Loading...
HomeMy WebLinkAboutStaff ReviewSTAFF REPORT Item: Consideration of a FINAL PLAT for the GREAT OAKS SUBDIVISION PHASE ONE (FP) (76.896 acres) located in the City of College Station ETJ bounded by Quail Run Estates to the north, property owned by M.S. Kavanaugh to the west, Gandy Road to the south and property owned by David Borsack to the east. (0-150) Applicant: MR. STEVE ARDEN representing Indivisa Corporation Item Summary: Great Oaks Subdivision Phase one Final Plat includes 55 single family rural subdivision (1.21 ac. avg.) lots and is in general compliance with the Great Oaks Master Preliminary Plat which was approved by the Planning and Zoning Commission July 06,2000. Phase one will have sole access to Gandy Road to the south. The Local Government Code prohibits the regulation by a city of land uses and densities within the City's extraterritorial jurisdiction. For information purposes the Land Use Plan for this area calls for rural density single family. Comprehensive Plan Consideration: No thoroughfare or other comprehensive plan issues in this area. Budgetary & Financial Summary: N/A Staff Recommendations: Staff recommends approval of the Final Plat. Commission Action Options: The Commissio plat. The options regarding the final plat are Defer action or table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Final Plat n has final authority over the final approval as submitted or denial. INFRASTRUCTURE AND FACILITIES Water: Welborn Special Utility District will supply water. Sewer: All lots will be served by on-site sewage disposal systems permitted by the Brazos County Health Department. Streets: Gandy Road is shown as a minor arterial on the Thoroughfare Plan. No additional right-of-way is required for Gandy Road. Gandy Road has recently been improved by the County from this site eastward to Welborn Road. The subsequent two phases will provide two access points through the existing Quail Run Subdivision to Quail Run Street and Walnut Drive. County Street standards will be constructed throughout the subdivision. Off-site Easements: None Drainage: Design is required to meet the City of College Station's Drainage Ordinance and Design Standards. Flood Plain: This Subdivision is located in the upper reaches of Hopes Creek. This section of creek is not mapped by FEMA. The initial analysis by the Developer's Engineer indicates the presents of 100 year flood plain adjacent to some of the creek channel. The Final Plat shows private drainage easements for those areas where 100 year floodplain is indicated. A floodplain permit will be required by Brazos County for all tracts prior to construction of any structure. NOTIFICATION: None required ENGINEERING REVIEW COMMENTS No. 1 Great Oaks Subdivision Phase One Final Plat 1. Sheets 1 &2- everything looks fine Infrastructure Drawings 1. Sheet 2-note: sta. 10+61.57 install two 4x2 RCB see profile this sheet ??? 2. Sheet 3- 3" W-3 should be W-2 ; 2-30" csp ?cmp 3. Sheet 4- Cheneau Street should be Kingswood Drive ; 2-24" csp ?cmp ; Drainage from 2-30" & 2- 24" cmp's -to creek- no defined path. 4. Sheet 5-Arboleda Lane or Drive-see master preliminary plat. 5. Sheet 7,8 &9-ditto 6. Sheet 9-street centerline intersection sta.-Great Oaks Drive-50+25,3 or 50+21.3 ;waterline intersection sta. 82+24.91 or 82+ 27.91 7. Sheet S-2-Grate inlet detail-3' 3" ID will not accommodate 42" ASP; add detail for single sloped headwall for 42" ACP. Drainage Report 1.Page ii-CSP CULVERT ANALYSIS: Clarify-10A or 10B -see Exhibit "A" 2. Page 2- Flowrates (cfs) from Drainage Areas: add area 13 (42"ACP) 3. Page 3- Add area 13; 10Aor 10B ? 4. EXHIBIT B-1-Add area 13 5. EXHIBIT C-S- Clarify-10Aor 10B 6. EXHIBIT C-6-re-examine total flow values vs. flow per pipe. Engineer's Cost Estimate 1. Everything looks fine Reviewed by: Ted Mayo _ Date: 08-21-00