HomeMy WebLinkAboutMiscMcCLURE ENGINEERING, INC.
August 2, 2000
Mrs. Natalie Ruiz
Development Coordinator
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, Texas 77842
RE: ALEXANDRIA SUBDIVISION, PHASE 3-B
FINAL PLAT SUBMITTAL
Dear Natalie:
Attached please find the following items for the above referenced submittal:
1. Final Plat Application
2. Final Plat Filing Fee of $200.00,
3. Development Permit Fee of $100.00,
4. Subdivision Inspection Fee of $300.00,
5. Thirteen (13) folded blueline prints
6. Two (2) sets of construction plans
7. Two (2) copies of the Engineer's Construction Cost Estimate and
8. Paid Tax Certificate
This phase of Alexandria Subdivision was included in the most current Drainage Report,
therefore, no additional drainage information is included in this submittal.
It is my understanding that this plat will be reviewed by the Planning and Zoning Commission
on Thursday, September 7, 2000.
Should you have any questions or need additional information, please advise.
Very truly yours, r! ~~
Y~~---
M chael R. McClure P.E., R.P.L.S.
MRM/rnlm
attachments
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
(979) 693-3838 • FAX (979) 693-2554 • email: mcclureC~?tca.net
08/15/00 07:43
$979 764 3496
DEVELOPMENT SVCS
~ ooi
' 08/15/00 07:47 '8`979 764 3496 DEVELOPMENT SVCS 1001
f
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 /Fax (979) 764-3496
MEMORANDUM
August 15, 2000
TO: Michael McClure, McClure Engineering, Inc., Via fa 693-2554
FROM: Bridgette George, Asst. Development Coordinator ~ ~~"
SUBJECT: Alexandria Phase 3 B -Final Plat ' 1
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by Monday, August 28, 10:00 a.m. to be placed on the next
available Planning and Zoning Commission meeting scheduled for September 7, 2000, 7:00
p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and
The Mylar original of the revised final plat with the owner's signature.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Edward Froehling, Via fax 774-0565
Case file #00-144
Home of Texas A&M University
McCLURE ENGINEERING, INC.
August 28, 2000
Mr. Ted Mayo, P.E.
Development Services Dept.
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, TX 77842
RE: Alexandria, Phase 3-B
Dear Ted:
Attached please find an additional four (4) sets of construction plans for the
Alexandria, Phase 3-B project. One (1) additional set is for your use and three (3)
sets are for our files and the Contractor's use on the job site.
Please call when I can pick up the three sets of plans that have been stamped
with your approval. Should you have any questions, please advise.
Very truly yours,
~~~~
chael R. McClure, P.E., R.P.L.S.
President
MRM/mlm
attachments
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
(979) 693-3838 • FAX (979) 693-2554 • email: mcclureC~3tca.net
McCLURE ENGINEERING, INC.
1008 Woodcreek Drive, Suite 103
College Station, Texas 77845
(979) 693-3838, FAX 693-2554
TRANSMITTAL LETTER
TO: Ms. Deborah Grace
Development Services Department
CITY OF COLLEGE STATION
Date: 1/31/2001 Proj. #
Attn:
RE: ALEXANDRIA SUBDIVISION, PHASE 3-B
We are sending you the following: ®Attached ^ Under Separate Cover Via:
^ Invoice ®Prints ^ Plans ^ Contractor Invoice ^ Bid Books ^ Specifications ^ Change Order
^ Contracts ^
Copies Date Description
1 Mylar original
These are transmitted as follows
^ For Approval ®Approved as Submitted Sets to be approved and returned to me
^ For your use ^Approved except as noted Copies for your files
^ As Requested ^ Resubmitted after Revisions Corrected Prints
^ For Review Comments ^ Other
REMARKS: PLEASE FILE FOR RECORD AS SOON AS POSSIBLE. THANX!
COPY TO: SIGNED: ~r
Michael`!R. McClure, P.E., R.P.L.S.
President
FEB-O1-2001 THU 1010 Ah1 C, S, PUBLIC WORKS FAX N0. 9797643489
P. O1
I~T,JTTER OI<' COMI'L + TYON
CITY EN(xINEER DATE: ~ Z. ~ 1 ~'~ ~ ~
CITY OF COLLEGE STATION
COLLl<:GE STATION, TE?{AS
.~ RE: COMPI,1<;'I'lON Or~ ~e ~ S A~N~ tr'~-t~'
Dear Sir:
The purpose of our letter is to request that the following listed improvements be approved
and accepted ~zs being constructed under, city inspection and completed according to plans
and specifications as apF~roved and required by the City of College Station, Te~:as. This
approval and acccpi;ance by the City is requested in order that we may finalize any sub-
contracts and to affirm their warranty on the work. This approval and accej~tance by the
City of the iml~rovemcnts listed below does hereby void the letter of guarantee for. the
listed improvements on the above reference project. `
The one year warranty is herby affirmed and agreed to by ~~ rn oZ ~ N ~ and
by their sub-contractors as indicated by signatures below.
W4RF~ COMPT,FTrp ~tl, DATE
~7L~e e ~s ~_ ~ z F 1 .z a o~
~~~~ 1 2/i~ 2 aa.a
~~~~~
5~~~•
Owner: ~~kl~tkD L t.~~l
Address: ~.3£?~7 !fI(N 1 o,~S~i+~ ~~~
Signat~ • /
ACCEPTANCE & APPROVAL
l2 ,~ ~D~a
/~ /r ~v~°
Contractor: ~@ti~~ ~' ~~,~s
Address: 1. ~ - J o Y ~ 3
,~ s ~~80 ~
~~ ~
r ..•, ,
Signature:
City Engineer
Post-it's Fax Note 7671 °a1~ ~ p~ jes-
To'~ ~•~, From ~..~
GENERAL NOTL~S
1. ORIGIN OF BEARING SYSTEM: The recorded bearing of the northwest boundary
line of Alexandria Phase 3-A (S 44. 39' 11' W) as recorded in Volume 3698.
Page 287 and found iron rod monuments denoting this line were used as the
Boats of Bearings for this Plat.
2. According to the Flood Insurance Rate Maps for Brazos County, Texas and
Incorporated Areas. Map Number 4804100205 C, effective July 2, 1992, this
property is not located in a 100-year flood hazard area.
3. All Building Setback lines ore as established by the City of College Station.
4. All distances shown along curves are arc lengths.
5. Unless otherw(se indicated, all lot comers are marked with 1 /2' iron rods.
~~ -Indicates 1/2-inch iron rod set for phase corner
'~~ -Indicates 3/4-inch iron pipe found
'--o-- -Indicates 3/4-inch iron pipe set
~~ -Indicates 1/2-inch iron rod found for phase corner
6• ~ - PK Natl Control Monuments set (n Asphalt Pavement.
Monuments set at ~ Intersections and Radius Points
of Culdesacs.
7. ABBREVIATIONS:
P.U.E. -Public Utility Easement
P.D.E. -Public Drainage Easement
E.E. -Electrical Easement
FINAL PLAT
~1L.~~~INDRIA S
UBDI VISION
PH~1S~ 3-B
4.220 .4 CRE-S
ROBERT STEI/EIVSON LEAGUE, A -54
COLLEGE STA T/ON, BRAZOS COUIV TY, TEXAS
AUGUST, 2000
SCALE 1 ' a ,gyp'
Surve"fir.
Ed~wa d Froehiing
3887 High Lonesome McClure Engineering, Inc.
Colle a Station, TX 77845 1722 Broadmoor, Suite 210
(4os~ 77s-82ss (4os)' ins ~asioo 02
~~ ~~~~~
Name of Plat:
~ ~ ~(Cc~ytG~4.C GZ. ~,(
Owner(s):
Block Lots t~
Block thru
Block
acres out of abstract
abstract
.~
~~.-
.~
~~~~~~
Filed far Record in:
B~197Q5 6~,1V1'Y,
On: Feb t~5, t'c~-i at d-3:3tAF'M
As a
Flats
Dscu~ent Nu~6et~: ~735f?57
AQOUnt 55. ~-0
Receipt Nu~6er• - 166:s1~4
RYA
Karen P~Queen
S(AlE ~ 1E~6 C~MiY ff
I hereby certify that this instrwent was
filed an the date a~ tiue staaff~eed hereon hY ue
aad was duly recorded in the rolwe and page
of the awed records af:
BBAl~ COIIUtY,
as sta.ped hereon hY ie. ,
Feb ~5, `~~i
t.E ICY ptN {ice, t~.tlTy 11E1~t
Bf~i~ C(XltTY,
Name Date Work Description Time
3 u~ ~ ~~
n
CITY OF COLLEGE STATION
.REPRINT
t~~ CUSTOMER RECEIPT **~
OPER: MFORD CT DRAWER: 1
DATE: 8/03/00 00 RECEIPT: 0281591
DESCRIPTION GTY AMOllNT TP TM
2000 144 1 5200.80 *PL CK
PLANNING & ZONIN CK: 5125
2080 500855 1 5400.00 +PL CK
PLANNING & ZONIN CK: 5125
TENDER DETAIL
CK 5125 5~•~
DATE: 8/03/00 TINE: 12:25:29
TOTAL PERSONAL CHECK •~
AMOUNT TENDERED •~
THANK YOU
~~
r
~ ~
~~
Flu
~; R
= ZC
~ G •~
-~ N n
z j~
~D W tNp
W
i ~~• A
~ . MWjbG+Y
o
lt~~