Loading...
HomeMy WebLinkAboutStaff ReportsSTAFF REVIEW COMMENTS No. 1 Project: ALEXANDRIA PHASE 3-B-FINAL PLAT (0-144) PLANNING 1. Need North arrow. 2. Change Note 3. Due to upcoming zoning ordinance changes, take out "Zoning Ordinance No. 1638." Reviewed by Shauna A. Laauwe Date: 8/14/00 ENGINEERING 1. No review comments. Reviewed by: Spencer Thompson ELECTRICAL Date: 8/14/00 1. Developer installs conduit per city spec and design. 2. Developer responsible for providing easements to cover all primary electric and equipment. 3. Developer responsible for providing and installing Street Lights per city spec and design. 4. Developer responsible for providing a 5' easement to cover street light services where they are necessary. Reviewed by: Jennifer Reeves Date: LAND MANAGEMENT 1. No comments Reviewed by: Melissa Rodgers Date: NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of MINUTES Planning and Zoning Commission CITY OF COLLEGE STATION, TEXAS September 7, 2000 7:00 P.M. COMMISSIONERS PRESENT: Commissioners Mooney, Floyd, Harris, Happ, Williams, Warren, and Horlen. COMMISSIONERS ABSENT: None. COUNCIL MEMBERS PRESENT: Council Members Maloney and Gardner. STAFF PRESENT: Staff Planners Jimmerson, Laauwe, and Hitchcock, Senior Staff Planner Kuenzel, Assistant City Engineer Mayo, Graduate Engineer Thompson, Transportation Planner Hard, Assistant City Attorney Nemcik, Neighborhood Senior Planner Battle and Assistant Flanery, City Planner Kee, Development Services Assistant Coordinator George, Assistant City Manager Brown, Director Foutz, Economic and Community Development, Senior ED Analyst Charles Wood, and Staff Assistant Hazlett. AGENDA ITEM NO. 1: Hear visitors None. AGENDA ITEM N0.2: Consent Agenda The following items were approved by common consent Agenda Item No. 2.1: Approved the minutes from the Regular Meeting held on August 17, 2000. Agenda Item No. 2.2: Removed the consideration of a Master Preliminary Plat for two C-1 General Commercial lots consisting of approximately 14.57 acres in the Harley Subdivision located at 4101 State Highway 6. (00-13 5) Agenda Item No. 2.3: Removed the consideration of a Final Plat for the Great Oaks Subdivision Phase I, 76.896 acres located in the City of College Station Extraterritorial Jurisdiction by Quail Run Estates to the north, property owned by M.S. Kavanaugh to the west, Gandy Road to the south and property owned by David Borsak to the east. (00-150) Agenda Item No. 2.4: Approved the Final Plat far 4.220 acres in Alexandria Phase 3-B located north and adjacent to Alexandria Phase 3-A. (00-144) P&Z~~inutes September 7, 2000 Page 1 of 10 STAFF REPORT Item: Consideration of a Final Plat of 4.220 acres, Alexandria Phase 3-B, located north and adjacent to Alexandria Phase 3-A. (0-144) Applicant: Michael McClure, P.E. for Edward Froehling Item Summary: This phase proposes 18 single-family lots for a density of approximately 4.25 dwelling units per acre. Comprehensive Plan Consideration: The land use plan shows this area as medium density single-family residential, which is associated with a density of 3-6 dwelling units per acre. This phase is in compliance with the land use plan. Parkland dedication for this phase has already been credited to the developer for previous dedications in Shenandoah Phases 6-10. As per the preliminary plat, an additional 16 acres along Lick Creek will be dedicated with later phases. No other comprehensive planning issues in this area was identified with this phase. Item Background: Council approved a preliminary plat for this property on January 14, 1999. This final plat is in compliance with the approved preliminary plat. Staff Recommendations: Staff recommends approval of the final plat. Commission Action Options: The Commission has final authority over the final plat. The options regarding the final plat are approval as submitted or denial. Defer action or table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Final Plat Created on 07/06/95 7:56 PM J:IPZTEXTISRP. DOC INFRASTRUCTURE AND FACILITIES Water: Water is provided by an 12 inch water line along Alexandria Avenue. New infrastructure will be extended within this subdivision to serve the residential development. Sewer: Sewer will be provided by the extension of a 6 inch line from the adjacent phase. Streets: Mullins Court will be constructed as a residential street. Off-site Easements: Not required. Drainage: A drainage plan for the entire subdivision has been previously submitted and approved by Staff. This phase meets the drainage plan. Flood Plain: None in this phase. Oversize request: None requested. Impact Fees: None required. NOTIFICATION: Notification is not required for final platting. Created on 07/06/95 7:56 PM J:IPZTEXTISRP.DOC