Loading...
HomeMy WebLinkAboutMisc~•, CITY OF COLLEGE STATIOI`I `~ February 20, 2001 Mr. Rabon Metcalf Municipal Development Group I g 2551 Texas Avenue South, Suite A ~l `~ College Station, Texas 77840 O Re: South Hampton Phase I Dear Rabon, The South Hampton Phase Ioff--site sewer line was completed on August 25, 2000 and is currently within a one year warranty period. A significant erosion problem has been noted that requires immediate attention to prevent the line from damage. The discharge water from the Nantucket Subdivision is flowing across the outfall of the sewer line at the south side of the creek crossing and has exposed a considerable portion of the ductile iron pipe and poly wrap. The erosion must be corrected along with the addition of adequate erosion protection for the sewer line. It is also suggested that the discharge water from the lake be channeled and prevented from discharge over the outfall of the sewer line to eliminate the possibility of future erosion. At this time you are requested to remedy the identified warranty item within the next thirty (30) days. There are also t<vo other issues related to the South Hampton Phase I Subdivision. Please verify that the off-site sewer line is located within a City of College Station public utility easement as it crosses the Nantucket Subdivision. Additionally, except for the on-site and off-site sewer lines, the other infrastructure associated with the South Hampton Phase I Subdivision (ie. water, streets, drainage) have not been accepted by the City of College Station. When these item are complete, please submit the "letter of completion" as required by City Ordinance. Should you have any questions, please call me at 764-381 or Vern Wright at 764-3503 (cell phone 777-0292). Please advise either Vern or myself when the erosion problem has been corrected, the easement verified, and the "letter of completion" submitted. Thank youu for youur response. ~ncerely, Robert W. Mosley, P. . City Engineer c: Ms. Phyllis Hobson, Nantucket Ltd., 1502 Nantucket Dr., College Station, TX 77845 Mark Smith, Director of Public Works Vern Wright, Engineering Technician Dale Schepers, Public Utilities Department Natalie Ruiz, Development Services \ / DEPARTMENT OF PUBLIC SERVICES POST OFFICE BOX 9960 2613 TEXAS AVENUE COLLEGE STATION, TEXAS 77842-9960 (409) 764-3690 .___ + Texas Department of Transportation FAX COVER SHEET Number of pages : 1 (including this sheet) Date: August 15, 2000 FROM: Jay Page PHONE #: (979) 778-6233 BRYAN AREA OFFICE, DISTRICT 17 FAX # : (979) 778-1375 TO: Ted Mayo, P.E~~~yl ~'-~6-oD COMPANY: City of College Station PHONE #: 764 - 3570 DEPARTMENT: Development Services FAX #: 764 - 3496 MESSAGES: RE: SH 6 West Frontane' Rri rca c„r~r~, U~mw•Fww C..L J7. .!_7_ ~YSit. We have completed a review of Items 3 & 4 that were addressed in MDG's letter of July 13. Although partial detention is indicated to be utilized for the channel flow entering the SH 6 ROW approx. 300' south of Bay Street there is no apparent reduction in the total Q arriving at the TxDOT 4' x 4' SBC ---- please investigate. The HWALL and HWAC-ruAL should be shown for the upstream entrance of the 4' x 4' SBC for an indicated Q,o of 193. cfs or whatever any detention reduced flow might be. Also, Item 2 concerning the overtlow at the Nantucket Drive entrance for a Q,o event stilt needs to be addressed_ Please call if you have any questions. ~, .,,. ~ - IF YOU DO N07 RECEIVE THE ENTIRE FAX OR IF ANY COPIES ARE ILLEGIBLE, PLEASE CONTACT THE SENDER IMMEDIATELY AT THE NUMBEA SHOWN ABOVE UO/lU/UU 1L. JJ ~ v (j4Uy ! ! O :11 UO ~, ~~ Sti`'`rs ~..' . ~1"` FAX Iyi(YH1V HKZ;H VI'I' Texas Department of Transportation COVER SHEET Number of pages : 5 (including this sheet) FROM: Jay Page BRYAN AREA OFFICE, DISTRICT 17 Date: August 10, 2000 PHONE #: (979) 778-6233 FAX # : (979} 778-1375 TO: Ted Mayo, P.E~.rA~~~aJ COMPANY: City of College Station PHONE #: 764 - 3570 DEPARTMENT: Development Services FAX #: 764 - 3496 MESSAGES: RE: SH 6 West Frontage Rd. C~ South Hampton Subdivision Attached is a copy of the comments that were faxed to Jeff Tondre on May 12 and June 21 from the previous reviews of this project. We are now reviewing the submittal that was returned here in late July. At this point Items 3 & 4 are being reviewed, however Item 2 was not addressed which dealt with the Nantucket Drive Entrance. This may have been partly due to a typo where Bay St. was inadvertently substituted for Nantucket Dr. in Item 2 (see corrected sheet}, Please call if you have any questions. L~UU1 IF YOU DO NOT RECEIVE THE ENTIRE FAX OR IF ANY COPIES ARE ILLEGIBLE, PLEASE CONTACT THE SENDER IMMEDIATELY AT THE NUMBER SHOWN ABOVE. S V O/ 1 V/ V V 1 6 u V T@XaS Department of Transportation Number of pages FROM: Jay Page y `tVJ I I V J I V V FAX COVER SHEET 3 (including this sheet) BRYAN AREA OFFICE, DISTRICT 17 ya~ini~ na~a:n va~a Date: June 21, 2000 PHONE #: (409) 778-9779 FAX # : (409) 778-9708 TO: Jeff Tondre, P.E. COMPANY: City of College Station PHONE #: 764 - 3570 DEPARTMENT: Development Services FAX #: 764 - 3496 MESSAGES: RE: SH 6 West Frontage Rd. C~1 South Hampton Subdivision Attached is a copy of the comments that were faxed to you on May 12 from the previous review of this project. We have now completed the review of the submittals that were returned here May 24, with additional attached comments. Please call if you have any questions. ~~~ IF YOU DO NOT RECEIVE THE ENTIRE FAX OR IF ANY COPIES ARE ILLEGIBLE, PLEASE CONTACT THE SENDER IMMEDIATELY AT THE NUMBER SHOWN ABOVE. US/lU/UU 1L:Dti p4Uy 77iS ylUts iSKYAN AKhA Ui'i' J June 21, 2000 RE: SH 6 West Frontage Rd. C~ Bay Street College Station, Tex. South Hampton 1 B. Structural: All Items (1- 4} have been adequately addressed. However, a P.E. seal & signature (s required for statements and details. (O.K. ------ 6/28/00) A. Drainage 1) Item 1 has been adequately addressed (P.E, seal required}. (O.K. ------ 6/28/00) 2} Items 2 - 4 addressed apparent discrepancies in the drainage report. It is now indicated that the amount of runoff arriving at Nantucket Drive and the TxDOT 4' x 4' SBC located approximately 450' south of Nantucket Drive (Bay Street) will exceed pre-development runoff amounts by approximately 50 % +. This will not be acceptable, since structure designs will be exceeded and flooding and ponding (detention) In the right-of-way will occur. This problem will require mitigation before the access and drainage permits can be approved. l{/J UU3 U8/1V/VV 1G:J/ -V-4Vy ((O y/UO ly1CTA1V AIC!~.A UI'1' May 12, 2000 (June 21, 2000) (August 10, 2aoo) RE: SH 6 West Frontage Rd. Bay Street College Station, Tex. South Hampton 1 General Comments A. Drainage 1) Show typical ditch section between west frontage road and right-of-way tine, and indica#e depth and width of flow for a D ~o runoff design. Show HW anx height allowable to edge of frontage road pavement. 2) Drainage report Indicates that area X, part of R, and an area east of areas X & R appear to flow to entrance at Nantucket Dr. If correct, please recalculate G1~o , HW~o , and Vour at this site. Also, show HW,~~oW using lowest elevation where Nantucket Drive and the west frontage road Intersect. 3) Drainage report (Section 7) shows drainage areas that flow to the existing 4' x 4' SBC. Post development runoff for ~~o is Indicated to be 169. cfs which is 27% larger than the TxDOT design value of 123. cfs. What about drainage areas W & Z which are not included, but probably should be ?? Please investigate & evaluate situation. Also, indicate HWA~~oW before runoff flows over the lowest elevation where proposed Bay Street intersects the west frontage road. 4) Continuous mainlane structure (30° skew) ~ Sta. 913 + i1 was designed for a Qsa of 190. cfs. Since stormwater management practices 'do not appear to be utilized for this development, please evaluate impacts to mainlane pavement elevations for a Qso runoff event (see attached). B. Structural: 1) Proposed 2 - 30" RCP's should enter TxDOT structure outside (west of) end of straight wings on 4' x 4' SBC. Extend bottom of existing apron. Show new detail, including new pipe-runner. 2) Shift proposed junction box west to accommodate relocation of 2 - 30" RCP's. Top of proposed junction box shall be flush with finished grade. 3) Maximum backslopes at Bay Street shall be 6:1 4) Extend proposed concrete pilot channel between Rockport Drive and Windrift Cove #o tie-in to existing flume ~ 4' x 4' SBC. Show detail. L(J UU4 May 12, 2000 (June 21, 2000) RE: SH 6 West Frontage Rd. @ Bay Street College Station, Tex. South Hampton 1 General- Comments A. Drainage 1) Show typical ditch section between west frontage road and right-of-way line, and indicate depth and width of flow for a ~,o runoff design. Show HW M,,,X height allowable to edge of frontage road pavement. 2) Drainage report indicates -that area- X, part •of.- R,- and an area east_ of areas X: & R. appear- to flow; to entrance at Nantucket: Dc. If~ correct, please recalculate- GZ,a ,-HW~o , a at this site: Also, sitow HWA~~aW;; -~sing° towesf~•°elevation. where -proposed .: ay 5tree nd the wes~:.fr-.Dotage road Intersect. 3) Dra__ a ._ epo.rt..($ection 7) ;,shows drainage .areas-~that~flow ~ fo he.,:•existing 4' x 4' SBC. :... Post development runoff~for Quo is indicated to..be.-:169. cis which is -27%''larger .than the ~TxDOT design value of 123. cfs. What about =drainage areas W ~ &.:Z which are not included,. but probably should be ?? Please investigate-&'`tiraluate situation. Also~•Indioete HWneraw'~before runoff- flows over the lowest elevation -where proposed Bay-=:Street ~lntersects _the west-:frontage road. 4) Continunus;„;mati,nlane structure:(30,° skew)- @ ~ Sta. 9•t3-+ 1 ?' was -designed for a Qso of 190. cfs. Since stormwater°Amanagement practices ~~do -not appear to be - ufilized for this development, please- evaluate .impacts to mainlarie pavement==•elevationsy.#or a --Aso...•rurroffrevent `(see •aftached). B. Structural: 1) Proposed 2 - 30" RCP's should enter TxDOT structure outside (west of) end of straight wings on 4' x 4' SBC. Extend bottom of existing apron. Shaw new detail, including new pipe-runner. 2) Shift proposed junction box west to accommodate relocation of 2 - 30" RCP's. Top of proposed junction box shall be flush with finished grade. 3) Maximum backslopes at Bay Street shall be 6:1 4) Extend proposed concrete pilot channel between Rockport Drive and Windrift Cove to tie-in to existing flume @ 4' x 4' SBC. Show detail. 11~IUNICIPAL DEVELOPMENT GROUP 2551 Texas Ave. South, Ste. A • College Station, Texas 77840 •979-693-5359 • FAX.• 979-693-4243 • E-mail: mdgcs@gte.com Consulting Engineers, Surveyors, Planners and Environmental Consultants July 13, 2000 Jay Page, P.E. Texas Department of Transportation Bryan Area Office 2102 Tabor Road Bryan, Texas 77803 . '~` RE: South Hampton, Phase One - TxDOT Permits NIDG Job No. 000025-2981(a) Dear Jay: o '`~ ~F ,' ~~~•~ • w B.~B ~E!_L.1R. 60873 ,_,,. ~~ ~ rr. ~. ~~~~~ ap~~k;= ~;=?_a `~ s 'eo~o•~~'~!a ~~~~,~~b Per your review comments, dated June 21, 2000, we have made our best attempts at mitigating flows to the mainlane structure by means of a limiting detention pond. Below is a brief description of each change and its corresponding affects. The supporting data for each item is attached. Item #1: The detention pond and its weir structure will result with TxDOT ditch flows into the mainlane structure of 86.650 cfs, 112.614 cfs and 117.599 cfs for the 10, 50, and 100-year rainfall events respectively. These restrictive flows will result in an approximate decrease in channel flows of +/- 30% from the pre- development rates of 123 cfs, 163 cfs, and 168 cfs. See supporting data labeled Section #4 -Channel Flow (I.D. #4). Item #4: With the addition of approximately 33,000 cu. ft. of detention storage, the increased flows to and through the mainlane structure have been reduced to +/- 32%. The proposed discharge rates will be 193.251 cfs, 251.532 cfs, and 262.432 cfs for the 10, 50, and 100-year rainfall events respectively. The pre- development discharge ra~ are 143 cfs, 190 cfs, and 196 cfs for each respective storm. As before, all analyzed rainfall events.: o not surcharge inlet-3, but the first two inlets are. Though these inlets are surcharged there is sufficient freeboard in the ditch and in no case is any diversion berm topped and runoff carried downstream in the TxDOT ditches. Also, as we discussed and along with the data you faxed me, the mainlane structure is inlet controlled so that discharge tailwater will be equal to the pipe soffit. See supporting data labeled (TxDOT 2) for calculation results during eac1: analyzed rainfall event. Please call me if you have any questions. Rabon A. Metcalf,lSJLT. Project Manager 000025-c.103-90(2981 a) ~.~~,<~~ 7-~8-a~ BI~AZOS VALLEY UTILITIES, INC. P.O. BOX 4088 BRYAN, TEXAS 77805 (979) 779-2609 / A FAX (979) 775-0276 A LETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS DATE_2-28-01 RE: COMPLETION OF~ h D' Ph I r v Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under city inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any sub-contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one year warranty is hereby affirmed and agreed to by Phillis Hobson and by their sub- contractors as indicated by signatures below. WORK COMPLETED DATE _~_ 3 r~s" a I Utility Representative(s) CEPTANCE & APPROVAL City Engineer Owner~~~~,7~C~/~-~~,~ /~ ~1i~~~~~c Address / 4~ `i „~~P_ 1L~/: Contractor Brazos Valley tili i , Ind r .. ~ cv~~BLi~_ By: W.A. Haveron oo-~~.~ COLLEGE STATION P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 July 12, 2aoo Ms. Phyllis Hobson Nantucket, Ltd. 1502 Nantucket Drive College Station, TX 77845 RE: Wastewater service for areas outside of the City of College Station. Dear Phyllis: Several weeks ago we discussed by phone your interest in wastewater services for portions of the Nantucket Subdivision. I wanted to follow up on that conversation in the event you still would like to seek City of College Station wastewater services for that area. Provision of wastewater service outside of the City's corporate limits requires Council approval of a service agreement with each property owner seeking service. It is also our policy that any request for service be accompanied by a petition for annexation. Please contact me if you are still interested in seeking wastewater service for the areas outside the City. I will be glad to assist you in the application process. incerely, ..-,... Jim Callaway Development Services Director Cc: John Woody, Director of Public Utilities Glenn Brown, Assistant City Manager Home of Texas A&M University COLLEGE STP~ P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 ~D~~ August 17, 2000 Rabon Metcalf, E.I.T. Municipal Development Group 2551 Texas Avenue Suite A College Station, Texas 77840 RE: South Hampton Phase 1 Subdivision TxDOT Permits NDG Job No. 000025-2981 (a ) Rabon: Attached is correspondence from TxDOT requesting additional clarification and evaluation in regard to your previous submittals. It is the City's desire that you address these concerns in a timely manner to the satisfaction of TxDOT. Please be reminded that the approved development permit excludes any work within the TxDOT right-of--way until TxDOT permits are approved. Thank you for your timely response. Teddy D. Mayo, P.E.(// Assistant City Engineer Attachment: Fax/Jay Page- TxDOT Development Permit CC: Bob Mosley, P.E., City Engineer Natalie Ruiz, Development Coordinator File Home of Texas A&M University JUL-12-2004 MON 08;30 AM FAX N0. LETTER O~~ COMPLE'TION CITY ENGINIH.FR C;ITX U~' COLI_,EGI~ STATION CULC.FaCE S'TATIUN, TEXAS DATE»~, 7/01/04 .,,,,~ RE: CQM~'r,TT1UN OF : Soutli,Ha.nn tcm Subdivision ~WP11ase l Fxtcnsi~~n of Waterline to Phase 3 1)cytr Sir: The purpose of our letter is to request that the following listed irraprovements be approved and accepted as being constructed ender city inspection and completed accordi~~i; to plans and specifications as approved and required by the City of C,ollc6e Station, Texas. '~f1~is a.pprovai and acecptanc~ by the City is requested in order shat we may f nali~e any sub- contracts and to a(`(irm their warranty on the work. This approval and acceptance by tl~e City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one year warranty is hereby affirmed and agreed to by 1'L"XC()1V _,.~_ txad by their sub-contractors as indicated by si~;natures below. 'WURIC CUMP'LLTED L1ATE Waierlin~~.. _..., ..... 06/21/4 .., ()WN1i;It:_._,._ Cit ~~f Collet7e Station Address: _. P.U. I~ax,9~60 ...._ C'c~llc~e Static>_n~"1'X 77842 Signattire:__„ ACCF,PTANCk. & APPROVAL C;UNTRA(:TOR:~,._ 'l"EXCC~N .Address:-., 1707 (3rahanr~ Rd~ P. O1 ~U-l?~ ~Colle =e Sta~t~io/n~. TX._ 7784~5~ „_ Signature:- ~~~~~f" ~~.,~~ ~~~_ ..~ w_ 7 ~~ U 'lily Represenlr~liv City En~ineCY LETTER OF COMPLETION~~ ~ ~~ CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS DATE• 2/15/01 RE: COMPLETION OF Streets and storm drains for South HamQton Subdivision Phase I Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under city inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any sub- contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one year warranty is hereby affirmed and agreed to by Texcon General Contractors and by their sub-contractors as indicated by signatures below. WORK COMPLETED Streets Storm Drains DATE August 25, 2000 August 25, 2000 OWNER: Nantucket. Ltd. Address: 1502 Nantucket Drive CONTRACTOR: TEXCON Address: 1707 Graham Road College Station, TX 77840 College Station, TX 77845 Signature: i~ O 4 Signature: ~/~~ 7 Representative ACCEPTANCE & APPROVAL City Engineer