Staff Recommendations: Staff recommends approval of the final plat as submitted. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Final Plat INFRASTRUCTURE AND FACILITIES Water: Existing infrastructure is adequate for the proposed use. New infrastructure will be extended within this subdivision to serve the residential development. Sewer : Existing infrastructure is adequate for the proposed use. New infrastructure will be extended within the subdivision to serve the residential development. Streets : Residential streets to be constructed are as follows : Phase 14-- Sophia Lane will be extended from Edelweiss Phase 15-B west to near Welborn Road. Streets running south from Sophia Lane starting from the east are : Salzburg Court, Von Trapp Lane and Neuburg Court. Phase 16--Marta Street will run from Edelweiss Avenue west to near Welborn Road. Streets running north from Marta Street starting from the east are : Von Trapp Lane and Fredrick Court. Hannover Street will run from Von Trapp Lane west to Wellborn Road. Hannover Street has 60' R O W and 39' pavement. All other streets have 50'R O W and 28' pavement. Off-site Easements : N/A Sidewalks : Sidewalks will be constructed on the south side of Sophie Lane the east side of Von Trapp Lane the north side of Marta Street and on both sides of Hannover Street. Drainage : A detention facility will be constructed in the northwest corner of Phase 14 to serve both Phase 14 and Phase 16. Floodplain : There is no Foodplain located on these properties. Oversize Request : None Parkland Dedication : This dedication was handled in previous phases of Edelweiss Estates. Impact Fees : None ENGINEERING REVIEW COMMENTS No. 2 Replat- Final Plat: Edelweiss Phase 16 1. Everything looks fine. Reviewed by: Ted Mayo Date: Sept. 27, 2000