Loading...
HomeMy WebLinkAboutStaff ReportsSTAFF REVIEW COMMENTS No. 1 Project: Pebble Hills Estates Phase 1 &2 Final Plat ~1. Remove "Approval of City Council" signature block from Plat. FYi: Planning and Zoning Commission has final approval authority of plats. 2. Show actual FEMA floodplain line as shown on LOMR 99-06-1336P, not "calculated floodplain." FYI: use the most recent information approved by FEMA. Clearly note the minimum finished floor elevations for Lots 1-9, Block 4 and Lot 1, Block 5. This should be 3 feet higher than floodplain elevation. FYI: As required by Section ll. D. of the Drainage Policy. ~ Remove building lines or clearly note as "Deed Restriction Building Lines." V FYI: Cify building setback lines are subject to change and should not be included on a Plaf. 5. Impact fee required prior to filing the plat. Impact fee is $349.55/Lot. FYI: Impact fee area 97-07. 6. A single Plat can not contain two "phases." Remove Phase line and rename as "Phase 1." Or provide two plats--one for each phase. FYi: Bad policy to allow two sections on one Plat. 7. Remove General Notes #" 3" and "6". FYI: See comment 4 and not required for roadways. Note: the plat reviewed included the entire parkland dedication area. Additional comments may result if the limits of the plat are altered. Reviewed by: Jeff Tondre Date: 11/12/99 Staff Review Comments Page 1 of 1 STAFF REPORT Item: A Final Plat of approximately 50.78 acres, Pebble Hills Estates Phase 1 Subdivision located on the north side of Greens Prairie Road approximately 1400 feet east of State Highway 6. (99-227) Applicant: Jerry Windham and Frank Thurmond. Item Summary: The Final Plat of 50.78 acres is in general conformance with the Preliminary Plat, which was approved by the Planning and Zoning Commission on December 2, 1999. The final plat is for 111 single-family lots, 3.21 acres of parkland dedication, and 11.16 of greenbelt dedication. The average lot size is 10,654 square feet. The gross density is 2.1 dwelling units per acre, and the net density (excluding rights-of--way and parkland dedication) will be 4.1 dwelling units per acre. The Land Use Plan shows the area as medium density single family with a density range of 3 to 6 dwelling units per acre. The property was re-zoned to R-1 by the City Council in July 1996. The property to the north is zoned R-1, to the east and northwest A-O, and to the south and southwest C-1. All surrounding properties are currently undeveloped with the exception of CIC insurance to the south across Greens Prairie Road. The development will include a parkway style entrance, a minor collector loop street system and four cul-de-sac local streets. Item Background: The Preliminary Plat for 56.06 acres was re-approved by the Planning and Zoning Commission on December 2, 1999. That Preliminary Plat was in general conformance with the Pebble Hills Estates Master Development Plan approved in August 1996 by the Planning and Zoning Commission and City Council. Several revisions have been made, but none affecting this portion of the development. On September 19, 1996, the Planning and Zoning Commission approved this preliminary plat. However, the project could not move forward due to the lack of sewer availability. The previously approved preliminary plat expired after 18 months. The Spring Creek Impact Fee Sewer Trunk line was completed approximately 4 months ago. Budgetary & Financial Summary: N/A Staff Recommendations: Staff recommends approval of the Final Plat with the condition that all items of the subdivision regulations be met. Related Advisory Board Recommendations: N/A Commission Action Options: The Commission has final authority over the final plat. The options regarding the preliminary plat are approval as submitted, approval with conditions, or denial. Defer action or table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Engineering Information and Notification Information 4. Copy of Final Plat INFRASTRUCTURE AND FACILITIES Water: An 18-inch water line currently exists in Greens Prairie Road. Water will be extended and looped through the subdivision at the final platting stage. Sewer: An impact fee based CIP project was completed approximately 4 months ago which extended sewer service along Spring Creek through the northern portion of this proposed subdivision. Sewer service will be extended throughout the subdivision as part of the platting process. A Sewer Impact Fee of $349.55 per Living Unit ($38,800.05) is required, prior to filing the plat. Streets: The property has frontage along Greens Prairie Road. The development will include a parkway style entrance, a minor collector loop street system and four cul-de- sac local streets. No city Thoroughfares extend through this property. Off-site Easements: None required Drainage: A detention pond will be constructed within the parkland dedication area to serve the development. The Parks Board reviewed this plan in July 1999. Flood Plain: FEMA approved a Letter of Map Revision to define the flood plain along Spring Creek in October 1999. The Final Plat shows that no lots are contained within the existing floodplain. In accordance with our drainage ordinance, all home adjacent to the creek will be required to be elevated to 3 feet above base flood elevation. A note stating the minimum finished floor elevation has been added to the plat. Oversize request: None Impact Fees: The property lies wholly within sanitary sewer impact fee area 97-01. At present the fees are $349.55 per living unit equivalent (LUE). Impact fees are collected at time of final platting of the subdivision. Parkland: 3.21 acres will be dedicated for parkland. The detention pond to serve this development will be located within this parkland area. The Parks Board approved this in July 1999 and reviewed minor modifications on November 17, 1999. In addition, 11.16 acres of predominately floodplain area is proposed as a Green Belt. The applicant is required to pay $309.00 per residential lot of parkland development. NOTIFICATION: None Required