HomeMy WebLinkAboutStaff ReviewSTAFF REVIEW COMMENTS
No. 1
Project: Cypress Grove Intermediate School (SP)-Site Plan (0-156)
PLANNING
1. Show the location of the utility easement that runs between the school and
temporary buildings.
2. The landscape plan for Cypress Grove Intermediate School shows 26
Chinese pistache trees in the same general area as the temporary
buildings; will these trees be removed? If the trees are removed, or if the
temporary buildings encroach into the trees' drip-line area, their landscape
point total will need to be added elsewhere on site.
3. The site plans and information submitted were only reviewed in regards to
the proposed changes.
Reviewed by: Shauna A. Laauwe Date: September 6, 2000
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1 of 2