Loading...
HomeMy WebLinkAboutMiscMcCLURE ENGINEERING, INC. August 2, 2000 Mrs. Natalie Ruiz Development Coordinator CITY OF COLLEGE STATION P.O. Box 9960 College Station, Texas 77842 RE: ALEXANDRIA SUBDIVISION, PHASE 3-B FINAL PLAT SUBMITTAL Dear Natalie: Attached please find the following items for the above referenced submittal: 1. Final Plat Application 2. Final Plat Filing Fee of $200.00, 3. Development Permit Fee of $100.00, 4. Subdivision Inspection Fee of $300.00, 5. Thirteen (13) folded blueline prints 6. Two (2) sets of construction plans 7. Two (2) copies of the Engineer's Construction Cost Estimate and 8. Paid Tax Certificate This phase of Alexandria Subdivision was included in the most current Drainage Report, therefore, no additional drainage information is included in this submittal. It is my understanding that this plat will be reviewed by the Planning and Zoning Commission on Thursday, September 7, 2000. Should you have any questions or need additional information, please advise. Very truly yours, r! ~~ Y~~--- M chael R. McClure P.E., R.P.L.S. MRM/rnlm attachments 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 (979) 693-3838 • FAX (979) 693-2554 • email: mcclureC~?tca.net 08/15/00 07:43 $979 764 3496 DEVELOPMENT SVCS ~ ooi ' 08/15/00 07:47 '8`979 764 3496 DEVELOPMENT SVCS 1001 f CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 /Fax (979) 764-3496 MEMORANDUM August 15, 2000 TO: Michael McClure, McClure Engineering, Inc., Via fa 693-2554 FROM: Bridgette George, Asst. Development Coordinator ~ ~~" SUBJECT: Alexandria Phase 3 B -Final Plat ' 1 Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, August 28, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for September 7, 2000, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; and The Mylar original of the revised final plat with the owner's signature. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Edward Froehling, Via fax 774-0565 Case file #00-144 Home of Texas A&M University McCLURE ENGINEERING, INC. August 28, 2000 Mr. Ted Mayo, P.E. Development Services Dept. CITY OF COLLEGE STATION P.O. Box 9960 College Station, TX 77842 RE: Alexandria, Phase 3-B Dear Ted: Attached please find an additional four (4) sets of construction plans for the Alexandria, Phase 3-B project. One (1) additional set is for your use and three (3) sets are for our files and the Contractor's use on the job site. Please call when I can pick up the three sets of plans that have been stamped with your approval. Should you have any questions, please advise. Very truly yours, ~~~~ chael R. McClure, P.E., R.P.L.S. President MRM/mlm attachments 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 (979) 693-3838 • FAX (979) 693-2554 • email: mcclureC~3tca.net McCLURE ENGINEERING, INC. 1008 Woodcreek Drive, Suite 103 College Station, Texas 77845 (979) 693-3838, FAX 693-2554 TRANSMITTAL LETTER TO: Ms. Deborah Grace Development Services Department CITY OF COLLEGE STATION Date: 1/31/2001 Proj. # Attn: RE: ALEXANDRIA SUBDIVISION, PHASE 3-B We are sending you the following: ®Attached ^ Under Separate Cover Via: ^ Invoice ®Prints ^ Plans ^ Contractor Invoice ^ Bid Books ^ Specifications ^ Change Order ^ Contracts ^ Copies Date Description 1 Mylar original These are transmitted as follows ^ For Approval ®Approved as Submitted Sets to be approved and returned to me ^ For your use ^Approved except as noted Copies for your files ^ As Requested ^ Resubmitted after Revisions Corrected Prints ^ For Review Comments ^ Other REMARKS: PLEASE FILE FOR RECORD AS SOON AS POSSIBLE. THANX! COPY TO: SIGNED: ~r Michael`!R. McClure, P.E., R.P.L.S. President FEB-O1-2001 THU 1010 Ah1 C, S, PUBLIC WORKS FAX N0. 9797643489 P. O1 I~T,JTTER OI<' COMI'L + TYON CITY EN(xINEER DATE: ~ Z. ~ 1 ~'~ ~ ~ CITY OF COLLEGE STATION COLLl<:GE STATION, TE?{AS .~ RE: COMPI,1<;'I'lON Or~ ~e ~ S A~N~ tr'~-t~' Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted ~zs being constructed under, city inspection and completed according to plans and specifications as apF~roved and required by the City of College Station, Te~:as. This approval and acccpi;ance by the City is requested in order that we may finalize any sub- contracts and to affirm their warranty on the work. This approval and accej~tance by the City of the iml~rovemcnts listed below does hereby void the letter of guarantee for. the listed improvements on the above reference project. ` The one year warranty is herby affirmed and agreed to by ~~ rn oZ ~ N ~ and by their sub-contractors as indicated by signatures below. W4RF~ COMPT,FTrp ~tl, DATE ~7L~e e ~s ~_ ~ z F 1 .z a o~ ~~~~ 1 2/i~ 2 aa.a ~~~~~ 5~~~• Owner: ~~kl~tkD L t.~~l Address: ~.3£?~7 !fI(N 1 o,~S~i+~ ~~~ Signat~ • / ACCEPTANCE & APPROVAL l2 ,~ ~D~a /~ /r ~v~° Contractor: ~@ti~~ ~' ~~,~s Address: 1. ~ - J o Y ~ 3 ,~ s ~~80 ~ ~~ ~ r ..•, , Signature: City Engineer Post-it's Fax Note 7671 °a1~ ~ p~ jes- To'~ ~•~, From ~..~ GENERAL NOTL~S 1. ORIGIN OF BEARING SYSTEM: The recorded bearing of the northwest boundary line of Alexandria Phase 3-A (S 44. 39' 11' W) as recorded in Volume 3698. Page 287 and found iron rod monuments denoting this line were used as the Boats of Bearings for this Plat. 2. According to the Flood Insurance Rate Maps for Brazos County, Texas and Incorporated Areas. Map Number 4804100205 C, effective July 2, 1992, this property is not located in a 100-year flood hazard area. 3. All Building Setback lines ore as established by the City of College Station. 4. All distances shown along curves are arc lengths. 5. Unless otherw(se indicated, all lot comers are marked with 1 /2' iron rods. ~~ -Indicates 1/2-inch iron rod set for phase corner '~~ -Indicates 3/4-inch iron pipe found '--o-- -Indicates 3/4-inch iron pipe set ~~ -Indicates 1/2-inch iron rod found for phase corner 6• ~ - PK Natl Control Monuments set (n Asphalt Pavement. Monuments set at ~ Intersections and Radius Points of Culdesacs. 7. ABBREVIATIONS: P.U.E. -Public Utility Easement P.D.E. -Public Drainage Easement E.E. -Electrical Easement FINAL PLAT ~1L.~~~INDRIA S UBDI VISION PH~1S~ 3-B 4.220 .4 CRE-S ROBERT STEI/EIVSON LEAGUE, A -54 COLLEGE STA T/ON, BRAZOS COUIV TY, TEXAS AUGUST, 2000 SCALE 1 ' a ,gyp' Surve"fir. Ed~wa d Froehiing 3887 High Lonesome McClure Engineering, Inc. Colle a Station, TX 77845 1722 Broadmoor, Suite 210 (4os~ 77s-82ss (4os)' ins ~asioo 02 ~~ ~~~~~ Name of Plat: ~ ~ ~(Cc~ytG~4.C GZ. ~,( Owner(s): Block Lots t~ Block thru Block acres out of abstract abstract .~ ~~.- .~ ~~~~~~ Filed far Record in: B~197Q5 6~,1V1'Y, On: Feb t~5, t'c~-i at d-3:3tAF'M As a Flats Dscu~ent Nu~6et~: ~735f?57 AQOUnt 55. ~-0 Receipt Nu~6er• - 166:s1~4 RYA Karen P~Queen S(AlE ~ 1E~6 C~MiY ff I hereby certify that this instrwent was filed an the date a~ tiue staaff~eed hereon hY ue aad was duly recorded in the rolwe and page of the awed records af: BBAl~ COIIUtY, as sta.ped hereon hY ie. , Feb ~5, `~~i t.E ICY ptN {ice, t~.tlTy 11E1~t Bf~i~ C(XltTY, Name Date Work Description Time 3 u~ ~ ~~ n CITY OF COLLEGE STATION .REPRINT t~~ CUSTOMER RECEIPT **~ OPER: MFORD CT DRAWER: 1 DATE: 8/03/00 00 RECEIPT: 0281591 DESCRIPTION GTY AMOllNT TP TM 2000 144 1 5200.80 *PL CK PLANNING & ZONIN CK: 5125 2080 500855 1 5400.00 +PL CK PLANNING & ZONIN CK: 5125 TENDER DETAIL CK 5125 5~•~ DATE: 8/03/00 TINE: 12:25:29 TOTAL PERSONAL CHECK •~ AMOUNT TENDERED •~ THANK YOU ~~ r ~ ~ ~~ Flu ~; R = ZC ~ G •~ -~ N n z j~ ~D W tNp W i ~~• A ~ . MWjbG+Y o lt~~